OR FLAP DOT 126(1), Blue Pool Safety and Access Enhancement Project

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
69056725B000002
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Oregon, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Transportation Federal Highway Administration is seeking a contractor for the OR FLAP DOT 126(1) Blue Pool Safety and Access Enhancement Project, a comprehensive infrastructure improvement initiative located in Oregon's Willamette National Forest. The project involves constructing a new paved parking area with approximately 100 vehicle capacity, improving Forest Service Road 2600-735, and enhancing approximately 1,900 feet of OR-126 with a new left turn lane. Key contract requirements include site grading, excavation, roadway aggregate installation, asphalt paving, erosion control measures, and constructing additional site amenities such as vault toilets, kiosks, and signage. The solicitation (No. 69056725B000002) requires contractors to demonstrate technical capability to manage complex roadway and trailhead infrastructure development, with a focus on environmental preservation and safety enhancement. Bids were due by November 21, 2024, with the contract anticipated to be awarded shortly thereafter.

The contract is designated as a Total Small Business set-aside, specifically targeting highway, street, and bridge construction firms within NAICS category 237310. Three contractors submitted bids: Marcum & Son LLC ($2,198,652.50), Cascade Civil CORP ($2,680,086.00), and North Santiam Paving Company ($3,566,955.00), with Marcum & Son LLC submitting the lowest bid against an Engineer's Estimate of $2,716,000. The project involves approximately 3,100 cubic yards of roadway excavation, 2,500 tons of asphalt concrete pavement, and 4,100 cubic yards of roadway aggregate, with work to be performed in Linn County, Oregon. The project is a collaborative effort between the Federal Highway Administration, United States Forest Service, and Oregon Department of Transportation, with construction expected to enhance safety and access at the McKenzie River National Recreation Trailhead. Contractors must also coordinate with the U.S. Forest Service, as there is an adjacent trail construction project running through September 2025.

Notice text

7 versions

Update #7 · Latest ·

Project: OR FLAP DOT 126(1), Blue Pool Safety and Access Enhancement Project

See attachments for full requirements.

Amendment A001 Posted 11/05/2024

QA_11-05-2024 Posted 11/05/2024

Amendment A002 Posted 11/15/2024

Bid Summary Posted 11/21/2024

Bid Tabulation Posted 11/22/2024

Reposted Bid Tabulation Posted 12/02/2024

Update #6 ·

Project: OR FLAP DOT 126(1), Blue Pool Safety and Access Enhancement Project

See attachments for full requirements.

Amendment A001 Posted 11/05/2024

QA_11-05-2024 Posted 11/05/2024

Amendment A002 Posted 11/15/2024

Bid Summary Posted 11/21/2024

Bid Tabulation Posted 11/22/2024

Update #5 ·

Project: OR FLAP DOT 126(1), Blue Pool Safety and Access Enhancement Project

See attachments for full requirements.

Amendment A001 Posted 11/05/2024

QA_11-05-2024 Posted 11/05/2024

Amendment A002 Posted 11/15/2024

Bid Summary Posted 11/21/2024

Update #4 ·

Project: OR FLAP DOT 126(1), Blue Pool Safety and Access Enhancement Project

See attachments for full requirements.

Amendment A001 Posted 11/05/2024

QA_11-05-2024 Posted 11/05/2024

Amendment A002 Posted 11/15/2024

Update #3 ·

Project: OR FLAP DOT 126(1), Blue Pool Safety and Access Enhancement Project

See attachments for full requirements.

Amendment A001 Posted 11/05/2024

QA_11-05-2024 Posted 11/05/2024

Update #2 ·

Project: OR FLAP DOT 126(1), Blue Pool Safety and Access Enhancement Project

See attachments for full requirements.

Amendment A001 Posted 11/05/2024

Update #1 ·

Project: OR FLAP DOT 126(1), Blue Pool Safety and Access Enhancement Project

See attachments for full requirements.

Files

Show all 18

Notice history

Notice Type Posted
OR FLAP DOT 126(1), Blue Pool Safety and Access Enhancement Project Award Award Notice
This notice Latest solicitation Solicitation
OR FLAP DOT 126(1), Blue Pool Safety and Access Enhancement Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity