This solicitation requests proposals for the construction and design of a Special Operations Forces Military Working Dog Facility at Fort Bragg, North Carolina. The scope of work includes building 48 kennels including 42 standard kennels and 6 isolation kennels, a veterinary clinic with surgical, radiological, and pharmacy spaces, classroom and office administrative areas, HVAC systems for the kennels and clinic, sound suppression in kennel areas, parking for organizational and non-organizational vehicles, fire suppression and alarm systems, mass notification and security measures, cybersecurity for life safety and building systems, sustainability measures, accessibility compliance, furnishings and audiovisual equipment, and demolition of two modular buildings. Facilities must be designed for a 40-year minimum life. Proposals are due by the issuing agency, the Department of the Army Corps of Engineers Engineering District Wilmington.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Construct Military Working Dog Facility, SOTF
(PN # 72426)
Fort Bragg, North Carolina
This project was designed by the Wilmington District of the U.S. Army Corps of Engineers. The initials or signatures and registration designations of individuals appear on these project documents within the scope of their employment as required by ER 1110-1-8152.
Amendment 0004 Specifications Volume III of III
SID & FF/E
October 2020
Solicitation No. W912PM21R0002
STANTEC PROJECT: 178451236
CONTRACT NO.: W912HN-15-D-0010
U.S. Army Corps of Engineers
Fort Bragg, NC
Wilmington District
ARCHITECT/DESIGN:
Stantec Architecture Inc.
4798 New Broad Street, Suite 100
Orlando, Florida 32814
BINDER PREPARED BY:
Lori Barnard, Interior Designer
Stantec Architecture Inc.
STRUCTURAL INTERIOR DESIGN BROCHURE
READY TO ADVERTISE
PN 72426, SOF MILITARY WORKING DOG FACILITY
U.S. Army Corps of Engineers
Fort Bragg, NC
Date: 12 October 2020
Date: 12 October 2020
U.S. Army Corps of Engineers Fort Bragg, NC Wilmington District
ARCHITECT/DESIGN:
Stantec Architecture Inc.
4798 New Broad Street, Suite 100
Orlando, Florida 32814
READY TO ADVERTISE
STRUCTURAL INTERIOR DESIGN
PN 72426, SOF MILITARY WORKING DOG FACILITY
U.S. Army Corps of Engineers Fort Bragg, NC
Index
1. Design Analysis
2. Floor Plan, Enlarged Interior Elevations & Finish Plans, Schedule & Key
AE101, AE102, AE121, AE122, AF101, AF102, AF601, AF602
3. Interior Finish Boards
BINDER PREPARED BY:
Lori Barnard, Interior Designer
Stantec Architecture Inc.
DIVIDER 1
FOUO
Design Narrative
SOF Military Working Dog Facility, SOTF
Fort Bragg, NC
PN 72426
12 October 2020 Prepared by
Stantec Consulting Services Inc.
Raleigh, North Carolina
With consultants AME Consulting Engineers PC – MEP Charlotte, North Carolina
JMMPE – Fire Protection Martinez, Georgia
Prepared for USACE Wilmington District
Ready to Advertise
Design Analysis
Military Working Dog Facility, SOTF 4-1
FOUO
Section 4
BUILDING ARCHITECTURAL SYSTEMS
4.1 CRITERIA AND REFERENCES
- Fort Bragg Installation Design Guide
- Savannah District Design Manual, June 2016
- DoD Space Planning Criteria Chapter 560:
Veterinary Services, July 1, 2017
- FM 3-19.17 Military Working Dogs
- AR 190-11 Physical Security of Arms, Ammunition, and
- Explosives, 17 Jan 2019
- AR 190-12 Military Working Dogs
- UFC 1-200-01, General Building Requirements. UFC 1-300-09N, Design Procedures.
- DoD Building Code, 8 Oct 2019.
- UFC 3-101-01, Architecture.
UFC 3-120-10, Interior Design.
- UFC 3-600-01, Fire Protection Engineering for Facilities. UFC 4-
010-01, DoD Minimum Antiterrorism Standards for Buildings
- UFC 3-490-06 Elevators
- International Building Code (IBC), 2018.
- National Fire Protection Association (NFPA) 101, Life Safety
Code, 2018 edition.
- Veterinary care and animal research facilities shall comply with the requirements of NFPA 150, Standard on Fire and
Life Safety in Animal House Facilities.
Military Working Dog Facility, SOTF 4-2
FOUO
4.2 BUILDING CONTEXT
The project site is located approximately 6 miles from Fort Bragg
Cantonment Area and is located within a separate secure perimeter with 24/7/365 security. The building has its own requirements for additional isolation within this context. The exterior features of the facility will match other buildings within the secure area such as exterior finishes.
4.3 GENERAL
The overall building area is calculated as 23,284 gross sq. ft. in accordance with the program limits. The building is designed as a two-story structure, with the second floor smaller than the first floor area by corresponding with the conditioned spaces on the first floor.
The first floor is expanded in area by the kennels and associated circulation, and the main mechanical room. The second floor is designed with a low slope roof with parapet. This provides a platform for air handler equipment.
The first floor includes 48 kennels and associated circulation wrap around the core building functional and support areas and are covered by a mono-slope roof that extends up the second floor walls but allows for windows at the second floor level.
Kennel support areas located on the first floor include mud room, food delivery, storage, and food preparation areas which are distributed throughout the floor area. Each kennel includes a den area and a run, with the kennel den area being fully conditioned space. Circulation for personnel and dogs is provided on two sides, with a door into the den area and a gate into the run. These circulation areas are subdivided into groups such that a loose animal can travel a limited distance. There are a number of doors from these circulation areas that allow access and egress without traversing the entire length of any area of kennels. Door swings and door lites afford vision from one area into another.
Military Working Dog Facility, SOTF 4-3
FOUO
The dog treatment area is located on the first floor, including radiology, surgery, exam room, sterilization, surgery preparation, and support spaces, and physical therapy.
The first floor also includes an arms vault, tack room, a larger room for trainers, mechanical room, main and emergency electrical rooms, communications room, fire riser room, and fire panel closet.
The second floor is dedicated to administrative space and includes
4 team rooms with room for individual lockers and associated latrine and shower facilities, a classroom for 40 personnel, team offices, a breakroom and a conference room. The remainder of the floor is devoted to Command work areas and offices. An exterior exit stair extends to the higher roof to facilitate equipment maintenance. A smaller electrical room and second communications room is also located on the second floor.
The floor to floor and floor to roof heights of the two story portion of the building are based upon coordination between structural member depths, ceiling heights, duct sizes and clearances required between secure and non-secure data cables.
Vertical circulation is provided by two stairs and a 3,000 lb rated combination passenger/freight hydraulic hole-less elevator not requiring a full machine room. The two stairs also provide required egress from the second floor, with the internal stair providing additional circulation between floors.
4.3.1 Kennels
Walls forming the kennels are constructed of 8-inch CMU to
8 feet with acoustical panel treatment above this height to the underside of the roof. The end of the runs will have 8 feet high fences with doors constructed of stainless steel metal bars, stiles and rails.
Military Working Dog Facility, SOTF 4-4
FOUO
Doors at the kennel dens have glass lites above and below with adjustable window coverings. Kennel area doors have two locks/ latches each and are self-closing. There are no personnel doors between the dens and the runs, but there are guillotine doors that are controlled by personnel through cabling.
4.4 BUILDING CODE SUMMARY
The military working dog facility is classified as a “Business” occupancy, and the construction is designed as Type II. Refer to
Section 10 for detailed information.
4.5 EXTERIOR
The exterior finishes of split face CMU veneer, painted doors and frames, exposed metal, and metal standing seam roof finish with colors that will match others within the SOTF compound.
4.5.1 Exterior Walls
The exterior finish of the exposed conditioned portions of the building and the non-conditioned main mechanical room is split face CMU veneer to match other existing nearby facilities. This cavity wall system will include an air barrier and
3 inches of rigid insulation.
The exterior enclosure of the kennels consists of chain link fencing and heavy insect screening. This enclosure will also be equipped with hand operated insulated coiling overhead doors which can be closed when weather conditions dictate protection of the run areas. These doors will have lite panels to provide ambient light to the kennel runs when in the closed position.
The walls separating the kennel areas from the rest of the first floor areas is CMU with furred gypsum board on the
Military Working Dog Facility, SOTF 4-5
FOUO
opposite interior most side.
4.5.2 Exterior Windows
Exterior windows on the second floor will be non-operable aluminum framed assemblies with minimally tinted low-e insulated glazing units with laminated exterior lite to comply with ATFP requirements.
4.5.3 Exterior Doors
Exterior personnel doors will be extra heavy duty rated hollow metal with insulated core with painted finish. Many doors will have glass lites to allow handlers to see personnel and dogs on the opposite side of doors.
4.5.4 Roofing
Low slope roofs will have modified bituminous roof systems.
The sloped roof over the kennels will be standing seam to match other existing facilities. Both roof systems will include rigid insulation such that the minimum R value of 33 is attained.
4.5.5 Building Insulation
The facility has areas which are heated only and areas which are fully conditioned. There are two roofing systems. The standing seam metal roof assembly has a continuous R-33 rigid polyisocyanurate insulation and a 5/8” gypsum product cover board. The low slope roof system has a rigid tapered polyisocyanurate insulation with a 5/8” gypsum cover board with an average R value of 33.
CMU exterior cavity walls have a 3” rigid polystyrene insulation within the cavity with an R-15 value.
Exterior doors are hollow metal with insulation cores except for the entrance doors which are aluminum with insulating glazing.
Overhead coiling doors at the exterior walls of the heated only
Military Working Dog Facility, SOTF 4-6
FOUO
kennel runs will have a minimum R-4 panel insulation.
Exterior windows at the second floor are fixed with thermally broken framing and insulating glass with U factor of 0.40 BTUH per sq. ft. degree F and SHGC of not less than 0.25.
4.5.6 Exterior Enclosures
There are no exterior enclosures beyond the building envelope.
4.6 INTERIOR
4.6.1 Interior Walls
The walls separating the kennel areas from the rest of the first floor areas is CMU with furred gypsum board on the opposite interior most side. The interior walls of the mechanical room are also CMU.
