NOAA ship fairweather dry docking

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
1305M223QNMAN0143
Agency
National Oceanic and Atmospheric Administration Department of Commerce
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
336611 Ship Building and Repairing
PSC
J019 Maint/Repair/Rebuild Of Equipment- Ships, Small Craft, Pontoons, And Floating Docks

Notice details come from SAM.gov. Updated .

About this opportunity

The National Oceanic and Atmospheric Administration seeks quotations to dry dock the NOAA Ship Fairweather to facilitate inspections, maintenance, and over 200 repair items. Offerors must demonstrate experience with ship dry docking and be able to provide temporary utilities, office space, and cleaning services aboard the ship. Evaluation will consider technical capability, past performance on contracts of similar size and complexity, and price. Proposals are due by August 29, 2023.

There is no set-aside. The primary NAICS code is 336611 for ship building and repairing. Repairs are to occur from November 2023 through March 2024 in Kodiak, Alaska. The solicitation requires overhauling over 50 sea valves and replacing sewage piping. Amendment five extended the response deadline and past performance questionnaire to August 29, 2023.

Notice text

8 versions

Update #8 · Latest ·

The reason for this amendment (0006) is to add Reference 2019 Valve List NOAA Fairweather Dry Docking that is listed on Paragraph 3.17.1.c  of Attachment I. The attachment and SF30 for Amendmant 0006 ate inthe list of attachments. 

The reason for this amendment (0005) is to extend the response date and time to 29 August 2023 at 4:00PM EST and to update the responst date on Attachment III- Past Performance Questionnaire REV B.

The reason for this amendment (0004) Is to address vendor Q and A 006 and provide requested references:

FA_Docking Plan_997_S0701-2-1_REV D

FA-S2901-6-2 Trim & Stability Booklet Rev H

FA-S4301-31 Propulsion Shafting Arrangement and Details

FA-324-001_CPP HYDRAULIC PUMP ELECTRICAL MODIFICATIONS Rev –

FA_HUB SIZE 72X PROPELLER HUB CLEARANCES

FA-561-001 - CPP Install

FA-RA_CONTROLLABLE PITCH PROPELLER SYSTEM SPARE PARTS LIST

FA-RA_CONTROLLABLE PITCH PROPELLER SYSTEM PARTS LIST.

The requested references will be made available via KITEWORKS by contacting the Contract Specialist, Jim Van Natta at jim.vannatta@noaa.gov. 

This is NOT an amendment. This is to replace SF30 from Amendment 0003 that contained a typographhical error. Block 15 was deleted from the original posting. The SF30 was replaced.

The reason for this amendment (0003) is to add references to the solicitation. These references will be made available vis KITEWORKS. Contact Jim Van Natta, jim.vannatta@noaa.gov. for access.

  1. FA_AUTONAV ELECTROHYDRAULIC STEERING E-1776-1
  2. FA_S0201-1_Booklet of General Plans_Rev
  3. Fairweather_1MC Service Report_ 1MAY2023
  4. NOAA-G Sheets 2-23-23 GALLEY ARRANGEMENT
  5. A-S2601-7_Anchor Windlass Instruction Book
  6. FA-S4901-1_COMPRESSED AIR PIPING SYSTEM ENGINE ROOM
  7. FA-RA 183_S16-5-1KA SERVICE ELEVATOR ARRANGEMENT
  8. FA-RA_183_S16-5-3K_Rev1_ELEVATOR CONTROL SYSTEM EWD & CABLE LAYOUT
  9. FA-RA 183_S11-7-K_ELEVATOR TRUNK & ESCAPE TRUNKS
  10. FA-S1605-16/20/25/26/29/30 Montgomery Elevator Components
  11. MVP-Data.Sheet_220624
  12. FA S4809-1 ARRGT OF VENTS & SOUNDING TUBES
  13. MO 2021-10 – Lesson Learned Wrong pipe Repaired
  14. FA-SO201-1 Rev B (General Arrangements)
  15. FA-623-002_P1_Gangway Padeyes & Pins
  16. FA-623-003_P1_Gangway Deployment Options
  17. FA_FWD UTILITY CRANES_TG811-AT-MMO-010
  18. FA_S1701_60 MODEL KEK2D 2.5-40 Aft Crane Technical Manual
  19. FA-S-2010-4_FANTAIL STBD J-FRAME FABRICATION Rev B
  20. FA-583-004_WINCH AND J-FRAME RELOCATION Rev –
  21. FA-S-2010-3_REACTIVATION FANTAIL AFT A-FRAME
  22. NOAA ship Fairweather Steering Gear Hose list
  23. FA_AUTONAV ELECTROHYDRAULIC STEERING E-1776-1
  24. FA-S-2200-12_OPERATION, FILLING & LUBRICATIONS CHART STEERING GEAR 27_4 VANE MOTORS
  25. FA-B-3514 - STEERING SYSTEM PIPING DIAGRAM E-1776-1
  26. FA-808612-D_GENERAL ARRANGEMENT STEERING GEAR 274 VANE MOTORS
  27. FA-RA-S-2201-1_RUDDERS AND RUDDER STOCKS
  28. NOAA ship Fairweather drawing S4106-5 “Engine & Reduction Gear installation”
  29. FA-S4201-1_LUFKIN MARINE GEAR INSTRUCTION MANUAL
  30. FA-S4100-9 BOW THRUSTER PART 1
  31. MASTER HOSE LIST 2022
  32. FA-S9301-2 Fire Control Plan (Rev F)
  33. Tech Manual “CS4000 Fire Alarm System”
  34. WFS Due Date Reports for Cylinders 2023
  35. Fairweather 2023 Annual Fire Detection Report
  36. GEA Westfalia Bilgemaster T 200 Tech Manual

The reason for this amendment (0002) is to add reference FA-S4801-11_Sewage and Plumbing Drain Piping System - Rev (Revised with Comments). and answer Vendor Q and A 0004.

  1. This amendment adds the following references:
    1. Standards for Lifting Appliances on NOAA Ships.
    2. NOAA Standard Specification S2000/S8200 – Weight Testing of Cranes and Davits.
  2. The response date is extended to 25 August 2023 at 2:00 PM EST.
  3. Primary Point of Contact is changed to Jim Van Natta, (757) 364-6906, jim.vannatta@noaa.gov.
  4. Q&A responses are incorporated in Attachment I, Specification Rev A.
  5. Updated Attachment III, Past Performance Questionnaire to reflect the current Primary Point of Contact..
  6. Updated Attachment V, AIR Process to reflect the current Primary Point of Contact..
  7. Request for missing references was addressed.
  8. Except for the changes made herewith, all other terms, conditions, and provisions remain unchanged.
  9. References listed as "Attached" will be made available vis KITEWORKS. Contact Jim Van Natta, jim.vannatta@noaa.gov. for access.

Please see attached RFQ 1305M223QNMAN0143 and documents for details.


**PLEASE NOTE** Due to the size of the reference documents and drawings
applicable to this RFQ, these documents are unable to be uploaded to
SAM.gov under this notice. Therefore, any interested parties that would
like access to the reference documents and drawings need to contact
Contract Specialist Jim VanNatta via email at jim.vannatta@noaa.gov and
Contracting Officer Mr. Ashley Perry via email at ashley.perry@noaa.gov.

The RFQ number shall be identified in the subject line of any email request or inquiries.

Update #7 ·

The reason for this amendment (0005) is to extend the response date and time to 29 August 2023 at 4:00PM EST and to update the responst date on Attachment III- Past Performance Questionnaire REV B.

The reason for this amendment (0004) Is to address vendor Q and A 006 and provide requested references:

FA_Docking Plan_997_S0701-2-1_REV D

FA-S2901-6-2 Trim & Stability Booklet Rev H

FA-S4301-31 Propulsion Shafting Arrangement and Details

FA-324-001_CPP HYDRAULIC PUMP ELECTRICAL MODIFICATIONS Rev –

FA_HUB SIZE 72X PROPELLER HUB CLEARANCES

FA-561-001 - CPP Install

FA-RA_CONTROLLABLE PITCH PROPELLER SYSTEM SPARE PARTS LIST

FA-RA_CONTROLLABLE PITCH PROPELLER SYSTEM PARTS LIST.

The requested references will be made available via KITEWORKS by contacting the Contract Specialist, Jim Van Natta at jim.vannatta@noaa.gov. 

This is NOT an amendment. This is to replace SF30 from Amendment 0003 that contained a typographhical error. Block 15 was deleted from the original posting. The SF30 was replaced.

