This document appears to be an Erosion and Sediment Control Plan (ESCP) for the OR FLAP DOT 126(1), Blue Pool Safety and Access Enhancement Project. The project is a solicitation being issued by the Department of Transportation Federal Highway Administration. The ESCP outlines the requirements for erosion and sediment control measures to be implemented during the construction of the project. Key details include:
The project aims to enhance safety and access at the Blue Pool site. The ESCP provides specifications and drawings for erosion and sediment control practices such as silt fencing, inlet protection, and revegetation. It also includes a construction sequence, temporary and permanent stabilization requirements, inspection and maintenance procedures, and other related information necessary for the construction contractor to comply with environmental regulations. No specific response dates, award information, or pricing terms are provided in this document, as it is a technical specification rather than the full solicitation.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Plan
S P
For:
Federal Highway Administration Western Federal Lands Highway Division
OR FLAP DOT 126(1)
Blue Pool Safety and Access Enhancement Project
Linn County, Oregon
Project Engineer General Contractor
Table of Contents
ESCP TABS
TAB 1:
TAB 2: Permit ( )
TAB 3: NOI , Correspondence
TAB 4: Delegation of Authority
TAB 5: Maps
TAB 6: Erosion/Sediment Control Plan Sheets ( lan et and BMP ypical etails)
TAB 7: Revegetation Plan (if applicable)
TAB 8: Amendment Log
TAB 9: Inspection Reports
TAB 10: Corrective Action Log
TAB 11: Water Quality Monitoring, Reporting Requirements, and Reports
TAB 12: Training/Certification Log
TAB 13: Government-Selected Waste, Borrow, Staging Sites
TAB 14: Grading and Stabilization Log
TAB 15: Hazardous Spill Plan or Spill Prevention, Control, and Countermeasures (SPCC)
TAB 1 : Quality Assurance Checklist
Tab 1
Tab 2
Tab 3
Tab 4
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS
HIGHWAY DIVISION
DELEGATION OF AUTHORITY
I, , hereby designate the person or specifically described position below to be a duly authorized representative for the purpose of overseeing compliance with environmental requirements, including the Construction General Permit, at the construction site.
The designee is authorized to sign any reports, stormwater pollution prevention plans and all other documents required by the permit.
Name or Position:
Company:
Address:
City, State, Zip:
Phone:
Company:
Title:
Signature:
FHWA, Western Federal Lands Highway Division
610 East Fifth Street
Vancouver, WA 98661-3801
360-619-7700
By signing this authorization, I confirm that I meet the requirements to make such a designation as set forth in and that the designee above meets the definition of a “duly authorized representative” as set forth in
I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
Name:
WFLHD, Western Federal Lands Highway Division
Environmental Manager
Jennifer Chariarse
OR FLAP DOT 126(1) - Blue Pool
Project Engineer
1200-CA
Jennifer Chariarse
JENNIFER A CHARIARSE Digitally signed by JENNIFER A CHARIARSE Date: 2024.08.21 06:37:49 -07'00'
Tab 5
Tab 6
Tab 7
Tab 8
WESTERN FEDERAL LANDS HIGHWAY DIVISION
AMENDMENT LOG
Project Name: Page:
Amendment Number Description of Amendment/BMP
Location of Amendment/BMP, Page/Sheet Number
Date of Amendment
Amendment Approved by:
(Name, Title)
WFLHD 157-4 (5/2011)
Blue Pool Safety and Access Enhancement Project
Tab 9 Inspection Reports
WESTERN FEDERAL LANDS
HIGHWAY DIVISION
CONSTRUCTION SITE INSPECTION REPORT
General Information Project Name:
Date of Inspection: Start/End Times:
Project Name:
Inspector’s Names: Inspectors Title:
Inspector’s Company:
Inspector’s Contact Information:
Inspector’s Qualifications (CESCL or other certification number): Inspector’s Qualifications expiration date:
Describe present phase of construction
Type of Inspection:
Regular Post-storm event Reduced inspection frequency period
Weather Information Has there been a storm event since the last inspection? Yes No If yes, provide:
Estimated Storm Start Date & Time:
Estimated Storm Duration (hrs):
Approximate Amount of Precipitation (in):
Weather at time of this inspection?