Metal stud and gypsum board partitions in the dog treatment area will be constructed on concrete curbs which will be finished with integral epoxy terrazzo base extending from the floor finish. The radiology partitions will include lead lining.
The walls surrounding the dog treatment area and those designated within the dog treatment area will have additional features including resilient channels and thicker insulation blankets to provide the STC 50 rating in accordance with the programming documents. The walls separating physical therapy from the corridors will also be STC 50 rated including windows of equal rating.
Interior partitions on the second floor are all metal stud framing with gypsum board types varying according to space functions. Insulation is provided in many partition types for increased sound attenuation, with many walls extending full height to the underside of the roof deck.
The interior stair and the elevator shaft are enclosed with 1-
Military Working Dog Facility, SOTF 4-7
FOUO
hour fire rated CMU with furred gypsum board on the exterior side.
The arms vault is formed by 8-inch reinforced concrete walls, floor, and ceiling, and is secured with a GSA approved vault door.
4.6.2 Interior Doors
Interior doors are hollow metal as scheduled. Many doors have vision panels.
4.6.3 Interior Finishes
Ceilings include painted exposed structure, suspended acoustical tile systems, and gypsum board ceilings as indicated. The sloped metal deck above the kennel runs will be partially covered with acoustical panels.
Materials used in the kennels need to be easy to wash, sanitize and dry. In general this requirement should be considered wherever dogs may be taken within the facility.
Many areas on the first floor are specified as sealed concrete flooring. An epoxy flooring system will be a Bid
Option for some of these areas as indicated on the construction drawings. Dog treatment area will have epoxy flooring as base bid with an integral base and rubber flooring is scheduled in the physical therapy room. Vinyl composite tile (VCT) is scheduled for the majority of the second floor as the base bid with an upgrade to luxury vinyl tile (LVT) as a bid option. Porcelain floor tile is scheduled for the toilet and shower rooms.
Walls will be painted except where tile is scheduled in the latrine rooms and shower areas.
4.7 SPECIALTIES
Signage that will be durable and interchangeable is provided
Military Working Dog Facility, SOTF 4-8
FOUO
throughout the interior of the building. Warning signage will be provided around the perimeter of the facility and there will be signage at all exterior doors.
Each latrine, toilet stall, and shower area will be equipped with toilet and shower room specialties including grab bars at latrines as required by accessibility standards.
Second floor windows will be equipped with horizontal window blinds.
4.7.1 Furnishings
Medical grade cabinetry with metal countertops are provided in the dog treatment area. Solid surface countertops with plastic laminate upper cabinets are provided in the several food preparation areas.
Plastic laminate cabinetry with solid surface countertops are provided on the second floor and the first floor food prep areas.
4.8 Acoustics
The functional spatial configuration of the spaces within the facility contributes to the overall acoustical design strategy of the facility.
The dog kennel areas are separated from the normally occupied portions of the facility by 8-inch CMU load bearing walls that are two stories in height. These walls have an estimated STC range of 44-
49 dependent upon density. Those CMU walls that abut the dog treatment areas are furred out to provide an estimated STC range of 55-58 with a single interconnected acoustical rated door assembly of STC 50.
The mechanical room is located away from all normally occupied spaces and mechanical units are located on the roof of the two-story portion of the facility.
The facility has multiple personnel doors around the perimeter to provide direct access to functional spaces, and to avoid potential conflict and noise from barking as dogs encounter or view each
Military Working Dog Facility, SOTF 4-9
FOUO
other coming and going from the kennel area.
Each dog kennel is separated from each other by 8-inch CMU walls that are nominally 8 feet high. Acoustical panels will be mounted above the 8 feet high walls in a back to back configuration and an acoustical panel will be mounted on the wall at the head of the kennel run. Six additional acoustical panels will be mounted to the underside of the metal deck above each kennel run with two panels extending over the exterior corridor. The kennel dens are also separated by 8-inch CMU walls and each has a door and glass sidelight. These doors and sidelights are components of the air barrier between the fully conditioned and heated spaces and are sealed at the perimeter by gaskets at the doors and membrane materials at the sidelights. These assemblies have insulated glass panels and a third pane of glass which also increases the STC values of the overall assembly.
Six kennels are designated as isolation kennels and they are separated by additional doors along the exterior and interior corridors that serve them.
Most of the partition walls separating spaces within the facility are full height from floor slab to underside of floor or roof deck above.
Partition walls forming the Physical Therapy 116 space are designed to provide STC 50 rating and include acoustical interior windows. The same partition type is specified at the perimeter of
Classroom 217, Breakroom 218, and Conference Room 224. Most metal stud and gypsum board partitions include batt insulation and acoustical sealant at floor and top of wall joints. Electrical junction boxes are specified to be staggered back to back and require installation of acoustical insulation and sealant.
The second floor is configured to separate typically active noise generating spaces from quieter spaces by locating the team rooms on one end of the floor and the offices are at the opposite end. This concept has also been implemented between the first and second floors by locating the offices areas over the dog treatment area and locating the team rooms over more active first floor spaces such as
Military Working Dog Facility, SOTF 4-10
FOUO
the trainers and handlers’ room, mud room, therapy pool, and food prep areas.
The floor-ceiling assembly between the first and second floor is a
Type 6 according to UFC 3-450-01 with several variations. The second floor slab is concrete over metal deck throughout and includes spray on fire proofing. Spaces on both floors that have a utilitarian function have an exposed ceiling open to the floor slab or roof deck above. A suspended moisture resistant, epoxy coated gypsum board ceiling system has been specified throughout the dog treatment area. Second floor ceilings are primarily suspended acoustical tile ceilings. All acoustical ceiling tiles are specified to have a sound absorption (NRC) of 1.00 at the Class and
Conference rooms.
DIVIDER 2
UP
GBA
F
C1
AE301
C1
AE301
PHYSICAL
THERAPY
STERILIZATION
SURGERY PREP
SURGERY
RADIOLOGY
SURGERY
LAUNDRY
EXPENDABLE
SUPPLY
MECH
OXYGEN
LAB / PHARMACY
TREATMENT
FOOD PREP
15D
DEN
14D
DEN
13D
DEN
12D
DEN
11D
DEN
10D
DEN
09D
DEN
08D
DEN
07D
DEN
06D
DEN
05D
DEN
04D
DEN
03D
DEN
02D
DEN
25D
DEN
26D
DEN
27D
DEN
28D
DEN
29D
DEN
30D
DEN
31D
DEN
32D
DEN
33D
DEN
34D
DEN
35D
DEN
36D
DEN
37D
DEN
38D
DEN
39D
DEN
40D
DEN
41D
DEN
42D
DEN
43D
DEN
44D
DEN
45D
DEN
46D
DEN
47D
DEN
47R
RUN
46R
RUN
45R
RUN
44R
RUN
43R
RUN
42R
RUN
41R
RUN
40R
RUN
39R
RUN
38R
RUN
37R
RUN
36R
RUN
35R
RUN
34R
RUN
33R
RUN
32R
RUN
31R
RUN
30R
RUN
29R
RUN
28R
RUN
27R
RUN
26R
RUN
25R
RUN
15R
RUN
14R
RUN
13R
RUN
12R
RUN
11R
RUN
10R
RUN
09R
RUN
08R
RUN
07R
RUN
06R
RUN
05R
RUN
04R
RUN
03R
RUN
02R
RUN
EXTERIOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
10E
ELEVATOR
RECOVERY
123A
MAIN ELECTRIC
1S2
STAIR 2
1S1
STAIR 1
BULK FOOD
STORAGE
LAUNDRY/ MUD
ROOM
TACK ROOM
PHYSICAL
THERAPY 2
CORRIDOR
FOOD PREP
TRAINER/HANDLERS
COMM
FIRE RISER
A1
AE201
D
A E
E
A E
B
A E
E1
AE201
B
A E
6 ISOLATION KENNELS
E1
AE301
E1
AE301
ARMS VAULT
FOOD PREP
ISOLATION
CORRIDOR
131A
CORRIDOR
01D
DEN
01R
RUN
48D
DEN
48R
RUN
A6
AE401
E1
AE421E1
AE420
C1
AE404
A1
AE301
A1
AE301
C6
AE301
C6
AE301
A1
AE402
A1
AE403
A.6 B.7 C.5 F.4 F.5 G.5G.2G.1A.8 A.9
3.2
3.1
2.7
2.5
2.4
2.2
1.6
FACP
A1
AE303
A4
AE303
A8
AE305
A1
AE302
A6
AE302
A8
AE302
A1
AE304
A5
AE304
A8
AE303
A8
AE304
A3
AE302
140C 133C
100A
112A
118100B
109A
15R
14R
13R
12R
11R
10R
09R
08R
07R
06R
05R
04R
03R
02R
34R
35R
36R
37R
38R
39R
40R
41R
42R
43R
44R
45R
46R
47R
138A 33R32R31R30R29R28R27R26R25R
120117
119A 119C
119B
25D 26D 27D 28D 29D 30D 31D 32D 33D
15D
14D
13D
12D
11D
10D
09D
08D
07D
06D
05D
04D
03D
02D
34D
35D
36D
37D
38D
39D
40D
41D
42D
43D
44D
45D
46D
47D
01R 01D 48R48D
130B
135J136F
132141
139A
139L
134A
109B
113B
113A
108A
134L
134M
1S2B
1S2A
CORRIDOR
ISOLATION
CORRIDOR
EXTERIOR
CORRIDOR
EXTERIOR
CORRIDOR
EXTERIOR
CORRIDOR
15B
15A
138C 136C
139B
139D
139F
139H
139J
135G
34G
35G
36G
37G
38G
39G
40G
41G
42G
43G
44G
45G
46G
47G
48G
15G
14G
13G
12G
11G
10G
09G
08G
07G
06G
05G
04G
03G
02G
01G
25G 26G 27G 31G 32G30G29G28G 33G
15A
108B
139K
139I
139G
139E
139C
135E135I136D
123B
EMERGENCY
ELEC.
111A
JANITOR
111A
113C
A3
AE304
A8
AE402
D1
AE501
C8
AE501
E8
AE501F3
AE501
C3
AE501
SIM
A3
AE501
A1
AE501
A1
AE405
131B
CORRIDOR
131A
5A
135C
F3
AE501
F3
AE501
F3
AE501
A1
AE408
A1
AE406
130A
133B 133A133A
CORRIDOR
140A 140B140A
CORRIDOR
E H
139M 135B135D135F135H136E138B 138D 138E 136B
HW
135A
134D
134E
134F
134C
134B
134K
134J
134I
134H
134G
DC.9
LATRINE
(ABA)
LATRINE
(ABA)
104 103
24R
RUN
23R
RUN
22R
RUN
21R
RUN
20R
RUN
19R
RUN
18R
RUN
17R
RUN
16R
RUN
16D
DEN
17D
DEN
18D
DEN
19D
DEN
20D
DEN
21D
DEN
22D
DEN
23D
DEN
24D
DEN
16D 17D 18D
18R17R16R 19R 20R 21R 22R 23R 24R
24G23G22G21G20G19G18G
17G
16G
19D 20D 21D 22D 23D 24D
4.2
3.8
C
123B 123A
W6
W6
A3
AE501
112B
142 131B
B
A E
B
A E
23A
3 3A
W6
14 14
13A
13A
13A
13A
13A13A
13A
13A
13A
15 15
14A 14A
17A
C1
AE423
A1
AE504
D1
AE502
D1
AE502
D1
AE502
D1
AE504
15A
136A
TYP.
13 TYP
13A
13A
A8
AE501
06 06
B1
AE407
UP
UP
F.D.
F.D.
F.D.
F.D.
F.D.
F.D.
F.D.
SIM
AE423 2
AE423
4'-10"
F.D.
1. UNLESS NOTED OTHERWISE, ALL DIMENSIONS ARE TO:
- FACE OF GWB
- FACE OF MASONRY
- FACE OF CONCRETE
2. SEE MECHANICAL, ELECTRICAL, TECHNOLOGY, PLUMBING
AND FIRE PROTECTION (M.E.P.) DRAWINGS AND ENLARGED
ARCHITECTURAL PLANS FOR INFORMATION NOT SHOWN ON
THIS SHEET.
3. COORDINATE AND PROVIDE BLOCKING IN PARTITIONS FOR
THE INSTALLATION AND ATTACHMENT OF ALL WALL MOUNTED
EQUIPMENT AND PRODUCTS. ALL CONCEALED BLOCKING
SHALL BE FIRE RETARDENT TREATED. SEE ARCHITECTURAL
PLANS AND M.E.P. DRAWINGS FOR THE LOCATIONS OF WALL
MOUNTED EQUIPMENT AND PRODUCTS.
4. DRAWINGS ARE NOT TO BE SCALED FOR INFORMATION.
GENERAL NOTES:KEY NOTES:
COUNTERTOP ON BASE CABINETS SEE
ENLARGED ELEVATIONS FOR WALL CABINETS
OR SHELVES ABOVE
DOWNSPOUT, PROVIDE BOOT CONNECTION
TO STORM DRAIN, SEE CIVIL
DOWNSPOUT, PROVIDE SPLASH BLOCK, SEE
CIVIL
04 LEAD LINED PARTITION
PROVIDE WIRE CAGE APPROX. 6' X 8' X 9'
HIGH W/ TOP CLOSURE, AND LOCKABLE
SLIDING DOOR.
07 GUARDRAIL - SEE CIVIL FOR SIDEWALK
08 08 WALKOFF MAT - SEE DETAIL A1/AE609
1 HOUR FIRE RATED WALL
PARTITION LEGEND:
NON RATED WALL
NON RATED CMU WALL
1 HOUR SHAFT WALL
PARTITION TYPE - SEE SHEET
AE701 - AE703
CORNER GUARD TAG - SEE
DETAIL D7/AE704
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
D
C
B
A
C A
T E
G O
R Y
C O
D E
A N
S I D
E
F
G
2 3 4 5 6 7 8 9 10
J O
N E
S F
R A
N K
L
IN
R D
S
U
IT
E
R A
L E
IG
H
N
C
-3
(9
-6
(9
-7
F
A X
L
IC
E N
S E
F
-0
FOR OFFICIAL USE ONLY
D
A R
L
IN
G T
O N
A V
E
W
IL
M
IN
G T
O N
D
IS
T
R
IC
T W
IL
M
IN
G
T O
N N
O R
T H
C A
R O
L
IN
A
F O
R T
B R
A G
G N
O R
T H
C A
R O
L
IN
A P
N
S
O F
M
IL
IT
A
R Y
W O
R K
IN
G
D O
G F
A C
IL
IT
Y O
C T
O B
E R
10/12/2020
AT
S
TE
FO LF
A
DI
RO
10.185
E R
S
G
ET
RED RA CH
T C
ETI
I
WARD
B
LA
IR
ED
N A
LD
R O
C:\Users\Public\Documents\Local_Revit_Files\stn_arch_MWD_Facility_178451236_R18_Robert.Murdock65NTK.rvt
9/29/2020 12:52:06 PM
W P
M R
W H
N -1
-D
-0
R B
G S
R B
A E
.D
G N
AE101
L E
V E
L
F L O
O R
P L A
N
K M
B
READY TO ADVERTISE
1/8" = 1'-0"A1
LEVEL 1 FLOOR PLAN
0 4 8 16' 1/8" = 1'-0"
N
TRUE NORTH -126°
FROM PLAN
NORTH
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
GBA
F
C1
AE301
C1
AE301
CLASSROOM - 40
PN
M. TEAM 8 PN
F. TEAM 4 PN
KENNEL MSTR
OFFICE
2S1
STAIR 1
M. LATRINE
TRAINER OFFICE
LAUNDRY
M. LOCKERS
BREAK RM
COMMAND
WORK SPACE
STORAGE
PROGRAM
MANAGER
STORAGE
2S2
STAIR 2
JANITOR
20E
ELEVATOR
CONFERENCE
ROOM
CORRIDOR
ELECTRIC
COMM
A1
AE201
D
A E
E
A E
B
A E
E1
AE201
B
A E
GATE AT STAIR
TO ROOF
E1
AE301
E1
AE301
TEAM OFFICE
M. TEAM 8 PN
M. TEAM 8 PN
CORRIDOR
A4
AE409E6
AE421E4
AE420
A1
AE409
A8
AE409
A1
AE301
A1
AE301
C6
AE301
C6
AE301
F. SHOWER
F. LATRINE
A.6 B.7 C.5 F.4 F.5 G.5G.2G.1A.8 A.9
3.2
3.1
2.7
2.5
2.4
2.2
1.6
A1
AE303
A4
AE303
A8
AE305
A6
AE302
A8
AE302
A1
AE304
A5
AE304
A8
AE303
A8
AE304
217A
2S2
217B
2S1
207 209
20A
MODIFIED BITUMEN ROOFING
ON COVER BOARD ON R-30
TAPERED POLY-ISO
INSULATION, OVER METAL
DECK
PREFINISHED METAL
COPING SYSTEM
STANDING SEAM METAL
ROOF ASSEMBLY WITH
FACTORY APPLIED FINISH.
STANDING SEAM METAL
ROOF ASSEMBLY WITH
FACTORY APPLIED FINISH.
PREFINISHED METAL GUTTER
AND DOWNSPOUT
PREFINISHED METAL GUTTER
AND DOWNSPOUT PREFINISHED METAL GUTTER
AND DOWNSPOUT
PRE-ENGINEERED
ALUMINUM CANOPY W/
SUPPORT RODS
LATRINE
(ABA)
LATRINE
(ABA)
A3
AE304
LAUNDRY
3"
1'
3" / 1' - 0"
E HDC.9
4.2
3.8
C
A1
AE413
B
A E
B
A E
A1
AE502
A1
AE502
A1
AE502
D1
AE502
A4
AE502
D4
AE502
A1
AE503
SIM
D1
AE503
A4
AE503
D4
AE503
E1
AE423
W5
W1
W1
W1
W2 W2
W3
W1
W4
W4
W1W4 W2 W2
W2
W2
DN
DN
DN
DN
DN
3"
1'
3" / 1' - 0"
3" / 1' - 0"
3" / 1' - 0"
COMMAND
WORK SPACE
ELEVATOR
CONTROLLER
A1
AE503
SIM
A1
AE503
SIM
1-HOUR FIRE
RATED MECH,
DUCT CHASE
PRE-ENGINEERED ALUMINUM
CANOPY W/ SUPPORT RODS
1. UNLESS NOTED OTHERWISE, ALL DIMENSIONS ARE TO:
- FACE OF GWB
- FACE OF MASONRY
- FACE OF CONCRETE
2. SEE MECHANICAL, ELECTRICAL, TECHNOLOGY, PLUMBING
AND FIRE PROTECTION (M.E.P.) DRAWINGS AND ENLARGED
ARCHITECTURAL PLANS FOR INFORMATION NOT SHOWN ON
THIS SHEET.
3. COORDINATE AND PROVIDE BLOCKING IN PARTITIONS FOR
THE INSTALLATION AND ATTACHMENT OF ALL WALL MOUNTED
EQUIPMENT AND PRODUCTS. ALL CONCEALED BLOCKING
SHALL BE FIRE RETARDENT TREATED. SEE ARCHITECTURAL
PLANS AND M.E.P. DRAWINGS FOR THE LOCATIONS OF WALL
MOUNTED EQUIPMENT AND PRODUCTS.
4. DRAWINGS ARE NOT TO BE SCALED FOR INFORMATION.
GENERAL NOTES:KEY NOTES:
COUNTERTOP ON BASE CABINETS SEE
ENLARGED ELEVATIONS FOR WALL CABINETS
OR SHELVES ABOVE
1 HOUR FIRE RATED WALL
PARTITION LEGEND:
NON RATED WALL
NON RATED CMU WALL
1 HOUR SHAFT WALL
PARTITION TYPE - SEE SHEET
AE701 - AE703
CORNER GUARD TAG - SEE
DETAIL D7/AE704
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
D
C
B
A
C A
T E
G O
R Y
C O
D E
A N
S I D
E
F
G
2 3 4 5 6 7 8 9 10
J O
N E
S F
R A
N K
L
IN
R D
S
U
IT
E
R A
L E
IG
H
N
C
-3
(9
-6
(9
-7
F
A X
L
IC
E N
S E
F
-0
FOR OFFICIAL USE ONLY
D
A R
L
IN
G T
O N
A V
E
W
IL
M
IN
G T
O N
D
IS
T
R
IC
T W
IL
M
IN
G
T O
N N
O R
T H
C A
R O
L
IN
A
F O
R T
B R
A G
G N
O R
T H
C A
R O
L
IN
A P
N
S
O F
M
IL
IT
A
R Y
W O
R K
IN
G
D O
G F
A C
IL
IT
Y O
C T
O B
E R
10/12/2020
AT
S
TE
FO LF
A
DI
RO
10.185
E R
S
G
ET
RED RA CH
T C
ETI
I
WARD
B
LA
IR
ED
N A
LD
R O
C:\Users\Public\Documents\Local_Revit_Files\stn_arch_MWD_Facility_178451236_R18_Robert.Murdock65NTK.rvt
9/29/2020 12:52:11 PM
W P
M R
W H
N -1
-D
-0
R B
G S
R B
A E
.D
G N
AE102
L E
V E
L
F L O
O R
P L A
N
K M
B
READY TO ADVERTISE
1/8" = 1'-0"A1
LEVEL 2 FLOOR PLAN
0 4 8 16' 1/8" = 1'-0"
N
TRUE NORTH -126°
FROM PLAN
NORTH
M A
R K
D E
S C
R
IP
T
IO
N D
A
F
9' - 0"9' - 0"
9' - 0"
8' - 0"
9' - 0"
9' - 0"
8' - 0" 8' - 0"
9' - 0"
9' - 0"
9' - 0"
A.6 B.7 C.5 F.4 F.5 G.5G.2G.1A.8 A.9
3.2
3.1
2.7
2.5
2.4
2.2
1.6
EXPOSED
EXPOSED
EXPOSED
EXPOSED
EXPOSED
8' - 0"
8' - 0"
8' - 0"
EXPOSED
EXPOSED
EXPOSED
EXPOSED
EXPOSED
EXPOSED
EXPOSED
EXPOSED
EXPOSED
EXPOSED
EXPOSED
EXPOSED
EXPOSED
EXPOSED
EXPOSED
EXPOSED
EXPOSED
EXPOSED
EXPOSED
8' - 0"
E H
EXPOSED
8' - 0"
9' - 0" 9' - 0"
DC.9
4.2
3.8
C
8' - 8"
GYPSUM BOARD SOFFIT
BELOW AIR CURTAIN
UNIT, SEE DETAIL
EXPOSED
EXPOSED
ABOVE
CAGES11' - 0"
PHYSICAL
THERAPY
STERILIZATION
SURGERY PREP 120
SURGERY
RADIOLOGY
SURGERY
LAUNDRY
EXPENDABLE
SUPPLY
MECH
OXYGEN
LAB / PHARMACY
TREATMENT
FOOD PREP
DEN
DEN
DEN
DEN
DEN
DEN
DEN
DEN
DEN
DEN
DEN
DEN
DEN
DEN
DEN DEN DEN DEN DEN DEN DEN DEN DEN
DEN
DEN
DEN
DEN
DEN
DEN
DEN
DEN
DEN
DEN
DEN
DEN
DEN
DEN
RUN
RUN
RUN
RUN
RUN
RUN
RUN
RUN
RUN
RUN
RUN
RUN
RUN
RUNRUNRUNRUNRUNRUNRUNRUNRUNRUNRUN
RUN
RUN
RUN
RUN
RUN
RUN
RUN
RUN
RUN
RUN
RUN
RUN
RUN
EXTERIOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
10E
ELEVATOR
RECOVERY
123A
MAIN ELECTRIC
1S2
STAIR 2
1S1
STAIR 1
BULK FOOD
STORAGE
LAUNDRY/ MUD
ROOM
TACK ROOM
PHYSICAL
THERAPY 2
CORRIDOR
FOOD PREP
TRAINER/HANDLERS
COMM
FIRE RISER
ISOLATION
CORRIDOR
FOOD PREP
DEN
RUN
DEN
RUN
EXTERIOR
CORRIDOR
EXTERIOR
CORRIDOR
EXTERIOR
CORRIDOR
ISOLATION
CORRIDOR
ARMS VAULT
131A
CORRIDOR
CORRIDOR
FACP
123B
EMERGENCY
ELEC.
111A
JANITOR
131B
CORRIDOR
133A
CORRIDOR
140A
CORRIDOR
HW
DEN DEN DEN DEN DEN DEN DEN DEN DEN
RUNRUNRUNRUNRUNRUNRUNRUNRUN
LATRINE (ABA)
LATRINE (ABA)
EXPOSED
EXPOSED
GWB BULKHEAD
A6
AE403
8' - 0"
EXPOSED
ABOVE
CAGES
EXPOSED
ABOVE
CAGES
EXPOSED
EXPOSED
9' - 0"
9' - 0"
8' - 0"
GWB BULKHEAD
UH
UH
UHUHUHUH
UH
UH
UH
UH
UH
UH
E5
AE517
E1
AE517
8'-0"
4'-0"
4'-0" 4'-0" 4'-0"4'-0"
4'-0"
4'-0"
20'-6"
PRE-ENGINEERED
ALUMINUM CANOPY W/
SUPPORT RODS
PRE-ENGINEERED ALUMINUM
CANOPY W/ SUPPORT RODS
PRE-ENGINEERED ALUMINUM
CANOPY W/ SUPPORT RODS
11' - 0"
UH
UH
UH
UH
UH
EXPOSED
2x2 SUSPENDED
CEILING TILES
GYP. BD. CEILING
DIFFUSERS & GRILLES,
SEE MECH DWG
LIGHT FIXTURES,
SEE ELEC. DWG
REINFORCED
CONCRETE CEILING
GENERAL NOTES:
RCP LEGEND:
A. REFER TO SHEETS AF601 AND
AE602 FOR FINISH KEY AND
SCHEDULE
B. REFER TO SHEET AE131
THROUGH AE132 FOR EQUIPMENT
INFORMATION, LOCATIONS AND
SCHEDULE
C. PROVIDE ACCESS PANEL AT ALL
EQUIPMENT AND VALVES ABOVE
HARD CEILINGS.
LEAD LINED GYP. BD.
CEILING
GYP. BD. CEILINGS
(MOISTURE RESISTANT)
WIRE GRID CAGE
LID @ 9'-0" AFF
EXIT SIGN, SEE ELEC.
DWG
18" x 48" ACCOUSTICAL
CEILING PANELS
SEE DETAIL E4/AE517
UNIT HEATER, SEE
MECH. DWG
UH
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
D
C
B
A
C A
T E
G O
R Y
C O
D E
A N
S I D
E
F
G
2 3 4 5 6 7 8 9 10
J O
N E
S F
R A
N K
L
IN
R D
S
U
IT
E
R A
L E
IG
H
N
C
-3
(9
-6
(9
-7
F
A X
L
IC
E N
S E
F
-0
FOR OFFICIAL USE ONLY
D
A R
L
IN
G T
O N
A V
E
W
IL
M
IN
G T
O N
D
IS
T
R
IC
T W
IL
M
IN
G
T O
N N
O R
T H
C A
R O
L
IN
A
F O
R T
B R
A G
G N
O R
T H
C A
R O
L
IN
A P
N
S
O F
M
IL
IT
A
R Y
W O
R K
IN
G
D O
G F
A C
IL
IT
Y O
C T
O B
E R
10/12/2020
AT
S
TE
FO LF
A
DI
RO
10.185
E R
S
G
ET
RED RA CH
T C
ETI
I
WARD
B
LA
IR
ED
N A
LD
R O
C:\Users\Public\Documents\Local_Revit_Files\stn_arch_MWD_Facility_178451236_R18_Robert.Murdock65NTK.rvt
9/29/2020 12:52:41 PM
W P
M R
W H
N -1
-D
-0
R B
G S
R B
A E
.D
G N
AE121
L E
V E
L
R E
F L E
C T
E D
C E
IL
IN
G P
L A
N
K M
B
READY TO ADVERTISE
1/8" = 1'-0"A1
LEVEL 1 REFLECTED CEILING PLAN
0 4 8 16' 1/8" = 1'-0"
N
TRUE NORTH -126°
FROM PLAN
NORTH
M A
R K
D E
S C
R
IP
T
IO
N D
A
GB
F
9' - 0" 9' - 0"
8' - 0"
9' - 0"
9' - 0" 9' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
9' - 0" 8' - 0"
8' - 0"
8' - 0"
B.7 C.5 F.4 F.5 G.2G.1A.8 A.9
3.2
3.1
2.7
2.5
2.4
2.2
8' - 0"
EXPOSED
EXPOSED
9' - 0"
9' - 0"
9' - 0"
8' - 0"
EXPOSED
8' - 0"
EDC.9
4.2
3.8
C
M. TEAM 8 PN
M. LOCKERS
BREAK RM
COMMAND
WORK SPACE
STORAGE
STORAGE
F. TEAM 4 PN
CLASSROOM - 40
PN
20E
ELEVATOR
LAUNDRY
CONFERENCE
ROOM
KENNEL MSTR
OFFICE
TRAINER OFFICE
2S2
STAIR 2
JANITOR
M. LATRINE
PROGRAM
MANAGER
2S1
STAIR 1
CORRIDOR
ELECTRIC
COMM
M. TEAM 8 PN
M. TEAM 8 PN
TEAM OFFICE
CORRIDOR
F. LATRINE
F. SHOWER
ELEVATOR
CONTROLLER
COMMAND
WORK SPACE
LATRINE (ABA)
LATRINE (ABA)
9' - 0"
E5
AE517
GWB BULKHEAD
EXPOSED
E Q
E Q
E Q
E Q
2x2 SUSPENDED
CEILING TILES
GYP. BD. CEILING
DIFFUSERS & GRILLES,
SEE MECH DWG
LIGHT FIXTURES,
SEE ELEC. DWG
REINFORCED
CONCRETE CEILING
GENERAL NOTES:
RCP LEGEND:
A. REFER TO SHEETS AF601 AND
AE602 FOR FINISH KEY AND
SCHEDULE
B. REFER TO SHEET AE131
THROUGH AE132 FOR EQUIPMENT
INFORMATION, LOCATIONS AND
SCHEDULE
C. PROVIDE ACCESS PANEL AT ALL
EQUIPMENT AND VALVES ABOVE
HARD CEILINGS.
LEAD LINED GYP. BD.
CEILING
GYP. BD. CEILINGS
(MOISTURE RESISTANT)
WIRE GRID CAGE
LID @ 9'-0" AFF
EXIT SIGN, SEE ELEC.
DWG
18" x 48" ACCOUSTICAL
CEILING PANELS
SEE DETAIL E4/AE517
UNIT HEATER, SEE
MECH. DWG
UH
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
D
C
B
A
C A
T E
G O
R Y
C O
D E
A N
S I D
E
F
G
2 3 4 5 6 7 8 9 10
J O
N E
S F
R A
N K
L
IN
R D
S
U
IT
E
R A
L E
IG
H
N
C
-3
(9
-6
(9
-7
F
A X
L
IC
E N
S E
F
-0
FOR OFFICIAL USE ONLY
D
A R
L
IN
G T
O N
A V
E
W
IL
M
IN
G T
O N
D
IS
T
R
IC
T W
IL
M
IN
G
T O
N N
O R
T H
C A
R O
L
IN
A
F O
R T
B R
A G
G N
O R
T H
C A
R O
L
IN
A P
N
S
O F
M
IL
IT
A
R Y
W O
R K
IN
G
D O
G F
A C
IL
IT
Y O
C T
O B
E R
10/12/2020
AT
S
TE
FO LF
A
DI
RO
10.185
E R
S
G
ET
RED RA CH
T C
ETI
I
WARD
B
LA
IR
ED
N A
LD
R O
C:\Users\Public\Documents\Local_Revit_Files\stn_arch_MWD_Facility_178451236_R18_Robert.Murdock65NTK.rvt
9/29/2020 12:52:44 PM
W P
M R
W H
N -1
-D
-0
R B
G S
R B
A E
.D
G N
AE122
L E
V E
L
R E
F L E
C T
E D
C E
IL
IN
G P
L A
N
K M
B
READY TO ADVERTISE
1/8" = 1'-0"A1
LEVEL 2 REFLECTED CEILING PLAN
0 4 8 16' 1/8" = 1'-0"
N
TRUE NORTH -126°
FROM PLAN
NORTH
M A
R K
D E
S C
R
IP
T
IO
N D
A
PHYSICAL
THERAPY
STERILIZATION
SURGERY PREP
SURGERY
RADIOLOGY
SURGERY
LAUNDRY
EXPENDABLE
SUPPLY
MECH
OXYGEN
LAB / PHARMACY
TREATMENT
FOOD PREP
15D
DEN
14D
DEN
13D
DEN
12D
DEN
11D
DEN
10D
DEN
09D
DEN
08D
DEN
07D
DEN
06D
DEN
05D
DEN
04D
DEN
03D
DEN
02D
DEN
25D
DEN
26D
DEN
27D
DEN
28D
DEN
29D
DEN
30D
DEN
31D
DEN
32D
DEN
33D
DEN
34D
DEN
35D
DEN
36D
DEN
37D
DEN
38D
DEN
39D
DEN
40D
DEN
41D
DEN
42D
DEN
43D
DEN
44D
DEN
45D
DEN
46D
DEN
47D
DEN
47R
RUN
46R
RUN
45R
RUN
44R
RUN
43R
RUN
42R
RUN
41R
RUN
40R
RUN
39R
RUN
38R
RUN
37R
RUN
36R
RUN
35R
RUN
34R
RUN
33R
RUN
32R
RUN
31R
RUN
30R
RUN
29R
RUN
28R
RUN
27R
RUN
26R
RUN
25R
RUN
15R
RUN
14R
RUN
13R
RUN
12R
RUN
11R
RUN
10R
RUN
09R
RUN
08R
RUN
07R
RUN
06R
RUN
05R
RUN
04R
RUN
03R
RUN
02R
RUN
EXTERIOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
10E
ELEVATOR
RECOVERY
123A
MAIN ELECTRIC
1S2
STAIR 2
1S1
STAIR 1
BULK FOOD
STORAGE
LAUNDRY/ MUD
ROOM
TACK ROOM
PHYSICAL
THERAPY 2
CORRIDOR
FOOD PREP
TRAINER/HANDLERS
COMM
FIRE RISER
ISOLATION
CORRIDOR
FOOD PREP
01D
DEN
01R
RUN
48D
DEN
48R
RUN
EXTERIOR
CORRIDOR 134
EXTERIOR
CORRIDOR
EXTERIOR
CORRIDOR
ISOLATION
CORRIDOR
ARMS VAULT
131A
CORRIDOR
CORRIDOR
SC-1
PFT-1
SC-1
WOM-1
SC-1
SC-1
PFT-1
SC-1
VCT-1
RF-1
SC-1
SC-1
SC-1
SC-1
SC-1
SC-1
SC-1
SC-1
SC-1
SC-1
SC-1SC-1
SC-1 SC-1SC-1
SC-1SC-1
TYP, U.N.O.
SC-1 SC-1 SC-1
SC-1
FACP
SC-1
123B
EMERGENCY
ELEC.
SC-1
SC-1 1
ER-1
ER-1
ER-1
ER-1ER-1
111A
JANITOR
131B
CORRIDOR
133A
CORRIDOR
140A
CORRIDOR
HW
16D
DEN
17D
DEN
18D
DEN
19D
DEN
20D
DEN
21D
DEN
22D
DEN
23D
DEN
24D
DEN
24R
RUN
23R
RUN
22R
RUN
21R
RUN
20R
RUN
19R
RUN
18R
RUN
17R
RUN
16R
RUN
131B
CORRIDOR
133A
CORRIDOR
140A
CORRIDOR
HW
16D
DEN
17D
DEN
18D
DEN
19D
DEN
20D
DEN
21D
DEN
22D
DEN
23D
DEN
24D
DEN
24R
RUN
23R
RUN
22R
RUN
21R
RUN
20R
RUN
19R
RUN
18R
RUN
17R
RUN
16R
RUN
LATRINE (ABA)
LATRINE (ABA)
SC-1
SC-1
SC-1
ER-1
ER-1
SC-1
PFT-1 PORCELAIN TILE
SC-1 SEALED CONCRETE
1. ALL FLOORING MATERIAL CHANGES TO OCCUR UNDER
C.L. OF DOOR, U.N.O.
2. GC TO INSPECT SLAB AND PROVIDE A SMOOTH FINISH
PRIOR TO FLOORING INSTALLATION.
3. APPLY A LEVELING COMPOUND TO FLOORING LEVELS
WHERE TWO DIFFERENT HEIGHT FINISHES MEET.
FLOOR FINISH GENERAL NOTES:FLOOR FINISH LEGEND:
VCT-1 VINYL COMPOSITION TILE ER-1 EPOXY RESIN FLOORING
RF-1 RUBBER FLOORING TILE
VCT-2 VINYL COMPOSITION TILE
BASE BID: SC-1
BID OPTION 01: ER-1
BASE BID: VCT-1
BID OPTION 05: LVT-1
WOM-1 WALK-OFF MAT
FLOOR FINISH KEY NOTES:
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
D
C
B
A
C A
T E
G O
R Y
C O
D E
A N
S I D
E
F
G
2 3 4 5 6 7 8 9 10
J O
N E
S F
R A
N K
L
IN
R D
S
U
IT
E
R A
L E
IG
H
N
C
-3
(9
-6
(9
-7
F
A X
L
IC
E N
S E
F
-0
FOR OFFICIAL USE ONLY
D
A R
L
IN
G T
O N
A V
E
W
IL
M
IN
G T
O N
D
IS
T
R
IC
T W
IL
M
IN
G
T O
N N
O R
T H
C A
R O
L
IN
A
F O
R T
B R
A G
G N
O R
T H
C A
R O
L
IN
A P
N
S
O F
M
IL
IT
A
R Y
W O
R K
IN
G
D O
G F
A C
IL
IT
Y O
C T
O B
E R
10/12/2020
AT
S
TE
FO LF
A
DI
RO
10.185
E R
S
G
ET
RED RA CH
T C
ETI
I
WARD
B
LA
IR
ED
N A
LD
R O
C:\Users\Public\Documents\Local_Revit_Files\stn_arch_MWD_Facility_178451236_R18_Robert.Murdock65NTK.rvt
9/29/2020 12:56:59 PM
W P
M R
W H
N -1
-D
-0
R B
G S
R B
A F
.D
G N
AF101
L E
V E
L
F L O
O R
F
IN
IS
H
P L A
N
K M
B
READY TO ADVERTISE
1/8" = 1'-0"A1
LEVEL 1 FLOOR FINISH PLAN
0 4 8 16' 1/8" = 1'-0"
N
TRUE NORTH -126°
FROM PLAN
NORTH
M A
R K
D E
S C
R
IP
T
IO
N D
A
M. TEAM 8 PN
M. LOCKERS
BREAK RM
COMMAND
WORK SPACE
STORAGE
STORAGE
F. TEAM 4 PN
CLASSROOM - 40
PN
20E
ELEVATOR
LAUNDRY
CONFERENCE
ROOM
KENNEL MSTR
OFFICE
TRAINER OFFICE
2S2
STAIR 2
JANITOR204
M. LATRINE
PROGRAM
MANAGER
2S1
STAIR 1
CORRIDOR
ELECTRIC
COMM
M. TEAM 8 PN
M. TEAM 8 PN
TEAM OFFICE
CORRIDOR
F. LATRINE
LAUNDRY
F. SHOWER
SC-1
VCT-1
PFT-1
PFT-1
PFT-1
PFT-1
SC-1
VCT-1
VCT-1
VCT-1
VCT-1
VCT-1
VCT-1
VCT-1
VCT-2
VCT-1
VCT-1 VCT-1 VCT-1
PFT-1
SC-1
VCT-2
VCT-1
VCT-2
VCT-1
LATRINE (ABA)
LATRINE (ABA)
SC-1
VCT-2
ELEVATOR
CONTROLLER
PFT-1 PORCELAIN TILE
SC-1 SEALED CONCRETE
1. ALL FLOORING MATERIAL CHANGES TO OCCUR UNDER
C.L. OF DOOR, U.N.O.
2. GC TO INSPECT SLAB AND PROVIDE A SMOOTH FINISH
PRIOR TO FLOORING INSTALLATION.
3. APPLY A LEVELING COMPOUND TO FLOORING LEVELS
WHERE TWO DIFFERENT HEIGHT FINISHES MEET.
FLOOR FINISH GENERAL NOTES:FLOOR FINISH LEGEND:
VCT-1 VINYL COMPOSITION TILE ER-1 EPOXY RESIN FLOORING
RF-1 RUBBER FLOORING TILE
VCT-2 VINYL COMPOSITION TILE
BASE BID: SC-1
BID OPTION 01: ER-1
BASE BID: VCT-1
BID OPTION 05: LVT-1
WOM-1 WALK-OFF MAT
FLOOR FINISH KEY NOTES:
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
D
C
B
A
C A
T E
G O
R Y
C O
D E
A N
S I D
E
F
G
2 3 4 5 6 7 8 9 10
J O
N E
S F
R A
N K
L
IN
R D
S
U
IT
E
R A
L E
IG
H
N
C
-3
(9
-6
(9
-7
F
A X
L
IC
E N
S E
F
-0
FOR OFFICIAL USE ONLY
D
A R
L
IN
G T
O N
A V
E
W
IL
M
IN
G T
O N
D
IS
T
R
IC
T W
IL
M
IN
G
T O
N N
O R
T H
C A
R O
L
IN
A
F O
R T
B R
A G
G N
O R
T H
C A
R O
L
IN
A P
N
S
O F
M
IL
IT
A
R Y
W O
R K
IN
G
D O
G F
A C
IL
IT
Y O
C T
O B
E R
10/12/2020
AT
S
TE
FO LF
A
DI
RO
10.185
E R
S
G
ET
RED RA CH
T C
ETI
I
WARD
B
LA
IR
ED
N A
LD
R O
C:\Users\Public\Documents\Local_Revit_Files\stn_arch_MWD_Facility_178451236_R18_Robert.Murdock65NTK.rvt
9/29/2020 12:57:03 PM
W P
M R
W H
N -1
-D
-0
R B
G S
R B
A F
.D
G N
AF102
L E
V E
L
F L O
O R
F
IN
IS
H
P L A
N S
K M
B
READY TO ADVERTISE
1/8" = 1'-0"A1
LEVEL 2 FLOOR FINISH PLAN
0 4 8 16' 1/8" = 1'-0"
N
TRUE NORTH -126°
FROM PLAN
NORTH
M A
R K
D E
S C
R
IP
T
IO
N D
A
1. BID OPTION TO MAKE FLOORING INCLUDING INTEGRAL BASE
ER-1 AS NOTED IN SCHEDULE. SPECS FOR ER-1 ARE LISTED ON
FINISH KEY, SHEET AF602.
2. ALL EXPOSED INTERIOR WALL CORNERS IN HIGH TRAFFIC
AREAS ARE TO RECEIVED CG-1: STAINLESS STEEL CORNER
GUARDS.
3. BID OPTION #5 TO MAKE FLOORING LVT AS NOTED IN
SCHEDULE. BASIS OF DESIGN TO BE ARMSTRONG BRUSHED
ESSENCE ENCHANTED.
4. ALL DOORS AND DOOR FRAMES TO BE PAINTED P-3, TYP
U.N.O.
5. REFER TO SHEET AE603 FOR INTERNAL BLINDS REQUIRED
FOR KENNELS.
GENERAL NOTES:
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
D
C
B
A
C A
T E
G O
R Y
C O
D E
A N
S I D
E
F
G
2 3 4 5 6 7 8 9 10
J
O N
E S
F R
A N
K L
IN
R
D
S U
IT
E
R
A L E
IG
H
N
C
-3
(9
-6
(9
-7
F
A X
L
IC
E N
S E
F
-0
FOR OFFICIAL USE ONLY
D
A R
L
IN
G T
O N
A V
E
W
IL
M
IN
G T
O N
D
IS
T
R
IC
T W
IL
M
IN
G
T O
N N
O R
T H
C A
R O
L
IN
A
F O
R T
B R
A G
G N
O R
T H
C A
R O
L
IN
A P
N
S
O F
M
IL
IT
A
R Y
W O
R K
IN
G
D O
G F
A C
IL
IT
Y O
C T
O B
E R
10/12/2020
AT
S
TE
FO LF
A
DI
RO
10.185
E R
S
G
ET
RED RA CH
T C
ETI
I
WARD
B
LA
IR
ED
N A
LD
R O
C:\Users\Public\Documents\Local_Revit_Files\stn_arch_MWD_Facility_178451236_R18_briana.mckeen.rvt
9/30/2020 2:45:31 PM
W P
M R
W H
N -1
-D
-0
R B
G S
R B
A F
.D
G N
AF601
IN
T
E R
IO
R
R O
O M
F
IN
IS
H
S C
H E
D U
L E
K M
B
READY TO ADVERTISE
INTERIOR FINISH SCHEDULE
ROOM
NUMBER ROOM NAME
FLOOR
FINISH
WALL
BASE
NORTH WALL
FINISH
EAST WALL
FINSH
SOUTH WALL
FINISH
WEST WALL
FINISH
CEILING MATERIAL /
FINISH MILLWORK REMARKS
142 CORRIDOR SC-1 RB-1 P-1 P-1 P-2 P-1 EXPOSED / P-6 BID OPTION TO BE ER-1
LEVEL 2
2S1 STAIR 1 - - - - - - - EXTERIOR STAIR, SEE
EXTERIOR FINISH SCHEDULE
2S2 STAIR 2 SC-1 RB-2 P-1 P-1 P-1 P-1 EXPOSED / P-6
20E ELEVATOR VCT-1 - PL-2 PL-2 PL-2 PL-2 PER MANUF.
RECOMMENDATION
BID OPTION TO BE LVT
201 CORRIDOR VCT-2 RB-1 P-1 P-1 P-1 P-1 ACT-1 BID OPTION TO BE LVT
202 TRAINER OFFICE VCT-1 RB-1 P-1 P-1 P-1 P-2 ACT-1 BID OPTION TO BE LVT
203 M. LOCKERS PFT-1 TB-1 WT-1 / WT-2 /
P-1
WT-1 / WT-2 /
P-1
WT-1 / WT-2 /
P-1
WT-1 / WT-2 /
P-1
GYP. BD. (MOISTURE
RESISTANT) / P-5
P-1 ABOVE WT-1. SEE
INTERIOR ELEVATIONS
204 M. LATRINE PFT-1 TB-1 WT-1 / WT-2 /
P-1
WT-1 / WT-2 /
P-1
WT-1 / WT-2 /
P-1
WT-1 / WT-2 /
P-1
GYP. BD. (MOISTURE
RESISTANT) / P-5
P-1 ABOVE WT-1. SEE
INTERIOR ELEVATIONS
205 LAUNDRY PFT-1 TB-1 P-1 P-1 P-1 P-1 GYP. BD. (MOISTURE
RESISTANT) / P-5
206 CORRIDOR VCT-2 RB-1 P-4 P-4 P-4 P-4 ACT-1 BID OPTION TO BE LVT
207 M. TEAM 8 PN VCT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 BID OPTION TO BE LVT
208 M. TEAM 8 PN VCT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 BID OPTION TO BE LVT
209 M. TEAM 8 PN VCT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 BID OPTION TO BE LVT
210 STORAGE VCT-2 RB-1 P-1 P-1 P-1 P-1 ACT-1 BID OPTION TO BE LVT
211 TEAM OFFICE VCT-1 RB-1 P-1 P-1 P-1 P-2 ACT-1 BID OPTION TO BE LVT
212 F. LATRINE PFT-1 TB-1 WT-1 / WT-2 /
P-1
WT-1 / WT-2 /
P-1
WT-1 / WT-2 /
P-1
WT-1 / WT-2 /
P-1
GYP. BD. (MOISTURE
RESISTANT) / P-5
P-1 ABOVE WT-1. SEE
INTERIOR ELEVATIONS
213 F. SHOWER PFT-1 TB-1 WT-1 / WT-2 /
P-1
WT-1 / WT-2 /
P-1
WT-1 / WT-2 /
P-1
WT-1 / WT-2 /
P-1
GYP. BD. (MOISTURE
RESISTANT) / P-5
P-1 ABOVE WT-1. SEE
INTERIOR ELEVATIONS
214 F. TEAM 4 PN VCT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 BID OPTION TO BE LVT
215 LAUNDRY VCT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 BID OPTION TO BE LVT
216 COMM SC-1 RB-1 P-1 P-1 P-1 P-1 EXPOSED / P-6
217 CLASSROOM - 40
PN
VCT-1 RB-1 P-2 P-1 P-1 P-1 ACT-3 BID OPTION TO BE LVT
218 BREAK RM VCT-1 RB-1 P-2 P-1 P-1 P-1 ACT-1 PL-1 / SS-1 BID OPTION TO BE LVT
219 COMMAND
WORK SPACE
VCT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 BID OPTION TO BE LVT
220 COMMAND
WORK SPACE
VCT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 BID OPTION TO BE LVT
221 PROGRAM
MANAGER
VCT-1 RB-1 P-1 P-2 P-1 P-1 ACT-1 BID OPTION TO BE LVT
222 KENNEL MSTR
OFFICE
VCT-1 RB-1 P-1 P-2 P-1 P-1 ACT-1 BID OPTION TO BE LVT
223 STORAGE VCT-1 RB-1 P-1 P-2 P-1 P-1 ACT-1 BID OPTION TO BE LVT
224 CONFERENCE
ROOM
VCT-1 RB-1 PT-1 / CR-1 /
PT-2
P-1 / CR-1 /
P-2
P-1 / CR-1 /
P-2
P-1 / CR-1 /
P-2
ACT-3 BID OPTION TO BE LVT. P-1
ABOVE CR-1 (CHAIR RAIL)
AND P-2 BELOW. CHAIR RAIL
MOUNTED AT 32" AFF
225 ELECTRIC SC-1 RB-1 P-1 P-1 P-1 P-1 EXPOSED / P-6
226 JANITOR SC-1 TB-1 P-1 P-1 WT-1 / P-1 WT-1 / P-1 ACT-1 P-1 ABOVE WT-1. SEE
INTERIOR ELEVATIONS
230 ELEVATOR
CONTROLLER
VCT-2 RB-1 P-1 P-1 P-1 P-1 ACT-1 BID OPTION TO BE LVT
231 LATRINE (ABA) PFT-1 TB-1 WT-1 / WT-2 /
P-1
WT-1 / WT-2 /
P-1
WT-1 / WT-2 /
P-1
WT-1 / WT-2 /
P-1
GYP. BD. (MOISTURE
RESISTANT) / P-5
P-1 ABOVE WT-1. SEE
INTERIOR ELEVATIONS
232 LATRINE (ABA) PFT-1 TB-1 WT-1 / WT-2 /
P-1
WT-1 / WT-2 /
P-1
WT-1 / WT-2 /
P-1
WT-1 / WT-2 /
P-1
GYP. BD. (MOISTURE
RESISTANT) / P-5
P-1 ABOVE WT-1. SEE
INTERIOR ELEVATIONS
INTERIOR FINISH SCHEDULE
ROOM
NUMBER ROOM NAME
FLOOR
FINISH
WALL
BASE
NORTH WALL
FINISH
EAST WALL
FINSH
SOUTH WALL
FINISH
WEST WALL
FINISH
CEILING MATERIAL /
FINISH MILLWORK REMARKS
LEVEL 1
01D DEN SC-1 - P-1 P-1 P-1 P-1 GYP. BD. (MOISTURE
RESISTANT) / P-5
BID OPTION TO BE ER-1
01R RUN SC-1 - P-1 P-1 P-1 P-1 EXPOSED / P-6 BID OPTION TO BE ER-1
1S1 STAIR 1 - - - - - - - EXTERIOR STAIR, SEE
EXTERIOR FINISH SCHEDULE
1S2 STAIR 2 SC-1 RB-2 P-1 P-1 P-1 P-1 EXPOSED / P-6
10E ELEVATOR VCT-1 - PL-2 PL-2 PL-2 PL-2 PER MANUF.
RECOMMENDATION
100 CORRIDOR WOM-1 RB-1 P-1 P-1 P-1 P-1 ACT-1
101 FACP SC-1 RB-2 P-1 P-1 P-1 P-1 EXPOSED / P-6 BID OPTION TO BE ER-1
102 FIRE RISER SC-1 RB-2 P-1 P-1 P-1 P-1 EXPOSED / P-6
103 LATRINE (ABA) PFT-1 TB-1 WT-1 / WT-2 /
P-1
WT-1 / WT-2 /
P-1
WT-1 / WT-2 /
P-1
WT-1 / WT-2 /
P-1
GYP. BD. (MOISTURE
RESISTANT) / P-5
WT-1 & WT-2 @ 4'-6" AFF. P-1
ABOVE WT-1. SEE INTERIOR
ELEVATIONS
104 LATRINE (ABA) PFT-1 TB-1 WT-1 / WT-2 /
P-1
WT-1 / WT-2 /
P-1
WT-1 / WT-2 /
P-1
WT-1 / WT-2 /
P-1
GYP. BD. (MOISTURE
RESISTANT) / P-5
WT-1 & WT-2 @ 4'-6" AFF. P-1
ABOVE WT-1. SEE INTERIOR
ELEVATIONS
105 HW SC-1 RB-2 P-1 P-1 P-1 P-1 EXPOSED / P-6 BID OPTION TO BE ER-1
106 TACK ROOM SC-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 PL-1 BID OPTION TO BE ER-1
107 ARMS VAULT SC-1 RB-2 P-1 P-1 P-1 P-1 GYP. BD. / P-4 BID OPTION TO BE ER-1
108 LAUNDRY/ MUD
ROOM
SC-1 RB-2 P-1 P-1 P-1 WT-1 / P-1 GYP. BD. (MOISTURE
RESISTANT) / P-5
SS-1 BID OPTION TO BE ER-1.
REFER TO SHEET AE402 FOR
WALL TILE PLACEMENT.
109 BULK FOOD
STORAGE
SC-1 RB-2 P-1 P-1 P-1 P-1 EXPOSED / P-6 PL-1 BID OPTION TO BE ER-1
110 FOOD PREP SC-1 RB-2 P-1 P-1 P-1 P-1 GYP. BD. / P-4 PL-1 / SS-1 BID OPTION TO BE ER-1
111 CORRIDOR SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 BID OPTION TO BE ER-1
111A JANITOR SC-1 TB-1 P-1 WT-1 / P-1 WT-1 / P-1 WT-1 / P-1 EXPOSED / P-6 WT-1 @ 4'-6" AFF. P-1 ABOVE
WT-1. SEE INTERIOR
ELEVATIONS
112 PHYSICAL
THERAPY 2
SC-1 RB-2 P-1 P-1 P-1 P-1 GYP. BD. (MOISTURE
RESISTANT) / P-5
PL-1 / SS-1 BID OPTION TO BE ER-1
113 TRAINER/HANDL
ERS
SC-1 RB-1 P-1 P-1 P-1 P-2 EXPOSED / P-6 BID OPTION TO BE ER-1
114 FOOD PREP SC-1 RB-1 P-1 P-1 P-1 P-1 GYP. BD. / P-4 PL-1 / SS-1 BID OPTION TO BE ER-1
115 COMM SC-1 - P-1 P-1 P-1 P-1 EXPOSED / P-6
116 PHYSICAL
THERAPY
RF-1 RB-2 P-1 P-1 P-1 P-1 GYP. BD. / P-4
117 STERILIZATION ER-1 ER-1 P-1 P-1 P-1 P-1 GYP. BD. (MOISTURE
RESISTANT) / P-5
PL-1 / SS-1
118 FOOD PREP SC-1 RB-1 P-1 P-1 P-1 P-1 GYP. BD. / P-4 PL-1 / SS-1 BID OPTION TO BE ER-1
119 SURGERY PREP ER-1 ER-1 P-1 P-1 P-1 P-1 GYP. BD. (MOISTURE
RESISTANT) / GEP
PL-1 / SS-1
120 SURGERY ER-1 ER-1 P-1 P-1 P-1 P-1 GYP. BD. (MOISTURE
RESISTANT) / GEP
BID OPTION TO BE ER-1
121 TREATMENT ER-1 ER-1 P-1 P-1 P-1 P-1 GYP. BD. (MOISTURE
RESISTANT) / GEP
PL-1 / SS-1
122 LAB / PHARMACY ER-1 ER-1 P-1 P-1 P-1 P-1 GYP. BD. (MOISTURE
RESISTANT) / GEP
PL-1 / SS-1
123A MAIN ELECTRIC SC-1 RB-2 P-1 P-1 P-1 P-1 EXPOSED / P-6
123B EMERGENCY
ELEC.
SC-1 RB-2 P-1 P-1 P-1 P-1 EXPOSED / P-6
124 RADIOLOGY ER-1 ER-1 P-1 P-1 P-1 P-1 LEAD LINED GYP. BD.
125 OXYGEN SC-1 RB-2 P-1 P-1 P-1 P-1 EXPOSED / P-6
126 EXPENDABLE
SUPPLY
ER-1 ER-1 P-1 P-1 P-1 P-1 GYP. BD. / P-4
127 SURGERY
LAUNDRY
SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-2
128 RECOVERY ER-1 ER-1 P-1 P-1 P-1 P-1 GYP. BD. (MOISTURE
RESISTANT) / GEP
129 CORRIDOR ER-1 ER-1 P-1 P-1 P-1 P-1 GYP. BD. (MOISTURE
RESISTANT) / GEP
130 ISOLATION
CORRIDOR
SC-1 RB-1 P-1 P-1 P-2 P-1 EXPOSED / P-6 BID OPTION TO BE ER-1
131A CORRIDOR SC-1 RB-1 P-1 P-1 P-2 P-1 EXPOSED / P-6 BID OPTION TO BE ER-1
131B CORRIDOR SC-1 RB-1 P-1 P-1 P-2 P-1 EXPOSED / P-6 BID OPTION TO BE ER-1
132 CORRIDOR SC-1 RB-1 P-1 P-1 P-1 P-2 EXPOSED / P-6 BID OPTION TO BE ER-1
133 CORRIDOR SC-1 RB-1 P-1 P-1 P-1 P-2 EXPOSED / P-6 BID OPTION TO BE ER-1
134 EXTERIOR
CORRIDOR
SC-1 - P-1 P-1 P-1 P-1 EXPOSED / P-6 SEE EXTERIOR ELEVATIONS,
BID OPTION TO BE ER-1
135 EXTERIOR
CORRIDOR
SC-1 - P-1 P-1 P-1 P-1 EXPOSED / P-6 SEE EXTERIOR ELEVATIONS,
BID OPTION TO BE ER-1
136 ISOLATION
CORRIDOR
SC-1 - P-1 P-1 P-1 P-1 EXPOSED / P-6 SEE EXTERIOR ELEVATIONS,
BID OPTION TO BE ER-1
137 MECH SC-1 - P-1 P-1 P-1 P-1 EXPOSED / P-6
138 EXTERIOR
CORRIDOR
SC-1 - P-1 P-1 P-1 P-1 EXPOSED / P-6 SEE EXTERIOR ELEVATIONS,
BID OPTION TO BE ER-1
139 EXTERIOR
CORRIDOR
SC-1 - P-1 P-1 P-1 P-1 EXPOSED / P-6 SEE EXTERIOR ELEVATIONS,
BID OPTION TO BE ER-1
140 CORRIDOR SC-1 RB-1 P-1 P-2 P-1 P-1 EXPOSED / P-6 BID OPTION TO BE ER-1
141 CORRIDOR SC-1 RB-1 P-1 P-1 P-2 P-1 EXPOSED / P-6 BID OPTION TO BE ER-1
M A
R K
D E
S C
R
IP
T I O
N D
A
1. ALL FINISHES ARE SELECTED FOR AN
OVERALL COORDINATED DESIGN INTENT,
OF WHICH PROPOSED SUBSTITUTIONS
WILL NEED TO BE CONSIDERED.
2. REFER TO SHEET AE603 FOR INTERNAL
BLINDS REQUIRED FOR KENNELS.
GENERAL NOTES:
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
C H
E C
K E
D B
Y
US Army Corps of Engineers ®
D
C
B
A
C A
T E
G O
R Y
C O
D E
A N
S I D
E
F
G
2 3 4 5 6 7 8 9 10
J O
N E
S F
R A
N K
L
IN
R D
S
U
IT
E
R A
L E
IG
H
N
C
-3
(9
-6
(9
-7
F
A X
L
IC
E N
S E
F
-0
FOR OFFICIAL USE ONLY
D
A R
L
IN
G T
O N
A V
E
W
IL
M
IN
G T
O N
D
IS
T
R
IC
T W
IL
M
IN
G
T O
N N
O R
T H
C A
R O
L
IN
A
F O
R T
B R
A G
G N
O R
T H
C A
R O
L
IN
A P
N
S
O F
M
IL
IT
A
R Y
W O
R K
IN
G
D O
G F
A C
IL
IT
Y O
C T
O B
E R
10/12/2020
AT
S
TE
FO LF
A
DI
RO
10.185
E R
S
G
ET
RED RA CH
T C
ETI
I
WARD
B
LA
IR
ED
N A
LD
R O
C:\Users\Public\Documents\Local_Revit_Files\stn_arch_MWD_Facility_178451236_R18_Robert.Murdock65NTK.rvt
9/29/2020 12:57:08 PM
W P
M R
W H
N -1
-D
-0
R B
G S
R B
A F
.D
G N
AF602
IN
T
E R
IO
R
F
IN
IS
H
K E
Y
K M
B
READY TO ADVERTISE
WB-1 WINDOW BLINDS BALI WINDOW BLINDS VINYL HORIZONTAL BLINDS 5005 1" GLOSS WHITE SATIN
TO BE PLACED ON ALL EXTERIOR
WINDOWS
TP-1 TOILET PARITIONS SCRANTON PRODUCTS HINY HIDERS SANDCASTLE
PL-2 PLASTIC LAMINATE WILSONART RAW COTTON 4947 38 ELEVATOR CAB WALLS
P-7 PAINT SHERWIN WILLIAMS CANTERBURY BLUE SEMI-GLOSS STAIRS, HANDRAILS & GUARDRAILS
CR-1 CHAIR RAIL S & S CRAFTSMAN CR6 11/16" X 5 1/4"
STAIN TO MATCH SHERWIN WILLIAMS:
SW 273 ESPRESSO
MISC. FINSHES
SS-1 SOLID SURFACE CORIAN AURORA
PL-1 PLASTIC LAMINATE WILSONART HARVEST MAPLE 7953-38
MILLWORK
P-6 PAINT SHERWIN WILLIAMS SW 9505 FROST BITE EPOXY FINISH
P-5 PAINT SHERWIN WILLIAMS SW 9505 FROST BITE SEMI GLOSS
P-4 PAINT SHERWIN WILLIAMS SW 9505 FROST BITE FLAT
GEP GYP BOARD CEILING - EPOXY FINISH SHERWIN WILLIAMS SW 9505 FROST BITE GLOSS
ACT-3 ACOUSTIC CEILING TILE ARMSTRONG CIRRUS 24" X 24" TEGUALR #572 - WHITE
ACT-2 ACOUSTIC CEILING TILE ARMSTRONG CLEAN ROOM FL 24" X 24"
SQUARE LAY IN #1715 WHITE W/ GREY
SPATTER
MOISTURE RESISTANT
ACT-1 ACOUSTIC CEILING TILE U.S.G. CLIMAPLUS 24" X 24" X 5/8" TEGUALR #2220 - WHITE
CEILING
WT-2 CERAMIC WALL TILE DALTILE COLOR WHEEL COLLECTION 4 1/4" X 4 1/4" GALAXY 1469 GLOSS
WT-1 CERAMIC WALL TILE DALTILE COLOR WHEEL COLLECTION 4 1/4" X 4 1/4" ALMOND 0135 GLOSS
P-3 PAINT SHERWIN WILLIAMS CANTERBURY BLUE SEMI-GLOSS DOORS, DOOR FRAMES & WALLS
P-2 PAINT SHERWIN WILLIAMS SW 0016 BILLIARD GREEN SATIN ACCENT PAINT
P-1 PAINT SHERWIN WILLIAMS SW 7003 TOQUE WHITE SATIN FEILD PAINT
ER-1 EPOXY RESIN WALLS STONHARD STONRES RTZ - STONHENGE
REFER TO INTERIOR ELEVATIONS FOR
FINISH HEIGHT AFF
GR-1 TILE GROUT LATICRETE 90 LIGHT PEWTER
CG-1 CORNER GUARDS - STAINLESS STEEL INPRO
SURFACE MOUNT STAINLESS
STEEL CORNER GUARD
6' HIGH AFF
TO BE PLACED AT ALL EXPOSED
CORNERS OF HIGH TRAFFIC AREAS
AP-1 ACOUSTIC PANELS LAB PRODUCTS INC. SOUNBREAK 2' X 4' WHITE
REFER TO SHEET AE403 FOR TYPICAL
KENNEL RUN ACOUSTIC PANELS
WALLS
TB-1 PORCELAIN TILE BASE AMERICAN OLEAN THEORETICAL 6" WALL BASE FUNDAMENTAL GRAY #P-36C9TB
RB-2 RUBBER BASE JOHNSONITE 4" 40 BLACK
RB-1 RUBBER BASE BURKE FLOORING SPECIFIY 4" 660 ROCKY
ER-1 EPOXY RESIN INTEGRAL COVE BASE STONHARD STONRES RTZ - STONHENGE
BASE
WOM-1 WALK OFF MAT CONSTRUCTION SPECIALTIES PEDI-TREAD 9325 GRAPHITE COLOR
REFER TO FINISH FLOOR PLANS FOR
SIZES
VCT-2 VINYL COMPOSITION TILE ARMSTRONG CHROMASPIN 12" X 12" 54801 PAYNES GRAY
VCT-1 VINYL COMPOSITION TILE ARMSTRONG CHROMASPIN 12" X 12" 54802 CARBONITE
SC-1 SEALED CONCRETE
RF-1 RUBBER TILE NORA GRANO 39.5" X 39.5" 4880 DRUSY
PFT-1 PORCELAIN TILE AMERICAN OLEAN THEORETICAL 12' X 24' FUNDAMENTAL GRAY #TH94
GR-1 TILE GROUT LATICRETE 90 LIGHT PEWTER
ER-1 EPOXY RESIN FLOORING STONHARD STONRES RTZ - STONHENGE
FLOORING
PATTERN / SERIES SIZE COLOR FINISH
CODE MATERIAL MANUFACTURER
FINISH
REMARKS
INTERIOR FINISH KEY (BASIS OF DESIGN)
M A
R K
D E
S C
R
IP
T
IO
N D
A
DIVIDER 3
brmckeen Snapshot brmckeen Image brmckeen Text Box SW0016 Billiard Green brmckeen Text Box brmckeen Snapshot brmckeen Text Box brmckeen Snapshot brmckeen Snapshot
Date: 12 October 2020
U.S. Army Corps of Engineers
Fort Bragg, NC
Wilmington District
ARCHITECT/DESIGN:
Stantec Architecture Inc.
4798 New Broad Street, Suite 100
Orlando, Florida 32814
BINDER PREPARED BY:
Lori Barnard, Interior Designer
Stantec Architecture Inc.
READY TO ADVERTISE
FF&E PACKAGE DESIGN BROCHURE
PN 72426, SOF MILITARY WORKING DOG FACILITY
U.S. Army Corps of Engineers
Fort Bragg, NC
Date: 12 October 2020
U.S. Army Corps of Engineers Fort Bragg, NC Wilmington District
ARCHITECT/DESIGN:
Stantec Architecture Inc.
4798 New Broad Street, Suite 100
Orlando, Florida 32814
READY TO ADVERTISE
PN 72426, SOF MILITARY WORKING DOG FACILITY
U.S. Army Corps of Engineers Fort Bragg, NC
Index
1. Design Analysis
2. Furniture Plans & Key
AE101, AE102, IN111, IN112, IN411, IN412, IN413, IN414
3. Cost Estimate Summary & Source by Summary
4. Procurement Data Sheets
5. Interior Finish Boards
BINDER PREPARED BY:
Lori Barnard, Interior Designer
Stantec Architecture Inc.
FF&E PACKAGE DESIGN BROCHURE
DIVIDER 1
Design Narrative
SOF Military Working Dog Facility, SOTF
Fort Bragg, NC
PN 72426
12 October 2020 Prepared by
Stantec Consulting Services Inc.
Raleigh, North Carolina
With consultants AME Consulting Engineers PC – MEP Charlotte, North Carolina
JMMPE – Fire Protection Martinez, Georgia
Prepared for USACE Wilmington District
Ready to Advertise
Military Working Dog Facility, SOTF 4-1
Section 4
BUILDING ARCHITECTURAL SYSTEMS
4.1 CRITERIA AND REFERENCES
- Fort Bragg Installation Design Guide
- Savannah District Design Manual, June 2016
- DoD Space Planning Criteria Chapter 560:
Veterinary Services, July 1, 2017
- FM 3-19.17 Military Working Dogs
- AR 190-11 Physical Security of Arms, Ammunition, and
- Explosives, 17 Jan 2019
- AR 190-12 Military Working Dogs
- UFC 1-200-01, General Building Requirements. UFC 1-300-09N, Design Procedures.
- DoD Building Code, 8 Oct 2019.
- UFC 3-101-01, Architecture.
UFC 3-120-10, Interior Design.
- UFC 3-600-01, Fire Protection Engineering for Facilities. UFC 4-
010-01, DoD Minimum Antiterrorism Standards for Buildings
- UFC 3-490-06 Elevators
- International Building Code (IBC), 2018.
- National Fire Protection Association (NFPA) 101, Life Safety
Code, 2018 edition.
- Veterinary care and animal research facilities shall comply with the requirements of NFPA 150, Standard on Fire and
Life Safety in Animal House Facilities.
Military Working Dog Facility, SOTF 4-2
4.2 BUILDING CONTEXT
The project site is located approximately 6 miles from Fort Bragg
Cantonment Area and is located within a separate secure perimeter with 24/7/365 security. The building has its own requirements for additional isolation within this context. The exterior features of the facility will match other buildings within the secure area such as exterior finishes.
4.3 GENERAL
The overall building area is calculated…