ora-dot126-1_1200-CA_cover.pdf
PDF 2 MB Posted
- Solicitation number
- 69056725B000002
About this file
This document appears to be an Erosion and Sediment Control Plan (ESCP) Cover Sheet related to a federal contract opportunity for the OR FLAP DOT 126(1), Blue Pool Safety and Access Enhancement Project.
The key details include:
- The project is for the Department of Transportation Federal Highway Administration.
- The total disturbed area is 6.6 acres.
- The project area includes the McKenzie River and tributaries, with a natural vegetative buffer of western hemlock and Douglas-fir.
- The ESCP outlines required erosion prevention, sediment control, runoff control, and stabilization measures for the various construction phases of the project.
- Inspection frequency and requirements are specified, including daily inspections during active periods and visual monitoring during inactive periods.
- The document includes a set of standard drawings related to erosion and sediment control best management practices.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P A
C F
I C
I O
E C
A N
C
OLUMBIA R
IV
ER
S N
A K
E R I V
E R
Lake
Malheur Lake
Harney
Lake
Summer
D E S
C H
U T
E S
R I
V E
R
Lake
Klamath
Upper
Abert
Lake
LAKE N.P.
CRATER
REFUGE
WILDLIFE
NATIONAL
MALHEUR
RANGE
ANTELOPE
NATIONAL
HART MT.
30 30
395395
Ashland
Roseburg
EUGENE
Bend
Corvallis
Newport
SALEM
PORTLAND
Astoria
Pendleton
La Grande
Ontario
Burns
Falls
Klamath
Bend
North
City
Baker
Dalles
The
WASHINGTON
I D
A H
O
NEVADACALIFORNIA
Grants Pass
MEDFORD
N
BEGIN PROJECT
END PROJECT
PREPARED FOR:
DATE:
NARRATIVE DESCRIPTIONS
Phone:
Address:
Address:
Contact:
Engineering & Survey Firm:
Developed Conditions:
protect the McKenzie River, and tributaries, from project activities.
Oregon grape, huckleberry, thimbleberry, sword fern, oxalis, hazel, and grasses western red cedar, big leaf maple, red alder, vine maple, salal, rhododendron, A natural vegetative buffer dominated by western hemlock and Douglas-fir, with areas are dirt and gravel.
Parking lot and access road are currently composed of dirt and existing staging
Existing Site Conditions:
Total Disturbed Area = 6.6 Acres
Soil description:
up to 36 inches in diameter. No groundwater was encountered during drilling.
ranged from 1.8 to 5.0 feet depth BGS, and the majority encountered cobbles and/or boulders consistent with what would be expected in river terrace deposits (alluvium). Boring depths from reddish brown silty gravel with sand, to reddish brown gravelly silt, and were generally available for the project area. However, subgrade borings encountered soils that graded
Service (NRCS) web soil survey was inconclusive. No digital soil survey information is
A query using the U.S Department of Agriculture (USDA) Natural Resources Conservation
Payne Creek
Water bodies within the area include
RECEIVING WATER BODIES:
SURVEYING FIRM
PLANNING / ENGINEERING /
SITE SOIL CLASSIFICATION:
Phone: 503- 229-5279
Portland, OR 97232
700 NE Multnomah St. Stuite 600
Oregon Dept. of Environmental Quality
HAZARDOUS MATERIALS: N/A
SHEET NO. DESCRIPTION
DEQ - ESCP Cover SheetDEQ01
DEQ - 1200CA Permit RequirementsDEQ02
EROSION AND SEDIMENT CONTROL SHEET INDEX
include that phase.
If VERTICAL CONSTRUCTION or LAND DEVELOPMENT is planned, matrix will
1200-CA permit supercedes requirements of this plan.
ESCP and general conditions have been developed to facilitate compliance with the
The permittee is required to meet all the conditions of the 1200-CA permit. This
BMP MATRIX FOR CONSTRUCTION PHASES
Phase 1 ESCP SheetsFB01-FB03
Phase 2 ESCP SheetsFB04-FB06
Phase 3 ESCP SheetsFB07-FB09
DEQ03 DEQ - Contractor's Notes
Drawings Standard Drawings
FA01- FA05 Final Stabilization
Phase/BMP
INSPECTION FREQUENCY:
runoff is occurring.