Clear Cloudy Rain Sleet Fog Snowing High Winds Other:
Temperature:
WFLHD 157-2 (5/2011)
OR FLAP DOT 126(1): Blue Pool Safety and Access Enhancement Project
Page 2 Project Name:
Inspection Date:
Site-specific BMPs BMP - Describe and give the location of the structural and non-structural BMPs identified in your SWPPP in the BMP column below (add as many BMPs as necessary on the continuation sheets. Include areas that are required to be inspected by the CGP, such as material storage areas that are exposed to precipitation.
BMP Installed – If a BMP should be installed at the current phase of the project and you marked “No” in the “BMP Installed” column, then you must check “Yes” in the “BMP Action Required?” column BMP Action Required? - .If a BMP needs repair, modification, replacement, maintenance or a new BMP is needed or a SWPPP amendment is needed, then a BMP Action is required.
BMP Action Required, Complete by Date - Before certifying the report, fill in the date when the BMP Action can reasonably be expected to be completed. When a BMP Action is NOT required, leave the “Complete by Date” blank.
Describe BMP Action, if Needed – Anytime you check “Yes” for “BMP Action Required”, then you must also fill in the “Describe BMP Action” column.
Delayed Action Item Report - When a BMP Action is required and the Complete by Date is not met, you must then fill out the Delayed Action Item Report to explain why the date was not met Keep the Delayed Action Item Report in the SWPPP.
Corrective Action Log - When a BMP Action is required as noted in this report, you must also enter all the information for this action in the Corrective Action Log.
BMP & Location BMP Installed?
BMP Action Required?
Describe BMP Action, if Needed
Yes No Yes No
Complete by Date:
Page 3 Project Name:
BMP & Location BMP Installed?
BMP Action Required?
Please use continuation sheets if there are additional BMPs to list.
Page 4 Project Name:
Overall Site Issues BMP or Activity -- These are some general site issues that must be assessed during inspections.
Implemented? – If a BMP or activity should be implemented at the current phase of the project and you check “No”, then you must mark “Yes” in the “Corrective Action Required?” column.
Corrective Action Required? - When maintenance or some other corrective action is required, check “Yes” in this column.
Corrective Action Required, Complete by Date - When a corrective action is required, before certifying the report, fill in the date when the corrective action can reasonably be expected to be completed. When a corrective action is NOT required, leave the “Complete by Date” blank.
Describe Corrective Action, if Needed – Anytime you check “Yes” in the “Corrective Action Required?”
column, you must fill in the “Describe Corrective Action” column as well.
Delayed Action Item Report – When a Corrective Action is required and the Complete by Date is not met, you must then fill out the Delayed Action Item Report to explain why the date was not met. Keep the Delayed Action Item Report in the SWPPP.
Corrective Action Log - When a Corrective Action is required as noted in this report, you must also enter all the information for this action in the Corrective Action Log.
BMP or Activity Implemented? Corrective Action Required?
Describe Corrective Action and Location, if Needed
1 Have stabilization measures been initiated on slopes and disturbed areas not actively being worked?
Yes No Yes No
2 Are natural resource areas (e.g., streams, wetlands, mature trees, etc.) required by the SWPPP to be delineated in the field, identified with barriers or markings?
Yes No Yes No
Complete by Date:
3 Are perimeter controls and sediment barriers adequately installed (keyed into substrate) and maintained?
Yes No Yes No
4 Are storm drain inlets properly protected?
Yes No Yes No
5 Are the construction exits preventing sediment from being tracked into the street?
Yes No Yes No
6 Is trash/litter from work areas collected and placed in covered dumpsters?
Yes No Yes No
7 Are washout facilities (e.g., paint, concrete) available, clearly marked, and maintained?
Yes No Yes No
Page 5 Project Name:
BMP or Activity Implemented? Corrective Action Required?
Describe Corrective Action and Location, if Needed
8 Are vehicle and equipment fueling, cleaning, and maintenance areas free of spills, leaks, or any other deleterious material?
Yes No Yes No
Complete by Date:
9 Are materials that are potential stormwater contaminants stored inside or under cover?
Yes No Yes No Complete by Date:
10 Are non-stormwater discharges (e.g., wash water, dewatering) properly controlled?
Yes No Yes No Complete by Date:
Overall Site Issue Answer to Question
Corrective Action Required?
Describe Corrective Action and Location, if Needed
1 At the time of inspection, are the discharge points and receiving waters free of pollutant discharges (sediment deposits, sediment plume or oil sheen)? (See continuation page for list of discharge points)
Yes No Yes No
2 Since the last inspection, are the discharge points and receiving waters free of evidence that pollutants had left the project site (for example, sediment deposits, oily residue)? (See continuation page for list of discharge points)
Yes No Yes No
3 Has Spill Response kit been used since the last inspection? If yes, has stock been maintained?
Yes No Yes No Complete by Date:
4 Are any additional BMPs needed?
Yes No Yes No Complete by
5 (Other)
Page 6 Project Name:
Scope of Inspection
Did you inspect all areas of the project that are required to be inspected by the CGP (areas disturbed by construction activity, areas used for storage of materials that are exposed to precipitation, discharge locations and locations where vehicles enter or exit the site)?
Yes No If you did not inspect any required areas, list those locations here and explain why they weren’t inspected.
Check the box below if the project is in compliance with the CGP and the SWPPP:
I certify that on the date of this inspection, this project was found to be in compliance with the terms of its Storm Water Pollution Prevention Plan and the current Construction General Permit.
If there are incidences of non-compliance, then do not check the box above.
When you don’t check the box above, then you must describe each incident of non-compliance and the actions that are needed to bring the project into compliance.
If there is an Action Item described in the non-compliance box that does not already have a “Complete by Date” assigned elsewhere in this report, then add a completion date within the box.
Non-Compliance
Incidence of Non-compliance:
Action Item and Complete by Date:
CERTIFICATION STATEMENT
“I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.”
Contractor’s Duly Authorized Representative FHWA’s Duly Authorized Representative
Print name: Print Name:
Title: Superintendent Title: Project Engineer Signature: Signature:
CONSTR CTION SITE INSPECTION REPORT
Continuation Sheets
Pro ect Name and Number
BMP & Location BMP Installed
BMP Action Required
Describe BMP Action, if Needed
Yes No Yes No
Complete by Date:
Yes No Yes No
Complete by Date:
Yes No Yes No
Complete by Date:
Yes No Yes No
Complete by Date:
Yes No Yes No
Complete by Date:
Yes No Yes No
Complete by Date:
Yes No Yes No
Complete by Date:
Yes No Yes No
Complete by Date:
Yes No Yes No
Complete by Date:
Yes No Yes No
Complete by Date:
Yes No Yes No
Complete by Date:
BMP & Location BMP Installed
BMP Action Required
Tab 10
CORRECTIVE ACTION LOG
Project Name: Page:
Inspection Date
Inspector Name Description of BMP Deficiency Location of BMP Deficiency Date Corrective Action Taken/
Responsible Person
WFLHD 157-5 (5/2011)
Tab 11
Construction Stormwater Discharge Permit Monitoring Oregon Department of Environmental Quality
DEQ21-LAB-0007-QAG 02/12/21
Version 1.0 Page 13 of 15
Appendix C Example Continuing Calibration Verification (CCV) Field Sheet
Sampling Agency: Date:
Sample
Collector:
Permit
Number:
pH
Meter S/N ID#1:
Accuracy Criterion: +/- 0.2 SU Meter Make:
Meter Model:
Pre time2: Post time3:
Std Temp (°C)
Theo
(SU)
Read
(SU)
Diff
(SU)
Pass4 (Y/N) Std
Temp (°C)
Theo
(SU)
Read
(SU)
Diff
(SU)
Pass4 (Y/N)
Turbidity
Meter S/N ID#1:
Accuracy Criterion: +/-
10%
Meter Make:
Meter Model:
Pre time2: Post time3:
Std Read
(NTU)
Diff
Pass4 (Y/N)
Read
(NTU)
Diff
Pass4 (Y/N)
Standards QA information5 pH
Std Value 7 10 4 Lot # Exp.
