This federal solicitation requests proposals for the construction of a Special Operations Forces military working dog facility at Fort Bragg, North Carolina. The scope of work includes building a 48-kennel facility with a veterinary clinic containing surgical, radiological, and pharmacy spaces. Additional requirements are a classroom, administrative offices, HVAC, sound suppression, parking, fire safety and security systems, sustainability measures, and accessibility. The project also involves demolishing two modular buildings. Proposals are due no later than January 19, 2021 with pricing on a firm-fixed-price basis. Evaluation will be based on corporate experience, past performance, key personnel, and a small business participation plan. Award will be made to the best-valued proposal determined by a tradeoff of non-cost and price factors.

View the file

Other files

File Type Posted
AMDT0002_PN72426_LEED_Scorecard.pdf PDF
AMDT0004_PN72426_ffe_sid_Vol-3 of 3.pdf PDF
AMDT0004_PN72426_specs_Vol-1 of 3.pdf PDF
AMDT0004_72426_TECHNICAL_SUMMARY_OF_CHANGES.pdf PDF
AMDT0004_PN72426_specs_Vol-2 of 3.pdf PDF
W912PM21R0002 Amendment 0004 PN 72426 MWD.pdf PDF
W912PM21R0002 Amendment 0003 PN 72426 MWD.pdf PDF
AMDT0002_72426_TECHNICAL_SUMMARY_OF_CHANGES.pdf PDF
W912PM21R0002 Amendment 0002 PN 72426 MWD.pdf PDF
AMDT0002_PN72426_ffe_sid_Vol-3 of 3.pdf PDF
AMDT0002_PN72426_specs_Vol-1 of 3.pdf PDF
AMDT0002_PN72426_specs_Vol-2 of 3.pdf PDF
dwg_all.zip ZIP file
AMDT0001_PDF_PLANS(rev1).pdf PDF
AMDT0001_TECHNICAL_SUMMARY_OF_CHANGES_72426(rev1).pdf PDF
AMDT0001_PN72426_specs_Vol-2 of 3.pdf PDF
AMDT0001_PN72426_specs_Vol-1 of 3.pdf PDF
W912PM21R0002 Amendment 0001 PN 72426 MWD (Conformed).pdf PDF
AMDT0001_PN72426_ffe_sid_Vol-3 of 3.pdf PDF
2 and 9 Dec site visit sign in roster scan.pdf PDF
ATTACHMENT 5.pdf PDF
PN 72426 Site Visit Map.pdf PDF
PN_72426_JA_Corning.pdf PDF
PN_72426_JA_Honeywell.pdf PDF
PN 72426_JA Security Solutions.pdf PDF
PN 72426_JA Siemon.pdf PDF
W912PM21R0002 PN 72426 MWD.pdf PDF
ATTACHMENT 2 PPQ.pdf PDF
PN72426_specs_rta_Vol-1 of 3.pdf PDF
PN 72426_RTA_VOL_2 (Unlocked).pdf PDF
PN72426_rta_ffe_sid_Vol-3 of 3_wp.pdf PDF
PN 72426_RTA_VOL_1 (Unlocked).pdf PDF
ATTACHMENT 3 Key Personnel SAMPLE Resume.pdf PDF
PN72426_specs_rta_Vol-2 of 3.pdf PDF
ATTACHMENT 1 PROJECT DATA SHEET .pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

72426

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

A. Correct Period of Perfomance from 580 to 540 days for the base bid items and acceptance periods of options B. Removed reference of W912PM20R0012 to W912PM21R0002.

C. Correct the Page Limitation for Past Performance to five (5) pages.

D. Included section 5.1.6. NAVFAC / USACE Past Performance Questionnaire (PPQ) in "Submission of Proposals" instructions E. See attached Technical Summary of Changes and reviesed specs and draw ings.

//////////////////////////////////////////////////////////////////NOTHING FOLLOWS////////////////////////////////////////////////

1. CONTRACT ID CODE PAGE OF PAGES

1 57

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 18-Dec-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912PM21R0002

X 9B. DATED (SEE ITEM 11)

20-Nov-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Dec-2020

CODE

U S ARMY CORPS OF ENGINEERS, WILMINGTON

69 DARLINGTON AVE.

WILMINGTON NC 28403

W912PM 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912PM21R0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The Issued By organization has changed from

U S ARMY CORPS OF ENGINEERS, WILMINGTON

WILMINGTON DISTRICT

ATTN: BOBBY LAW

69 DARLINGTON AVE

WILMINGTON NC 28403-1343

to

U S ARMY CORPS OF ENGINEERS, WILMINGTON

WILMINGTON DISTRICT

ATTN: CONTRACTING DIVISION

69 DARLINGTON AVE

WILMINGTON NC 28403-1343

The contractor period of performance end date has decreased by 40 days from 580 days to 540 days.

The following Delivery Schedule item for CLIN 0001 has been changed from:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

580 dys. ANP 1 N/A

FOB: Destination

To:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

540 dys. ANP 1 ARMY CORPS OF ENGINEERS MOTSU

OFFICE

ELISA A BECK

6280 SUNNY POINT ROAD

SOUTHPORT NC 28461

(910) 908-0572

W912PM

The following Delivery Schedule item for CLIN 0002 has been changed from:

CAGE

CAGE

540 dys. ANP 1 ARMY CORPS OF ENGINEERS MOTSU

OFFICE

ELISA A BECK

6280 SUNNY POINT ROAD

SOUTHPORT NC 28461

(910) 908-0572

The following Delivery Schedule item for CLIN 0003 has been changed from:

CAGE

CAGE

540 dys. ANP 1 ARMY CORPS OF ENGINEERS MOTSU

OFFICE

ELISA A BECK

6280 SUNNY POINT ROAD

SOUTHPORT NC 28461

(910) 908-0572

The following Delivery Schedule item for CLIN 0004 has been changed from:

CAGE

10 dys. ADC 1 N/A

10 dys. ADC 1 ARMY CORPS OF ENGINEERS MOTSU

ELISA A BECK

6280 SUNNY POINT ROAD

SOUTHPORT NC 28461

(910) 908-0572

The following Delivery Schedule item for CLIN 0005 has been changed from:

CAGE

CAGE

540 dys. ANP 1 ARMY CORPS OF ENGINEERS MOTSU

OFFICE

ELISA A BECK

6280 SUNNY POINT ROAD

SOUTHPORT NC 28461

(910) 908-0572

The following Delivery Schedule for CLIN 0006 has been added:

CAGE

540 dys. AOE 1 ARMY CORPS OF ENGINEERS MOTSU

OFFICE

ELISA A BECK

6280 SUNNY POINT ROAD

SOUTHPORT NC 28461

(910) 908-0572

The following Delivery Schedule for CLIN 0007 has been added:

540 dys. AOE 1 ARMY CORPS OF ENGINEERS MOTSU

ELISA A BECK

6280 SUNNY POINT ROAD

SOUTHPORT NC 28461

(910) 908-0572

The following Delivery Schedule for CLIN 0008 has been added:

CAGE

540 dys. AOE 1 ARMY CORPS OF ENGINEERS MOTSU

OFFICE

ELISA A BECK

6280 SUNNY POINT ROAD

SOUTHPORT NC 28461

(910) 908-0572

The following Delivery Schedule for CLIN 0009 has been added:

CAGE

540 dys. AOE 1 ARMY CORPS OF ENGINEERS MOTSU

OFFICE

ELISA A BECK

6280 SUNNY POINT ROAD

SOUTHPORT NC 28461

(910) 908-0572

The following Delivery Schedule for CLIN 0010 has been added:

CAGE

540 dys. AOE 1 ARMY CORPS OF ENGINEERS MOTSU

OFFICE

ELISA A BECK

6280 SUNNY POINT ROAD

SOUTHPORT NC 28461

(910) 908-0572

The following Delivery Schedule for CLIN 0011 has been added:

540 dys. AOE 1 ARMY CORPS OF ENGINEERS MOTSU

ELISA A BECK

6280 SUNNY POINT ROAD

SOUTHPORT NC 28461

(910) 908-0572

The following Delivery Schedule for SUBCLIN 0012AA has been added:

CAGE

540 dys. AOE 1 ARMY CORPS OF ENGINEERS MOTSU

OFFICE

ELISA A BECK

6280 SUNNY POINT ROAD

SOUTHPORT NC 28461

(910) 908-0572

The following Delivery Schedule for SUBCLIN 0012AB has been added:

CAGE

540 dys. AOE 1 ARMY CORPS OF ENGINEERS MOTSU

OFFICE

ELISA A BECK

6280 SUNNY POINT ROAD

SOUTHPORT NC 28461

(910) 908-0572

The following Delivery Schedule item for SUBCLIN 0013AA has been changed from:

CAGE

365 dys. ANP 1 N/A

540 dys. ANP 1 ARMY CORPS OF ENGINEERS MOTSU

ELISA A BECK

6280 SUNNY POINT ROAD

SOUTHPORT NC 28461

(910) 908-0572

The following Delivery Schedule item for SUBCLIN 0013AB has been changed from:

CAGE

365 dys. ANP 1 N/A

CAGE

540 dys. ANP 1 ARMY CORPS OF ENGINEERS MOTSU

OFFICE

ELISA A BECK

6280 SUNNY POINT ROAD

SOUTHPORT NC 28461

(910) 908-0572

The following have been modified:

ATTACHMENT 1

See attached Project Data Sheet.

ATTACHMENT 2

See attached PPQ

ATTACHMENT 3

See attached example Resume

INFO TO ALL CONTRACTORS

System for Award Management (SAM) and Electronic Funds Transfer (EFT)

1. All contractors must register in the System for Award Management (SAM) database before they can be awarded a contract. You may register at https://beta.sam.gov. SAM information or help is also available by calling 866-606-8220.

2. Public Law 104-134 requires the use of Electronic Funds Transfer (EFT) for all Federal payments. EFT information will be pulled from your SAM by the USACE FINANCE CENTER, 5720 INTEGRITY DRIVE, MILLINGTON, TN 38054-5005 for contractor payments.

(End)

NOTICE TO OFFERORS

NOTE 1:

The period of performance for base bids and all option periods shall run concurrently with the entire contract duration so that the period of performance shall not exceed 540 calendar days.

NOTE 2:

The exercise of all optional bid items 1 through 8 (CLIN’s 0006-0013) shall be subject to the availability of funds.

NOTE 3:

The government reserves the right to exercise optional bid items 1 through 6 (CLIN’s 0006, -0011) by no later than 180 Days after Notice To Proceed.

NOTE 4:

The government reserves the right to exercise optional bid items 7 and 8 (CLIN’s 0012-0013) by no later than 365 Days after Notice To Proceed.

PRE-AWARD INFO

1. Contracts shall be awarded to responsible prospective contractors only. Before award, to be determined responsible, a prospective contractor must:

a. Have adequate financial resources to perform the contract, or the ability to obtain them;

b. Be able to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and government business commitments;

c. Have a satisfactory performance record;

d. Have a satisfactory record of integrity and business ethics;

e. Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them;

f. Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them; and

g. Be otherwise qualified and eligible to receive an award under applicable laws and regulations.

2. Each Offeror shall, upon request of the Contracting Officer, furnish information on any or all of the above areas so that the Contracting Officer can make an affirmative determination of responsibility or nonresponsibility.

(End of Paragraph)

SITE VISIT

SITE VISIT INFORMATION AND SECURITY REQUIREMENTS

Two site visits will be held on 2 December at 1300 and 9 December at 1300. Participation in the site visits is not required but attending at least one is highly encouraged. Please plan to arrive at least 30 minutes early to process through security. See attached site visit map for location.

No later than noon Eastern Standard Time 1 December 2020, provide the following information to Mr. James Griffith, USACE project manager, at James.G.Griffith@usace.army.mil in order to attend the site visit on 2 December 2020. The same information is due No later than noon Eastern Standard Time 8 December 2020 in order to attend the site visit on 9 December 2020.

1) A personnel listing to include full name (first, middle, and last) and social security number, and name of the company the individual works for.

2) A signed memorandum on company letterhead stating that the company uses eVerify. A separate eVerify memorandum is required for each company (to include sub-contractors). eVerify documentation for individual employees is not required.

This sensitive information is required by security regulations and will not be distributed beyond those required for official purposes. No additions or changes to personnel rosters may be submitted past noon on 1 December 2020 for the site visit on 2 December 2020, and no additions or changes to personnel rosters may be submitted past noon on 8 December 2020 for the site visit on 9 December 2020. Offerors are limited to five (5) personnel from each prime contractor. Offerors must bring one valid government issued form of photo identification. Offerors who arrive at the site without advance notice or the required identification may be denied access to the site. Offerors should not assume that previous access to the project site will guarantee access and should submit a new request with the information above for this site visit.

Offerors will be prohibited from possessing any electronic devices (laptops, cell phones, cameras, etc) or other contraband (firearms, ammunition, etc) while inside the compound.

Offerors are cautioned to heed all directions from the guard force or escorts for the duration of the site visit.

SOLICITATION/TECHNICAL INQUIRY

Solicitation/Technical Inquiries via ProjNet (Local Instruction CECT-SAW October 2012)

1. Solicitation/Technical Inquiries.

a. Inquiries are to be submitted via Bidder Inquiry at the ProjNet website at https://www.projnet.org <https://www.projnet.org> .

b. If you have technical problems accessing the Bidder Inquiry via the ProjNet website, contact the ProjNet Help Desk at 1-800-428-4357 (HELP). This number is for technical issues accessing the website ONLY.

2. Read this paragraph in conjunction with contract provision FAR 52.214-6, “Explanation to Prospective Bidders”.

3. Any prospective bidder/offeror desiring an explanation or interpretation of the solicitation, drawings specifications, etc., must request it in writing via Bidder Inquiry in ProjNet within no less than ten (10) calendar days prior to the date of bid opening or receipt of proposals. The Government reserves the right to decline addressing questions received less than ten (10) calendar days prior to receipt of bid opening or receipt of proposals.

4. No Inquiries will be accepted by the Bidder Inquiry system within ten (10) calendar days prior to the date of bid opening. However, you may still access the Bidder Inquiry system to view answers/replies to previous inquiries until the bid opening.

5. ProjNet - Bidder Inquiry module.

a. To submit and review bid inquiry items, bidders/offerors will need to be a current registered user or self-register into system. To access Bidder Inquiry, go to the ProjNet web page at http://www.projnet.org <http://www.projnet.org> and click the “Quick Add” link. Once at the Quick Add screen, select agency USACE, enter Bidder Inquiry Key for this solicitation listed below, and bidder’s/offeror’s e-mail address, then click login. If this is bidder’s/offeror’s first time logging in they will be taken to the Bidder Inquiry Create Account screen to self-register. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.

Please remember your Secret Question Answer and email address used for future access to this website.

b. From this page you may view all bidder/offeror inquiries under Reports or post a new inquiry under Submit.

c. Bidders/Offerors will receive an acknowledgement of their question via email, followed by another email notification that an answer to their question has been posted after it has been reviewed by our technical team and responded to by a Contracting Officer. It is the responsibility of the Bidder/Offeror to check their junk email and email delivery options to ensure delivery of these acknowledgement emails.

d. Bidders/Offerors are responsible for checking bid inquiry items.

e. Bidders/Offerors are requested to review the specification in its entirety, review the Bidder Inquiry

System for answers to questions prior to submission of a new inquiry. The name of the submitter or firm is not published for the public on the report of all Bidder Inquiries. Bidders/ Offerors are on notice of, and assumed to be aware of, all inquiries, responses, and information posted in the Bidder Inquiry System up to the date of bid submission, whether the inquiry was generated by the Bidder themselves or another potential Bidder/ Offeror. Bidders are responsible for incorporating all such information into their bid, or for requesting further clarification."

6. Solicitation Information: IFB/RFP No: W912PM21R0002 Bidder Inquiry Key: D6SB3F-WDWZ3W

(end)

SUBMISSION OF PROPOSALS

GENERAL PROPOSAL SUBMISSION INSTRUCTIONS & REQUIREMENTS

***AMENDMENT 0001***

***AMENDMENT 0001***

PN 72426

SOF Military Working Dog Facility at Fort Bragg, Cumberland County, North Carolina

1. OVERVIEW.

1.1 This Request for Proposal (RFP) solicits construction of a SOF Military Working Dog Facility, at Fort Bragg NC. The scope of work includes: Construction of a facility that contains 48 kennels, a veterinary clinic, surgery rooms, educational spaces, including a classroom, and an administrative area including office space for a permanent party cadre. The veterinary clinic includes three distinct areas: surgical space, radiological space, and a pharmacy. The facility will house a total of 48 kennels, which will include: 42 standard kennels and 6 kennels used for isolation of the military working dogs. An existing obstacle course and exercise yard will be shared to serve this projects mission. A portion of the existing obstacle course will be relocated, as it is currently on the site for the new kennel project. The kennels, isolation kennels, veterinary clinic, and administrative space will require dedicated HVAC units. Sound suppression will be provided in the kennel areas. Organizational parking will require six spaces for a truck and trailer as well as eight spaces for a training fleet of sedans and/or sport utility vehicles. Non-organizational parking will require 15 spaces. Provide fire suppression, fire alarm, mass notification, and security measures. Install cybersecurity measures including identity assurance of and operational resilience to fire life safety systems, building automation (EMCS/UEMCS) systems, and electronic access control systems, integrated commercial intrusion detection security systems (CCTV, IDS), cable TV, a protected distribution system, and connection to the energy management control system. Provide sustainability/energy measures and building information systems. Access for individuals with disabilities will be provided. Furnishings and equipment, comprehensive interior design, electronic security systems, and audio visual services are included. Department of Defense principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Demolish 2 modular buildings at Fort Bragg, NC (approximately 3,350 Total SF). Air Conditioning (Estimated 95 Tons). Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope, and integrated building systems performance.

The period of performance shall not exceed 540 calendar days. Work location is Fort Bragg, North Carolina. Antiterrorism/Force protection measures and sustainment mandates will be incorporated. The resultant contract will be Firm-Fixed Price (FFP).

1.2 The instructions and requirements contained herein establish uniform evaluation procedures for the technical evaluation of proposals by the Source Selection Evaluation Board (SSEB) and the development of the Best Value Decision by the Source Selection Authority (SSA) using the Trade-Off Process (See Federal Acquisition Regulation 15.101-1). The proposal shall describe the capability of the offeror to perform the contract. The proposal should be specific and complete in every detail as well as be prepared simply and economically, providing a straightforward and concise description of capabilities to satisfactorily perform the contract as set forth in these instructions and requirements.

1.3 Each offeror must submit both a Price Proposal and Technical Proposal, in addition to Past Performance Questionnaires. The Price Proposal, Technical Proposal, and Past Performance Questionnaires must be submitted as separate volumes/files. All information intended to be evaluated as part of the Technical Proposal must be submitted as part of the Technical Proposal. Do not cross-reference similar material in the Price Proposal, or vice versa.

The Price and the Technical Proposals in addition to the Past Performance Questionnaires must be received by the closing date and time set for receipt of proposals. No dollar amounts from the Price Proposal are to be included in the Technical proposal.

Do not include exceptions to the terms and conditions of the solicitation in either the technical or price proposal. Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the offer may be determined “unacceptable” and thus ineligible for award. Should the offeror have any questions related to specific terms and conditions, these should be resolved prior to the submission of the offer.

The technical data criteria specified for each factor identified herein, shall be submitted as part of the proposal.

The offeror is responsible for including sufficient details in its proposal to permit a complete and accurate evaluation. Accordingly, the offeror shall be clear and concise in its proposal. The Government will not make assumptions concerning the offeror’s intent.

Failure to submit all the data required by the RFP and its Attachments, may be cause for determining a proposal incomplete and therefore may not considered for award.

2. GENERAL INSTRUCTIONS.

In accordance with FAR Clause 52.215-1, Instructions to Offerors – Competitive Acquisitions, the Government reserves the right to make award without discussions. Therefore, offerors should submit their best past performance questionnaires and price terms in their initial offer and not automatically assume that they will have an opportunity to participate in discussions or to submit a revised offer. The Government may make award of a conforming proposal without discussions, if deemed to be within the best interests of the Government.

In accordance with 15.306(c) (1) and FAR Clause 52.215-1(f) (4), Instructions to Offerors – Competitive Acquisitions, the Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

2.1 Contractor Team Arrangements. The Government will recognize the integrity and validity of contractor teaming arrangements, provided the arrangements are identified and company relationships are fully disclosed in the offer. As further described in paragraph 2.3, below, the Government will only evaluate the information submitted by the legal entity with whom the Government would enter into a contract. This is the legal entity represented in Tab E, as registered in System for Award Management (SAM) and identified by its specifically assigned CAGE Code.

2.2 If applicable, the offeror shall submit evidence from the offeror’s SBA Servicing Agency that the offeror has notified and discussed the proposed joint venture for this project with the appropriate SBA personnel. For 8(a) set- aside procurements, all prospective Joint Ventures must comply with Title 13 Code of Federal Regulations (CFR) Part 124.513. For HUBZone set- aside procurements and awards to HUBZone SBCs through full and open competition after a price evaluation preference in favor of qualified HUBZone SBCs, a Joint Venture must comply with

13 CFR 126.616.

2.3 The Government will only evaluate the information submitted by the legal entity with whom the Government would enter into a contract. This is the legal entity represented in Tab E, as registered in System for Award Management (SAM) and identified by its specifically assigned CAGE Code. However, IAW CFR 125.8(e), the Government will also evaluate past experience and past performance submitted by the individual firms that make up a joint venture.

2.4 Notwithstanding the specific requirements of any other area of the RFP, information submitted about any company other than the offeror, whether a predecessor company, affiliated company, subsidiary (including wholly owned subsidiaries), or subcontractor, WILL NOT be evaluated for any factor. Successor entities shall clearly demonstrate in Volume I, Tab A of their proposal the official legal means performed to transform the former Predecessor Company to its current Successor, legal business entity. Examples of substantive documentation may include but is not limited to Articles of Incorporation, Joint Venture Agreements, Novation Agreements, and Merger Documentation.

"Successor" means an entity that has replaced a predecessor by acquiring the assets and carrying out the affairs of the predecessor under a new name (often through acquisition or merger).

Note: The term ''successor'' does not include new offices/ divisions of the same company or a company that only changes its name.

2.5 Offerors shall submit their proposal in accordance with the Section 3. General Proposal Format, paragraph 3.4.

2.6 Proposals are due no later than the time and date specified in Block 13 of Standard Form 1442.

3. GENERAL PROPOSAL FORMAT.

3.1 Cover Page. Include the title of the solicitation, solicitation number, offeror name, and date of the submittal.

3.2 Table of Contents. Each volume of the proposal shall contain a detailed table of contents. If more than one Adobe PDF file is used for a volume, the complete table of contents shall be included in each. Any materials submitted but not required by this solicitation (such as company brochures) shall be relegated to appendices.

3.3 All information intended to be evaluated as part of the Past Performance Volume must be submitted as part of the Past Performance Volume. Do not cross-reference similar material in the Price Proposal, or vice versa. No dollar amounts from the Price Proposal are to be included in the Past Performance Volume.

3.4 Each offeror must submit both a Price Proposal and Past Performance Questionnaires via email to the Wilmington District Contracting Division at SAW-CT- MilitaryProposals@usace.army.mil . Ensure the solicitation number is included in the subject line of the email. Note that attachments exceeding 15 MB may not be accepted by the email server. No hard paper copies will be accepted or evaluated. Both the Price Proposal and the Past Performance Questionnaires must be received by the closing date and time set for receipt of proposals. In an effort to reduce paperwork and reduce cost, all proposals shall be submitted electronically. All submissions shall be in Adobe PDF format and shall be on 8 ½ x 11 size pages in no less than a 10 pitch or 10 font. Page limitations, where specified in the RFP, shall be considered a maximum. Offerors may use compressions utility software such as WinZip or PKZip to reduce file size and facilitate transmission.

Title the file(s) in the following format:

W912PM21R0002_COMPANY NAME_VOLUME I

W912PM21R0002_COMPANY NAME_VOLUME II

Offerors shall submit bid bonds (Standard Form 24) in both electronic and hard copy format.

Electronic copies of bid bonds shall be included in Volume 1: Offerors Certifications and Price under Tab G. Hard copies of bid bonds shall be submitted via USPS, UPS, FedEx or DHL. Hand carried bid bonds will not be accepted. Bid bond submissions shall be due by the proposal due date and time to the following address:

USACE-Wilmington Contracting Division Attn: Mr. Michael Mullen 69 Darlington Avenue Wilmington, NC 28403

Proposal due Date and Time:

Request For Proposal No: W912PM21R0002

Due Date of Proposal: 19 January, 2021 Time by which Proposals are due: 2:00 P.M. (Eastern Time) Title of Project: PN 72426 SOF Military Working Dog Facility, Fort Bragg, North Carolina

Proposals are due as specified on the solicitation document (as amended if applicable). The time & date of proposal receipt will be the upload completion / delivery time & date recorded by the email server. Do not assume that electronic communication is instantaneous. Offerors should time their upload effort with prudence by not waiting until the last few minutes—this will allow for unexpected delays in the transmittal process. If an electronic submission is uploaded minutes before the deadline but the upload doesn’t complete until after the deadline, the submission will be considered late. Offerors are encouraged to keep a copy of the upload confirmation for their records.

3.5 The offeror is responsible for including sufficient details in its proposal to permit a complete and accurate evaluation. Accordingly, the offeror shall be clear and concise in its proposal. The Government will not make assumptions concerning the offeror’s intent.

3.6 Failure to submit all the data required by the RFP, and these instructions may be cause for determining a proposal incomplete and, therefore, not considered for award.

3.7 Do not include exceptions to the terms and conditions of the solicitation in either the technical or price proposal. Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the offer may be determined “unacceptable” and thus ineligible for award. Should the offeror have any questions related to specific terms and conditions, these should be resolved prior to the submission of the offer.

3.8 Tabs. Proposal shall be organized and tabbed as follows:

3.8.1 VOLUME I: OFFEROR’S CERTIFICATIONS AND PRICE (FACTOR 1)

One (1) electronic copy Adobe PDF file as tabbed per the table below shall be submitted and one (1) original copy of the bid guarantee in both electronic and hardcopy shall be submitted.

TAB CONTENTS OF THE PRICE PROPOSAL

A The Proposal Cover Sheet

B Standard Form 1442

C Acknowledgement of Amendments (If Applicable)

D FACTOR 1: PRICE

E Section 00 45 00 – Representations and Certifications

F Teaming Arrangement (If Applicable)

G Bid Guarantee (Bid Bond)

H Financial Information and Bonding Capability

I Factor 5: Small Business Participation Plan

J Subcontracting Plan (FOR LARGE BUSINESSES ONLY)

TAB A – The proposal cover sheet is required by FAR 52.215-1 (c) (2) and must be submitted by all offerors. The format for the proposal cover sheet is as follows:

PROPOSAL COVER

SHEET

Offerors should ensure telephone number; fax number, e-mail address, DUNS number and CAGE Code are all included. DUNS number will be used to access Contractor Performance Assessment Reporting System (CPARS) data. Offerors should also provide any other assigned number that identifies them in the CPARS database. If a separate DUNS has been created for a joint venture (J-V) it must be submitted. The offeror should also submit their Tax ID number on the proposal data Sheet.

TAB B - Standard Form 1442, completed and signed by authorized individual(s) of the offeror. Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal.

TAB C - If applicable - ALL amendments must be acknowledged by all offerors and duly executed with an original signature by an official authorized to bind the company in accordance with FAR 4.102.

TAB D – Factor 1 - Price. Proposed price schedule is to be completed in its entirety by all offerors to include the Subtotals and Totals section as found in Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule.

1. The solicitation number;

2. The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);

3. A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;

4. Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation; and

5. Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.

TAB E - Section 00 45 00 – Representations and Certifications. Offerors shall include any narratives as it pertains to the requirement at 2.2 to document any teaming arrangement the offeror has or will enter into.

TAB F - Teaming Agreement, if applicable. See paragraph 2.1 and 2.2 Note to 8(a)—SBA must approve a joint venture agreement prior to the award of an 8(a) contract on behalf of the joint venture.

TAB G - Offerors shall provide a fully executed Bid Bond as required by FAR Clause 52.228-1, Bid Guarantee in both Hard copy and electronically in Tab G. Hard copies of Bid Guarantees (submitted via UPS, FedEx, USPS, etc.) shall be addressed to the Contract Officer at:

USACE – Wilmington District Attention: Michael Mullen 69 Darlington Ave Wilmington NC 28403

For the purposes of this Request for Proposal, please note that in accordance with

(IAW) FAR 28.001:

“Bond means a written instrument executed by a bidder or contractor (the “principal”), and a second party (the “surety” or “sureties”) (except as provided in 28.204), to assure fulfillment of the principal’s obligations to a third party (the “obligee” or “Government”), identified in the bond. If the principal’s obligations are not met, the bond assures payment, to the extent stipulated, of any loss sustained by the obligee.”

Bonds shall therefore be executed in the name of the legal entity, whether a joint venture, partnership or the Prime Contractor of an informal teaming arrangement, with whom the government would enter into a contract for a successful offeror. The entity named on the bond must be able to acquire bonding capacity on its own merits, and not as the result of indemnification from a subcontractor or third party.

TAB H - Financial Information & Bonding Capability (e.g. past three years financial statements, annual reports, Dun & Bradstreet Ratings and/or number, etc.) Provide a list of all current contracts held, total dollar value, award date, anticipated completion, performance and payment bond amount.

TAB I - Factor 5- Small Business Participation Plan. Further Description and information of TAB I, Factor 5 can be found in the subsequent paragraph 9 of this section, entitled the

GENERAL PROPOSAL SUBMISSION INSTRUCTIONS & REQUIREMENTS

TAB J - Subcontracting Plan – FOR LARGE BUSINESS OFFERORS ONLY.

Subcontracting Plan shall be prepared in accordance with FAR 52.219-9, and SBA’s Electronic Subcontracting Reporting System (eSRS) located at http://esrs.gov. Instructions for completion of requisite forms, as well as guidance on coordinating and preparing for all compliance reviews by Federal agencies can be found at this website. Offerors are to ensure subcontractors agree to submit to ESRS.

3.8.2 VOLUME II: TECHNICAL PROPOSAL (FACTORS 2-4)

One (1) electronic copy Adobe PDF file as tabbed per the table below shall be submitted.

TAB CONTENTS OF THE TECHNICAL PROPOSAL

A Factor 2: Corporate Specialized Experience

B Factor 3: Past Performance

C Factor 4: Key Personnel

Page Limitations: The following page limitations are established for each factor described above:

Factor 2: Past Experience, Construction – Limited to 25 pages Factor 3: Past Performance – Limited to no fewer than three (3) and no more than five (5) projects. Individual project Past Performance Assessment Questionnaires shall not exceed five (5) pages;

Government evaluators will review and evaluate only the information contained on the first five (5) pages.

Factor 4: Key Personnel – Limited to 5 pages per individual resume

NOTE: Pages that exceed the required page limitations will not be evaluated. Additional pages over the maximum allowed will be removed or not read and will not be evaluated by the Government.

Tables of content, proposal cover letters, and tabs between proposal information do not count toward any page limitations in the proposal.

4. SUBMISSION REQUIREMENTS & EVALUATION FACTORS

VOLUME II: TAB A—FACTOR 2 – Corporate Specialized Experience

4.1 SUBMISSION/MINIMUM REQUIREMENTS:

4.1.1 The offeror shall demonstrate the experience as a prime contractor on projects of similar size, scope, and complexity.

4.1.2 Projects must be deemed relevant to be considered for this procurement. Relevant projects are those projects which meet all of the minimum criteria specified in paragraph

4.1.2.1. The Government will not consider multiple projects such as individual task orders combined to meet the criteria referenced in 4.1.2.1 below. Projects which do not meet all of the minimum criteria specified shall be deemed not relevant and shall not be considered further. Relevant projects which meet some or all of the additional criteria specified in paragraph 4.1.2.2 may be given more weight by the Government in determining the appropriate rating. Sample Project Data Sheet is included with this RFP (see Attachment 1).

4.1.2.1 The minimum requirement for a project of similar size, scope, and complexity is defined as having all of the following criteria:

o Fifteen thousand 15,000 square feet (SF) or more aggregate interior space.

o Total value of project equal to or greater than $8,000,000.00 o A minimum of one project submitted shall include construction of a human or animal medical facility such as a clinic, hospital, veterinary clinic, zoo clinic, etc.

o A minimum of one project submitted shall include construction of a multi-story steel-framed building.

4.1.2.2 Additional Criteria:

o Projects which include construction on a site within a high security controlled area, defined as an area requiring armed security guard escort at all times, perimeter intrusion detection or access control measures (into the actual project site), and contractor personnel require identification badges and are subject to random searches of vehicles, equipment and personnel (by users special security).

o Projects which include construction of a climate controlled dog kennel facility, a combined dog kennel and veterinary care facility, or construction / renovation of a military kennel facility.

4.1.3 All projects submitted must be at least 50% complete within the last six (6) years preceding the date of the solicitation

4.1.4 For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP. If the same project is being used to demonstrate construction and design experience, submit separate Project Data Sheets for construction and design. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed Five (5) pages.

4.1.5 If the offeror is a Joint Venture (J-V), relevant project experience should be submitted for projects completed by the Joint Venture entity, or the individual firms that make up the joint venture. Offerors that are part of the DoD Mentor Protégé program may only submit two

(2) recent and relevant project completed by the Mentor. Offerors are still limited to a total of five (5) projects. Experience of proposed subcontractors to be utilized on this project will NOT be considered.

4.2 EVALUATION CRITERIA:

4.2.1 The Government will evaluate the extent of recent, relevant experience of the prime contractor as identified in paragraph 4.1.2. Projects that were awarded on an individual task/delivery order basis will not be aggregated for purposes of meeting minimum or additional criteria. Federal Government project experience will not be rated inherently more important than non-Federal Government project experience.

4.2.2 To be considered eligible for award, the Government will verify that each offeror has submitted a minimum of three (3) projects which meet the minimum criteria of paragraph

4.1.2.1. The offeror’s Corporate Specialized Experience will be evaluated based on the Government’s assessment of each submitted project’s similarity (in terms of size, scope and complexity) to the work described in this RFP.

4.2.3 The Government intends to give greater consideration to proposals that demonstrate experience with the additional criteria listed in paragraph 4.1.2.2 when assigning evaluation standards in accordance with paragraphs 8.1 through 8.4.

4.2.4 The Government reserves the right to verify the experience record of cited projects or other recent projects by reviewing the Contractor Performance Assessment Reporting System (CPARS), and other DOD or Government appraisal systems or by contacting owners or references. The Government may check any or all cited references, or available uncited references, to verify supplied information.

4.2.5 The relevant experience of key personnel proposed for this project will not be evaluated or considered under this factor.

4.2.6 If the offeror is determined to have insufficient recent, relevant experience in accordance with the submission requirements of this RFP, the offeror will be considered ineligible for award.

5. SUBMISSION REQUIREMENTS & EVALUATION FACTORS

VOLUME II: TAB B — FACTOR 3 - PAST PERFORMANCE.

5.1 SUBMISSION/MINIMUM REQUIREMENTS:

5.1.1 Past performance refers to the quality of recent, relevant project experience from the owner’s perspective. The offeror shall complete and provide a NAVFAC/USACE Past Performance Questionnaire (PPQ), on no fewer than three (3) and no more than five (5) projects.

Sample PPQ format is included with this RFP (see Attachment 2). Projects submitted under this factor must first be deemed Relevant in accordance with the minimum criteria specified in paragraph 4.1.2.1 and additional criteria in paragraph 4.1.2.2 before being evaluated for quality in accordance with the criteria specified in paragraph 5.2.4 and the evaluation standards set forth in paragraphs 9.2 and 9.3. For submissions to be considered Recent, Projects of similar size, scope, and complexity that must have been completed (fully designed and at least 50% construction progress completed) within six (6) years preceding the date of the solicitation.

It is at the offerors discretion if they would like NAVFAC/USACE PPQs completed by their previous clients to be completed and returned to them to be included in their submission or submitted electronically to the attention of both the Contract Specialist, Robert Law at robert.n.law@usace.army.mil and the Contracting Officer, Michael Mullen, via email at michael.m.mullen@usace.army.mil.

5.1.2 Other Sources. The Government may contact sources other than those provided by the offeror for information with respect to past performance. These other sources may include but are not limited to: Past Contractor Past Performance Reporting System (CPARS), Federal Awardee Performance Integrity Information System (FAPIIS), other Government sources, and interviews with organizations or individuals familiar with the offeror’s performance.

5.1.3 Though not required, ideally project past performance information submitted under this factor would be on the same projects submitted for consideration under FACTOR 2, CORPORATE SPECIALIZED EXPERIENCE. Individual project Past Performance Assessment Questionnaires shall not exceed Five (5) pages; Government evaluators will review and evaluate only the information contained on the first five (5) pages. If any firm has multiple functions or divisions, limit the project examples to those performed by the division, unit or team member submitting the offer. The Government will call and confirm information provided by the offeror on the Past Performance Assessment Questionnaire with the points of contact, to the extent necessary to conduct a meaningful evaluation. The Government reserves the right to interview other individuals if the point of contact is not available.

5.1.4 If the offeror is a Joint Venture (J-V), relevant project experience should be submitted for projects completed by the Joint Venture entity, or the individual firms that make up the joint venture. Offerors that are part of the DoD Mentor Protégé program may only submit two

(2) recent and relevant project completed by the Mentor. Offerors are still limited to a total of five (5) projects. Experience of proposed subcontractors to be utilized on this project will not be considered.

5.1.5 The past performance of individuals will not be considered under this factor.

***AMENDMENT 0001***

5.1.6. NAVFAC / USACE Past Performance Questionnaire (PPQ)

The Past Performance Questionnaire (PPQ) included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor 3 Past Performance. Ensure correct phone numbers and email addresses are provided for the client point of contact. Completed Past Performance Questionnaires should be submitted with your proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ (Attachment 2), which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Robert Law, Contracting Specialist via email at robert.n.law@usace.army.mil and/or Michael Mullen via email at michael.m.mullen@usace.army.mil prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. Also include performance recognition documents received within the last 6 years such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition.

In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.

***AMENDMENT 0001***

5.2 EVALUATION CRITERIA:

5.2.1 The Government will evaluate the offeror's past performance using the sources available to it including but not limited to: the example projects identified by the offeror and submitted on the NAVFAC/USACE PPQs and any additional information received from references, CPARS or other sources. Offerors may be provided an opportunity to address any negative past performance information about which the offeror has not previously had an opportunity to respond if such information is determined to present an impact on the rating to be assessed.

5.2.2 The Government will consider past performance of the prime construction contractor. If a firm has multiple functions or divisions, the Government will only evaluate the past performance of the unit or division submitting the offer. Where the Government views an offeror’s role, or that of its team members, if any, as not significant or as not clearly defined, the Government reserves the right to view this lack of involvement, or clarity, as a risk which may impact an offeror’s rating for this factor despite the quality of recent, relevant past performance information

5.2.3 The Government will consider recent, relevant projects that are successfully completed, or substantially completed (fully designed and at least 50% construction progress completed) within six (6) years preceding the date of the solicitation. To be deemed relevant, projects must comply with minimum criteria in paragraph 4.1.2.1. The Government will consider the recency and relevance of the information, source of the information, context of the data, and general trends in contractor performance. The Government places higher value on projects that comply with the additional criteria in paragraph 4.1.2.2. The Government places higher value on projects for which successful performance can be validated by means other than the offeror’s self-assessment such as through independent telephone interviews with points of contact identified in the proposal, CPARS or other agency performance databases, offeror furnished references or personal knowledge. The Government places a higher value on projects which provided particularly difficult or unique challenges and the innovative methods the offeror used to resolve problems successfully.

5.3 The Government will evaluate recent, relevant past performance (as set forth in paragraph 10.3) based on the elements listed below to assign a confidence rating in accordance with paragraph 10.4:

5.3.1 Quality of Construction. The Government will evaluate all information available with respect to the quality of the actual construction undertaken and the standards of workmanship exhibited by the offeror.

5.3.2 Timeliness of Performance. The Government will evaluate all information available with respect to the completion of projects within the scheduled completion times.

5.3.3 Customer Satisfaction. The Government will evaluate all information available with respect to customer satisfaction, cooperation with customers, and interaction on past projects.

5.3.4 Management. The Government will evaluate all information available with respect to effective management of subcontractors, suppliers and labor on past projects.

5.3.5 Cost. The Government will evaluate all information available with respect to the contractor’s ability to perform within the contractually agreed price.

5.3.6 Safety. The Government will evaluate all information available with respect to the…