AMDT0004_PN72426_ffe_sid_Vol-3 of 3.pdf

PDF 19 MB Posted

Attached to
PN 72426 Military Working Dog Facility
Solicitation number
W912PM21R0002
Issued by

About this file

This solicitation requests proposals for the construction and design of a Special Operations Forces Military Working Dog Facility at Fort Bragg, North Carolina. The scope of work includes building 48 kennels including 42 standard kennels and 6 isolation kennels, a veterinary clinic with surgical, radiological, and pharmacy spaces, classroom and office administrative areas, HVAC systems for the kennels and clinic, sound suppression in kennel areas, parking for organizational and non-organizational vehicles, fire suppression and alarm systems, mass notification and security measures, cybersecurity for life safety and building systems, sustainability measures, accessibility compliance, furnishings and audiovisual equipment, and demolition of two modular buildings. Facilities must be designed for a 40-year minimum life. Proposals are due by the issuing agency, the Department of the Army Corps of Engineers Engineering District Wilmington.

View the file

Other files

File Type Posted
AMDT0002_PN72426_LEED_Scorecard.pdf PDF
AMDT0004_PN72426_specs_Vol-1 of 3.pdf PDF
AMDT0004_72426_TECHNICAL_SUMMARY_OF_CHANGES.pdf PDF
AMDT0004_PN72426_specs_Vol-2 of 3.pdf PDF
W912PM21R0002 Amendment 0004 PN 72426 MWD.pdf PDF
W912PM21R0002 Amendment 0003 PN 72426 MWD.pdf PDF
AMDT0002_72426_TECHNICAL_SUMMARY_OF_CHANGES.pdf PDF
W912PM21R0002 Amendment 0002 PN 72426 MWD.pdf PDF
AMDT0002_PN72426_ffe_sid_Vol-3 of 3.pdf PDF
AMDT0002_PN72426_specs_Vol-1 of 3.pdf PDF
AMDT0002_PN72426_specs_Vol-2 of 3.pdf PDF
dwg_all.zip ZIP file
AMDT0001_PDF_PLANS(rev1).pdf PDF
AMDT0001_TECHNICAL_SUMMARY_OF_CHANGES_72426(rev1).pdf PDF
AMDT0001_PN72426_specs_Vol-2 of 3.pdf PDF
W912PM21R0002 Amendment 0001 PN 72426 MWD (mod).pdf PDF
AMDT0001_PN72426_specs_Vol-1 of 3.pdf PDF
W912PM21R0002 Amendment 0001 PN 72426 MWD (Conformed).pdf PDF
AMDT0001_PN72426_ffe_sid_Vol-3 of 3.pdf PDF
2 and 9 Dec site visit sign in roster scan.pdf PDF
ATTACHMENT 5.pdf PDF
PN 72426 Site Visit Map.pdf PDF
PN_72426_JA_Corning.pdf PDF
PN_72426_JA_Honeywell.pdf PDF
PN 72426_JA Security Solutions.pdf PDF
PN 72426_JA Siemon.pdf PDF
W912PM21R0002 PN 72426 MWD.pdf PDF
ATTACHMENT 2 PPQ.pdf PDF
PN72426_specs_rta_Vol-1 of 3.pdf PDF
PN 72426_RTA_VOL_2 (Unlocked).pdf PDF
PN72426_rta_ffe_sid_Vol-3 of 3_wp.pdf PDF
PN 72426_RTA_VOL_1 (Unlocked).pdf PDF
ATTACHMENT 3 Key Personnel SAMPLE Resume.pdf PDF
PN72426_specs_rta_Vol-2 of 3.pdf PDF
ATTACHMENT 1 PROJECT DATA SHEET .pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construct Military Working Dog Facility, SOTF

(PN # 72426)

Fort Bragg, North Carolina

This project was designed by the Wilmington District of the U.S. Army Corps of Engineers. The initials or signatures and registration designations of individuals appear on these project documents within the scope of their employment as required by ER 1110-1-8152.

Amendment 0004 Specifications Volume III of III

SID & FF/E

October 2020

Solicitation No. W912PM21R0002

STANTEC PROJECT: 178451236

CONTRACT NO.: W912HN-15-D-0010

U.S. Army Corps of Engineers

Fort Bragg, NC

Wilmington District

ARCHITECT/DESIGN:

Stantec Architecture Inc.

4798 New Broad Street, Suite 100

Orlando, Florida 32814

BINDER PREPARED BY:

Lori Barnard, Interior Designer

Stantec Architecture Inc.

STRUCTURAL INTERIOR DESIGN BROCHURE

READY TO ADVERTISE

PN 72426, SOF MILITARY WORKING DOG FACILITY

U.S. Army Corps of Engineers

Fort Bragg, NC

Date: 12 October 2020

Date: 12 October 2020

U.S. Army Corps of Engineers Fort Bragg, NC Wilmington District

ARCHITECT/DESIGN:

Stantec Architecture Inc.

4798 New Broad Street, Suite 100

Orlando, Florida 32814

READY TO ADVERTISE

STRUCTURAL INTERIOR DESIGN

PN 72426, SOF MILITARY WORKING DOG FACILITY

U.S. Army Corps of Engineers Fort Bragg, NC

Index

1. Design Analysis

2. Floor Plan, Enlarged Interior Elevations & Finish Plans, Schedule & Key

AE101, AE102, AE121, AE122, AF101, AF102, AF601, AF602

3. Interior Finish Boards

BINDER PREPARED BY:

Lori Barnard, Interior Designer

Stantec Architecture Inc.

DIVIDER 1

FOUO

Design Narrative

SOF Military Working Dog Facility, SOTF

Fort Bragg, NC

PN 72426

12 October 2020 Prepared by

Stantec Consulting Services Inc.

Raleigh, North Carolina

With consultants AME Consulting Engineers PC – MEP Charlotte, North Carolina

JMMPE – Fire Protection Martinez, Georgia

Prepared for USACE Wilmington District

Ready to Advertise

Design Analysis

Military Working Dog Facility, SOTF 4-1

FOUO

Section 4

BUILDING ARCHITECTURAL SYSTEMS

4.1 CRITERIA AND REFERENCES

- Fort Bragg Installation Design Guide

- Savannah District Design Manual, June 2016

- DoD Space Planning Criteria Chapter 560:

Veterinary Services, July 1, 2017

- FM 3-19.17 Military Working Dogs

- AR 190-11 Physical Security of Arms, Ammunition, and

- Explosives, 17 Jan 2019

- AR 190-12 Military Working Dogs

- UFC 1-200-01, General Building Requirements. UFC 1-300-09N, Design Procedures.

- DoD Building Code, 8 Oct 2019.

- UFC 3-101-01, Architecture.

UFC 3-120-10, Interior Design.

- UFC 3-600-01, Fire Protection Engineering for Facilities. UFC 4-

010-01, DoD Minimum Antiterrorism Standards for Buildings

- UFC 3-490-06 Elevators

- International Building Code (IBC), 2018.

- National Fire Protection Association (NFPA) 101, Life Safety

Code, 2018 edition.

- Veterinary care and animal research facilities shall comply with the requirements of NFPA 150, Standard on Fire and

Life Safety in Animal House Facilities.

Military Working Dog Facility, SOTF 4-2

FOUO

4.2 BUILDING CONTEXT

The project site is located approximately 6 miles from Fort Bragg

Cantonment Area and is located within a separate secure perimeter with 24/7/365 security. The building has its own requirements for additional isolation within this context. The exterior features of the facility will match other buildings within the secure area such as exterior finishes.

4.3 GENERAL

The overall building area is calculated as 23,284 gross sq. ft. in accordance with the program limits. The building is designed as a two-story structure, with the second floor smaller than the first floor area by corresponding with the conditioned spaces on the first floor.

The first floor is expanded in area by the kennels and associated circulation, and the main mechanical room. The second floor is designed with a low slope roof with parapet. This provides a platform for air handler equipment.

The first floor includes 48 kennels and associated circulation wrap around the core building functional and support areas and are covered by a mono-slope roof that extends up the second floor walls but allows for windows at the second floor level.

Kennel support areas located on the first floor include mud room, food delivery, storage, and food preparation areas which are distributed throughout the floor area. Each kennel includes a den area and a run, with the kennel den area being fully conditioned space. Circulation for personnel and dogs is provided on two sides, with a door into the den area and a gate into the run. These circulation areas are subdivided into groups such that a loose animal can travel a limited distance. There are a number of doors from these circulation areas that allow access and egress without traversing the entire length of any area of kennels. Door swings and door lites afford vision from one area into another.

Military Working Dog Facility, SOTF 4-3

FOUO

The dog treatment area is located on the first floor, including radiology, surgery, exam room, sterilization, surgery preparation, and support spaces, and physical therapy.

The first floor also includes an arms vault, tack room, a larger room for trainers, mechanical room, main and emergency electrical rooms, communications room, fire riser room, and fire panel closet.

The second floor is dedicated to administrative space and includes

4 team rooms with room for individual lockers and associated latrine and shower facilities, a classroom for 40 personnel, team offices, a breakroom and a conference room. The remainder of the floor is devoted to Command work areas and offices. An exterior exit stair extends to the higher roof to facilitate equipment maintenance. A smaller electrical room and second communications room is also located on the second floor.

The floor to floor and floor to roof heights of the two story portion of the building are based upon coordination between structural member depths, ceiling heights, duct sizes and clearances required between secure and non-secure data cables.

Vertical circulation is provided by two stairs and a 3,000 lb rated combination passenger/freight hydraulic hole-less elevator not requiring a full machine room. The two stairs also provide required egress from the second floor, with the internal stair providing additional circulation between floors.

4.3.1 Kennels

Walls forming the kennels are constructed of 8-inch CMU to

8 feet with acoustical panel treatment above this height to the underside of the roof. The end of the runs will have 8 feet high fences with doors constructed of stainless steel metal bars, stiles and rails.

Military Working Dog Facility, SOTF 4-4

FOUO

Doors at the kennel dens have glass lites above and below with adjustable window coverings. Kennel area doors have two locks/ latches each and are self-closing. There are no personnel doors between the dens and the runs, but there are guillotine doors that are controlled by personnel through cabling.

4.4 BUILDING CODE SUMMARY

The military working dog facility is classified as a “Business” occupancy, and the construction is designed as Type II. Refer to

Section 10 for detailed information.

4.5 EXTERIOR

The exterior finishes of split face CMU veneer, painted doors and frames, exposed metal, and metal standing seam roof finish with colors that will match others within the SOTF compound.

4.5.1 Exterior Walls

The exterior finish of the exposed conditioned portions of the building and the non-conditioned main mechanical room is split face CMU veneer to match other existing nearby facilities. This cavity wall system will include an air barrier and

3 inches of rigid insulation.

The exterior enclosure of the kennels consists of chain link fencing and heavy insect screening. This enclosure will also be equipped with hand operated insulated coiling overhead doors which can be closed when weather conditions dictate protection of the run areas. These doors will have lite panels to provide ambient light to the kennel runs when in the closed position.

The walls separating the kennel areas from the rest of the first floor areas is CMU with furred gypsum board on the

Military Working Dog Facility, SOTF 4-5

FOUO

opposite interior most side.

4.5.2 Exterior Windows

Exterior windows on the second floor will be non-operable aluminum framed assemblies with minimally tinted low-e insulated glazing units with laminated exterior lite to comply with ATFP requirements.

4.5.3 Exterior Doors

Exterior personnel doors will be extra heavy duty rated hollow metal with insulated core with painted finish. Many doors will have glass lites to allow handlers to see personnel and dogs on the opposite side of doors.

4.5.4 Roofing

Low slope roofs will have modified bituminous roof systems.

The sloped roof over the kennels will be standing seam to match other existing facilities. Both roof systems will include rigid insulation such that the minimum R value of 33 is attained.

4.5.5 Building Insulation

The facility has areas which are heated only and areas which are fully conditioned. There are two roofing systems. The standing seam metal roof assembly has a continuous R-33 rigid polyisocyanurate insulation and a 5/8” gypsum product cover board. The low slope roof system has a rigid tapered polyisocyanurate insulation with a 5/8” gypsum cover board with an average R value of 33.

CMU exterior cavity walls have a 3” rigid polystyrene insulation within the cavity with an R-15 value.

Exterior doors are hollow metal with insulation cores except for the entrance doors which are aluminum with insulating glazing.

Overhead coiling doors at the exterior walls of the heated only

Military Working Dog Facility, SOTF 4-6

FOUO

kennel runs will have a minimum R-4 panel insulation.

Exterior windows at the second floor are fixed with thermally broken framing and insulating glass with U factor of 0.40 BTUH per sq. ft. degree F and SHGC of not less than 0.25.

4.5.6 Exterior Enclosures

There are no exterior enclosures beyond the building envelope.

4.6 INTERIOR

4.6.1 Interior Walls

The walls separating the kennel areas from the rest of the first floor areas is CMU with furred gypsum board on the opposite interior most side. The interior walls of the mechanical room are also CMU.

Metal stud and gypsum board partitions in the dog treatment area will be constructed on concrete curbs which will be finished with integral epoxy terrazzo base extending from the floor finish. The radiology partitions will include lead lining.

The walls surrounding the dog treatment area and those designated within the dog treatment area will have additional features including resilient channels and thicker insulation blankets to provide the STC 50 rating in accordance with the programming documents. The walls separating physical therapy from the corridors will also be STC 50 rated including windows of equal rating.

Interior partitions on the second floor are all metal stud framing with gypsum board types varying according to space functions. Insulation is provided in many partition types for increased sound attenuation, with many walls extending full height to the underside of the roof deck.

The interior stair and the elevator shaft are enclosed with 1-

Military Working Dog Facility, SOTF 4-7

FOUO

hour fire rated CMU with furred gypsum board on the exterior side.

The arms vault is formed by 8-inch reinforced concrete walls, floor, and ceiling, and is secured with a GSA approved vault door.

4.6.2 Interior Doors

Interior doors are hollow metal as scheduled. Many doors have vision panels.

4.6.3 Interior Finishes

Ceilings include painted exposed structure, suspended acoustical tile systems, and gypsum board ceilings as indicated. The sloped metal deck above the kennel runs will be partially covered with acoustical panels.

Materials used in the kennels need to be easy to wash, sanitize and dry. In general this requirement should be considered wherever dogs may be taken within the facility.

Many areas on the first floor are specified as sealed concrete flooring. An epoxy flooring system will be a Bid

Option for some of these areas as indicated on the construction drawings. Dog treatment area will have epoxy flooring as base bid with an integral base and rubber flooring is scheduled in the physical therapy room. Vinyl composite tile (VCT) is scheduled for the majority of the second floor as the base bid with an upgrade to luxury vinyl tile (LVT) as a bid option. Porcelain floor tile is scheduled for the toilet and shower rooms.

Walls will be painted except where tile is scheduled in the latrine rooms and shower areas.

4.7 SPECIALTIES

Signage that will be durable and interchangeable is provided

Military Working Dog Facility, SOTF 4-8

FOUO

throughout the interior of the building. Warning signage will be provided around the perimeter of the facility and there will be signage at all exterior doors.

Each latrine, toilet stall, and shower area will be equipped with toilet and shower room specialties including grab bars at latrines as required by accessibility standards.

Second floor windows will be equipped with horizontal window blinds.

4.7.1 Furnishings

Medical grade cabinetry with metal countertops are provided in the dog treatment area. Solid surface countertops with plastic laminate upper cabinets are provided in the several food preparation areas.

Plastic laminate cabinetry with solid surface countertops are provided on the second floor and the first floor food prep areas.

4.8 Acoustics

The functional spatial configuration of the spaces within the facility contributes to the overall acoustical design strategy of the facility.

The dog kennel areas are separated from the normally occupied portions of the facility by 8-inch CMU load bearing walls that are two stories in height. These walls have an estimated STC range of 44-

49 dependent upon density. Those CMU walls that abut the dog treatment areas are furred out to provide an estimated STC range of 55-58 with a single interconnected acoustical rated door assembly of STC 50.

The mechanical room is located away from all normally occupied spaces and mechanical units are located on the roof of the two-story portion of the facility.

The facility has multiple personnel doors around the perimeter to provide direct access to functional spaces, and to avoid potential conflict and noise from barking as dogs encounter or view each

Military Working Dog Facility, SOTF 4-9

FOUO

other coming and going from the kennel area.

Each dog kennel is separated from each other by 8-inch CMU walls that are nominally 8 feet high. Acoustical panels will be mounted above the 8 feet high walls in a back to back configuration and an acoustical panel will be mounted on the wall at the head of the kennel run. Six additional acoustical panels will be mounted to the underside of the metal deck above each kennel run with two panels extending over the exterior corridor. The kennel dens are also separated by 8-inch CMU walls and each has a door and glass sidelight. These doors and sidelights are components of the air barrier between the fully conditioned and heated spaces and are sealed at the perimeter by gaskets at the doors and membrane materials at the sidelights. These assemblies have insulated glass panels and a third pane of glass which also increases the STC values of the overall assembly.

Six kennels are designated as isolation kennels and they are separated by additional doors along the exterior and interior corridors that serve them.

Most of the partition walls separating spaces within the facility are full height from floor slab to underside of floor or roof deck above.

Partition walls forming the Physical Therapy 116 space are designed to provide STC 50 rating and include acoustical interior windows. The same partition type is specified at the perimeter of

Classroom 217, Breakroom 218, and Conference Room 224. Most metal stud and gypsum board partitions include batt insulation and acoustical sealant at floor and top of wall joints. Electrical junction boxes are specified to be staggered back to back and require installation of acoustical insulation and sealant.

The second floor is configured to separate typically active noise generating spaces from quieter spaces by locating the team rooms on one end of the floor and the offices are at the opposite end. This concept has also been implemented between the first and second floors by locating the offices areas over the dog treatment area and locating the team rooms over more active first floor spaces such as

Military Working Dog Facility, SOTF 4-10

FOUO

the trainers and handlers’ room, mud room, therapy pool, and food prep areas.

The floor-ceiling assembly between the first and second floor is a

Type 6 according to UFC 3-450-01 with several variations. The second floor slab is concrete over metal deck throughout and includes spray on fire proofing. Spaces on both floors that have a utilitarian function have an exposed ceiling open to the floor slab or roof deck above. A suspended moisture resistant, epoxy coated gypsum board ceiling system has been specified throughout the dog treatment area. Second floor ceilings are primarily suspended acoustical tile ceilings. All acoustical ceiling tiles are specified to have a sound absorption (NRC) of 1.00 at the Class and

Conference rooms.

DIVIDER 2

UP

GBA

F

C1

AE301

C1

AE301

PHYSICAL

THERAPY

STERILIZATION

SURGERY PREP

SURGERY

RADIOLOGY

SURGERY

LAUNDRY

EXPENDABLE

SUPPLY

MECH

OXYGEN

LAB / PHARMACY

TREATMENT

FOOD PREP

15D

DEN

14D

DEN

13D

DEN

12D

DEN

11D

DEN

10D

DEN

09D

DEN

08D

DEN

07D

DEN

06D

DEN

05D

DEN

04D

DEN

03D

DEN

02D

DEN

25D

DEN

26D

DEN

27D

DEN

28D

DEN

29D

DEN

30D

DEN

31D

DEN

32D

DEN

33D

DEN

34D

DEN

35D

DEN

36D

DEN

37D

DEN

38D

DEN

39D

DEN

40D

DEN

41D

DEN

42D

DEN

43D

DEN

44D

DEN

45D

DEN

46D

DEN

47D

DEN

47R

RUN

46R

RUN

45R

RUN

44R

RUN

43R

RUN

42R

RUN

41R

RUN

40R

RUN

39R

RUN

38R

RUN

37R

RUN

36R

RUN

35R

RUN

34R

RUN

33R

RUN

32R

RUN

31R

RUN

30R

RUN

29R

RUN

28R

RUN

27R

RUN

26R

RUN

25R

RUN

15R

RUN

14R

RUN

13R

RUN

12R

RUN

11R

RUN

10R

RUN

09R

RUN

08R

RUN

07R

RUN

06R

RUN

05R

RUN

04R

RUN

03R

RUN

02R

RUN

EXTERIOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

10E

ELEVATOR

RECOVERY

123A

MAIN ELECTRIC

1S2

STAIR 2

1S1

STAIR 1

BULK FOOD

STORAGE

LAUNDRY/ MUD

ROOM

TACK ROOM

PHYSICAL

THERAPY 2

CORRIDOR

FOOD PREP

TRAINER/HANDLERS

COMM

FIRE RISER

A1

AE201

D

A E

E

A E

B

A E

E1

AE201

B

A E

6 ISOLATION KENNELS

E1

AE301

E1

AE301

ARMS VAULT

FOOD PREP

ISOLATION

CORRIDOR

131A

CORRIDOR

01D

DEN

01R

RUN

48D

DEN

48R

RUN

A6

AE401

E1

AE421E1

AE420

C1

AE404

A1

AE301

A1

AE301

C6

AE301

C6

AE301

A1

AE402

A1

AE403

A.6 B.7 C.5 F.4 F.5 G.5G.2G.1A.8 A.9

3.2

3.1

2.7

2.5

2.4

2.2

1.6

FACP

A1

AE303

A4

AE303

A8

AE305

A1

AE302

A6

AE302

A8

AE302

A1

AE304

A5

AE304

A8

AE303

A8

AE304

A3

AE302

140C 133C

100A

112A

118100B

109A

15R

14R

13R

12R

11R

10R

09R

08R

07R

06R

05R

04R

03R

02R

34R

35R

36R

37R

38R

39R

40R

41R

42R

43R

44R

45R

46R

47R

138A 33R32R31R30R29R28R27R26R25R

120117

119A 119C

119B

25D 26D 27D 28D 29D 30D 31D 32D 33D

15D

14D

13D

12D

11D

10D

09D

08D

07D

06D

05D

04D

03D

02D

34D

35D

36D

37D

38D

39D

40D

41D

42D

43D

44D

45D

46D

47D

01R 01D 48R48D

130B

135J136F

132141

139A

139L

134A

109B

113B

113A

108A

134L

134M

1S2B

1S2A

CORRIDOR

ISOLATION

CORRIDOR

EXTERIOR

CORRIDOR

EXTERIOR

CORRIDOR

EXTERIOR

CORRIDOR

15B

15A

138C 136C

139B

139D

139F

139H

139J

135G

34G

35G

36G

37G

38G

39G

40G

41G

42G

43G

44G

45G

46G

47G

48G

15G

14G

13G

12G

11G

10G

09G

08G

07G

06G

05G

04G

03G

02G

01G

25G 26G 27G 31G 32G30G29G28G 33G

15A

108B

139K

139I

139G

139E

139C

135E135I136D

123B

EMERGENCY

ELEC.

111A

JANITOR

111A

113C

A3

AE304

A8

AE402

D1

AE501

C8

AE501

E8

AE501F3

AE501

C3

AE501

SIM

A3

AE501

A1

AE501

A1

AE405

131B

CORRIDOR

131A

5A

135C

F3

AE501

F3

AE501

F3

AE501

A1

AE408

A1

AE406

130A

133B 133A133A

CORRIDOR

140A 140B140A

CORRIDOR

E H

139M 135B135D135F135H136E138B 138D 138E 136B

HW

135A

134D

134E

134F

134C

134B

134K

134J

134I

134H

134G

DC.9

LATRINE

(ABA)

LATRINE

(ABA)

104 103

24R

RUN

23R

RUN

22R

RUN

21R

RUN

20R

RUN

19R

RUN

18R

RUN

17R

RUN

16R

RUN

16D

DEN

17D

DEN

18D

DEN

19D

DEN

20D

DEN

21D

DEN

22D

DEN

23D

DEN

24D

DEN

16D 17D 18D

18R17R16R 19R 20R 21R 22R 23R 24R

24G23G22G21G20G19G18G

17G

16G

19D 20D 21D 22D 23D 24D

4.2

3.8

C

123B 123A

W6

W6

A3

AE501

112B

142 131B

B

A E

B

A E

23A

3 3A

W6

14 14

13A

13A

13A

13A

13A13A

13A

13A

13A

15 15

14A 14A

17A

C1

AE423

A1

AE504

D1

AE502

D1

AE502

D1

AE502

D1

AE504

15A

136A

TYP.

13 TYP

13A

13A

A8

AE501

06 06

B1

AE407

UP

UP

F.D.

F.D.

F.D.

F.D.

F.D.

F.D.

F.D.

SIM

AE423 2

AE423

4'-10"

F.D.

1. UNLESS NOTED OTHERWISE, ALL DIMENSIONS ARE TO:

- FACE OF GWB

- FACE OF MASONRY

- FACE OF CONCRETE

2. SEE MECHANICAL, ELECTRICAL, TECHNOLOGY, PLUMBING

AND FIRE PROTECTION (M.E.P.) DRAWINGS AND ENLARGED

ARCHITECTURAL PLANS FOR INFORMATION NOT SHOWN ON

THIS SHEET.

3. COORDINATE AND PROVIDE BLOCKING IN PARTITIONS FOR

THE INSTALLATION AND ATTACHMENT OF ALL WALL MOUNTED

EQUIPMENT AND PRODUCTS. ALL CONCEALED BLOCKING

SHALL BE FIRE RETARDENT TREATED. SEE ARCHITECTURAL

PLANS AND M.E.P. DRAWINGS FOR THE LOCATIONS OF WALL

MOUNTED EQUIPMENT AND PRODUCTS.

4. DRAWINGS ARE NOT TO BE SCALED FOR INFORMATION.

GENERAL NOTES:KEY NOTES:

COUNTERTOP ON BASE CABINETS SEE

ENLARGED ELEVATIONS FOR WALL CABINETS

OR SHELVES ABOVE

DOWNSPOUT, PROVIDE BOOT CONNECTION

TO STORM DRAIN, SEE CIVIL

DOWNSPOUT, PROVIDE SPLASH BLOCK, SEE

CIVIL

04 LEAD LINED PARTITION

PROVIDE WIRE CAGE APPROX. 6' X 8' X 9'

HIGH W/ TOP CLOSURE, AND LOCKABLE

SLIDING DOOR.

07 GUARDRAIL - SEE CIVIL FOR SIDEWALK

08 08 WALKOFF MAT - SEE DETAIL A1/AE609

1 HOUR FIRE RATED WALL

PARTITION LEGEND:

NON RATED WALL

NON RATED CMU WALL

1 HOUR SHAFT WALL

PARTITION TYPE - SEE SHEET

AE701 - AE703

CORNER GUARD TAG - SEE

DETAIL D7/AE704

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C H

E C

K E

D B

Y

US Army Corps of Engineers ®

D

C

B

A

C A

T E

G O

R Y

C O

D E

A N

S I D

E

F

G

2 3 4 5 6 7 8 9 10

J O

N E

S F

R A

N K

L

IN

R D

S

U

IT

E

R A

L E

IG

H

N

C

-3

(9

-6

(9

-7

F

A X

L

IC

E N

S E

F

-0

FOR OFFICIAL USE ONLY

D

A R

L

IN

G T

O N

A V

E

W

IL

M

IN

G T

O N

D

IS

T

R

IC

T W

IL

M

IN

G

T O

N N

O R

T H

C A

R O

L

IN

A

F O

R T

B R

A G

G N

O R

T H

C A

R O

L

IN

A P

N

S

O F

M

IL

IT

A

R Y

W O

R K

IN

G

D O

G F

A C

IL

IT

Y O

C T

O B

E R

10/12/2020

AT

S

TE

FO LF

A

DI

RO

10.185

E R

S

G

ET

RED RA CH

T C

ETI

I

WARD

B

LA

IR

ED

N A

LD

R O

C:\Users\Public\Documents\Local_Revit_Files\stn_arch_MWD_Facility_178451236_R18_Robert.Murdock65NTK.rvt

9/29/2020 12:52:06 PM

W P

M R

W H

N -1

-D

-0

R B

G S

R B

A E

.D

G N

AE101

L E

V E

L

F L O

O R

P L A

N

K M

B

READY TO ADVERTISE

1/8" = 1'-0"A1

LEVEL 1 FLOOR PLAN

0 4 8 16' 1/8" = 1'-0"

N

TRUE NORTH -126°

FROM PLAN

NORTH

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

GBA

F

C1

AE301

C1

AE301

CLASSROOM - 40

PN

M. TEAM 8 PN

F. TEAM 4 PN

KENNEL MSTR

OFFICE

2S1

STAIR 1

M. LATRINE

TRAINER OFFICE

LAUNDRY

M. LOCKERS

BREAK RM

COMMAND

WORK SPACE

STORAGE

PROGRAM

MANAGER

STORAGE

2S2

STAIR 2

JANITOR

20E

ELEVATOR

CONFERENCE

ROOM

CORRIDOR

ELECTRIC

COMM

A1

AE201

D

A E

E

A E

B

A E

E1

AE201

B

A E

GATE AT STAIR

TO ROOF

E1

AE301

E1

AE301

TEAM OFFICE

M. TEAM 8 PN

M. TEAM 8 PN

CORRIDOR

A4

AE409E6

AE421E4

AE420

A1

AE409

A8

AE409

A1

AE301

A1

AE301

C6

AE301

C6

AE301

F. SHOWER

F. LATRINE

A.6 B.7 C.5 F.4 F.5 G.5G.2G.1A.8 A.9

3.2

3.1

2.7

2.5

2.4

2.2

1.6

A1

AE303

A4

AE303

A8

AE305

A6

AE302

A8

AE302

A1

AE304

A5

AE304

A8

AE303

A8

AE304

217A

2S2

217B

2S1

207 209

20A

MODIFIED BITUMEN ROOFING

ON COVER BOARD ON R-30

TAPERED POLY-ISO

INSULATION, OVER METAL

DECK

PREFINISHED METAL

COPING SYSTEM

STANDING SEAM METAL

ROOF ASSEMBLY WITH

FACTORY APPLIED FINISH.

STANDING SEAM METAL

ROOF ASSEMBLY WITH

FACTORY APPLIED FINISH.

PREFINISHED METAL GUTTER

AND DOWNSPOUT

PREFINISHED METAL GUTTER

AND DOWNSPOUT PREFINISHED METAL GUTTER

AND DOWNSPOUT

PRE-ENGINEERED

ALUMINUM CANOPY W/

SUPPORT RODS

LATRINE

(ABA)

LATRINE

(ABA)

A3

AE304

LAUNDRY

3"

1'

3" / 1' - 0"

E HDC.9

4.2

3.8

C

A1

AE413

B

A E

B

A E

A1

AE502

A1

AE502

A1

AE502

D1

AE502

A4

AE502

D4

AE502

A1

AE503

SIM

D1

AE503

A4

AE503

D4

AE503

E1

AE423

W5

W1

W1

W1

W2 W2

W3

W1

W4

W4

W1W4 W2 W2

W2

W2

DN

DN

DN

DN

DN

3"

1'

3" / 1' - 0"

3" / 1' - 0"

3" / 1' - 0"

COMMAND

WORK SPACE

ELEVATOR

CONTROLLER

A1

AE503

SIM

A1

AE503

SIM

1-HOUR FIRE

RATED MECH,

DUCT CHASE

PRE-ENGINEERED ALUMINUM

CANOPY W/ SUPPORT RODS

1. UNLESS NOTED OTHERWISE, ALL DIMENSIONS ARE TO:

- FACE OF GWB

- FACE OF MASONRY

- FACE OF CONCRETE

2. SEE MECHANICAL, ELECTRICAL, TECHNOLOGY, PLUMBING

AND FIRE PROTECTION (M.E.P.) DRAWINGS AND ENLARGED

ARCHITECTURAL PLANS FOR INFORMATION NOT SHOWN ON

THIS SHEET.

3. COORDINATE AND PROVIDE BLOCKING IN PARTITIONS FOR

THE INSTALLATION AND ATTACHMENT OF ALL WALL MOUNTED

EQUIPMENT AND PRODUCTS. ALL CONCEALED BLOCKING

SHALL BE FIRE RETARDENT TREATED. SEE ARCHITECTURAL

PLANS AND M.E.P. DRAWINGS FOR THE LOCATIONS OF WALL

MOUNTED EQUIPMENT AND PRODUCTS.

4. DRAWINGS ARE NOT TO BE SCALED FOR INFORMATION.

GENERAL NOTES:KEY NOTES:

COUNTERTOP ON BASE CABINETS SEE

ENLARGED ELEVATIONS FOR WALL CABINETS

OR SHELVES ABOVE

1 HOUR FIRE RATED WALL

PARTITION LEGEND:

NON RATED WALL

NON RATED CMU WALL

1 HOUR SHAFT WALL

PARTITION TYPE - SEE SHEET

AE701 - AE703

CORNER GUARD TAG - SEE

DETAIL D7/AE704

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C H

E C

K E

D B

Y

US Army Corps of Engineers ®

D

C

B

A

C A

T E

G O

R Y

C O

D E

A N

S I D

E

F

G

2 3 4 5 6 7 8 9 10

J O

N E

S F

R A

N K

L

IN

R D

S

U

IT

E

R A

L E

IG

H

N

C

-3

(9

-6

(9

-7

F

A X

L

IC

E N

S E

F

-0

FOR OFFICIAL USE ONLY

D

A R

L

IN

G T

O N

A V

E

W

IL

M

IN

G T

O N

D

IS

T

R

IC

T W

IL

M

IN

G

T O

N N

O R

T H

C A

R O

L

IN

A

F O

R T

B R

A G

G N

O R

T H

C A

R O

L

IN

A P

N

S

O F

M

IL

IT

A

R Y

W O

R K

IN

G

D O

G F

A C

IL

IT

Y O

C T

O B

E R

10/12/2020

AT

S

TE

FO LF

A

DI

RO

10.185

E R

S

G

ET

RED RA CH

T C

ETI

I

WARD

B

LA

IR

ED

N A

LD

R O

C:\Users\Public\Documents\Local_Revit_Files\stn_arch_MWD_Facility_178451236_R18_Robert.Murdock65NTK.rvt

9/29/2020 12:52:11 PM

W P

M R

W H

N -1

-D

-0

R B

G S

R B

A E

.D

G N

AE102

L E

V E

L

F L O

O R

P L A

N

K M

B

READY TO ADVERTISE

1/8" = 1'-0"A1

LEVEL 2 FLOOR PLAN

0 4 8 16' 1/8" = 1'-0"

N

TRUE NORTH -126°

FROM PLAN

NORTH

M A

R K

D E

S C

R

IP

T

IO

N D

A

F

9' - 0"9' - 0"

9' - 0"

8' - 0"

9' - 0"

9' - 0"

8' - 0" 8' - 0"

9' - 0"

9' - 0"

9' - 0"

A.6 B.7 C.5 F.4 F.5 G.5G.2G.1A.8 A.9

3.2

3.1

2.7

2.5

2.4

2.2

1.6

EXPOSED

EXPOSED

EXPOSED

EXPOSED

EXPOSED

8' - 0"

8' - 0"

8' - 0"

EXPOSED

EXPOSED

EXPOSED

EXPOSED

EXPOSED

EXPOSED

EXPOSED

EXPOSED

EXPOSED

EXPOSED

EXPOSED

EXPOSED

EXPOSED

EXPOSED

EXPOSED

EXPOSED

EXPOSED

EXPOSED

EXPOSED

8' - 0"

E H

EXPOSED

8' - 0"

9' - 0" 9' - 0"

DC.9

4.2

3.8

C

8' - 8"

GYPSUM BOARD SOFFIT

BELOW AIR CURTAIN

UNIT, SEE DETAIL

EXPOSED

EXPOSED

ABOVE

CAGES11' - 0"

PHYSICAL

THERAPY

STERILIZATION

SURGERY PREP 120

SURGERY

RADIOLOGY

SURGERY

LAUNDRY

EXPENDABLE

SUPPLY

MECH

OXYGEN

LAB / PHARMACY

TREATMENT

FOOD PREP

DEN

DEN

DEN

DEN

DEN

DEN

DEN

DEN

DEN

DEN

DEN

DEN

DEN

DEN

DEN DEN DEN DEN DEN DEN DEN DEN DEN

DEN

DEN

DEN

DEN

DEN

DEN

DEN

DEN

DEN

DEN

DEN

DEN

DEN

DEN

RUN

RUN

RUN

RUN

RUN

RUN

RUN

RUN

RUN

RUN

RUN

RUN

RUN

RUNRUNRUNRUNRUNRUNRUNRUNRUNRUNRUN

RUN

RUN

RUN

RUN

RUN

RUN

RUN

RUN

RUN

RUN

RUN

RUN

RUN

EXTERIOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

10E

ELEVATOR

RECOVERY

123A

MAIN ELECTRIC

1S2

STAIR 2

1S1

STAIR 1

BULK FOOD

STORAGE

LAUNDRY/ MUD

ROOM

TACK ROOM

PHYSICAL

THERAPY 2

CORRIDOR

FOOD PREP

TRAINER/HANDLERS

COMM

FIRE RISER

ISOLATION

CORRIDOR

FOOD PREP

DEN

RUN

DEN

RUN

EXTERIOR

CORRIDOR

EXTERIOR

CORRIDOR

EXTERIOR

CORRIDOR

ISOLATION

CORRIDOR

ARMS VAULT

131A

CORRIDOR

CORRIDOR

FACP

123B

EMERGENCY

ELEC.

111A

JANITOR

131B

CORRIDOR

133A

CORRIDOR

140A

CORRIDOR

HW

DEN DEN DEN DEN DEN DEN DEN DEN DEN

RUNRUNRUNRUNRUNRUNRUNRUNRUN

LATRINE (ABA)

LATRINE (ABA)

EXPOSED

EXPOSED

GWB BULKHEAD

A6

AE403

8' - 0"

EXPOSED

ABOVE

CAGES

EXPOSED

ABOVE

CAGES

EXPOSED

EXPOSED

9' - 0"

9' - 0"

8' - 0"

GWB BULKHEAD

UH

UH

UHUHUHUH

UH

UH

UH

UH

UH

UH

E5

AE517

E1

AE517

8'-0"

4'-0"

4'-0" 4'-0" 4'-0"4'-0"

4'-0"

4'-0"

20'-6"

PRE-ENGINEERED

ALUMINUM CANOPY W/

SUPPORT RODS

PRE-ENGINEERED ALUMINUM

CANOPY W/ SUPPORT RODS

PRE-ENGINEERED ALUMINUM

CANOPY W/ SUPPORT RODS

11' - 0"

UH

UH

UH

UH

UH

EXPOSED

2x2 SUSPENDED

CEILING TILES

GYP. BD. CEILING

DIFFUSERS & GRILLES,

SEE MECH DWG

LIGHT FIXTURES,

SEE ELEC. DWG

REINFORCED

CONCRETE CEILING

GENERAL NOTES:

RCP LEGEND:

A. REFER TO SHEETS AF601 AND

AE602 FOR FINISH KEY AND

SCHEDULE

B. REFER TO SHEET AE131

THROUGH AE132 FOR EQUIPMENT

INFORMATION, LOCATIONS AND

SCHEDULE

C. PROVIDE ACCESS PANEL AT ALL

EQUIPMENT AND VALVES ABOVE

HARD CEILINGS.

LEAD LINED GYP. BD.

CEILING

GYP. BD. CEILINGS

(MOISTURE RESISTANT)

WIRE GRID CAGE

LID @ 9'-0" AFF

EXIT SIGN, SEE ELEC.

DWG

18" x 48" ACCOUSTICAL

CEILING PANELS

SEE DETAIL E4/AE517

UNIT HEATER, SEE

MECH. DWG

UH

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C H

E C

K E

D B

Y

US Army Corps of Engineers ®

D

C

B

A

C A

T E

G O

R Y

C O

D E

A N

S I D

E

F

G

2 3 4 5 6 7 8 9 10

J O

N E

S F

R A

N K

L

IN

R D

S

U

IT

E

R A

L E

IG

H

N

C

-3

(9

-6

(9

-7

F

A X

L

IC

E N

S E

F

-0

FOR OFFICIAL USE ONLY

D

A R

L

IN

G T

O N

A V

E

W

IL

M

IN

G T

O N

D

IS

T

R

IC

T W

IL

M

IN

G

T O

N N

O R

T H

C A

R O

L

IN

A

F O

R T

B R

A G

G N

O R

T H

C A

R O

L

IN

A P

N

S

O F

M

IL

IT

A

R Y

W O

R K

IN

G

D O

G F

A C

IL

IT

Y O

C T

O B

E R

10/12/2020

AT

S

TE

FO LF

A

DI

RO

10.185

E R

S

G

ET

RED RA CH

T C

ETI

I

WARD

B

LA

IR

ED

N A

LD

R O

C:\Users\Public\Documents\Local_Revit_Files\stn_arch_MWD_Facility_178451236_R18_Robert.Murdock65NTK.rvt

9/29/2020 12:52:41 PM

W P

M R

W H

N -1

-D

-0

R B

G S

R B

A E

.D

G N

AE121

L E

V E

L

R E

F L E

C T

E D

C E

IL

IN

G P

L A

N

K M

B

READY TO ADVERTISE

1/8" = 1'-0"A1

LEVEL 1 REFLECTED CEILING PLAN

0 4 8 16' 1/8" = 1'-0"

N

TRUE NORTH -126°

FROM PLAN

NORTH

M A

R K

D E

S C

R

IP

T

IO

N D

A

GB

F

9' - 0" 9' - 0"

8' - 0"

9' - 0"

9' - 0" 9' - 0"

8' - 0"

8' - 0"

8' - 0"

8' - 0"

8' - 0"

9' - 0" 8' - 0"

8' - 0"

8' - 0"

B.7 C.5 F.4 F.5 G.2G.1A.8 A.9

3.2

3.1

2.7

2.5

2.4

2.2

8' - 0"

EXPOSED

EXPOSED

9' - 0"

9' - 0"

9' - 0"

8' - 0"

EXPOSED

8' - 0"

EDC.9

4.2

3.8

C

M. TEAM 8 PN

M. LOCKERS

BREAK RM

COMMAND

WORK SPACE

STORAGE

STORAGE

F. TEAM 4 PN

CLASSROOM - 40

PN

20E

ELEVATOR

LAUNDRY

CONFERENCE

ROOM

KENNEL MSTR

OFFICE

TRAINER OFFICE

2S2

STAIR 2

JANITOR

M. LATRINE

PROGRAM

MANAGER

2S1

STAIR 1

CORRIDOR

ELECTRIC

COMM

M. TEAM 8 PN

M. TEAM 8 PN

TEAM OFFICE

CORRIDOR

F. LATRINE

F. SHOWER

ELEVATOR

CONTROLLER

COMMAND

WORK SPACE

LATRINE (ABA)

LATRINE (ABA)

9' - 0"

E5

AE517

GWB BULKHEAD

EXPOSED

E Q

E Q

E Q

E Q

2x2 SUSPENDED

CEILING TILES

GYP. BD. CEILING

DIFFUSERS & GRILLES,

SEE MECH DWG

LIGHT FIXTURES,

SEE ELEC. DWG

REINFORCED

CONCRETE CEILING

GENERAL NOTES:

RCP LEGEND:

A. REFER TO SHEETS AF601 AND

AE602 FOR FINISH KEY AND

SCHEDULE

B. REFER TO SHEET AE131

THROUGH AE132 FOR EQUIPMENT

INFORMATION, LOCATIONS AND

SCHEDULE

C. PROVIDE ACCESS PANEL AT ALL

EQUIPMENT AND VALVES ABOVE

HARD CEILINGS.

LEAD LINED GYP. BD.

CEILING

GYP. BD. CEILINGS

(MOISTURE RESISTANT)

WIRE GRID CAGE

LID @ 9'-0" AFF

EXIT SIGN, SEE ELEC.

DWG

18" x 48" ACCOUSTICAL

CEILING PANELS

SEE DETAIL E4/AE517

UNIT HEATER, SEE

MECH. DWG

UH

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C H

E C

K E

D B

Y

US Army Corps of Engineers ®

D

C

B

A

C A

T E

G O

R Y

C O

D E

A N

S I D

E

F

G

2 3 4 5 6 7 8 9 10

J O

N E

S F

R A

N K

L

IN

R D

S

U

IT

E

R A

L E

IG

H

N

C

-3

(9

-6

(9

-7

F

A X

L

IC

E N

S E

F

-0

FOR OFFICIAL USE ONLY

D

A R

L

IN

G T

O N

A V

E

W

IL

M

IN

G T

O N

D

IS

T

R

IC

T W

IL

M

IN

G

T O

N N

O R

T H

C A

R O

L

IN

A

F O

R T

B R

A G

G N

O R

T H

C A

R O

L

IN

A P

N

S

O F

M

IL

IT

A

R Y

W O

R K

IN

G

D O

G F

A C

IL

IT

Y O

C T

O B

E R

10/12/2020

AT

S

TE

FO LF

A

DI

RO

10.185

E R

S

G

ET

RED RA CH

T C

ETI

I

WARD

B

LA

IR

ED

N A

LD

R O

C:\Users\Public\Documents\Local_Revit_Files\stn_arch_MWD_Facility_178451236_R18_Robert.Murdock65NTK.rvt

9/29/2020 12:52:44 PM

W P

M R

W H

N -1

-D

-0

R B

G S

R B

A E

.D

G N

AE122

L E

V E

L

R E

F L E

C T

E D

C E

IL

IN

G P

L A

N

K M

B

READY TO ADVERTISE

1/8" = 1'-0"A1

LEVEL 2 REFLECTED CEILING PLAN

0 4 8 16' 1/8" = 1'-0"

N

TRUE NORTH -126°

FROM PLAN

NORTH

M A

R K

D E

S C

R

IP

T

IO

N D

A

PHYSICAL

THERAPY

STERILIZATION

SURGERY PREP

SURGERY

RADIOLOGY

SURGERY

LAUNDRY

EXPENDABLE

SUPPLY

MECH

OXYGEN

LAB / PHARMACY

TREATMENT

FOOD PREP

15D

DEN

14D

DEN

13D

DEN

12D

DEN

11D

DEN

10D

DEN

09D

DEN

08D

DEN

07D

DEN

06D

DEN

05D

DEN

04D

DEN

03D

DEN

02D

DEN

25D

DEN

26D

DEN

27D

DEN

28D

DEN

29D

DEN

30D

DEN

31D

DEN

32D

DEN

33D

DEN

34D

DEN

35D

DEN

36D

DEN

37D

DEN

38D

DEN

39D

DEN

40D

DEN

41D

DEN

42D

DEN

43D

DEN

44D

DEN

45D

DEN

46D

DEN

47D

DEN

47R

RUN

46R

RUN

45R

RUN

44R

RUN

43R

RUN

42R

RUN

41R

RUN

40R

RUN

39R

RUN

38R

RUN

37R

RUN

36R

RUN

35R

RUN

34R

RUN

33R

RUN

32R

RUN

31R

RUN

30R

RUN

29R

RUN

28R

RUN

27R

RUN

26R

RUN

25R

RUN

15R

RUN

14R

RUN

13R

RUN

12R

RUN

11R

RUN

10R

RUN

09R

RUN

08R

RUN

07R

RUN

06R

RUN

05R

RUN

04R

RUN

03R

RUN

02R

RUN

EXTERIOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

10E

ELEVATOR

RECOVERY

123A

MAIN ELECTRIC

1S2

STAIR 2

1S1

STAIR 1

BULK FOOD

STORAGE

LAUNDRY/ MUD

ROOM

TACK ROOM

PHYSICAL

THERAPY 2

CORRIDOR

FOOD PREP

TRAINER/HANDLERS

COMM

FIRE RISER

ISOLATION

CORRIDOR

FOOD PREP

01D

DEN

01R

RUN

48D

DEN

48R

RUN

EXTERIOR

CORRIDOR 134

EXTERIOR

CORRIDOR

EXTERIOR

CORRIDOR

ISOLATION

CORRIDOR

ARMS VAULT

131A

CORRIDOR

CORRIDOR

SC-1

PFT-1

SC-1

WOM-1

SC-1

SC-1

PFT-1

SC-1

VCT-1

RF-1

SC-1

SC-1

SC-1

SC-1

SC-1

SC-1

SC-1

SC-1

SC-1

SC-1

SC-1SC-1

SC-1 SC-1SC-1

SC-1SC-1

TYP, U.N.O.

SC-1 SC-1 SC-1

SC-1

FACP

SC-1

123B

EMERGENCY

ELEC.

SC-1

SC-1 1

ER-1

ER-1

ER-1

ER-1ER-1

111A

JANITOR

131B

CORRIDOR

133A

CORRIDOR

140A

CORRIDOR

HW

16D

DEN

17D

DEN

18D

DEN

19D

DEN

20D

DEN

21D

DEN

22D

DEN

23D

DEN

24D

DEN

24R

RUN

23R

RUN

22R

RUN

21R

RUN

20R

RUN

19R

RUN

18R

RUN

17R

RUN

16R

RUN

131B

CORRIDOR

133A

CORRIDOR

140A

CORRIDOR

HW

16D

DEN

17D

DEN

18D

DEN

19D

DEN

20D

DEN

21D

DEN

22D

DEN

23D

DEN

24D

DEN

24R

RUN

23R

RUN

22R

RUN

21R

RUN

20R

RUN

19R

RUN

18R

RUN

17R

RUN

16R

RUN

LATRINE (ABA)

LATRINE (ABA)

SC-1

SC-1

SC-1

ER-1

ER-1

SC-1

PFT-1 PORCELAIN TILE

SC-1 SEALED CONCRETE

1. ALL FLOORING MATERIAL CHANGES TO OCCUR UNDER

C.L. OF DOOR, U.N.O.

2. GC TO INSPECT SLAB AND PROVIDE A SMOOTH FINISH

PRIOR TO FLOORING INSTALLATION.

3. APPLY A LEVELING COMPOUND TO FLOORING LEVELS

WHERE TWO DIFFERENT HEIGHT FINISHES MEET.

FLOOR FINISH GENERAL NOTES:FLOOR FINISH LEGEND:

VCT-1 VINYL COMPOSITION TILE ER-1 EPOXY RESIN FLOORING

RF-1 RUBBER FLOORING TILE

VCT-2 VINYL COMPOSITION TILE

BASE BID: SC-1

BID OPTION 01: ER-1

BASE BID: VCT-1

BID OPTION 05: LVT-1

WOM-1 WALK-OFF MAT

FLOOR FINISH KEY NOTES:

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C H

E C

K E

D B

Y

US Army Corps of Engineers ®

D

C

B

A

C A

T E

G O

R Y

C O

D E

A N

S I D

E

F

G

2 3 4 5 6 7 8 9 10

J O

N E

S F

R A

N K

L

IN

R D

S

U

IT

E

R A

L E

IG

H

N

C

-3

(9

-6

(9

-7

F

A X

L

IC

E N

S E

F

-0

FOR OFFICIAL USE ONLY

D

A R

L

IN

G T

O N

A V

E

W

IL

M

IN

G T

O N

D

IS

T

R

IC

T W

IL

M

IN

G

T O

N N

O R

T H

C A

R O

L

IN

A

F O

R T

B R

A G

G N

O R

T H

C A

R O

L

IN

A P

N

S

O F

M

IL

IT

A

R Y

W O

R K

IN

G

D O

G F

A C

IL

IT

Y O

C T

O B

E R

10/12/2020

AT

S

TE

FO LF

A

DI

RO

10.185

E R

S

G

ET

RED RA CH

T C

ETI

I

WARD

B

LA

IR

ED

N A

LD

R O

C:\Users\Public\Documents\Local_Revit_Files\stn_arch_MWD_Facility_178451236_R18_Robert.Murdock65NTK.rvt

9/29/2020 12:56:59 PM

W P

M R

W H

N -1

-D

-0

R B

G S

R B

A F

.D

G N

AF101

L E

V E

L

F L O

O R

F

IN

IS

H

P L A

N

K M

B

READY TO ADVERTISE

1/8" = 1'-0"A1

LEVEL 1 FLOOR FINISH PLAN

0 4 8 16' 1/8" = 1'-0"

N

TRUE NORTH -126°

FROM PLAN

NORTH

M A

R K

D E

S C

R

IP

T

IO

N D

A

M. TEAM 8 PN

M. LOCKERS

BREAK RM

COMMAND

WORK SPACE

STORAGE

STORAGE

F. TEAM 4 PN

CLASSROOM - 40

PN

20E

ELEVATOR

LAUNDRY

CONFERENCE

ROOM

KENNEL MSTR

OFFICE

TRAINER OFFICE

2S2

STAIR 2

JANITOR204

M. LATRINE

PROGRAM

MANAGER

2S1

STAIR 1

CORRIDOR

ELECTRIC

COMM

M. TEAM 8 PN

M. TEAM 8 PN

TEAM OFFICE

CORRIDOR

F. LATRINE

LAUNDRY

F. SHOWER

SC-1

VCT-1

PFT-1

PFT-1

PFT-1

PFT-1

SC-1

VCT-1

VCT-1

VCT-1

VCT-1

VCT-1

VCT-1

VCT-1

VCT-2

VCT-1

VCT-1 VCT-1 VCT-1

PFT-1

SC-1

VCT-2

VCT-1

VCT-2

VCT-1

LATRINE (ABA)

LATRINE (ABA)

SC-1

VCT-2

ELEVATOR

CONTROLLER

PFT-1 PORCELAIN TILE

SC-1 SEALED CONCRETE

1. ALL FLOORING MATERIAL CHANGES TO OCCUR UNDER

C.L. OF DOOR, U.N.O.

2. GC TO INSPECT SLAB AND PROVIDE A SMOOTH FINISH

PRIOR TO FLOORING INSTALLATION.

3. APPLY A LEVELING COMPOUND TO FLOORING LEVELS

WHERE TWO DIFFERENT HEIGHT FINISHES MEET.

FLOOR FINISH GENERAL NOTES:FLOOR FINISH LEGEND:

VCT-1 VINYL COMPOSITION TILE ER-1 EPOXY RESIN FLOORING

RF-1 RUBBER FLOORING TILE

VCT-2 VINYL COMPOSITION TILE

BASE BID: SC-1

BID OPTION 01: ER-1

BASE BID: VCT-1

BID OPTION 05: LVT-1

WOM-1 WALK-OFF MAT

FLOOR FINISH KEY NOTES:

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C H

E C

K E

D B

Y

US Army Corps of Engineers ®

D

C

B

A

C A

T E

G O

R Y

C O

D E

A N

S I D

E

F

G

2 3 4 5 6 7 8 9 10

J O

N E

S F

R A

N K

L

IN

R D

S

U

IT

E

R A

L E

IG

H

N

C

-3

(9

-6

(9

-7

F

A X

L

IC

E N

S E

F

-0

FOR OFFICIAL USE ONLY

D

A R

L

IN

G T

O N

A V

E

W

IL

M

IN

G T

O N

D

IS

T

R

IC

T W

IL

M

IN

G

T O

N N

O R

T H

C A

R O

L

IN

A

F O

R T

B R

A G

G N

O R

T H

C A

R O

L

IN

A P

N

S

O F

M

IL

IT

A

R Y

W O

R K

IN

G

D O

G F

A C

IL

IT

Y O

C T

O B

E R

10/12/2020

AT

S

TE

FO LF

A

DI

RO

10.185

E R

S

G

ET

RED RA CH

T C

ETI

I

WARD

B

LA

IR

ED

N A

LD

R O

C:\Users\Public\Documents\Local_Revit_Files\stn_arch_MWD_Facility_178451236_R18_Robert.Murdock65NTK.rvt

9/29/2020 12:57:03 PM

W P

M R

W H

N -1

-D

-0

R B

G S

R B

A F

.D

G N

AF102

L E

V E

L

F L O

O R

F

IN

IS

H

P L A

N S

K M

B

READY TO ADVERTISE

1/8" = 1'-0"A1

LEVEL 2 FLOOR FINISH PLAN

0 4 8 16' 1/8" = 1'-0"

N

TRUE NORTH -126°

FROM PLAN

NORTH

M A

R K

D E

S C

R

IP

T

IO

N D

A

1. BID OPTION TO MAKE FLOORING INCLUDING INTEGRAL BASE

ER-1 AS NOTED IN SCHEDULE. SPECS FOR ER-1 ARE LISTED ON

FINISH KEY, SHEET AF602.

2. ALL EXPOSED INTERIOR WALL CORNERS IN HIGH TRAFFIC

AREAS ARE TO RECEIVED CG-1: STAINLESS STEEL CORNER

GUARDS.

3. BID OPTION #5 TO MAKE FLOORING LVT AS NOTED IN

SCHEDULE. BASIS OF DESIGN TO BE ARMSTRONG BRUSHED

ESSENCE ENCHANTED.

4. ALL DOORS AND DOOR FRAMES TO BE PAINTED P-3, TYP

U.N.O.

5. REFER TO SHEET AE603 FOR INTERNAL BLINDS REQUIRED

FOR KENNELS.

GENERAL NOTES:

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C H

E C

K E

D B

Y

US Army Corps of Engineers ®

D

C

B

A

C A

T E

G O

R Y

C O

D E

A N

S I D

E

F

G

2 3 4 5 6 7 8 9 10

J

O N

E S

F R

A N

K L

IN

R

D

S U

IT

E

R

A L E

IG

H

N

C

-3

(9

-6

(9

-7

F

A X

L

IC

E N

S E

F

-0

FOR OFFICIAL USE ONLY

D

A R

L

IN

G T

O N

A V

E

W

IL

M

IN

G T

O N

D

IS

T

R

IC

T W

IL

M

IN

G

T O

N N

O R

T H

C A

R O

L

IN

A

F O

R T

B R

A G

G N

O R

T H

C A

R O

L

IN

A P

N

S

O F

M

IL

IT

A

R Y

W O

R K

IN

G

D O

G F

A C

IL

IT

Y O

C T

O B

E R

10/12/2020

AT

S

TE

FO LF

A

DI

RO

10.185

E R

S

G

ET

RED RA CH

T C

ETI

I

WARD

B

LA

IR

ED

N A

LD

R O

C:\Users\Public\Documents\Local_Revit_Files\stn_arch_MWD_Facility_178451236_R18_briana.mckeen.rvt

9/30/2020 2:45:31 PM

W P

M R

W H

N -1

-D

-0

R B

G S

R B

A F

.D

G N

AF601

IN

T

E R

IO

R

R O

O M

F

IN

IS

H

S C

H E

D U

L E

K M

B

READY TO ADVERTISE

INTERIOR FINISH SCHEDULE

ROOM

NUMBER ROOM NAME

FLOOR

FINISH

WALL

BASE

NORTH WALL

FINISH

EAST WALL

FINSH

SOUTH WALL

FINISH

WEST WALL

FINISH

CEILING MATERIAL /

FINISH MILLWORK REMARKS

142 CORRIDOR SC-1 RB-1 P-1 P-1 P-2 P-1 EXPOSED / P-6 BID OPTION TO BE ER-1

LEVEL 2

2S1 STAIR 1 - - - - - - - EXTERIOR STAIR, SEE

EXTERIOR FINISH SCHEDULE

2S2 STAIR 2 SC-1 RB-2 P-1 P-1 P-1 P-1 EXPOSED / P-6

20E ELEVATOR VCT-1 - PL-2 PL-2 PL-2 PL-2 PER MANUF.

RECOMMENDATION

BID OPTION TO BE LVT

201 CORRIDOR VCT-2 RB-1 P-1 P-1 P-1 P-1 ACT-1 BID OPTION TO BE LVT

202 TRAINER OFFICE VCT-1 RB-1 P-1 P-1 P-1 P-2 ACT-1 BID OPTION TO BE LVT

203 M. LOCKERS PFT-1 TB-1 WT-1 / WT-2 /

P-1

WT-1 / WT-2 /

P-1

WT-1 / WT-2 /

P-1

WT-1 / WT-2 /

P-1

GYP. BD. (MOISTURE

RESISTANT) / P-5

P-1 ABOVE WT-1. SEE

INTERIOR ELEVATIONS

204 M. LATRINE PFT-1 TB-1 WT-1 / WT-2 /

P-1

WT-1 / WT-2 /

P-1

WT-1 / WT-2 /

P-1

WT-1 / WT-2 /

P-1

GYP. BD. (MOISTURE

RESISTANT) / P-5

P-1 ABOVE WT-1. SEE

INTERIOR ELEVATIONS

205 LAUNDRY PFT-1 TB-1 P-1 P-1 P-1 P-1 GYP. BD. (MOISTURE

RESISTANT) / P-5

206 CORRIDOR VCT-2 RB-1 P-4 P-4 P-4 P-4 ACT-1 BID OPTION TO BE LVT

207 M. TEAM 8 PN VCT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 BID OPTION TO BE LVT

208 M. TEAM 8 PN VCT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 BID OPTION TO BE LVT

209 M. TEAM 8 PN VCT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 BID OPTION TO BE LVT

210 STORAGE VCT-2 RB-1 P-1 P-1 P-1 P-1 ACT-1 BID OPTION TO BE LVT

211 TEAM OFFICE VCT-1 RB-1 P-1 P-1 P-1 P-2 ACT-1 BID OPTION TO BE LVT

212 F. LATRINE PFT-1 TB-1 WT-1 / WT-2 /

P-1

WT-1 / WT-2 /

P-1

WT-1 / WT-2 /

P-1

WT-1 / WT-2 /

P-1

GYP. BD. (MOISTURE

RESISTANT) / P-5

P-1 ABOVE WT-1. SEE

INTERIOR ELEVATIONS

213 F. SHOWER PFT-1 TB-1 WT-1 / WT-2 /

P-1

WT-1 / WT-2 /

P-1

WT-1 / WT-2 /

P-1

WT-1 / WT-2 /

P-1

GYP. BD. (MOISTURE

RESISTANT) / P-5

P-1 ABOVE WT-1. SEE

INTERIOR ELEVATIONS

214 F. TEAM 4 PN VCT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 BID OPTION TO BE LVT

215 LAUNDRY VCT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 BID OPTION TO BE LVT

216 COMM SC-1 RB-1 P-1 P-1 P-1 P-1 EXPOSED / P-6

217 CLASSROOM - 40

PN

VCT-1 RB-1 P-2 P-1 P-1 P-1 ACT-3 BID OPTION TO BE LVT

218 BREAK RM VCT-1 RB-1 P-2 P-1 P-1 P-1 ACT-1 PL-1 / SS-1 BID OPTION TO BE LVT

219 COMMAND

WORK SPACE

VCT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 BID OPTION TO BE LVT

220 COMMAND

WORK SPACE

VCT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 BID OPTION TO BE LVT

221 PROGRAM

MANAGER

VCT-1 RB-1 P-1 P-2 P-1 P-1 ACT-1 BID OPTION TO BE LVT

222 KENNEL MSTR

OFFICE

VCT-1 RB-1 P-1 P-2 P-1 P-1 ACT-1 BID OPTION TO BE LVT

223 STORAGE VCT-1 RB-1 P-1 P-2 P-1 P-1 ACT-1 BID OPTION TO BE LVT

224 CONFERENCE

ROOM

VCT-1 RB-1 PT-1 / CR-1 /

PT-2

P-1 / CR-1 /

P-2

P-1 / CR-1 /

P-2

P-1 / CR-1 /

P-2

ACT-3 BID OPTION TO BE LVT. P-1

ABOVE CR-1 (CHAIR RAIL)

AND P-2 BELOW. CHAIR RAIL

MOUNTED AT 32" AFF

225 ELECTRIC SC-1 RB-1 P-1 P-1 P-1 P-1 EXPOSED / P-6

226 JANITOR SC-1 TB-1 P-1 P-1 WT-1 / P-1 WT-1 / P-1 ACT-1 P-1 ABOVE WT-1. SEE

INTERIOR ELEVATIONS

230 ELEVATOR

CONTROLLER

VCT-2 RB-1 P-1 P-1 P-1 P-1 ACT-1 BID OPTION TO BE LVT

231 LATRINE (ABA) PFT-1 TB-1 WT-1 / WT-2 /

P-1

WT-1 / WT-2 /

P-1

WT-1 / WT-2 /

P-1

WT-1 / WT-2 /

P-1

GYP. BD. (MOISTURE

RESISTANT) / P-5

P-1 ABOVE WT-1. SEE

INTERIOR ELEVATIONS

232 LATRINE (ABA) PFT-1 TB-1 WT-1 / WT-2 /

P-1

WT-1 / WT-2 /

P-1

WT-1 / WT-2 /

P-1

WT-1 / WT-2 /

P-1

GYP. BD. (MOISTURE

RESISTANT) / P-5

P-1 ABOVE WT-1. SEE

INTERIOR ELEVATIONS

INTERIOR FINISH SCHEDULE

ROOM

NUMBER ROOM NAME

FLOOR

FINISH

WALL

BASE

NORTH WALL

FINISH

EAST WALL

FINSH

SOUTH WALL

FINISH

WEST WALL

FINISH

CEILING MATERIAL /

FINISH MILLWORK REMARKS

LEVEL 1

01D DEN SC-1 - P-1 P-1 P-1 P-1 GYP. BD. (MOISTURE

RESISTANT) / P-5

BID OPTION TO BE ER-1

01R RUN SC-1 - P-1 P-1 P-1 P-1 EXPOSED / P-6 BID OPTION TO BE ER-1

1S1 STAIR 1 - - - - - - - EXTERIOR STAIR, SEE

EXTERIOR FINISH SCHEDULE

1S2 STAIR 2 SC-1 RB-2 P-1 P-1 P-1 P-1 EXPOSED / P-6

10E ELEVATOR VCT-1 - PL-2 PL-2 PL-2 PL-2 PER MANUF.

RECOMMENDATION

100 CORRIDOR WOM-1 RB-1 P-1 P-1 P-1 P-1 ACT-1

101 FACP SC-1 RB-2 P-1 P-1 P-1 P-1 EXPOSED / P-6 BID OPTION TO BE ER-1

102 FIRE RISER SC-1 RB-2 P-1 P-1 P-1 P-1 EXPOSED / P-6

103 LATRINE (ABA) PFT-1 TB-1 WT-1 / WT-2 /

P-1

WT-1 / WT-2 /

P-1

WT-1 / WT-2 /

P-1

WT-1 / WT-2 /

P-1

GYP. BD. (MOISTURE

RESISTANT) / P-5

WT-1 & WT-2 @ 4'-6" AFF. P-1

ABOVE WT-1. SEE INTERIOR

ELEVATIONS

104 LATRINE (ABA) PFT-1 TB-1 WT-1 / WT-2 /

P-1

WT-1 / WT-2 /

P-1

WT-1 / WT-2 /

P-1

WT-1 / WT-2 /

P-1

GYP. BD. (MOISTURE

RESISTANT) / P-5

WT-1 & WT-2 @ 4'-6" AFF. P-1

ABOVE WT-1. SEE INTERIOR

ELEVATIONS

105 HW SC-1 RB-2 P-1 P-1 P-1 P-1 EXPOSED / P-6 BID OPTION TO BE ER-1

106 TACK ROOM SC-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 PL-1 BID OPTION TO BE ER-1

107 ARMS VAULT SC-1 RB-2 P-1 P-1 P-1 P-1 GYP. BD. / P-4 BID OPTION TO BE ER-1

108 LAUNDRY/ MUD

ROOM

SC-1 RB-2 P-1 P-1 P-1 WT-1 / P-1 GYP. BD. (MOISTURE

RESISTANT) / P-5

SS-1 BID OPTION TO BE ER-1.

REFER TO SHEET AE402 FOR

WALL TILE PLACEMENT.

109 BULK FOOD

STORAGE

SC-1 RB-2 P-1 P-1 P-1 P-1 EXPOSED / P-6 PL-1 BID OPTION TO BE ER-1

110 FOOD PREP SC-1 RB-2 P-1 P-1 P-1 P-1 GYP. BD. / P-4 PL-1 / SS-1 BID OPTION TO BE ER-1

111 CORRIDOR SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 BID OPTION TO BE ER-1

111A JANITOR SC-1 TB-1 P-1 WT-1 / P-1 WT-1 / P-1 WT-1 / P-1 EXPOSED / P-6 WT-1 @ 4'-6" AFF. P-1 ABOVE

WT-1. SEE INTERIOR

ELEVATIONS

112 PHYSICAL

THERAPY 2

SC-1 RB-2 P-1 P-1 P-1 P-1 GYP. BD. (MOISTURE

RESISTANT) / P-5

PL-1 / SS-1 BID OPTION TO BE ER-1

113 TRAINER/HANDL

ERS

SC-1 RB-1 P-1 P-1 P-1 P-2 EXPOSED / P-6 BID OPTION TO BE ER-1

114 FOOD PREP SC-1 RB-1 P-1 P-1 P-1 P-1 GYP. BD. / P-4 PL-1 / SS-1 BID OPTION TO BE ER-1

115 COMM SC-1 - P-1 P-1 P-1 P-1 EXPOSED / P-6

116 PHYSICAL

THERAPY

RF-1 RB-2 P-1 P-1 P-1 P-1 GYP. BD. / P-4

117 STERILIZATION ER-1 ER-1 P-1 P-1 P-1 P-1 GYP. BD. (MOISTURE

RESISTANT) / P-5

PL-1 / SS-1

118 FOOD PREP SC-1 RB-1 P-1 P-1 P-1 P-1 GYP. BD. / P-4 PL-1 / SS-1 BID OPTION TO BE ER-1

119 SURGERY PREP ER-1 ER-1 P-1 P-1 P-1 P-1 GYP. BD. (MOISTURE

RESISTANT) / GEP

PL-1 / SS-1

120 SURGERY ER-1 ER-1 P-1 P-1 P-1 P-1 GYP. BD. (MOISTURE

RESISTANT) / GEP

BID OPTION TO BE ER-1

121 TREATMENT ER-1 ER-1 P-1 P-1 P-1 P-1 GYP. BD. (MOISTURE

RESISTANT) / GEP

PL-1 / SS-1

122 LAB / PHARMACY ER-1 ER-1 P-1 P-1 P-1 P-1 GYP. BD. (MOISTURE

RESISTANT) / GEP

PL-1 / SS-1

123A MAIN ELECTRIC SC-1 RB-2 P-1 P-1 P-1 P-1 EXPOSED / P-6

123B EMERGENCY

ELEC.

SC-1 RB-2 P-1 P-1 P-1 P-1 EXPOSED / P-6

124 RADIOLOGY ER-1 ER-1 P-1 P-1 P-1 P-1 LEAD LINED GYP. BD.

125 OXYGEN SC-1 RB-2 P-1 P-1 P-1 P-1 EXPOSED / P-6

126 EXPENDABLE

SUPPLY

ER-1 ER-1 P-1 P-1 P-1 P-1 GYP. BD. / P-4

127 SURGERY

LAUNDRY

SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-2

128 RECOVERY ER-1 ER-1 P-1 P-1 P-1 P-1 GYP. BD. (MOISTURE

RESISTANT) / GEP

129 CORRIDOR ER-1 ER-1 P-1 P-1 P-1 P-1 GYP. BD. (MOISTURE

RESISTANT) / GEP

130 ISOLATION

CORRIDOR

SC-1 RB-1 P-1 P-1 P-2 P-1 EXPOSED / P-6 BID OPTION TO BE ER-1

131A CORRIDOR SC-1 RB-1 P-1 P-1 P-2 P-1 EXPOSED / P-6 BID OPTION TO BE ER-1

131B CORRIDOR SC-1 RB-1 P-1 P-1 P-2 P-1 EXPOSED / P-6 BID OPTION TO BE ER-1

132 CORRIDOR SC-1 RB-1 P-1 P-1 P-1 P-2 EXPOSED / P-6 BID OPTION TO BE ER-1

133 CORRIDOR SC-1 RB-1 P-1 P-1 P-1 P-2 EXPOSED / P-6 BID OPTION TO BE ER-1

134 EXTERIOR

CORRIDOR

SC-1 - P-1 P-1 P-1 P-1 EXPOSED / P-6 SEE EXTERIOR ELEVATIONS,

BID OPTION TO BE ER-1

135 EXTERIOR

CORRIDOR

SC-1 - P-1 P-1 P-1 P-1 EXPOSED / P-6 SEE EXTERIOR ELEVATIONS,

BID OPTION TO BE ER-1

136 ISOLATION

CORRIDOR

SC-1 - P-1 P-1 P-1 P-1 EXPOSED / P-6 SEE EXTERIOR ELEVATIONS,

BID OPTION TO BE ER-1

137 MECH SC-1 - P-1 P-1 P-1 P-1 EXPOSED / P-6

138 EXTERIOR

CORRIDOR

SC-1 - P-1 P-1 P-1 P-1 EXPOSED / P-6 SEE EXTERIOR ELEVATIONS,

BID OPTION TO BE ER-1

139 EXTERIOR

CORRIDOR

SC-1 - P-1 P-1 P-1 P-1 EXPOSED / P-6 SEE EXTERIOR ELEVATIONS,

BID OPTION TO BE ER-1

140 CORRIDOR SC-1 RB-1 P-1 P-2 P-1 P-1 EXPOSED / P-6 BID OPTION TO BE ER-1

141 CORRIDOR SC-1 RB-1 P-1 P-1 P-2 P-1 EXPOSED / P-6 BID OPTION TO BE ER-1

M A

R K

D E

S C

R

IP

T I O

N D

A

1. ALL FINISHES ARE SELECTED FOR AN

OVERALL COORDINATED DESIGN INTENT,

OF WHICH PROPOSED SUBSTITUTIONS

WILL NEED TO BE CONSIDERED.

2. REFER TO SHEET AE603 FOR INTERNAL

BLINDS REQUIRED FOR KENNELS.

GENERAL NOTES:

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C H

E C

K E

D B

Y

US Army Corps of Engineers ®

D

C

B

A

C A

T E

G O

R Y

C O

D E

A N

S I D

E

F

G

2 3 4 5 6 7 8 9 10

J O

N E

S F

R A

N K

L

IN

R D

S

U

IT

E

R A

L E

IG

H

N

C

-3

(9

-6

(9

-7

F

A X

L

IC

E N

S E

F

-0

FOR OFFICIAL USE ONLY

D

A R

L

IN

G T

O N

A V

E

W

IL

M

IN

G T

O N

D

IS

T

R

IC

T W

IL

M

IN

G

T O

N N

O R

T H

C A

R O

L

IN

A

F O

R T

B R

A G

G N

O R

T H

C A

R O

L

IN

A P

N

S

O F

M

IL

IT

A

R Y

W O

R K

IN

G

D O

G F

A C

IL

IT

Y O

C T

O B

E R

10/12/2020

AT

S

TE

FO LF

A

DI

RO

10.185

E R

S

G

ET

RED RA CH

T C

ETI

I

WARD

B

LA

IR

ED

N A

LD

R O

C:\Users\Public\Documents\Local_Revit_Files\stn_arch_MWD_Facility_178451236_R18_Robert.Murdock65NTK.rvt

9/29/2020 12:57:08 PM

W P

M R

W H

N -1

-D

-0

R B

G S

R B

A F

.D

G N

AF602

IN

T

E R

IO

R

F

IN

IS

H

K E

Y

K M

B

READY TO ADVERTISE

WB-1 WINDOW BLINDS BALI WINDOW BLINDS VINYL HORIZONTAL BLINDS 5005 1" GLOSS WHITE SATIN

TO BE PLACED ON ALL EXTERIOR

WINDOWS

TP-1 TOILET PARITIONS SCRANTON PRODUCTS HINY HIDERS SANDCASTLE

PL-2 PLASTIC LAMINATE WILSONART RAW COTTON 4947 38 ELEVATOR CAB WALLS

P-7 PAINT SHERWIN WILLIAMS CANTERBURY BLUE SEMI-GLOSS STAIRS, HANDRAILS & GUARDRAILS

CR-1 CHAIR RAIL S & S CRAFTSMAN CR6 11/16" X 5 1/4"

STAIN TO MATCH SHERWIN WILLIAMS:

SW 273 ESPRESSO

MISC. FINSHES

SS-1 SOLID SURFACE CORIAN AURORA

PL-1 PLASTIC LAMINATE WILSONART HARVEST MAPLE 7953-38

MILLWORK

P-6 PAINT SHERWIN WILLIAMS SW 9505 FROST BITE EPOXY FINISH

P-5 PAINT SHERWIN WILLIAMS SW 9505 FROST BITE SEMI GLOSS

P-4 PAINT SHERWIN WILLIAMS SW 9505 FROST BITE FLAT

GEP GYP BOARD CEILING - EPOXY FINISH SHERWIN WILLIAMS SW 9505 FROST BITE GLOSS

ACT-3 ACOUSTIC CEILING TILE ARMSTRONG CIRRUS 24" X 24" TEGUALR #572 - WHITE

ACT-2 ACOUSTIC CEILING TILE ARMSTRONG CLEAN ROOM FL 24" X 24"

SQUARE LAY IN #1715 WHITE W/ GREY

SPATTER

MOISTURE RESISTANT

ACT-1 ACOUSTIC CEILING TILE U.S.G. CLIMAPLUS 24" X 24" X 5/8" TEGUALR #2220 - WHITE

CEILING

WT-2 CERAMIC WALL TILE DALTILE COLOR WHEEL COLLECTION 4 1/4" X 4 1/4" GALAXY 1469 GLOSS

WT-1 CERAMIC WALL TILE DALTILE COLOR WHEEL COLLECTION 4 1/4" X 4 1/4" ALMOND 0135 GLOSS

P-3 PAINT SHERWIN WILLIAMS CANTERBURY BLUE SEMI-GLOSS DOORS, DOOR FRAMES & WALLS

P-2 PAINT SHERWIN WILLIAMS SW 0016 BILLIARD GREEN SATIN ACCENT PAINT

P-1 PAINT SHERWIN WILLIAMS SW 7003 TOQUE WHITE SATIN FEILD PAINT

ER-1 EPOXY RESIN WALLS STONHARD STONRES RTZ - STONHENGE

REFER TO INTERIOR ELEVATIONS FOR

FINISH HEIGHT AFF

GR-1 TILE GROUT LATICRETE 90 LIGHT PEWTER

CG-1 CORNER GUARDS - STAINLESS STEEL INPRO

SURFACE MOUNT STAINLESS

STEEL CORNER GUARD

6' HIGH AFF

TO BE PLACED AT ALL EXPOSED

CORNERS OF HIGH TRAFFIC AREAS

AP-1 ACOUSTIC PANELS LAB PRODUCTS INC. SOUNBREAK 2' X 4' WHITE

REFER TO SHEET AE403 FOR TYPICAL

KENNEL RUN ACOUSTIC PANELS

WALLS

TB-1 PORCELAIN TILE BASE AMERICAN OLEAN THEORETICAL 6" WALL BASE FUNDAMENTAL GRAY #P-36C9TB

RB-2 RUBBER BASE JOHNSONITE 4" 40 BLACK

RB-1 RUBBER BASE BURKE FLOORING SPECIFIY 4" 660 ROCKY

ER-1 EPOXY RESIN INTEGRAL COVE BASE STONHARD STONRES RTZ - STONHENGE

BASE

WOM-1 WALK OFF MAT CONSTRUCTION SPECIALTIES PEDI-TREAD 9325 GRAPHITE COLOR

REFER TO FINISH FLOOR PLANS FOR

SIZES

VCT-2 VINYL COMPOSITION TILE ARMSTRONG CHROMASPIN 12" X 12" 54801 PAYNES GRAY

VCT-1 VINYL COMPOSITION TILE ARMSTRONG CHROMASPIN 12" X 12" 54802 CARBONITE

SC-1 SEALED CONCRETE

RF-1 RUBBER TILE NORA GRANO 39.5" X 39.5" 4880 DRUSY

PFT-1 PORCELAIN TILE AMERICAN OLEAN THEORETICAL 12' X 24' FUNDAMENTAL GRAY #TH94

GR-1 TILE GROUT LATICRETE 90 LIGHT PEWTER

ER-1 EPOXY RESIN FLOORING STONHARD STONRES RTZ - STONHENGE

FLOORING

PATTERN / SERIES SIZE COLOR FINISH

CODE MATERIAL MANUFACTURER

FINISH

REMARKS

INTERIOR FINISH KEY (BASIS OF DESIGN)

M A

R K

D E

S C

R

IP

T

IO

N D

A

DIVIDER 3

brmckeen Snapshot brmckeen Image brmckeen Text Box SW0016 Billiard Green brmckeen Text Box brmckeen Snapshot brmckeen Text Box brmckeen Snapshot brmckeen Snapshot

Date: 12 October 2020

U.S. Army Corps of Engineers

Fort Bragg, NC

Wilmington District

ARCHITECT/DESIGN:

Stantec Architecture Inc.

4798 New Broad Street, Suite 100

Orlando, Florida 32814

BINDER PREPARED BY:

Lori Barnard, Interior Designer

Stantec Architecture Inc.

READY TO ADVERTISE

FF&E PACKAGE DESIGN BROCHURE

PN 72426, SOF MILITARY WORKING DOG FACILITY

U.S. Army Corps of Engineers

Fort Bragg, NC

Date: 12 October 2020

U.S. Army Corps of Engineers Fort Bragg, NC Wilmington District

ARCHITECT/DESIGN:

Stantec Architecture Inc.

4798 New Broad Street, Suite 100

Orlando, Florida 32814

READY TO ADVERTISE

PN 72426, SOF MILITARY WORKING DOG FACILITY

U.S. Army Corps of Engineers Fort Bragg, NC

Index

1. Design Analysis

2. Furniture Plans & Key

AE101, AE102, IN111, IN112, IN411, IN412, IN413, IN414

3. Cost Estimate Summary & Source by Summary

4. Procurement Data Sheets

5. Interior Finish Boards

BINDER PREPARED BY:

Lori Barnard, Interior Designer

Stantec Architecture Inc.

FF&E PACKAGE DESIGN BROCHURE

DIVIDER 1

Design Narrative

SOF Military Working Dog Facility, SOTF

Fort Bragg, NC

PN 72426

12 October 2020 Prepared by

Stantec Consulting Services Inc.

Raleigh, North Carolina

With consultants AME Consulting Engineers PC – MEP Charlotte, North Carolina

JMMPE – Fire Protection Martinez, Georgia

Prepared for USACE Wilmington District

Ready to Advertise

Military Working Dog Facility, SOTF 4-1

Section 4

BUILDING ARCHITECTURAL SYSTEMS

4.1 CRITERIA AND REFERENCES

- Fort Bragg Installation Design Guide

- Savannah District Design Manual, June 2016

- DoD Space Planning Criteria Chapter 560:

Veterinary Services, July 1, 2017

- FM 3-19.17 Military Working Dogs

- AR 190-11 Physical Security of Arms, Ammunition, and

- Explosives, 17 Jan 2019

- AR 190-12 Military Working Dogs

- UFC 1-200-01, General Building Requirements. UFC 1-300-09N, Design Procedures.

- DoD Building Code, 8 Oct 2019.

- UFC 3-101-01, Architecture.

UFC 3-120-10, Interior Design.

- UFC 3-600-01, Fire Protection Engineering for Facilities. UFC 4-

010-01, DoD Minimum Antiterrorism Standards for Buildings

- UFC 3-490-06 Elevators

- International Building Code (IBC), 2018.

- National Fire Protection Association (NFPA) 101, Life Safety

Code, 2018 edition.

- Veterinary care and animal research facilities shall comply with the requirements of NFPA 150, Standard on Fire and

Life Safety in Animal House Facilities.

Military Working Dog Facility, SOTF 4-2

4.2 BUILDING CONTEXT

The project site is located approximately 6 miles from Fort Bragg

Cantonment Area and is located within a separate secure perimeter with 24/7/365 security. The building has its own requirements for additional isolation within this context. The exterior features of the facility will match other buildings within the secure area such as exterior finishes.

4.3 GENERAL

The overall building area is calculated…

This is the start of the file's text. The full file is on GovTribe.