Date
Version 1.0 Page 14 of 15
Instructions for completing CCV:
1 Meter ID, please record the meter number used for each parameter
2 Pre-time, please record the time each meter was checked with standards prior to sample analysis
3 Post-time, please record the time each meter was checked with standards after sample analysis
4 Pass, please indicate whether the meter passed the pre-check according to the accuracy criteria for the meter by indicating Y or N
5 Standards QA Information, please record the lot numbers and expiration dates for pH standards being used in the field
Version 1.0 Page 15 of 15
Appendix D Example Data Field Sheet Monitoring
Agency: Monitoring Observation Date1:
Monitoring Personnel2: Permit Number:
Monitoring Information Field Data
Notes5 pH
(SU)
Conductivity
(NTU)
Result
Monitoring Site
Description3 Time4
Instructions for completing Data Field Sheet:
1 Observation Date, please record the date once at the top of the data field sheet
2 For Monitoring Personnel, please list all personnel that were present during sampling. Initials are not sufficient for this field
3 The Monitoring Site Description should describe the exact location from which the sample was collected
4 Please record the Time the field measurement was observed
For Notes, please identify any pertinent information, including but not limited to whether initial test failed acceptance criteria, any treatment performed, and whether result is a re-test after treatment
Tab 12
TRAINING LOG
Sediment and Erosion Control/NPDES Training
Project Name:
Course Title:
Instructor’s Name(s)/Title(s):
Course Location:
Course Date: Course Length (hours):
Training Topics:
Erosion Control BMPs Good Housekeeping BMPs Other (Specify)
Sediment Control BMPs SWPPP Provisions
Non-Storm Water BMPs Conducting Inspections
Emergency Procedures Turbidity Monitoring
(attach additional pages as necessary)
Name of Attendee Company/Agency
WFLHD 157-3 (5/2011)
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS
HIGHWAY DIVISION
Tab 13
Tab 14
GRADING AND STABILIZATION LOG
Project Name: Page:
Date Grading Activity Initiated
Description of Grading Activity and Location
Date Grading Activity Ceased
(Indicate Temporarily or Permanently)
Date When Stabilization Measures Initiated
Description of Stabilization Measures
WFLHD 157-6 (5/2011)
Tab 15
Tab 1
Quality Assurance Checklist
General Information Project Name:
Date of Inspection:
Project Reviewed by:
Contact Information:
Describe present phase of construction:
Information Date of Original SWPPP: Date of Most Recent
Amendment or Modification:
Is the SWPPP signage properly and conspicuously posted? Yes No (Signage should include where the SWPPP is located, who to contact for viewing the SWPPP, and a copy of the NOI(s) if applicable)
Are the SWPPP narrative and plan sheets being updated to accurately reflect the progress of the project?
Yes No
If the answer is No to any of the above questions, the following corrective action is recommended:
Inspections (Review SWPPP documentation to assure required inspections are being performed as required)
Inspection Frequency Required by SWPPP:
At least once every 7 calendar days
At least once every 14 calendar days and within 24 hours of the end of a storm event of 0.5 inches or greater.
Are inspections being performed and documented at the above stated frequency? Yes No
Are inspection reports included in the SWPPP? Yes No Are borrow and/or waste sites dedicated to the project inspected as part of the SWPPP construction site inspection? Yes No
Are stormwater pollution controls effectively in place at borrow and/or waste sites? Yes No Are inspections and SWPPP documentation signed by the Signatory Official? Yes No (Ensure all SWPPP documentation is signed by the Signatory Official designated in Tab 4 of the SWPPP)
Stormwater Pollution Controls
Are perimeter controls installed before any ground disturbing activities take place? Yes No Are temporary and permanent erosion control practices properly installed and effectively maintained within the required timeframe? Yes No Are temporary and permanent sediment control practices properly installed and effectively maintained?
Yes No
If the answer is No to any of the above questions, the following corrective action is recommended:
Are BMPs being selected, installed, implemented, and maintained as stated in the SWPPP? Yes No
Is the SWPPP being updated and revised as needed to address problems and reflect changes in the contractor’s operations? Yes No (SWPPP must be updated within 7 days of revisions, amendments, and modifications)
Are the BMPs adequate to minimize pollutants in stormwater discharge necessary to meet water quality standards as stated by the State Water Quality Certification and/or NPDES? Yes No (State Water Quality Certification found in Tab 16 of the SWPPP; NPDES permit found in Tab 2 of the SWPPP)
WFLHD 157-1 (2/2011)