AMDT0004_PN72426_specs_Vol-2 of 3.pdf

PDF 5 MB Posted

Attached to
PN 72426 Military Working Dog Facility
Solicitation number
W912PM21R0002
Issued by

About this file

This is a request for proposal for construction and design services. The scope of work includes constructing a facility at Fort Bragg, NC to house 48 kennels for military working dogs, including standard and isolation kennels. Additional spaces include a veterinary clinic with surgical, radiological, and pharmacy areas, classrooms, and administrative offices. Organizational and non-organizational parking is required. Fire suppression, alarm, security, and sustainability systems will be installed. Demolition of two modular buildings is included. The facilities must be designed for a 40-year minimum life. The Department of the Army Corps of Engineers Engineering District Wilmington is the issuing agency. The closing date is not provided.

View the file

Other files

File Type Posted
AMDT0002_PN72426_LEED_Scorecard.pdf PDF
AMDT0004_PN72426_ffe_sid_Vol-3 of 3.pdf PDF
AMDT0004_PN72426_specs_Vol-1 of 3.pdf PDF
AMDT0004_72426_TECHNICAL_SUMMARY_OF_CHANGES.pdf PDF
W912PM21R0002 Amendment 0004 PN 72426 MWD.pdf PDF
W912PM21R0002 Amendment 0003 PN 72426 MWD.pdf PDF
AMDT0002_72426_TECHNICAL_SUMMARY_OF_CHANGES.pdf PDF
W912PM21R0002 Amendment 0002 PN 72426 MWD.pdf PDF
AMDT0002_PN72426_ffe_sid_Vol-3 of 3.pdf PDF
AMDT0002_PN72426_specs_Vol-1 of 3.pdf PDF
AMDT0002_PN72426_specs_Vol-2 of 3.pdf PDF
dwg_all.zip ZIP file
AMDT0001_PDF_PLANS(rev1).pdf PDF
AMDT0001_TECHNICAL_SUMMARY_OF_CHANGES_72426(rev1).pdf PDF
AMDT0001_PN72426_specs_Vol-2 of 3.pdf PDF
W912PM21R0002 Amendment 0001 PN 72426 MWD (mod).pdf PDF
AMDT0001_PN72426_specs_Vol-1 of 3.pdf PDF
W912PM21R0002 Amendment 0001 PN 72426 MWD (Conformed).pdf PDF
AMDT0001_PN72426_ffe_sid_Vol-3 of 3.pdf PDF
2 and 9 Dec site visit sign in roster scan.pdf PDF
ATTACHMENT 5.pdf PDF
PN 72426 Site Visit Map.pdf PDF
PN_72426_JA_Corning.pdf PDF
PN_72426_JA_Honeywell.pdf PDF
PN 72426_JA Security Solutions.pdf PDF
PN 72426_JA Siemon.pdf PDF
W912PM21R0002 PN 72426 MWD.pdf PDF
ATTACHMENT 2 PPQ.pdf PDF
PN72426_specs_rta_Vol-1 of 3.pdf PDF
PN 72426_RTA_VOL_2 (Unlocked).pdf PDF
PN72426_rta_ffe_sid_Vol-3 of 3_wp.pdf PDF
PN 72426_RTA_VOL_1 (Unlocked).pdf PDF
ATTACHMENT 3 Key Personnel SAMPLE Resume.pdf PDF
PN72426_specs_rta_Vol-2 of 3.pdf PDF
ATTACHMENT 1 PROJECT DATA SHEET .pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construct Military Working Dog Facility, SOTF

(PN # 72426)

Fort Bragg, North Carolina

This project was designed by the Wilmington District of the U.S. Army Corps of Engineers. The initials or signatures and registration designations of individuals appear on these project documents within the scope of their employment as required by ER 1110-1-8152.

Amendment 0004 Specifications Volume II of III

October 2020

Solicitation No. W912PM21R0002

FOUO

MILITARY WORKING DOG FACILITY, SOTF

(PN 72426)

Fort Bragg, North Carolina Ready to Advertise | 12 October 2020

Specifications

Prepared by:

Raleigh, North Carolina with consultants:

AME Consulting Engineers PC, Charlotte, NC

JMMPE, Martinez, GA

SOF Military Work Dog Facility, SOTF Solicitation No: W912PM21R0002 Fort Bragg, NC Project Number PN 72426

PROJECT TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 00 05 GENERAL AND SPECIAL PROVISIONS

01 00 60 SECURITY PROCEDURES GUIDE

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 20 00.00 20 PRICE AND PAYMENT PROCEDURES

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 37 PROJECT SCHEDULE

01 33 00.00 37 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REPORTING

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 74 19.00 37 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00.00 37 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 91 00.00 37 COMMISSIONING

DI VI SI ON 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

DI VI SI ON 04 - MASONRY

04 20 00 UNIT MASONRY

DI VI SI ON 05 - METALS

05 12 00 STRUCTURAL STEEL

05 21 00 STEEL JOIST FRAMING

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 00 METAL STAIRS

05 52 00 METAL RAILINGS

DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES

06 10 00 ROUGH CARPENTRY

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

06 61 16 SOLID SURFACING FABRICATIONS

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS

07 13 53 ELASTOMERIC SHEET WATERPROOFING

07 16 19 METALLIC OXIDE WATERPROOFING

07 21 13 BOARD INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 22 00 ROOF AND DECK INSULATION

07 27 10.00 10 BUILDING AIR BARRIER SYSTEM

07 27 19.01 SELF-ADHERING AIR BARRIERS

PROJECT TABLE OF CONTENTS Page 1

07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 41 13 METAL ROOF PANELS

07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING

07 60 00 FLASHING AND SHEET METAL

07 81 00 SPRAY-APPLIED FIREPROOFING

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DI VI SI ON 08 - OPENI NGS

08 11 13 STEEL DOORS AND FRAMES

08 11 16 ALUMINUM DOORS AND FRAMES

08 31 00 ACCESS DOORS AND PANELS

08 33 23 OVERHEAD COILING DOORS

08 34 59 VAULT DOORS

08 51 13 ALUMINUM WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DI VI SI ON 09 - FI NI SHES

09 06 00 SCHEDULES FOR FINISHES

09 22 00 SUPPORTS FOR GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 10 CERAMIC TILING

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 67 23 RESINOUS FLOORING SYSTEM

09 84 20 ACOUSTICAL PANELS

09 90 00 PAINTS AND COATINGS

DI VI SI ON 10 - SPECI ALTI ES

10 11 00 VISUAL DISPLAY UNITS

10 14 00.10 EXTERIOR SIGNAGE

10 14 00.20 INTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 22 13 WIRE MESH PARTITIONS

10 26 00 WALL PROTECTION

10 28 13 TOILET ACCESSORIES

10 73 16.13 ENTRY CANOPIES - ALUMINUM

DI VI SI ON 11 - EQUI PMENT

11 31 13 EQUIPMENT

DI VI SI ON 12 - FURNI SHI NGS

12 21 00 WINDOW BLINDS

12 24 13 DOOR AND WINDOW SHADES

12 35 70 METAL CASEWORK

12 48 13 ENTRANCE FLOOR MATS AND FRAMES

DI VI SI ON 13 - SPECI AL CONSTRUCTI ON

13 49 10 X-RAY SHIELDING

DI VI SI ON 14 - CONVEYI NG EQUI PMENT

PROJECT TABLE OF CONTENTS Page 2

14 24 23 HYDRAULIC PASSENGER ELEVATORS

DI VI SI ON 21 - FI RE SUPPRESSI ON

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

21 13 17.00 10 DRY PIPE SPRINKLER SYSTEM, FIRE PROTECTION

DI VI SI ON 22 - PLUMBI NG

22 00 00 PLUMBING, GENERAL PURPOSE

22 60 70 GAS AND VACUUM SYSTEMS FOR HEALTHCARE FACILITIES

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 05 15 COMMON PIPING FOR HVAC

23 05 48.00 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND

EQUIPMENT

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23 09 23.01 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER

BUILDING CONTROL SYSTEMS

23 11 25 FACILITY GAS PIPING

23 21 23 HYDRONIC PUMPS

23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS

23 52 00 HEATING BOILERS

23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 CHILLED WATER PIPING SYSTEMS

23 82 00.00 20 TERMINAL HEATING UNITS

DI VI SI ON 25 - I NTEGRATED AUTOMATI ON

25 05 11.01 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS - FIRE

ALARM AND MASS NOTIFICATION SYSTEM

25 05 11.02 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS - HVAC

CONTROLS

DI VI SI ON 26 - ELECTRI CAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL

26 05 19.10 10 INSULATED WIRE AND CABLE

26 08 00 APPARATUS INSPECTION AND TESTING

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 32 15.00 10 DIESEL-GENERATOR SET STATIONARY 100-2500 KW, WITH

AUXILIARIES

26 36 00.00 10 AUTOMATIC TRANSFER SWITCH AND BY-PASS/ISOLATION SWITCH

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DI VI SI ON 27 - COMMUNI CATI ONS

27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM

27 10 24 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

PROJECT TABLE OF CONTENTS Page 3

27 51 16 RADIO AND PUBLIC ADDRESS SYSTEMS

DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY

28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING

28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DI VI SI ON 31 - EARTHWORK

31 00 00 EARTHWORK

31 11 00 CLEARING AND GRUBBING

31 31 16.13 CHEMICAL TERMITE CONTROL

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 05 33 LANDSCAPE ESTABLISHMENT

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE

FACILITIES

32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 31 13 CHAIN LINK FENCES AND GATES

32 31 16 CHAIN LINK FENCE PANELS

32 92 23 SODDING

32 93 00 EXTERIOR PLANTS

DI VI SI ON 33 - UTI LI TI ES

33 40 00 STORM DRAINAGE UTILITIES

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

DI VI SI ON 34 - TRANSPORTATI ON

34 71 13.19 CRASH RATED ACTIVE VEHICLE BARRIERS AND CONTROLS

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 4

SECTION TABLE OF CONTENTS

DIVISION 13 - SPECIAL CONSTRUCTION

SECTION 13 49 10

X-RAY SHIELDING

02/09

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 QUALIFICATIONS

1.4 DELIVERY, STORAGE, AND HANDLING

1.5 WARRANTY

PART 2 PRODUCTS

2.1 SHIELDING SYSTEM

2.2 LEAD SHEET

2.3 LEAD-LINED GYPSUM WALLBOARD

2.4 LEADED GLASS

2.5 LEAD TABS OR CLIPS

2.6 LEAD-LINED STEEL DOORS AND FRAMES

2.6.1 Doors

2.6.2 Frames

2.7 DESIGNATING PLAQUES

2.7.1 Required Information

2.7.2 Radiographic Rooms

PART 3 EXECUTION

3.1 INSTALLATION

3.1.1 Workmanship

3.1.2 Protection

3.2 LEAD-LINED GYPSUM WALLBOARD

3.2.1 Joints

3.2.2 Corner Joints

3.2.3 Metal Supports

3.2.4 Finish Ply

3.3 SUSPENDED LEAD-LINED CEILINGS

3.4 LEAD DOOR THRESHOLDS

3.5 LEAD-LINED WOOD DOORS

3.5.1 Door Hardware

3.5.2 View Windows

3.6 TESTING AND CERTIFICATION

-- End of Section Table of Contents --

SECTION 13 49 10 Page 1

SECTION 13 49 10

X-RAY SHIELDING

02/09

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM B749 (2014) Standard Specification for Lead and Lead Alloy Strip, Sheet and Plate Products

ASTM C1396/C1396M (2017) Standard Specification for Gypsum Board

NATIONAL COUNCIL ON RADIATION PROTECTION AND MEASUREMENTS (NCRP)

NCRP 147 (2004) Structural Shielding Design for Medical X-Ray Imaging Facilities

STEEL DOOR INSTITUTE (SDI/DOOR)

SDI/DOOR A250.8 (2003; R2008) Recommended Specifications for Standard Steel Doors and Frames

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910.1025 Lead

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00.00 37 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

X-Ray Shielding ; G, AO

SD-03 Product Data

Leaded Glass ; G, AO

Lead-Lined Steel Doors and Frames ; G, AO

SD-06 Test Reports

Testing and Certification

SECTION 13 49 10 Page 2

Submit four copies of surveyor's report.

SD-07 Certificates

X-Ray Shielding

1.3 QUALIFICATIONS

Work shall be performed by a company which specializes in the type of shielding work required by the Contract documents. Company shall have a minimum of 5 years of documented successful experience.

1.4 DELIVERY, STORAGE, AND HANDLING

Deliver materials in the original containers bearing the name of the manufacturer and brand name. Store shielding materials off the ground under watertight cover. Handle materials preventing damage to edges, ends or surfaces in conformance with 29 CFR 1910.1025 . Remove damaged materials from the premises. Leave protective paper on acrylic panels until installation is complete.

1.5 WARRANTY

Lead sheet shielding materials shall be warranted against sagging and curling for 10 years.

PART 2 PRODUCTS

2.1 SHIELDING SYSTEM

Shielding system shall be designed and constructed as required by the equipment to be utilized. Coordinate equipment requirements with Contracting Officer prior to submitting product data and installation drawings. Include data for equipment to be utilized and illustrating shielding required.

Construct X-ray shielding unimpaired by joints, openings for ducts, pipes, or other openings through shielding, or conduits, service boxes, and other items embedded in the shielding. The shielding shall appear to be continuous. Install lead patches, lead sleeves, and/or mazes as required to provide continuity of the shielding. Minimum lead lap shall be 1 inch .

Sleeves shall be not less than 1 inch in length. Thicknesses indicated for shielding are minimum acceptable thickness.

a. Submit shop drawings that indicate thickness of lead at all locations;

construction at floor, walls, ceiling, doors, and columns; details of lead laps and lap securing methods; fastenings, profiles, details of items and accessories penetrating the shielding materials; and any special method of construction.

b. Certify the shielding materials supplied comply with quality and thicknesses required by radiation equipment.

2.2 LEAD SHEET

Lead sheet shall conform to ASTM B749, Grade C, thickness as indicated.

SECTION 13 49 10 Page 3

2.3 LEAD-LINED GYPSUM WALLBOARD

Lead-lined gypsum wallboard shall be a single thickness of unpierced lead laminated to 5/8 inch thick gypsum board conforming to ASTM C1396/C1396M , Type III, Grade R, Class 1, Form a. Provide factory laminated lead-lined gypsum wallboard.

2.4 LEADED GLASS

Leaded glass shall be clear X-ray protective quality glass in single or multiple thicknesses. Leaded glass shall have lead equivalence required for the door vision lite in which the leaded glass is installed.

2.5 LEAD TABS OR CLIPS

Lead tabs or clips shall be unpierced sheet lead not less than the thickness of lead in the barrier. Prior to folding, the tabs shall be rectangular in shape and shall be the required size to provide an effective lead lap over an unleaded nail, screw, or tie wire penetration when folded.

2.6 LEAD-LINED STEEL DOORS AND FRAMES

2.6.1 Doors

Doors shall conform to Section 08 11 13 STEEL DOORS AND FRAMES, in accordance with SDI/DOOR A250.8 , Grade II, heavy duty, Model 1, minimum 18 gage faces with steel stiffeners throughout. Apply unpierced lead sheet, of thickness equal to that used in the adjoining wall, in the center of the door between the two faces, continuously from top to bottom and edge to edge. Shield cutouts for locksets with sheet lead of the same thickness as used in the door; lap lead lining of locksets and the door lining. Prepare doors to receive viewing windows as indicated. Provide removable stops for glazed openings. Use Section 08 71 00 DOOR HARDWARE for protective hardware requirements. Line thresholds with a single sheet of lead to provide required shielding.

2.6.2 Frames

Provide steel frames as specified in Section 08 11 13 STEEL DOORS AND FRAMES. The inside of frames shall be lined with a single thickness of sheet lead. The thickness of the lead lining shall be the same as the lead lining of the system in which the frames are used. Linings shall be installed at the factory, and shall be continuous. Lining shall be formed to contour of frame. Lead shields shall be formed around areas prepared to receive hardware. Each lining shall be wide enough to provide and maintain an effective lead lap with the lead of the adjoining shielding units.

2.7 DESIGNATING PLAQUES

2.7.1 Required Information

Furnish and install designating plaques as specified below in rooms and as indicated on the drawings. Locations where shielding thickness changes, or is not continuous, shall be indicated on the plaque. Plaque shall be of aluminum, plastic, bakelite, or other approved materials and shall contain the required information as specified below.

SECTION 13 49 10 Page 4

2.7.2 Radiographic Rooms

One sign shall be provided for room insulated with sheet lead lettered as follows:

"SURFACES OF THIS ROOM HAVE BEEN INSULATED WITH SHEET LEAD OF FOLLOWING

THICKNESS TO FULL HEIGHT ABOVE FLOOR SLAB:

LEAD

THICKNESS

TOTAL LEAD

EQUIVALENT

PROTECTION

DOORS inches inches

PARTITIONS inches inches

FLOORS inches inches

PART 3 EXECUTION

3.1 INSTALLATION

Perform installation of materials and assemblies in accordance with drawings and approved manufacturer's recommendations and NCRP 147.

3.1.1 Workmanship

Install sheet lead free of waves, lumps, and wrinkles and with a minimum of joints. Joints in sheet lead shall provide protection equivalent to the protection provided by the adjacent sheet lead. Joints shall be finished smooth and neat.

3.1.2 Protection

Use lead shields to maintain continuity of protection where unshielded built-in items penetrate lead linings. Where outlet boxes, junction boxes, ducts, conduits, and similar items prevent the use of shields, lead sleeves or lead lining shall be used. Fasteners shall not disrupt the continuity of shielding.

3.2 LEAD-LINED GYPSUM WALLBOARD

Lead-lined gypsum wallboard shall be applied over supports specified in Section 09 22 00 METAL SUPPORT ASSEMBLIES. Method of predrilling or drilling pilot holes shall not cause deformation of the fastener and shall not cause distortion of wallboard. Wallboard shall be applied vertically, with long edges parallel to supports, and with lead linings placed next to supports. Blocking shall be provided at end joints.

3.2.1 Joints

Sheet-lead strips not less than the lead thickness used for wallboard and not less than 1-1/2 inches wide shall be installed on blocking and supports at all joints.

SECTION 13 49 10 Page 5

3.2.2 Corner Joints

Corner joints shall consist of 1-3/4 by 1-3/4 inch lead angle.

3.2.3 Metal Supports

Edges of gypsum wallboard at metal studs shall be fastened with 1 inch long lead-headed screws. Heads shall be covered with 1/2 inch diameter lead disc cemented to wallboard and installed flush with surface of wallboard.

3.2.4 Finish Ply

Gypsum wallboard receive a finish ply of gypsum wallboard bonded to the first ply with laminating adhesive as recommended by the wallboard manufacturer. Nailing the finish ply will not be permitted. A shoring system shall be used to hold finish ply in place during adhesive drying period. Shoring shall be left in place at least 24 hours. Joint and corner treatment shall be as specified in Section 09 29 00 GYPSUM BOARD.

3.3 SUSPENDED LEAD-LINED CEILINGS

Provide suspended lead-lined ceilings consisting of lead-lined gypsum board , ceiling bars, and hangers. Continuous bars shall be spaced approximately 16-1/2 inch on center and supported by steel hangers from overhead structure. Lead in the ceiling shall lap lead in the wall by not less than 1-1/2 inch .

3.4 LEAD DOOR THRESHOLDS

Thresholds shall be installed in accordance with approved detail drawings. Prior to installation, lead threshold surfaces in contact with concrete shall be painted with a coat of asphalt paint or latex material.

3.5 LEAD-LINED WOOD DOORS

Doors shall be fit, hung, and trimmed as required. Doors shall be installed with a clearance of 1/16 inch at sides and top and minimum adequate clearance at bottom. Lock edge shall be beveled 1/8 inch , and hardware shall be adjusted as required. Warp or twist of lead-lined doors after doors have been hung and finished shall not exceed 1/4 inch in any face dimension of door including full diagonal. Cuts required for installation shall be sealed with a clear varnish or sealer.

3.5.1 Door Hardware

Bolts and screws which penetrate lead lining shall be recessed on the side of the door opposite hardware and shall be plugged with lead plugs to match face of door. Nuts for securing surface-applied hardware such as hinges, door closers and automatic door operators shall be countersunk and covered with lead-lined 16 gauge thick stainless steel pans. Stainless steel pans shall be secured with round-head screws with dull chromium-plated finish. Cutouts for lock sets and latch cases shall be patched with sheet lead. Lead lining of the lock set and lead lining of the door shall be lapped to provide x-ray absorption equal to the door.

3.5.2 View Windows

View windows shall be installed in doors with hardwood stops to match face

SECTION 13 49 10 Page 6 veneer. Stops shall be glued to door on corridor side and shall be fastened with countersunk oval head screws or finishing nails.

3.6 TESTING AND CERTIFICATION

Before and after x-ray equipment has been installed and placed in operating condition, the x-ray installation shall be surveyed by a qualified expert as defined in NCRP 147. Survey shall be performed in accordance with NCRP 147. Any part of x-ray shielding work found to be defective shall be corrected or replaced, including all other work affected thereby.

-- End of Section --

SECTION 13 49 10 Page 7

SECTION TABLE OF CONTENTS

DIVISION 14 - CONVEYING EQUIPMENT

HYDRAULIC PASSENGER ELEVATORS

05/16

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.2.1 Shop Drawing Requirements

1.2.2 Product Data Requirements

1.2.3 Design Data

1.2.3.1 Reaction Loads

1.2.3.2 Heat Loads

1.2.3.3 Emergency Power Systems

1.2.4 Welders' Requirements

1.2.5 Maintenance Control Program (MCP)

1.3 QUALITY ASSURANCE

1.3.1 Qualification

1.3.1.1 Elevator Contractor's Elevator Technicians

1.3.2 Manufacturers' Technical Support

1.3.3 Operation and Maintenance Data

1.3.4 Wiring Diagrams

1.3.5 Machine Room/Control Room Cabinet

1.4 NEW INSTALLATION SERVICE

1.4.1 Periodic Elevator Certification Inspection and Testing

1.5 FIRE PROTECTION SYSTEM

1.5.1 Fire Alarm Initiating Devices

1.5.2 Fire Sprinklers

1.5.3 Shunt Trip Disconnect

PART 2 PRODUCTS

2.1 ELEVATOR DESCRIPTION

2.1.1 Elevator Design Parameters

2.1.1.1 Elevator - Emergency Medical Service Accessibility (EMSA)

2.1.2 Cab Enclosure and Hoistway Entrance Assemblies

2.2 ELEVATOR OPERATION

2.2.1 Single, Two-Stop, Automatic Operation

2.3 SPECIAL OPERATION AND CONTROL

2.3.1 Keys for Elevator Key Switches

2.3.2 Firefighters' Emergency Operation (FEO)

2.3.2.1 Firefighters' Emergency Operation (FEO) Key Box

2.3.3 Hoistway Access Operation

2.3.4 In-Car Inspection Operation

2.3.5 Independent Service

2.3.6 Selective Door Operation

2.3.7 Elevator Emergency Power Operation

2.3.8 Elevator Auxiliary Power Operating System

2.4 ELEVATOR DRIVE SYSTEM

2.4.1 Hydraulic Pump Unit

2.4.1.1 Pump Motor

2.4.2 Hydraulic Controls and Equipment

SECTION 14 24 23 Page 1

2.4.2.1 Hydraulic Control Valve

2.4.2.2 Hydraulic Overspeed Safety Valve

2.4.3 Hydraulic Piping and Accessories

2.4.3.1 Containment of Hydraulic Oil Supply Line

2.4.4 Hydraulic Elevator Type

2.4.4.1 Cylinder-Plunger (Jack) Unit

2.5 CONTROL EQUIPMENT

2.5.1 Motor Control Equipment

2.5.2 Elevator Microprocessor Controller

2.5.2.1 Elevator Controller Interface Cabinet

2.5.2.1.1 Elevator Microprocessor Human Interface

2.5.2.2 Software and Documentation

2.5.2.3 Elevator Controller Certification

2.6 OPERATING PANELS, SIGNAL FIXTURES, AND COMMUNICATIONS CABINETS

2.6.1 Car and Hall Buttons

2.6.2 Passenger Car-Operating Panel

2.6.2.1 Passenger Controls

2.6.2.2 Service Controls

2.6.2.3 Certificate Window

2.6.2.4 Emergency Signaling Devices

2.6.3 Elevator In-Car Position Indicators

2.6.4 Elevator In-Car Direction Indicators

2.6.5 Hall Call Landing Fixtures

2.6.5.1 Designated Landing Hall Call Fixture

2.6.5.1.1 Location of COMMUNICATION MEANS FAILURE (CMF) Visual

Signal

2.6.5.1.2 COMMUNICATION MEANS FAILURE (CMF) Visual and Audible

Signal Operation

2.6.5.1.3 Firefighters' Emergency Operation Phase I Switch and

Visual Signal

2.6.6 Emergency or Standby Power

2.7 CAR DOOR EQUIPMENT

2.7.1 Car Door Operator

2.7.2 Infra-red Curtain Unit

2.8 PASSENGER ELEVATOR GUIDES, PLATFORM, AND ENCLOSURE

2.8.1 Roller Guides

2.8.2 Car Enclosure Wall Panels, Return Panels, Doors, Entrance

Columns, and Transom

2.8.3 Car Enclosure Top

2.8.4 Car Door

2.8.5 Car Entrance Sill

2.8.6 Cab Finish Floor

2.8.7 Car Fan

2.8.8 Car Lighting

2.8.9 Car Protection Pads and Hooks

2.9 PASSENGER ELEVATOR HOISTWAY DOORS AND ENTRANCES

2.9.1 Hoistway Entrance Frames

2.9.2 Hoistway Entrance Sills

2.9.3 Hoistway Entrance Doors

2.9.4 Hoistway Entrance Door Track Dust Covers

2.10 HOISTWAY EQUIPMENT

2.10.1 Car Guide Rails and Fastenings

2.10.2 Pit Equipment and Support Channels

2.10.3 Pit "STOP" Switch

2.10.4 Traveling Cables

2.10.5 Hoistway Pit Ladder

PART 3 EXECUTION

SECTION 14 24 23 Page 2

3.1 INSTALLATION

3.1.1 Structural Members and Finish Materials

3.1.2 Miscellaneous Requirements

3.1.3 Elevator Key Lock Box

3.2 FIELD QUALITY CONTROL

3.3 ACCEPTANCE INSPECTION, TESTING AND COMMISSIONING

3.3.1 Acceptance Inspection Support

3.3.2 Testing Materials and Instruments

3.3.3 Field Tests

3.3.3.1 Endurance Tests

3.3.3.2 Speed Tests

3.3.3.3 Leveling Tests

3.3.3.4 Temperature Rise Tests

3.3.3.5 Motor Ampere Tests

3.3.3.6 Elevator Performance and Ride Quality Testing

3.3.3.7 Hydraulic Safety Valve (Automatic Shutoff Valve) Tests

3.3.3.8 Hydraulic Pressure Tests

-- End of Section Table of Contents --

SECTION 14 24 23 Page 3

****Amemdment 0002****

SECTION 14 24 23

HYDRAULIC PASSENGER ELEVATORS

05/16

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN WELDING SOCIETY (AWS)

AWS D1.1/D1.1M (2015; Errata 1 2015; Errata 2 2016) Structural Welding Code - Steel

ASME INTERNATIONAL (ASME)

ASME A17.1/CSA B44 (2016) Safety Code for Elevators and Escalators

ASME A17.2 (2017) Guide for Inspection of Elevators, Escalators, and Moving Walks Includes Inspection Procedures for Electric Traction and Winding Drum Elevators, Hydraulic Elevators, and Escalators and Moving Walks

ASME B16.9 (2018) Factory-Made Wrought Buttwelding Fittings

ASME B16.11 (2016) Forged Fittings, Socket-Welding and Threaded

ASTM INTERNATIONAL (ASTM)

ASTM A53/A53M (2018) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless

ASTM A106/A106M (2019a) Standard Specification for Seamless Carbon Steel Pipe for High-Temperature Service

INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)

IEEE C62.41 (1991; R 1995) Recommended Practice on Surge Voltages in Low-Voltage AC Power Circuits

INTERNATIONAL CODE COUNCIL (ICC)

ICC IBC (2018) International Building Code

SECTION 14 24 23 Page 4

NATIONAL ELEVATOR INDUSTRY, INC. (NEII)

NEII-1 (2000; R thru 2017) Building Transportation Standards and Guidelines, including the Performance Standards Matrix for New Elevator Installation

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 70 (2019; TIA 19-1; TIA 19-2; TIA 19-3; TIA

19-4; ERTA 1 2019) National Electrical Code

NFPA 70E (2018; TIA 18-1; TIA 81-2) Standard for Electrical Safety in the Workplace

NFPA 72 (2019; TIA 19-1; ERTA 2019) National Fire Alarm and Signaling Code

NFPA 101 (2018; TIA 18-1; TIA 18-2; TIA 18-3) Life Safety Code

U.S. DEPARTMENT OF DEFENSE (DOD)

UFC 3-490-06 (2018) Elevators

UFC 3-560-01 (2017, with Change 1, 2018) Operations and Maintenance: Electrical Safety

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

36 CFR 1191 Americans with Disabilities Act (ADA) Accessibility Guidelines for Buildings and Facilities; Architectural Barriers Act (ABA) Accessibility Guidelines

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00.00 37 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Elevator System; G, AO

Elevator Components ; G, AO

Elevator Machine ; G, AO

Elevator Controller ; G, AO

Wiring Diagrams ; G, AO

SD-03 Product Data

SECTION 14 24 23 Page 5

Elevator and Accessories; G, AO

Elevator Components ; G, AO

Data Sheets ; G, AO

Elevator Microprocessor Controller ; G, AO

SD-05 Design Data

Emergency Power Systems

Heat Loads

Reaction Loads

SD-07 Certificates

Elevator Parts and Components Price Lists ; G, AO

Warranty

Endorsement Letter

Welders' Qualifications

Elevator Controller Certification ; G, AO

SD-10 Operation and Maintenance Data

Elevator , Data Package 4; G, AO

Maintenance Control Program (MCP) ; G, AO

Software and Documentation ; G, AO

Submit in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA and 01 78 24.05 20 FACILITY OPERATION AND

MAINTENANCE SUPPORT INFORMATION.

1.2.1 Shop Drawing Requirements

Provide assembly and arrangement of elevators, accessories, and elevator components . Show location of elevator machine in elevator machine room (MR) or machinery space (MS). Show location of elevator controller in elevator machine room or elevator control room (CR). Provide details for materials and equipment, including but not limited to operating and signal fixtures, doors, door and car frames, car enclosure, controllers, motors, guide rails and brackets, layout of hoistway in plan and elevation, and other layout information and clearance dimensions.

1.2.2 Product Data Requirements

Provide manufacturers' product data for all elevator components , including but not limited to the following: elevator controller, hydraulic pump unit, hydraulic pump and motor, hydraulic cylinder, hydraulic piping and fittings, car and hall fixture buttons and switches, cab and machine room or control room communication devices, door operator, door protection

SECTION 14 24 23 Page 6 system, car roller guides, and buffers. For data sheets , provide document identification number or bulletin number, published or copyrighted prior to the date of contract bid opening. Provide controller manufacturer's published procedures for performance of each and all testing required by

ASME A17.1/CSA B44 .

1.2.3 Design Data

1.2.3.1 Reaction Loads

Provide calculations by registered professional engineer for reaction loads imposed on building by elevator system. Demonstrate calculations complying with ASME A17.1/CSA B44

1.2.3.2 Heat Loads

Provide calculations from elevator manufacturer, or by registered professional engineer, for total anticipated heat loads generated by all of the elevator equipment.

1.2.3.3 Emergency Power Systems

Where the facility does have an emergency power system, confirm the elevators that will be connected to the emergency power system. Confirm the complete emergency power system and sequence of operation for all elevators, including operation of the elevator lobby manual selection switch. Provide wiring diagrams for building emergency power interface with elevator controls. For elevators not supplied by an emergency power system, provide manufacturers' product data for auxiliary power systems.

1.2.4 Welders' Requirements

Comply with AWS D1.1/D1.1M , Section 5. Include certified copies of field welders' qualifications . List welders' names with corresponding code marks to identify each welder's welding work

1.2.5 Maintenance Control Program (MCP)

For each elevator, prepare and provide a written Maintenance Control Program (MCP) that complies with ASME A17.1/CSA B44 Section 8.6, including written documentation that details the test procedures for each and every test that is required to be performed by ASME A17.1/CSA B44 . Assemble all MCP documentation, and supporting technical attachments, in a single MCP package and provide in both electronic and hard copy. Assemble entire hard copy MCP in 3-ring binders. For each elevator provided, the MCP must include only documentation and instruction that apply to the elevator specified.

For each elevator, provide an additional, separate binder that includes all maintenance, repair, replacement, call back, and other records required by ASME A17.1/CSA B44 . The records binder must be kept in the elevator mechanical room, maintained by elevator maintenance and service personnel, and be available at all times to authorized personnel.

Provide detailed information regarding emergency service procedures and elevator installation company personnel contact information. Provide a listing of all tools to be provided to the Contracting Officer as components of the elevator system.

SECTION 14 24 23 Page 7

1.3 QUALITY ASSURANCE

1.3.1 Qualification

Provide a designed and engineered elevator system by an elevator contractor regularly engaged in the installation of elevator systems.

Provide elevator components manufactured by companies regularly engaged in the manufacture of elevator components. Utilize only licensed and certified elevator personnel for the installation, adjusting, testing, and servicing of the elevators.

1.3.1.1 Elevator Contractor's Elevator Technicians

For elevator installations in the United States, including United States territories, perform all elevator related work under the direct guidance of a state certified elevator technician with a minimum of three years of experience in the installation of elevator systems of the type and complexity specified in the contract documents. Provide an endorsement letter from the elevator manufacturer, certifying that the elevator specialist is qualified. All elevator technicians must carry a current certification issued by one of the following organizations:

a. National Association of Elevator Contractors (NAEC)

b. National Elevator Industry Education Program (NEIEP)

1.3.2 Manufacturers' Technical Support

Provide elevator components from manufacturers that provide factory training and online and live telephone elevator technical support to any elevator installation, service, and maintenance contractor. Provide elevator components from manufacturers that guarantee accessibility to all replacement and repair parts and components to any elevator installation, service, and maintenance contractor. Use only elevator component manufacturers that provide current published price lists for all elevator parts and components.

1.3.3 Operation and Maintenance Data

Assemble all shop drawing and product data material into O&M Data Packages in accordance with Article SUBMITTALS. Provide two complete O&M Data Packages in hard copy and two complete electronic O&M data packages on separate CDs, in PDF format. Provide all O&M Data Packages to Contracting Officer. Include controller diagnostic documentation and software as required under Article CONTROL EQUIPMENT.

1.3.4 Wiring Diagrams

Provide complete wiring diagrams and sequence of operations, which show electrical connections and functions of elevator systems. Provide one set ( 11 inch by 17 inch minimum size) of wiring diagrams, with individual sheets laminated in plastic and assembled in binder, to be stored in the machine room or control room cabinet. Provide one additional hard copy set and two complete electronic sets on separate CDs, in PDF format.

Provide all wiring diagram sets to the Contracting Officer. Coded diagrams are not acceptable unless fully identified.

SECTION 14 24 23 Page 8

1.3.5 Machine Room/Control Room Cabinet

For storage of O&M Data Packages and Wiring Diagrams, provide locking metal cabinet with a minimum size of 20 inch W by 12 inch D by 30 inch H .

Cabinet must be sized large enough to accommodate all O&M Data and hardware required in paragraphs OPERATION AND MAINTENANCE DATA and WIRING DIAGRAMS. Secure cabinet to machine room or control room wall.

1.4 NEW INSTALLATION SERVICE

Provide elevator warranty service in accordance with the manufacturer's maintenance plan, warranty requirements and applicable safety codes, for a period of 12 months after the date of acceptance by Contracting Officer.

Perform this work during regular working hours. Provide supplies and parts to keep elevator system in operation. Perform service only by factory trained personnel. Provide Monthly services to include repairs, adjustments, greasing, oiling, and cleaning. Provide service log in elevator machine room or control room and update Monthly, throughout the one-year warranty period.

Provide 24-hour emergency service, with two hour on-site response time, during this period without additional cost to the Government.

1.4.1 Periodic Elevator Certification Inspection and Testing

Provide elevator mechanic to support QEI Certified Elevator Inspector in the periodic six-month and the annual Category 1 elevator certification inspection and testing. Perform Category 1 inspection and testing no greater than 30 days prior to the end of the warranty period. Perform all elevator certification testing in the presence of QEI Certified Elevator Inspector.

In conjunction with the testing noted above, test systems for Emergency Power Operation, Earthquake Emergency Operation, and Hospital Emergency Commandeering Service Operation, as applicable. Schedule so that testing does not interfere with building operations.

1.5 FIRE PROTECTION SYSTEM

Coordinate interface between building fire protection system and elevator controls.

Additional fire protection requirements are located in: Section 28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM, Section 21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION, and Section 26 20 00 INTERIOR

DISTRIBUTION SYSTEM.

1.5.1 Fire Alarm Initiating Devices

Fire alarm initiating devices are specified in Section 28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM, including conduit and wiring from each detector to fire protection addressable modules in elevator machine room or control room.

1.5.2 Fire Sprinklers

Provide fire sprinklers in accordance with all applicable safety codes and with Section 21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION.

Provide shutoff valve, check valve, and non-adjustable, zero time-delay

SECTION 14 24 23 Page 9 flow switch, in each sprinkler line immediately outside of each machine room, control room, and hoistway, as applicable. Provide inspectors' test valve for periodic testing of flow switch and shunt trip disconnect.

Pipe sprinkler piping serving these spaces in a series manner with no laterals. Locate inspectors' test connection at the end of pipe runs such that operation of the test connection will purge air from system piping.

1.5.3 Shunt Trip Disconnect

Provide flow switches specified in paragraph FIRE SPRINKLERS to comply with ASME A17.1/CSA B44 and NFPA 72 for shunt trip of the main line power supply. For each elevator, provide control wiring connecting the flow switch to a shunt trip equipped circuit breaker located in the elevator machine room or control room. Upon flow of water, flow switch will instantaneously cause opening of the shunt-trip circuit breaker and remove power from the elevator. Flow switch must also send a signal to fire alarm control panel to indicate water flow condition.

PART 2 PRODUCTS

2.1 ELEVATOR DESCRIPTION

Provide elevator system that complies with ASME A17.1/CSA B44 in its entirety, ASME A17.2 in its entirety, UFC 3-490-06 in its entirety, and additional requirements specified herein. Provide elevator system that meets or exceeds the NEII-1 Ride Quality Performance Standards Matrix (RQPSM). Comply with the RQPSM "Intermediate Performance" criteria.

Provide and install elevators in accordance with 36 CFR 1191 - ABAAS, ICC IBC , IEEE C62.41 , NFPA 70 and NFPA 101 requirements.

****Amemdment 0002****

2.1.1 Elevator Design Parameters

2.1.1.1 Elevator - Emergency Medical Service Accessibility (EMSA)

Provide elevator(s) with minimum size and arrangement to accommodate an ambulance stretcher 24-inch by 84-inch with not less than 5-inch radius corners, in the open, horizontal position.

a. Type: Holeless

b. Rated load: 3500 lb.

c. Rated Speed: 125 fpm minimum

d. Car Door Type: Single-speed side slide.

e. Car Door Opening Width: 3 ft.-6 in. minimum.

****Amemdment 0002****

2.1.2 Cab Enclosure and Hoistway Entrance Assemblies

Provide finishes as indicated in Section 09 06 00 SCHEDULES FOR FINISHES.

a. Floor; vinyl composition tile.

SECTION 14 24 23 Page 10

b. Walls; laminated plastic on plywood. Provide each cab wall with equally spaced and equally sized wall panels. All wall panel fasteners must be concealed.

Wall trim; stainless steel.

Accessories; Provide manufacturers standard stainless steel hand rails on full length of back wall and side walls of elevator cab.

c. Car doors, car door returns, and wall reveals; stainless steel.

d. Ceilings; eggcrate.

Ceiling frame; stainless steel.

e. Hoistway Entrance Assembly Material and Finishes; stainless steel.

2.2 ELEVATOR OPERATION

ASME A17.1/CSA B44 , Introduction, Section 3, Definitions.

2.2.1 Single, Two-Stop, Automatic Operation

Provide Single Two-Stop Automatic Operation.

2.3 SPECIAL OPERATION AND CONTROL

Provide the following special operations and control systems.

2.3.1 Keys for Elevator Key Switches

Provide a minimum of twelve keys per unique cylinder used on all key switches for a single elevator. Provide keys with brass or fiberglass tags marked "PROPERTY OF THE U.S. GOVERNMENT" on one side with function of key or approved code number on the other side.

2.3.2 Firefighters' Emergency Operation (FEO)

Provide FEO equipment and signaling devices. The designated level for the FEO Phase I key operated switch is the ground floor. In the FEO Phase I fixture, provide FEO Operating Instructions.

2.3.2.1 Firefighters' Emergency Operation (FEO) Key Box

Provide flush mounted, locking, FEO Key Box of a minimum size of 6 inch W by 8 inch H by 1.25 inch D . Provide box equipped with lock that uses the FEO K1 key.

2.3.3 Hoistway Access Operation

Provide hoistway access operation with switches at top and bottom terminal landings. Locate switch 6 feet above floor level, within 12 inches of elevator hoistway entrance frame or with the ferrule exposed when located in the elevator entrance frame.

2.3.4 In-Car Inspection Operation

Provide In-Car Inspection Operation.

SECTION 14 24 23 Page 11

2.3.5 Independent Service

Provide exposed key-operated switch in car operating panel to enable independent service and simultaneously disable in-car signals and landing-call responses. Provide indicator lights that automatically illuminate during independent service. For duplex or group operation, if one car is removed from group another car will respond to its hall calls.

2.3.6 Selective Door Operation

For elevator with one or more rear openings at same level as front opening, provide full-selective operation with car and door operating buttons clearly marked for front and rear openings, front and rear car button for each such floor, and front and rear "DOOR OPEN" and "DOOR CLOSE" buttons. Only door for which the button was operated opens or closes.

2.3.7 Elevator Emergency Power Operation

Provide elevator emergency power operation. Coordinate power supply and control wiring to accomplish initiation and operation of elevators on emergency power.

2.3.8 Elevator Auxiliary Power Operating System

Provide elevator auxiliary power operating system.

2.4 ELEVATOR DRIVE SYSTEM

Provide hydraulic elevator drive system, including pump unit, piping, cylinder/plunger assembly, and associated equipment, which will operate at a maximum working pressure of 500 psi or less. Provide complete elevator system that meets or exceeds the NEII-1 Ride Quality Standard, including elevator ride quality and noise levels in car and in elevator machine room and machinery space.

2.4.1 Hydraulic Pump Unit

Provide self-contained pump unit, including oil-hydraulic elevator pump, electric motor, suction-line oil strainer, and structural steel outer base with tank supports and isolation pads. Provide oil tank capacity for full plunger displacement plus at least 10 gallons . Provide means to maintain oil temperature between 100 and 130 degrees F regardless of ambient temperature. Limit acoustic output in elevator machine room and machinery space to 80 dbA.

2.4.1.1 Pump Motor

Provide intermittent-duty pump motor rated at 120 starts/hour. Provide motor that is sized so that the motor amperage does not exceed the motor data tag amperage in any operating condition, exclusive of acceleration and deceleration. Provide minimum of one mega ohm insulation resistance between conductors and motor frame. Provide motor and pump nameplate and data tags permanently mounted on the outside of the pump unit frame, with all data viewable without the use of mirrors or other tools.

SECTION 14 24 23 Page 12

2.4.2 Hydraulic Controls and Equipment

Provide control valve, overspeed safety valve, blowout-proof muffler, and hydraulic pump discharge strainer in the hydraulic oil supply line.

Provide two 1/4 turn, ball valve type manual shutoff valves. Provide one in the elevator hoistway pit and one in the elevator machine room or machinery space.

2.4.2.1 Hydraulic Control Valve

Provide constant-velocity, down-speed regulated, control valve.

Down-speed regulated control valve allows the car to travel at the same speed in the down direction, regardless of the load on the elevator. In addition, the hydraulic control valve must have built-in adjustment capability to operate the elevator at 140 percent of rated speed to facilitate periodic testing of the overspeed safety valve.

2.4.2.2 Hydraulic Overspeed Safety Valve

Provide overspeed safety valve in hydraulic oil supply line, directly adjacent to the hydraulic cylinder. Provide threaded pipe connections between the hydraulic cylinder and the overspeed valve. Provide valve equipped with manufacturer's manual shutoff feature. Overspeed valve must not be equipped with a manual or automatic lowering feature. Provide adjustable valve with means to seal adjustment after inspection and testing by certified elevator inspector.

2.4.3 Hydraulic Piping and Accessories

Provide ASTM A53/A53M or ASTM A106/A106M , Schedule 80, black steel piping with ASME B16.9 or ASME B16.11 fittings for supply piping. Extend schedule 80 piping from the pump control valve body, inside the pump unit, to the hydraulic cylinder in the hoistway. Provide welded or threaded forged pipe fittings for all fittings and components of the hydraulic oil supply line. Provide hangers or supports for all piping and components.

2.4.3.1 Containment of Hydraulic Oil Supply Line

Protect all portions of hydraulic oil supply line that are installed below ground, including portions encapsulated in concrete or covered by construction, with continuous, Schedule 80, PVC. Inside diameter of PVC must be 3 inches larger than the outside diameter of the hydraulic oil supply line pipe and couplings.

2.4.4 Hydraulic Elevator Type

Provide a holeless direct plunger type hydraulic elevator. Elevators with telescopic or inverted cylinder-plungers are not acceptable and may not be used. Rope hydraulic elevator design is not acceptable and may not be used.

2.4.4.1 Cylinder-Plunger (Jack) Unit

Provide a single-stage plunger of seamless steel construction. Provide cylinder with self-stabilizing mount that will support and hold cylinder plumb without the need for stabilization means at the bottom of the cylinder. Provide a threaded, 1/4 inch bleeder valve at the top of the cylinder, just below packing gland.

SECTION 14 24 23 Page 13

2.5 CONTROL EQUIPMENT

Enclose all elevator control equipment in factory-primed and baked-enamel coated sheet-metal cabinets with ventilation louvers and removable or hinged doors. Mount cabinets at a height of 10 inches above machine room or control room finish floor.

2.5.1 Motor Control Equipment

Provide elevator motor control with electronic, soft-start motor starter.

2.5.2 Elevator Microprocessor Controller

For each individual elevator controller, and for each group controller, provide a microprocessor controller that complies with the following paragraphs. Provide controller(s) package that includes all hardware and software required for the installation, maintenance, and service of the elevator, in its' entirety. Provide verification of technical support service that the controller manufacturer provides to any licensed elevator installation, service, and maintenance company.

Provide an elevator controller from a manufacturer that provides comprehensive factory training to include controller installation, adjustment, service, and maintenance. The training must be identified as available to any licensed elevator contractor. Provide verification of an established and documented training schedule, with pricing, for factory training classes that manufacturer has provided for a minimum period of one year prior to contract award date.

The elevator controller must be identified as available for purchase and installation by any licensed elevator contractor. All components, parts, diagnostic tools, and software must be available for purchase and installation and use by any licensed elevator contractor; "exchange-only" provisions for the purchase of spare parts are not acceptable. The elevator controller manufacturer must publish an industry competitive price listing for all controller parts, diagnostic tools, and software.

Provide verification of telephone and internet based technical support service that the elevator controller manufacturer provides to any licensed elevator installation, service, and maintenance company at an industry competitive price. The service must include live telephone based technical support for installation, adjustment, maintenance, and troubleshooting of the elevator controller and related elevator components. The service must be available during standard working hours.

Provide an elevator controller that is designed to automatically reestablish normal elevator operation following any temporary loss of power, regardless of duration.

2.5.2.1 Elevator Controller Interface Cabinet

For each individual elevator microprocessor controller, provide a separate elevator control cabinet with an integrated human interface system. For group elevator installations, a single cabinet and interface system with full access to each elevator controller may be utilized. The separate controller interface cabinet must be supplied by the elevator controller manufacturer and include a minimum 12 inch wide keyboard and a minimum 10 inch monitor. The elevator controller interface cabinet must comply with arc-flash protection requirements of NFPA 70E and UFC 3-560-01 .

SECTION 14 24 23 Page 14

2.5.2.1.1 Elevator Microprocessor Human Interface

The interface system must provide complete elevator controller interface capability and must include the elevator controller manufacturer's comprehensive package of installation and diagnostic software. The microprocessor interface system must provide unrestricted access to all parameters, all levels of adjustment, and all flags necessary for installation, adjustment, maintenance, and troubleshooting of each elevator and for the elevator group. All software programming must be stored in non-volatile memory. The elevator controller fault log must provide non-volatile memory fault log storage of all faults, trouble calls, and fault history for a minimum of one year and the ability to download or print the fault log. The controller interface must also provide the capability to display and diagnose trouble calls, faults, and shutdowns. Expiring software, degrading operation, and "key" access controls are not acceptable.

2.5.2.2 Software and Documentation

Provide three copies of the manufacturer's maintenance and service diagnostic software, with complete software documentation, that will enable the same level of unrestricted access to all controllers of the same make and model, regardless of the installation date or location.

Provide signed certification, from the manufacturer's corporate headquarters, that guarantees that the microprocessor software and access system will not terminate the unlimited and unrestricted access at any future date.

2.5.2.3 Elevator Controller Certification

For elevator installations in the United States, including United States territories, provide an elevator microprocessor controller that has a current certificate of safety code compliance issued by the Technical Standards and Safety Authority (TSSA), Toronto, Canada.

2.6 OPERATING PANELS, SIGNAL FIXTURES, AND COMMUNICATIONS CABINETS

For all panels and fixtures, provide identical and uniform panel and fixture design, material, finish, and components for all elevators. For all panels and fixtures, legibly and indelibly identify all buttons, devices, and all operating positions for each device.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .