AMDT0002_PN72426_LEED_Scorecard.pdf
PDF 86 KB Posted
- Attached to
- PN 72426 Military Working Dog Facility
- Solicitation number
- W912PM21R0002
About this file
This document contains details for a federal contract solicitation for construction services. The Army Corps of Engineers is seeking to construct a new Military Working Dog Facility at Fort Bragg, North Carolina to house 48 kennels including standard and isolation kennels, a veterinary clinic with surgical, radiological, and pharmacy spaces, classrooms, and administrative offices. The scope of work includes demolishing two existing modular buildings, installing HVAC, sound suppression, parking, fire suppression and alarm systems, security measures, sustainability features, and furnishings. Bidders are to follow DoD high performance building guidelines and design the facility to last 40 years. The response deadline is not provided.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 29 16 5 3 5 13 16 Credit 16 Y Prereq Required
1 Credit 1 Y Prereq Required 2 Credit 2 5 Credit 5
5 Credit 5 1 1 Credit 2
5 Credit 5 1 1 Credit 2 1 Credit 1 1 1 Credit Building Product Disclosure and Optimization - Material Ingredients 2
1 Credit 1 2 Credit 2 1 Credit Green Vehicles 1
10 0 6 Indoor Environmental Quality 16 5 2 3 10 Y Prereq Required
Y Prereq Required Y Prereq Required
1 Credit 1 1 1 Credit 2 2 Credit 2 3 Credit 3
1 Credit 1 1 Credit Construction Indoor Air Quality Management Plan 1 2 1 Credit 3 2 Credit 2 1 1 Credit 2 1 Credit 1 1 Credit 1 2 Credit 2
3 Credit 3 7 0 4 11 1 Credit 1 Y Prereq Required 1 Credit 1 Y Prereq Required Y Prereq Building-Level Water Metering Required 2 0 5 Innovation 6 2 Credit 2 1 5 Credit 5 4 2 Credit 6 1 Credit 1
2 Credit 2 1 Credit Water Metering 1 2 0 2 Regional Priority 4
1 Credit Regional Priority: S Reduced Parking Footprint 1 19 0 14 33 1 Credit Regional Priority: S Heat Island Reduction 1 Y Prereq Required 1 Credit Regional Priority: Specific Credit 1 Y Prereq Required 1 Credit Regional Priority: Specific Credit 1 Y Prereq Required Y Prereq Required 51 7 68 TOTALS Possible Points: 110 6 Credit 6
12 6 Credit 18 1 Credit 1
2 Credit 2 3 Credit 3 1 Credit 1 2 Credit 2
Acoustic Performance Quality Views
Enhanced Indoor Air Quality Strategies Low-Emitting Materials
Indoor Air Quality Assessment Thermal Comfort
Certified: 40 to 49 points, Silver: 50 to 59 points, Gold: 60 to 79 points, Platinum: 80 to 110
Access to Quality Transit
Reduced Parking Footprint
Open Space
Site Assessment
Interior Lighting Daylight
LEED Accredited Professional Green Housekeeping
Rainwater Management
Light Pollution Reduction
Environmental Tobacco Smoke Control
Energy and Atmosphere
Minimum Energy Performance
Fundamental Refrigerant Management
Cooling Tower Water Use
Green Power and Carbon Offsets
Heat Island Reduction
Outdoor Water Use Reduction Indoor Water Use Reduction
Outdoor Water Use Reduction Indoor Water Use Reduction
Enhanced Commissioning
Building-Level Energy Metering
Water Efficiency
Fundamental Commissioning and Verification
Demand Response Renewable Energy Production Enhanced Refrigerant Management
Optimize Energy Performance Advanced Energy Metering
Construction Activity Pollution Prevention
High Priority Site
Surrounding Density and Diverse Uses
Sustainable Sites
Building Life-Cycle Impact Reduction
Site Development - Protect or Restore Habitat
Building Product Disclosure and Optimization - Sourcing of Raw Materials
Location and Transportation
Sensitive Land Protection LEED for Neighborhood Development Location
Bicycle Facilities
Construction and Demolition Waste Management Planning
Materials and Resources Storage and Collection of Recyclables
Construction and Demolition Waste Management
Minimum Indoor Air Quality Performance
Building Product Disclosure and Optimization - Environmental Product Declarations
File details come from the government source that posted it. Updated .