At least once every 14 days, regardless of whether stormwater melt, that results in discharge from the site.
Within 24 hours of any storm event, including runoff from snow
On initial data that land disturbance activities commence.1. Active period conditions.
suspended and runoff is unlikely due to frozen
4. Periods during which construction activities are consecutive calendar days
2. Inactive periods greater than fourteen (14) inclement weather
3. Periods during which the site is inaccessible due to conditions.
conducted and runoff is unlikely during frozen
5. Periods during which construction activities are than 14 calendar days apart, then once per month.
been completed to twice per month for the first month, no less have Section 2.2.20of the site where the stabilization steps in
The inspector may reduce the frequency of inspections in any area
SITE CONDITION MINIMUM FREQUENCY
waterbody.
relevant discharge point or downstream location of the receiving
If safe, accessible and practical, inspections must occur daily at a conditions make discharges likely.
Immediately resume monitoring upon thawing, or when weather
Visual monitoring inspections may be temporarily suspended.
conditions make discharges likely.
Immediately resume monitoring upon thawing, or when weather
Visual monitoring inspections may be reduced to once a month.
consecutive calendar days, retain the ESCP at the construction site or at another location.
DEQ, agent, or the local municipality. During inactive periods of greater than seven (7)
Retain a copy of the ESCP and all revisions on site and make it available on request to
Inspection logs must be kept in accordance with DEQ's 1200-CA permit requirements.
All inspections must be made in accordance with DEQ 1200-CA permit requirements.
inspector to discuss erosion and sediment control measures and construction limits.
Hold a pre-construction meeting of project construction personnel that includes the
* ATTENTION EXCAVATORS
these rules by calling 503-232-1987.
commencing an excavation. Call 503-246-6699. You may obtain copies of two business days before you to notify the utility notification center at least
Oregon law, OAR 952-001-0010 through OAR 952-001-0090, requires
For Information Only
NOT TO SCALE
VICINITY MAP
For Information Only
NOT TO SCALE
SITE MAP
STANDARD DRAWINGS
W629-02
W629-01
W157-21
W157-20
W157-19
W157-18
W157-17
W157-16
W157-15
W157-02
W157-01
157-07
157-06
157-05
157-04
157-02
Rolled Erosion Control Product in Channels
Rolled Erosion Control Product on Slopes
Fiber Roll
Sediment Wattle
Stabilized Construction Exit
Water Filtration Bag
Temporary Diversion Berm Methods
Check Dam with Rolled Erosion Control Product
Check Dam, Moderate Grades
Temporary Inlet Protection
Silt Fence and Lined Waterways
Temporary Erosion Control Berms, Slope Drains, Check Dam
Temporary Diversion Channels
Sediment Trap
Temporary Inlet Protection
Year 2025
CLEARING
Ground Cover
Plastic Sheeting
Dust Control
Mulch/Hydroseed)
Stabilization (Straw
Temporary
Stabilization
Permanent
EROSION PREVENTION
SEDIMENT CONTROL
Straw Wattles
Inlet Protection
Dewatering
RUNOFF CONTROL
Ravine)
Buffer Zone (from
(Perimeter)
Sediment Fence
(Interior)
Sediment Fence
Entrance
Construction
Protection
Existing Outlet
Protection
New Outlet
Check Dams
Existing Curb Inlet
POLLUTION PREVENTION
Management
Hazard Waste
Spill Kit Onsite
Area
Concrete Washout
STABILIZATION
FINAL
X
X
X
X
X
X
:5
A
M
J u ly
C O
V E
R S
H E
E T c p w w o r k
\d
\o r a d o t1
E
S C
O
R D
E Q
C o v e r S h ts
.d g n
COVER SHEET 1
PROJECT
NUMBER
SHEET
OR FLAP DOT 126(1)
File details come from the government source that posted it. Updated .