The reason for this amendment (0003) is to add references to the solicitation. These references will be made available vis KITEWORKS. Contact Jim Van Natta, jim.vannatta@noaa.gov. for access.

  1. FA_AUTONAV ELECTROHYDRAULIC STEERING E-1776-1
  2. FA_S0201-1_Booklet of General Plans_Rev
  3. Fairweather_1MC Service Report_ 1MAY2023
  4. NOAA-G Sheets 2-23-23 GALLEY ARRANGEMENT
  5. A-S2601-7_Anchor Windlass Instruction Book
  6. FA-S4901-1_COMPRESSED AIR PIPING SYSTEM ENGINE ROOM
  7. FA-RA 183_S16-5-1KA SERVICE ELEVATOR ARRANGEMENT
  8. FA-RA_183_S16-5-3K_Rev1_ELEVATOR CONTROL SYSTEM EWD & CABLE LAYOUT
  9. FA-RA 183_S11-7-K_ELEVATOR TRUNK & ESCAPE TRUNKS
  10. FA-S1605-16/20/25/26/29/30 Montgomery Elevator Components
  11. MVP-Data.Sheet_220624
  12. FA S4809-1 ARRGT OF VENTS & SOUNDING TUBES
  13. MO 2021-10 – Lesson Learned Wrong pipe Repaired
  14. FA-SO201-1 Rev B (General Arrangements)
  15. FA-623-002_P1_Gangway Padeyes & Pins
  16. FA-623-003_P1_Gangway Deployment Options
  17. FA_FWD UTILITY CRANES_TG811-AT-MMO-010
  18. FA_S1701_60 MODEL KEK2D 2.5-40 Aft Crane Technical Manual
  19. FA-S-2010-4_FANTAIL STBD J-FRAME FABRICATION Rev B
  20. FA-583-004_WINCH AND J-FRAME RELOCATION Rev –
  21. FA-S-2010-3_REACTIVATION FANTAIL AFT A-FRAME
  22. NOAA ship Fairweather Steering Gear Hose list
  23. FA_AUTONAV ELECTROHYDRAULIC STEERING E-1776-1
  24. FA-S-2200-12_OPERATION, FILLING & LUBRICATIONS CHART STEERING GEAR 27_4 VANE MOTORS
  25. FA-B-3514 - STEERING SYSTEM PIPING DIAGRAM E-1776-1
  26. FA-808612-D_GENERAL ARRANGEMENT STEERING GEAR 274 VANE MOTORS
  27. FA-RA-S-2201-1_RUDDERS AND RUDDER STOCKS
  28. NOAA ship Fairweather drawing S4106-5 “Engine & Reduction Gear installation”
  29. FA-S4201-1_LUFKIN MARINE GEAR INSTRUCTION MANUAL
  30. FA-S4100-9 BOW THRUSTER PART 1
  31. MASTER HOSE LIST 2022
  32. FA-S9301-2 Fire Control Plan (Rev F)
  33. Tech Manual “CS4000 Fire Alarm System”
  34. WFS Due Date Reports for Cylinders 2023
  35. Fairweather 2023 Annual Fire Detection Report
  36. GEA Westfalia Bilgemaster T 200 Tech Manual

The reason for this amendment (0002) is to add reference FA-S4801-11_Sewage and Plumbing Drain Piping System - Rev (Revised with Comments). and answer Vendor Q and A 0004.

  1. This amendment adds the following references:
    1. Standards for Lifting Appliances on NOAA Ships.
    2. NOAA Standard Specification S2000/S8200 – Weight Testing of Cranes and Davits.
  2. The response date is extended to 25 August 2023 at 2:00 PM EST.
  3. Primary Point of Contact is changed to Jim Van Natta, (757) 364-6906, jim.vannatta@noaa.gov.
  4. Q&A responses are incorporated in Attachment I, Specification Rev A.
  5. Updated Attachment III, Past Performance Questionnaire to reflect the current Primary Point of Contact..
  6. Updated Attachment V, AIR Process to reflect the current Primary Point of Contact..
  7. Request for missing references was addressed.
  8. Except for the changes made herewith, all other terms, conditions, and provisions remain unchanged.
  9. References listed as "Attached" will be made available vis KITEWORKS. Contact Jim Van Natta, jim.vannatta@noaa.gov. for access.

Please see attached RFQ 1305M223QNMAN0143 and documents for details.


**PLEASE NOTE** Due to the size of the reference documents and drawings
applicable to this RFQ, these documents are unable to be uploaded to
SAM.gov under this notice. Therefore, any interested parties that would
like access to the reference documents and drawings need to contact
Contract Specialist Jim VanNatta via email at jim.vannatta@noaa.gov and
Contracting Officer Mr. Ashley Perry via email at ashley.perry@noaa.gov.

The RFQ number shall be identified in the subject line of any email request or inquiries.

Update #6 ·

The reason for this amendment (0004) Is to address vendor Q and A 006 and provide requested references:

FA_Docking Plan_997_S0701-2-1_REV D

FA-S2901-6-2 Trim & Stability Booklet Rev H

FA-S4301-31 Propulsion Shafting Arrangement and Details

FA-324-001_CPP HYDRAULIC PUMP ELECTRICAL MODIFICATIONS Rev –

FA_HUB SIZE 72X PROPELLER HUB CLEARANCES

FA-561-001 - CPP Install

FA-RA_CONTROLLABLE PITCH PROPELLER SYSTEM SPARE PARTS LIST

FA-RA_CONTROLLABLE PITCH PROPELLER SYSTEM PARTS LIST.

The requested references will be made available via KITEWORKS by contacting the Contract Specialist, Jim Van Natta at jim.vannatta@noaa.gov. 

This is NOT an amendment. This is to replace SF30 from Amendment 0003 that contained a typographhical error. Block 15 was deleted from the original posting. The SF30 was replaced.

The reason for this amendment (0003) is to add references to the solicitation. These references will be made available vis KITEWORKS. Contact Jim Van Natta, jim.vannatta@noaa.gov. for access.

  1. FA_AUTONAV ELECTROHYDRAULIC STEERING E-1776-1
  2. FA_S0201-1_Booklet of General Plans_Rev
  3. Fairweather_1MC Service Report_ 1MAY2023
  4. NOAA-G Sheets 2-23-23 GALLEY ARRANGEMENT
  5. A-S2601-7_Anchor Windlass Instruction Book
  6. FA-S4901-1_COMPRESSED AIR PIPING SYSTEM ENGINE ROOM
  7. FA-RA 183_S16-5-1KA SERVICE ELEVATOR ARRANGEMENT
  8. FA-RA_183_S16-5-3K_Rev1_ELEVATOR CONTROL SYSTEM EWD & CABLE LAYOUT
  9. FA-RA 183_S11-7-K_ELEVATOR TRUNK & ESCAPE TRUNKS
  10. FA-S1605-16/20/25/26/29/30 Montgomery Elevator Components
  11. MVP-Data.Sheet_220624
  12. FA S4809-1 ARRGT OF VENTS & SOUNDING TUBES
  13. MO 2021-10 – Lesson Learned Wrong pipe Repaired
  14. FA-SO201-1 Rev B (General Arrangements)
  15. FA-623-002_P1_Gangway Padeyes & Pins
  16. FA-623-003_P1_Gangway Deployment Options
  17. FA_FWD UTILITY CRANES_TG811-AT-MMO-010
  18. FA_S1701_60 MODEL KEK2D 2.5-40 Aft Crane Technical Manual
  19. FA-S-2010-4_FANTAIL STBD J-FRAME FABRICATION Rev B
  20. FA-583-004_WINCH AND J-FRAME RELOCATION Rev –
  21. FA-S-2010-3_REACTIVATION FANTAIL AFT A-FRAME
  22. NOAA ship Fairweather Steering Gear Hose list
  23. FA_AUTONAV ELECTROHYDRAULIC STEERING E-1776-1
  24. FA-S-2200-12_OPERATION, FILLING & LUBRICATIONS CHART STEERING GEAR 27_4 VANE MOTORS
  25. FA-B-3514 - STEERING SYSTEM PIPING DIAGRAM E-1776-1
  26. FA-808612-D_GENERAL ARRANGEMENT STEERING GEAR 274 VANE MOTORS
  27. FA-RA-S-2201-1_RUDDERS AND RUDDER STOCKS
  28. NOAA ship Fairweather drawing S4106-5 “Engine & Reduction Gear installation”
  29. FA-S4201-1_LUFKIN MARINE GEAR INSTRUCTION MANUAL
  30. FA-S4100-9 BOW THRUSTER PART 1
  31. MASTER HOSE LIST 2022
  32. FA-S9301-2 Fire Control Plan (Rev F)
  33. Tech Manual “CS4000 Fire Alarm System”
  34. WFS Due Date Reports for Cylinders 2023
  35. Fairweather 2023 Annual Fire Detection Report
  36. GEA Westfalia Bilgemaster T 200 Tech Manual

The reason for this amendment (0002) is to add reference FA-S4801-11_Sewage and Plumbing Drain Piping System - Rev (Revised with Comments). and answer Vendor Q and A 0004.

  1. This amendment adds the following references:
    1. Standards for Lifting Appliances on NOAA Ships.
    2. NOAA Standard Specification S2000/S8200 – Weight Testing of Cranes and Davits.
  2. The response date is extended to 25 August 2023 at 2:00 PM EST.
  3. Primary Point of Contact is changed to Jim Van Natta, (757) 364-6906, jim.vannatta@noaa.gov.
  4. Q&A responses are incorporated in Attachment I, Specification Rev A.
  5. Updated Attachment III, Past Performance Questionnaire to reflect the current Primary Point of Contact..
  6. Updated Attachment V, AIR Process to reflect the current Primary Point of Contact..
  7. Request for missing references was addressed.
  8. Except for the changes made herewith, all other terms, conditions, and provisions remain unchanged.
  9. References listed as "Attached" will be made available vis KITEWORKS. Contact Jim Van Natta, jim.vannatta@noaa.gov. for access.

Please see attached RFQ 1305M223QNMAN0143 and documents for details.


**PLEASE NOTE** Due to the size of the reference documents and drawings
applicable to this RFQ, these documents are unable to be uploaded to
SAM.gov under this notice. Therefore, any interested parties that would
like access to the reference documents and drawings need to contact
Contract Specialist Jim VanNatta via email at jim.vannatta@noaa.gov and
Contracting Officer Mr. Ashley Perry via email at ashley.perry@noaa.gov.

The RFQ number shall be identified in the subject line of any email request or inquiries.

Update #5 ·

This is NOT an amendment. This is to replace SF30 from Amendment 0003 that contained a typographhical error. Block 15 was deleted from the original posting. The SF30 was replaced.

The reason for this amendment (0003) is to add references to the solicitation. These references will be made available vis KITEWORKS. Contact Jim Van Natta, jim.vannatta@noaa.gov. for access.

  1. FA_AUTONAV ELECTROHYDRAULIC STEERING E-1776-1
  2. FA_S0201-1_Booklet of General Plans_Rev
  3. Fairweather_1MC Service Report_ 1MAY2023
  4. NOAA-G Sheets 2-23-23 GALLEY ARRANGEMENT
  5. A-S2601-7_Anchor Windlass Instruction Book
  6. FA-S4901-1_COMPRESSED AIR PIPING SYSTEM ENGINE ROOM
  7. FA-RA 183_S16-5-1KA SERVICE ELEVATOR ARRANGEMENT
  8. FA-RA_183_S16-5-3K_Rev1_ELEVATOR CONTROL SYSTEM EWD & CABLE LAYOUT
  9. FA-RA 183_S11-7-K_ELEVATOR TRUNK & ESCAPE TRUNKS
  10. FA-S1605-16/20/25/26/29/30 Montgomery Elevator Components
  11. MVP-Data.Sheet_220624
  12. FA S4809-1 ARRGT OF VENTS & SOUNDING TUBES
  13. MO 2021-10 – Lesson Learned Wrong pipe Repaired
  14. FA-SO201-1 Rev B (General Arrangements)
  15. FA-623-002_P1_Gangway Padeyes & Pins
  16. FA-623-003_P1_Gangway Deployment Options
  17. FA_FWD UTILITY CRANES_TG811-AT-MMO-010
  18. FA_S1701_60 MODEL KEK2D 2.5-40 Aft Crane Technical Manual
  19. FA-S-2010-4_FANTAIL STBD J-FRAME FABRICATION Rev B
  20. FA-583-004_WINCH AND J-FRAME RELOCATION Rev –
  21. FA-S-2010-3_REACTIVATION FANTAIL AFT A-FRAME
  22. NOAA ship Fairweather Steering Gear Hose list
  23. FA_AUTONAV ELECTROHYDRAULIC STEERING E-1776-1
  24. FA-S-2200-12_OPERATION, FILLING & LUBRICATIONS CHART STEERING GEAR 27_4 VANE MOTORS
  25. FA-B-3514 - STEERING SYSTEM PIPING DIAGRAM E-1776-1
  26. FA-808612-D_GENERAL ARRANGEMENT STEERING GEAR 274 VANE MOTORS
  27. FA-RA-S-2201-1_RUDDERS AND RUDDER STOCKS
  28. NOAA ship Fairweather drawing S4106-5 “Engine & Reduction Gear installation”
  29. FA-S4201-1_LUFKIN MARINE GEAR INSTRUCTION MANUAL
  30. FA-S4100-9 BOW THRUSTER PART 1
  31. MASTER HOSE LIST 2022
  32. FA-S9301-2 Fire Control Plan (Rev F)
  33. Tech Manual “CS4000 Fire Alarm System”
  34. WFS Due Date Reports for Cylinders 2023
  35. Fairweather 2023 Annual Fire Detection Report
  36. GEA Westfalia Bilgemaster T 200 Tech Manual

The reason for this amendment (0002) is to add reference FA-S4801-11_Sewage and Plumbing Drain Piping System - Rev (Revised with Comments). and answer Vendor Q and A 0004.

  1. This amendment adds the following references:
    1. Standards for Lifting Appliances on NOAA Ships.
    2. NOAA Standard Specification S2000/S8200 – Weight Testing of Cranes and Davits.
  2. The response date is extended to 25 August 2023 at 2:00 PM EST.
  3. Primary Point of Contact is changed to Jim Van Natta, (757) 364-6906, jim.vannatta@noaa.gov.
  4. Q&A responses are incorporated in Attachment I, Specification Rev A.
  5. Updated Attachment III, Past Performance Questionnaire to reflect the current Primary Point of Contact..
  6. Updated Attachment V, AIR Process to reflect the current Primary Point of Contact..
  7. Request for missing references was addressed.
  8. Except for the changes made herewith, all other terms, conditions, and provisions remain unchanged.
  9. References listed as "Attached" will be made available vis KITEWORKS. Contact Jim Van Natta, jim.vannatta@noaa.gov. for access.

Please see attached RFQ 1305M223QNMAN0143 and documents for details.


**PLEASE NOTE** Due to the size of the reference documents and drawings
applicable to this RFQ, these documents are unable to be uploaded to
SAM.gov under this notice. Therefore, any interested parties that would
like access to the reference documents and drawings need to contact
Contract Specialist Jim VanNatta via email at jim.vannatta@noaa.gov and
Contracting Officer Mr. Ashley Perry via email at ashley.perry@noaa.gov.

The RFQ number shall be identified in the subject line of any email request or inquiries.

Update #4 ·

The reason for this amendment (0003) is to add references to the solicitation. These references will be made available vis KITEWORKS. Contact Jim Van Natta, jim.vannatta@noaa.gov. for access.

  1. FA_AUTONAV ELECTROHYDRAULIC STEERING E-1776-1
  2. FA_S0201-1_Booklet of General Plans_Rev
  3. Fairweather_1MC Service Report_ 1MAY2023
  4. NOAA-G Sheets 2-23-23 GALLEY ARRANGEMENT
  5. A-S2601-7_Anchor Windlass Instruction Book
  6. FA-S4901-1_COMPRESSED AIR PIPING SYSTEM ENGINE ROOM
  7. FA-RA 183_S16-5-1KA SERVICE ELEVATOR ARRANGEMENT
  8. FA-RA_183_S16-5-3K_Rev1_ELEVATOR CONTROL SYSTEM EWD & CABLE LAYOUT
  9. FA-RA 183_S11-7-K_ELEVATOR TRUNK & ESCAPE TRUNKS
  10. FA-S1605-16/20/25/26/29/30 Montgomery Elevator Components
  11. MVP-Data.Sheet_220624
  12. FA S4809-1 ARRGT OF VENTS & SOUNDING TUBES
  13. MO 2021-10 – Lesson Learned Wrong pipe Repaired
  14. FA-SO201-1 Rev B (General Arrangements)
  15. FA-623-002_P1_Gangway Padeyes & Pins
  16. FA-623-003_P1_Gangway Deployment Options
  17. FA_FWD UTILITY CRANES_TG811-AT-MMO-010
  18. FA_S1701_60 MODEL KEK2D 2.5-40 Aft Crane Technical Manual
  19. FA-S-2010-4_FANTAIL STBD J-FRAME FABRICATION Rev B
  20. FA-583-004_WINCH AND J-FRAME RELOCATION Rev –
  21. FA-S-2010-3_REACTIVATION FANTAIL AFT A-FRAME
  22. NOAA ship Fairweather Steering Gear Hose list
  23. FA_AUTONAV ELECTROHYDRAULIC STEERING E-1776-1
  24. FA-S-2200-12_OPERATION, FILLING & LUBRICATIONS CHART STEERING GEAR 27_4 VANE MOTORS
  25. FA-B-3514 - STEERING SYSTEM PIPING DIAGRAM E-1776-1
  26. FA-808612-D_GENERAL ARRANGEMENT STEERING GEAR 274 VANE MOTORS
  27. FA-RA-S-2201-1_RUDDERS AND RUDDER STOCKS
  28. NOAA ship Fairweather drawing S4106-5 “Engine & Reduction Gear installation”
  29. FA-S4201-1_LUFKIN MARINE GEAR INSTRUCTION MANUAL
  30. FA-S4100-9 BOW THRUSTER PART 1
  31. MASTER HOSE LIST 2022
  32. FA-S9301-2 Fire Control Plan (Rev F)
  33. Tech Manual “CS4000 Fire Alarm System”
  34. WFS Due Date Reports for Cylinders 2023
  35. Fairweather 2023 Annual Fire Detection Report
  36. GEA Westfalia Bilgemaster T 200 Tech Manual

The reason for this amendment (0002) is to add reference FA-S4801-11_Sewage and Plumbing Drain Piping System - Rev (Revised with Comments). and answer Vendor Q and A 0004.

  1. This amendment adds the following references:
    1. Standards for Lifting Appliances on NOAA Ships.
    2. NOAA Standard Specification S2000/S8200 – Weight Testing of Cranes and Davits.
  2. The response date is extended to 25 August 2023 at 2:00 PM EST.
  3. Primary Point of Contact is changed to Jim Van Natta, (757) 364-6906, jim.vannatta@noaa.gov.
  4. Q&A responses are incorporated in Attachment I, Specification Rev A.
  5. Updated Attachment III, Past Performance Questionnaire to reflect the current Primary Point of Contact..
  6. Updated Attachment V, AIR Process to reflect the current Primary Point of Contact..
  7. Request for missing references was addressed.
  8. Except for the changes made herewith, all other terms, conditions, and provisions remain unchanged.
  9. References listed as "Attached" will be made available vis KITEWORKS. Contact Jim Van Natta, jim.vannatta@noaa.gov. for access.

Please see attached RFQ 1305M223QNMAN0143 and documents for details.


**PLEASE NOTE** Due to the size of the reference documents and drawings
applicable to this RFQ, these documents are unable to be uploaded to
SAM.gov under this notice. Therefore, any interested parties that would
like access to the reference documents and drawings need to contact
Contract Specialist Jim VanNatta via email at jim.vannatta@noaa.gov and
Contracting Officer Mr. Ashley Perry via email at ashley.perry@noaa.gov.

The RFQ number shall be identified in the subject line of any email request or inquiries.

Update #3 ·

The reason for this amendment (0002) is to add reference FA-S4801-11_Sewage and Plumbing Drain Piping System - Rev (Revised with Comments). and answer Vendor Q and A 0004.

  1. This amendment adds the following references:
    1. Standards for Lifting Appliances on NOAA Ships.
    2. NOAA Standard Specification S2000/S8200 – Weight Testing of Cranes and Davits.
  2. The response date is extended to 25 August 2023 at 2:00 PM EST.
  3. Primary Point of Contact is changed to Jim Van Natta, (757) 364-6906, jim.vannatta@noaa.gov.
  4. Q&A responses are incorporated in Attachment I, Specification Rev A.
  5. Updated Attachment III, Past Performance Questionnaire to reflect the current Primary Point of Contact..
  6. Updated Attachment V, AIR Process to reflect the current Primary Point of Contact..
  7. Request for missing references was addressed.
  8. Except for the changes made herewith, all other terms, conditions, and provisions remain unchanged.
  9. References listed as "Attached" will be made available vis KITEWORKS. Contact Jim Van Natta, jim.vannatta@noaa.gov. for access.

Please see attached RFQ 1305M223QNMAN0143 and documents for details.


**PLEASE NOTE** Due to the size of the reference documents and drawings
applicable to this RFQ, these documents are unable to be uploaded to
SAM.gov under this notice. Therefore, any interested parties that would
like access to the reference documents and drawings need to contact
Contract Specialist Jim VanNatta via email at jim.vannatta@noaa.gov and
Contracting Officer Mr. Ashley Perry via email at ashley.perry@noaa.gov.

The RFQ number shall be identified in the subject line of any email request or inquiries.

Update #2 ·
  1. This amendment adds the following references:
    1. Standards for Lifting Appliances on NOAA Ships.
    2. NOAA Standard Specification S2000/S8200 – Weight Testing of Cranes and Davits.
  2. The response date is extended to 25 August 2023 at 2:00 PM EST.
  3. Primary Point of Contact is changed to Jim Van Natta, (757) 364-6906, jim.vannatta@noaa.gov.
  4. Q&A responses are incorporated in Attachment I, Specification Rev A.
  5. Updated Attachment III, Past Performance Questionnaire to reflect the current Primary Point of Contact..
  6. Updated Attachment V, AIR Process to reflect the current Primary Point of Contact..
  7. Request for missing references was addressed.
  8. Except for the changes made herewith, all other terms, conditions, and provisions remain unchanged.
  9. References listed as "Attached" will be made available vis KITEWORKS. Contact Jim Van Natta, jim.vannatta@noaa.gov. for access.

Please see attached RFQ 1305M223QNMAN0143 and documents for details.


**PLEASE NOTE** Due to the size of the reference documents and drawings
applicable to this RFQ, these documents are unable to be uploaded to
SAM.gov under this notice. Therefore, any interested parties that would
like access to the reference documents and drawings need to contact
Contract Specialist Jim VanNatta via email at jim.vannatta@noaa.gov and
Contracting Officer Mr. Ashley Perry via email at ashley.perry@noaa.gov.

The RFQ number shall be identified in the subject line of any email request or inquiries.

Update #1 ·

Please see attached RFQ 1305M223QNMAN0143 and documents for details.


**PLEASE NOTE** Due to the size of the reference documents and drawings
applicable to this RFQ, these documents are unable to be uploaded to
SAM.gov under this notice. Therefore, any interested parties that would
like access to the reference documents and drawings need to contact
Contract Specialist Bridget Cofo via email at bridget.cofo@noaa.gov and
Contracting Officer Mr. Ashley Perry via email at ashley.perry@noaa.gov.

The RFQ number shall be identified in the subject line of any email request or inquiries.

Attachments

Files attached to this notice, newest first
File Type Posted
SF 30 AMENDMENT 0006.doc DOC document
2019 Valve list NOAA Fairweather Dry docking.docx DOCX document
Attachment III - Past Performance Questionnaire_REV B.pdf PDF
SF 30 AMENDMENT 0005.doc DOC document
SF 30 AMENDMENT 0004.doc DOC document
SF 30 AMENDMENT 0003.doc DOC document
SF 30 AMENDMENT 0003.doc DOC document
SF 30 AMENDMENT 0002.doc DOC document
FA-S4801-11_SEWAGE AND PLUMBING DRAIN PIPING SYSTEM Rev - (Revised with comments).pdf PDF
SF 30 AMENDMENT 0001.doc DOC document
Attachment III - Past Performance Questionnaire_REV A.pdf PDF
Attachment V - AIR Process_REV A.pdf PDF
Attachment I - Specification_REV A.pdf PDF
Attachment VI - Subcontracting Plan Outline.pdf PDF
Attachment IV - Price Schedule.xlsx XLSX spreadsheet
RFQ 1305M223QNMAN0143.pdf PDF
Attachment V - AIR Process.pdf PDF
Attachment III - Past Performance Questionnaire.pdf PDF
Attachment I- Specification.pdf PDF
Attachment II - Past Performance Information Form.pdf PDF
Show all 20

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
NOAA ship fairweather dry docking Award Award Notice
NOAA ship fairweather dry docking This notice · Latest solicitation Solicitation
FY 24 NOAA ship fairweather dry docking Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity