This document is an amendment to a solicitation for drydocking and repair services for the NOAA Ship Fairweather. The amendment extends the response date to August 25, 2023 at 2:00 PM EST. It adds references to standards for lifting appliances and weight testing of cranes and davits. The amendment also provides question and answer responses to inquiries from potential bidders, covering topics like sewage piping repairs, shore power plugs, mast cable penetrations, potable water cofferdam locations, and lists of expansion joints and air compressors requiring service. Attachments revise the past performance questionnaire and AIR process guide to reflect a changed point of contact. Except as amended, all other terms and conditions of the original solicitation remain in effect.

View the file

Other files for this federal contract opportunity

Other files attached to NOAA SHIP FAIRWEATHER DRY DOCKING, newest first.
File Type Posted
2019 Valve list NOAA Fairweather Dry docking.docx DOCX document
SF 30 AMENDMENT 0006.doc DOC document
Attachment III - Past Performance Questionnaire_REV B.pdf PDF
SF 30 AMENDMENT 0005.doc DOC document
SF 30 AMENDMENT 0004.doc DOC document
SF 30 AMENDMENT 0003.doc DOC document
SF 30 AMENDMENT 0003.doc DOC document
FA-S4801-11_SEWAGE AND PLUMBING DRAIN PIPING SYSTEM Rev - (Revised with comments).pdf PDF
SF 30 AMENDMENT 0002.doc DOC document
Attachment I - Specification_REV A.pdf PDF
Attachment III - Past Performance Questionnaire_REV A.pdf PDF
Attachment V - AIR Process_REV A.pdf PDF
Attachment VI - Subcontracting Plan Outline.pdf PDF
Attachment IV - Price Schedule.xlsx XLSX spreadsheet
RFQ 1305M223QNMAN0143.pdf PDF
Attachment I- Specification.pdf PDF
Attachment II - Past Performance Information Form.pdf PDF
Attachment V - AIR Process.pdf PDF
Attachment III - Past Performance Questionnaire.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. Contract ID Code
Page of Pages
1
14
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req. No.
5. Project No. (if applicable)
0001
8/11/2023
NM-AN2120-23-01186
6. Issued By
Code AJ930073
7. Administered By (If other than Item 6)
Code

NOAA/Eastern Acquisition Division 200 Granby Street, Suite 405 Norfolk, VA 23510 See Block 6

8. Name and Address of Contractor (No., Street, County, and Zip Code)
(X)
9A. Amendment of Solicitation No.
X
1305M223QNMAN0143

9B. Date (See Item 11)

JULY 18, 2023

10A. Modification of Contract/Order No.

10B. Date (See Item 13)

Code
Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers
is extended
X
is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning
1
copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer

submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG-

MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT

IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter refer to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

1. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x)
A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A.
B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.)

Set fourth item 14, pursuant to the authority of FAR 43.103 (b)

C. This supplemental agreement is entered into pursuant to authority of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor
is not,
X
is required to sign this document and return 1 copies to the issuing office.

14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amend Solicitation 1305M223QNMAN0143 as follows:

a. This amendment adds the following references:

1. Standards for Lifting Appliances on NOAA Ships

2. NOAA Standard Specification S2000/S8200 – Weight Testing of Cranes and Davits

b. The response date is extended to 25 August 2023 at 2:00 PM EST.

c. Primary Point of Contact is changed to Jim Van Natta, (757) 364-6906, jim.vannatta@noaa.gov

d. Q&A responses are incorporated in Attachment I, Specification Rev A

Block 14. Description of Amendment/Modification Continued:

e. Updated Attachment III, Past Performance Questionnaire to reflect the current Primary Point of Contact.

f. Updated Attachment V, AIR Process to reflect the current Primary Point of Contact.

g. Request for missing references was addressed.

h. Except for the changes made herewith, all other terms, conditions, and provisions remain unchanged.

Q&A Responses

NOAA Ship Fairweather – FY24 Drydock – Pre-Bid Survey Bidder’s Questions

7/31/23 Dutch Harbor, AK.

Questions by potential bidders in attendance, response by Fairweather Port Engineer Henry Holtz

1.

Q:

What is the required level of testing and QA-NDT on sewage piping repairs? (WI 3.19)

A:

Level II QA to provide visual examination of joints

Testing per ABS surveyor requirements, expect air or hydro as practical

2.

Q:

Spec requires 300A NATO shore tie plugs vs. 400A, is this a typo? (WI 3.6)

A:

Yes, shore power receptacle is 2x400A, assume 400A plugs for new (3.6.4.d.6) and modified cables (3.6.4.d.5)

3.

Q:

Significant mast cable penetration is on the STBD side, spec calls for port side modification. Is this a typo? (WI 7.1)

A:

Yes, Primary mast transit penetration is STBD. NOAA would like to convert this to MSC style “doghouse” enclosure on Rox penetration, other options may be proposed by contractor.

4.

Q:

Does NOAA want to modify the port side Roxtec Penetration as well? (WI 7.1)

A:

Not currently, port side Rox penetration is smaller and does not indicate any leakage. Contractor may propose in CFR after start of contract if justification is found.

5.

Q:

What are the inspection port locations for main exhaust louvers? (WI 3.13)

A:

Reference WI 3.4.4.v.3.a, ABS has requested a single port on aft of stack. This supersedes port requirement in WI 3.13.

6.

Q:

Where is transformer cleaning mentioned in specification? (WI 3.6)

A:

Reference WI 3.6.4.b.2.b

7.

Q:

Do bunks need to be removed in staterooms for flooring installation? (WI 7.6)

A:

No, permanently installed furniture such as lockers, desks, and beds may remain in place. Appropriate fairing and rolling of edges must be incorporated to protect against water pooling under furniture.

8.

Q:

Please define the location titled “potable water cofferdam”. (WI 3.11)

A:

Potable water cofferdam is shown in “FA_S0201-1_Booklet of General Plans_Rev C” sheet 5 of 9. It includes the entire deck in the potable water space.

9.

Q:

Please provide a list of expansion joints to be replaced. (WI 3.8)

A:

Main SW Suction (pumps 1 & 2): 4 ea Suction/Discharge 3x10

Main Fire Pump: 2 ea Suction/Discharge 2x7

Main Engine JW: 2ea Suction 6x12. 2ea Discharge 5x12

AC Plants – ASW: 4ea Suction/Discharge 3x6

These are existing fittings observed by the port engineer on 7/31/23 and should supersede the list in 3.8.4.d.1.b.1. Note spec lists an additional two joints beyond what was observed. Contractor to provide allowance for additional two joints discovered during repairs, unknown size, estimate cost as largest size listed in spec.

10.

Q:

Please clarify if galley deck drain piping is to be included in sewage repairs. (WI 3.19)

A:

Yes, piping to be replaced is marked in red on attached reference “FA-S4801-11_SEWAGE AND PLUMBING DRAIN PIPING SYSTEM Rev - (Revised with comments)” (WI 3.19 Reference B). Any galley drain cups are to be understood as the bulkhead penetration and not to be replaced under this work item.

Fairweather DD FY23 Question and Answers 001

Responses and/or comments in red by H. Holtz 09AUG23.

“Attached” to mean documents will be provided to NOAA contracting officer for delivery to bidders.

001 Question: WI 3.2 Temporary Services

Will the vessels crew be inhabiting the vessel at all during the period of performance?

Answer: No, it’s safe to assume the ship will not meet the legal definition of habitability while undergoing repairs. The contractor’s work schedule will be used to determine when the ship’s crew will be housed elsewhere.

Will NOAA confirm that guard services are required during normal work hours (0600hrs- 1430hrs) Monday through Friday?

Answer: Yes, assume guards will be used the entire PoP

Will an OSHA approved crane and man basket an acceptable means for high reach assist?

Answer: Yes, assume up to 80 hours (10ea 8-hour days) of aloft time including a two-man basket with a contractor-employed rigger riding with the NOAA technician. These 80 hours are at NOAA’s discretion and do not include time required by subcontractors for work item completion.

002 Question: WI 3.4 Abs Load Line Survey and Inspection Report

What % of touch up paint should be assumed in the chain lockers?

Answer:

3.11.4.d Assumes 5% of area will require tooling to bare metal and primed, then fully coated.

3.4.4.t

Includes a requirement for a stripe-coat prior to the full top coat

Will the Contractor only be responsible for ABS inspections specifically outlined in the statement of work?

Answer: NOAA will contract ABS survey services directly. The contractor is responsible for scheduling callouts with the local survey office on work accomplished or inspections required. Work beyond what is listed in the specification but required by survey would be addressed as a change order through the CFR (condition found report) process.

Will lead, ACM's, or zinc chromate be encountered, abatement of these hazardous materials will be the subject of a change order?

Answer:

Lead paint has not been found on Fairweather.

Zinc chromate (yellow) was heavily used in the ship’s interior. Interior spaces have not been subject to blasting/tooling over the life of the ship to the extent exterior spaces have. Incidental contact through steel repairs is the most common disturbance of the original primer system. Incidental contact is typically dealt with by providing organic respirators and negative ventilation for work crews (not remediation). Because respirators and ventilation are typical for these tasks regardless of coating composition, this would not be grounds for a change order.

Asbestos is primarily occurring under perforated metal as loose sheeting facing of fiberglass insulation. Work items requiring removal for completion and not requiring abatement in the specification would be grounds for a CFR.

Occasionally, it is preferable to leave these materials undisturbed rather than go through the time/expense of removal.

003 Question: WI 3.5 Propulsion Equipment Maintenance

In paragraph 4h. 1 thru 7 pulling Port and Starboard shafting (4 total), are all four shafts to be put in the lathe for checking runouts?

Answer: No, alignment survey and bearing clearances will indicate if shaft deflection is present. Machine work beyond listed requirements would be addressed in a CFR.

004 Question: WI 3.6 Electric Plant Maintenance

Ship currently has two 400-amp NATO plugs for shore power connection. Does NOAA wish to have shore power cable cut to two 150' lengths and contractor to purchase and install two male and two female 400-amp connectors to cables?

Answer: Yes, the item 3.6.4.d.5 requires taking an existing cable, cutting in half, and installing new NATO plugs (2 male, 2 female).

005 Question: WI 3.7 Machinery Controls Maintenance and Repairs

Provide part #'s for Woodward Easygen controls /Woodward main engine Governors?

Answer: Main switch board (3ea) and emergency switchboard (1ea) use Woodward easYgen-3500XT controllers.

Main engines use Woodward 723 Plus Digital Controls and Woodward PG-EG actuators

006 Question: WI 3.10 Life Raft and Immersion Suit Maintenance and Certification

What is the definition of "items nearing expiration"?

Answer: Items that will expire prior to the next winter service, assume December 2024.

007 Question: WI 3.25 Davit Maintenance And Inspection

Please provide the actual Vest Davit Technical Manuals and not the User Manuals or the installation manuals as referenced in 3.25.1 and 3.26.1 below?

a. Vest Davit Technical Manual – Type PLR-3600

b. Vest Davit Technical Manual – Type H-7000 1995

c. Vest Davit Technical Manual – Type HN-9001 Winch Type A-320

Please provide the other References in 3.26.1as follows?

d. NOAA Standard Specification S8200 “Crane & Davit Weight Testing”

e. 29 CFR §1919.1, Gear Certification – Purpose and Scope

f. 29 CFR §1919 Subpart C, Duties of Persons Accredited

g. 29 CFR §1919 Subpart D, Certification of Vessels Cargo Gear

h. OMAO Procedure 0606-01 Ver 1.0, “Shipboard Lifting Appliance Certification and Inspections”

Answer:

a.

Included in additional references package b.

Included in additional references package c.

Included in additional references package d.

Attached e.

Publicly available at: www.ecfr.gov/ f.

Publicly available at: www.ecfr.gov/ g.

Publicly available at: www.ecfr.gov/ h.

Attached

008 Question: WI 3.27 Crane Service and Repairs

Please provide Reference g. CFR 1919 – Gear Certification?

Answer: Publicly available at: www.ecfr.gov/

In paragraph 3.27.3.d – on the two forward cranes, Define “Full Rebuilds”?

Answer: Removal and total disassembly, remanufacturing, reinstallation, testing.

Booms have extensive corrosion inside the hollow beams.

The Contractor can disassemble, clean, inspect, measure parts for wear, but not knowing everything that needs to be replaced or repaired on these two cranes is yet to be determined. Can Paragraph – 3 a. – On the Aft Crane Slew Bearings, does the bearing have to be removed and disassembled to degrease and inspect wear surfaces?

Answer: Only as needed to determine bearing wear/condition. Full disassembly is not expressly required.

In Paragraph – 4 a. through e. Slew Gear and gear Boxes - Are they to be removed?

Answer: Removal not expressly required, minimal disassembly to clean, inspect, and replace bearings would be allowed.

On Paragraphs – 5. Pivot pins, 7. Sheaves, 9. Limit switch and Limit switch valves, what is the Contractors direction of work to be accomplishing on these items?

Answer: If service is not expressly stated, the header provides direction. The service level on items 5/7/9 would inspection. Required repairs would be addressed via CFR.

On Paragraph – 8. HPU are the motor and the pump to be rebuilt, remanufactured or replaced with new? Describe what work is to be done to the motor and pump?

Answer:

Paragraph - f.-3. – On the A-Frame and J-Frame “Rebuild Hydraulic cylinders including all damaged components, wear parts”. Does NOAA know what damage there is to the components?

Answer: Systems are operational. A/J Frame wear parts are pins/washers/bushings. Hydraulic cylinders have external corrosion and require a shop disassembly/paint/rebuild with new seals.

Other than opening, inspecting, reporting, reassemble with new seals, test and touch up paint on the hydraulic cylinders, would anything additional be addressed as a change order?

Answer: Cylinders will need more paint support than “touch up”. If cylinders require bore/hone/machining this would be included in item. Fabrication or replacement of major cylinder components is not expected and would be addressed via CFR if found.

On paragraph - .g.1 and 2 on the Forward and Aft ships service HPU’s, Define “Remanufacture Motors and Pumps” - Does NOAA want to rebuild or renew?

Answer: Renew

Other than opening, inspecting, reporting, reassemble with new seals and gaskets, test and touch up paint, would anything additional be addressed as a change order for the motors and pumps?

Answer: CFR if damage is found that requires replacement of major equipment components (i.e. bent shaft, cracked frame, etc.).

009 Question: WI 3.30 Underwater Hull and Freeboard Preservation

Are we correct in our interpretation of the specifications regarding freeboard coatings (top of boot stripe to top of bulwarks), that other than cleaning the freeboard and recoating distinguishing figures, there is no other surface preparation or coating application to be performed on the freeboard?

Answer: Freeboard is included with underwater hull item, reference 3.30.0 Scope

Will NOAA revise the specification to eliminate "within 3 hours after dry-docking" and replace this with "In accordance with direction of the Paint Manufacturers Representative".

Answer: Intent is for water wash to occur immediately after block inspection. Item is time critical for paint application integrity as well as anode, equipment, and hull inspections. Accommodations will be made for other work in progress and good-faith effort to meet the spirit of the specification.

Will NOAA revise the specification to eliminate "within the first hour" and replace this with "First, immediately upon initiation of the washing process ". REASON FOR PROPOSED

MODIFICATIONS: Set-up of scaffolding, man lifts, pressure washers and wash water treatment necessary to initiate requires several hours to complete.

Answer: Accommodations will be made for other work in progress and good-faith effort to meet the spirit of the specification.

Will NOAA change "If the top black coat is soft and is washing off exposing any of the red AF coat, then perform high pressure wash sufficient to completely remove all of the AF top coat that is degraded (soft)" to indicate that "the contractor should anticipate that a secondary pressure was shall be applied to remove degraded black AF. For bidding purposes this shall be limited to 20% of the black AF coating".

Answer: Intent of WI is a total sweep blast and renewal of top coats (UW hull and freeboard), 20% allowance is for localized base coat repairs. Specifics of criteria and application details may be proposed in the contractor’s paint plan subject to acknowledgment of warranty burden.

010 Question: WI 6.2 Tank Vents

Paragraph 6.2.1 states to remove and replace all goose neck piping, valves, vent labels, and pipe hangers exterior to the vessel. Install new flanged inverted check valves. The Fairweather has approximately 42 tank and void goose neck vents of various sizes as shown in Reference a.

On the list of inverted check valves in Reference:

a., there is 69 inverted check valves (53-2.5”, 9-1.5”, 1-4”, 6-2”). Is the Contractor to replace all 69 inverted check valves with associated piping, labels, and hangers?

Answer: No

If not all 69 valves and piping to be replaced, can NOAA give us a list of valves and sizes and which tanks that will be effective by the replacements?

Answer: External main (“D”) deck vents are of primary concern. Contactor to estimate as 42ea 2.5” for bidding purposes and measure onboard after vessel arrives for exact sizes.

Will the Contractor need to clean & pump out each tank effected to a gas free state before cutting and welding to replace the piping and valves?

Answer: Yes

011 Question: WI 6.7 Compressed Air System Maintenance

Provide a list of bearings requiring replacement. Specifically, do the air end and motor bearings require replacement. If so, it may be more economical to replace these unit. Is this an acceptable alternative?

Answer: NOAA does not have technical materials for the compressors beyond manuals provided. We do not object to replacement if the equipment can be replaced in kind for less than the cost of the service level specified.

How many hours are on each air compressor unit?

Answer: Approximately 60,000

012 Question: WI 6.8 Exterior Paint

The format might be off, are the following sections below supposed to be:

"Section 3.12.1" supposed to be "6.8.1"

"Section 3.12.4.d" supposed to be "6.8.1"

"Section 3.12.2.a" supposed to be "6.8.1"

Answer: Agree, please proceed with assumed correction

013 Question: WI 6.11 Windlass Overhaul and Improvements

Paragraph 6.11.1a. And c. on page 208 and d. on page 209, Will NOAA go into more detail and provide drawing of shipside deck foundation and associated tackle/jewelry that is to be renewed?

Answer: Reference FA-S2601-7 Anchor Windlass Instruction book.

Foundation and bolting shown in figure 2

Linkage and transfer levers are labeled as Clutch/shifter components shown in figure 1

Associated tackle/jewelry to mean devil’s claws and pawl/stoppers. Service level to include removal, cleaning, reaming/bushing as needed, coatings, grease fittings.

014 Question: WI 7.1 Navigation Equipment Replacement

Will NOAA provide reference 7.1.2 B Furuno FAR -33xx Installation Manual?

Answer: See additional references: far3000_series_installation_manual 015 Question: WI 3.8

New pump replacements Carver pump list, Carver will need to know what materials of construction NOAA wants - i.e. CI (all cast iron), CISF (cast iron with stainless impellers), AB (all bronze) CIBF (cast iron bronze fitted impellers).

Please provide they type of material of construction?

Answer: All bronze is preferred, duplex SS is also acceptable

016 Question:

Request to extend the solicitation until August 25th?

Contracting officer agrees

FAIRWEATHER 2023 MISSING REFERENCES

Responses and/or comments in red by H. Holtz 26JUL23.

“Attached” to mean documents will be provided to NOAA contracting officer for delivery to bidders.

Bidders are encouraged to use publicly available regulatory information when available.

· American Bureau of Shipping “Rules for Building and Classing Steel Vessels” Publicly available at: ww2.eagle.org/en/rules-and-resources/rules-and-guides.html

· ABS Guide for “Shipbuilding and Repair Quality Standard for Hull Structures during Construction” Publicly available at: ww2.eagle.org/en/rules-and-resources/rules-and-guides.html

· U.S. Coast Guard “Subchapter F – Marine Engineering”, 46CFR 50 through 46 CFR 64.

Publicly available at: www.ecfr.gov/

· U.S. Coast Guard “Subchapter J – Electrical Engineering”,46 CFR 110 through 46 CFR 113.

Publicly available at: www.ecfr.gov/

· 46 CFR 110.10-1, IEEE Standard 45-2002, “IEEE 45: Recommended Practice for Electric Installations on Shipboard”

Publicly available at: www.ecfr.gov/

· 29 CFR 1910.1200 “OSHA, Toxic and Hazardous Substances, Hazard Communication” Publicly available at: www.ecfr.gov/

· 29 CFR 1915, Subpart A, “OSHA Standards for Shipyard Employment, General Provisions, Competent Person”

Publicly available at: www.ecfr.gov/

· 29 CFR 1915, Subpart B, “OSHA Standards for Shipyard Employment, Confined and Enclosed Spaces and Other Dangerous Atmospheres in Shipyard Employment”

Publicly available at: www.ecfr.gov/

· 29 CFR 1915, Subpart P, “Fire Protection in a Shipyard Environment” Publicly available at: www.ecfr.gov/

· NFPA 10-2013, Chapter 5, “Standard for Portable Fire Extinguishers, Selection of Portable Fire Extinguishers” Trade standard. Not publicly owned or in the public domain, available for license at: www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=10

· MIL-STD-777 “Schedule of Piping, Valves, Fittings, and Associated Piping Components for Naval Surface Ships”

Attached

· NOAA Standard Specification, “Overhaul/Repair of Hydraulic Cylinders Attached

· NOAA Standard Specification AMC-581-1A, “Inspection and Preservation of Ground Tackle Attached

· NOAA Standard Specification MOC-631-2D, “57-10-01 for Steel Surfaces Attached

· NOAA Standard Specification S1600, “Structural Access Cuts” Attached

· NOAA Standard Specification, S2906, “Arc Welding on Waterborne Vessels” Attached

· NOAA form 57-17-09 – NOAA Hotwork Permit Attached

· NOAA Weight Report Form Attached

· Drydock Worksheet Attached

· NOAA Form 57-10-01 Attached

· NOAA Form 57-10-02 Attached

· NOAA Standard Spec S0700-3, Drydock Standards for NOAA Ship Availabilities Attached

· NOAA Standard Spec S0700-1, Drydocking of NOAA Ships Attached

· Drawings NOAA Ship Fairweather Drawing Set Significant drawings provided with references package

· American Bureau of Shipping (ABS), “Rules for Survey After Construction 2005", Part 7.

Publicly available at: ww2.eagle.org/en/rules-and-resources/rules-and-guides.html

· American Bureau of Shipping (ABS) Rules for Building and Classing Steel Vessels, Section 2/1.13, “Anchor Chains”

Publicly available at: ww2.eagle.org/en/rules-and-resources/rules-and-guides.html

· NAVSEA Standard Item 009-32, “Cleaning and Painting Requirements; accomplish,” date: 01 AUG 2008, CATEGORY: II

Attached

· Fairweather Ultrasonic Gauging Survey May-December 2003 Attached

· NOAA Standard Specification AMC-583-1b, “General Requirements for Life Raft Inspections” Attached

· 46 CFR Part 160, Subpart 160.151 – Inflatable Liferafts (SOLAS) Publicly available at: www.ecfr.gov/

· NOAA STD 631-2D – “Coating Systems for Steel Surfaces” Same as “NOAA Standard Specification MOC-631-2D, “57-10-01 for Steel Surfaces”

· Steel Structures Paint Council (SSPC) Surface Preparation Standards.

Attached as “NACE Surface_preparation_standards”

· Drawing: FA-SO201-1 Rev B (General Arrangements) Superseded by FA_S0201-1_Booklet of General Plans_Rev C

· NOAA STD 505-1B – “Valve Overhaul and Test” Attached

· MO 2021-10 – Lesson Learned Wrong Pipe Repaired.

Attached

· FA-S4801-11_SEWAGE AND PLUMBING DRAIN PIPING SYSTEM Rev – (Revised with comments)

Attached

· FA-528-001_Rev -_GRAY AND BLACK WATER PIPING MODIFICATIONS Attached

· NOAA Standard Specification, 510-1B “HVAC Cleaning” Attached

· NOAA ship Fairweather Steering Gear Hose list Included in “Master Hose List”

· Steyr Marine Engine 4 Cylinders + 6 Cylinders, P/N Z001140-0, 7th Edition November 2018 Superseded by provided “Steyr Motor Marine Engines MO SERIES 4 Cylinders +6 Cylinders, Operation, Maintenance and Warranty Manual, P_N Z001022_0, 10th Edition, July 2011”

· ZF Marine Operators Manual 25A,25,45A,45-1,63A,63,63IV,80A,80-1A, 80IV,80- 1IV,85A,85IV, 310_01_0005k, rev 2008-09-12

· Steyr Motor Marine Engines MO SERIES 4 Cylinders +6 Cylinders, Operation, Maintenance and Warranty Manual, P_N Z001022_0, 10th Edition, July 2011

Included in original references package

· ZF Marine Operators Manual ZF 305 Family, Code 3270.305.5001 Ed., January 2001 Included in original references package as “ZF_Repair Manual_ ZF305”

· VESTDAVIT Technical Manual PLR-3600 Attached, Vestdavit Type P-3600- Winch Type C (For FWD Utility Boat)

· VESTDAVIT technical manual – “Type H-7000 1995” Attached, FA_BOAT DAVIT PL -2500 (For Rescue Boat)

· VESTDAVIT technical manual – “Type HN-9001 Winch Type A-320” Attached, FA_BOAT DAVIT INSPECTION & INSTALLATION MODEL HN-9002 (For Survey Boats)

· 29 CFR 1919 - Gear Certification Publicly available at: www.ecfr.gov/

· NOAA Standard Specification S2603, “Inspection, Repair, and Preservation of Ground Tackle” Attached, as S2603B

· ASTM F-1321 (CURRENT REVISION) Standard Guide for Conducting a Stability Test (Lightweight Survey and Inclining Experiment) to Determine the Light Ship Displacement and Centers of Gravity of a Vessel

Attached, F1321

· NVIC 3-97 Stability Related Review Performed by the American Bureau of Shipping for U.S. Flag Vessels

Publicly available at: www.dco.uscg.mil/Portals/9/DCO%20Documents/5p/5ps/NVIC/1997/n3-97.pdf

· USCG MSC Plan Review Guideline GEN-02 Submission of Stability Test (Deadweight Survey or Inclining Experiment) Results

No submission to USCG required, guidance at: www.dco.uscg.mil/Our-Organization/Assistant-Commandant-for-Prevention-Policy-CG-5P/Commercial-Regulations-Standards-CG-5PS/Marine-Safety-Center-CG-MSC/Plan-Review-Guides/

· USCG MSC Plan Review Guideline GEN-05 Submission of Stability Test Procedures No submission to USCG required, guidance at: www.dco.uscg.mil/Our-Organization/Assistant-Commandant-for-Prevention-Policy-CG-5P/Commercial-Regulations-Standards-CG-5PS/Marine-Safety-Center-CG-MSC/Plan-Review-Guides/

· Ingersoll Rand SSR UP6 Manual Attached

· NOAA Standard Specification MOC-300-3, General Requirements for Electrical/Electronic Items Attached

· Furuno FAR-33xx Installation Manual Attached, far3000_series_installation_manual

· FMD3300 Installation Manual “INSTALLATION MANUALIME44730L_FMD3200_3300.pdf” Included in original references package

· Touchscreen Manual Hatteland 4K “hd32t22fudma4aogp_usermanual.pdf” Included in original references package

SECTION D – LIST OF EXHIBITS AND ATTACHMENTS

Attachment I Specification titled “NOAA Ship Faiweather(S-220) Drydock and Repair Detail Specifications”REV A Attachment III Past Performance Questionnaire REV A

Attachment V AIRS Process Guide Attachment REV A The thirty-one (31) attachments listed below will be made available via KITE WORKS. Contact the Contract Specialist, Jim Van Natta, at jim.vannatta@noaa.gov.

MIL-STD-777 “Schedule of Piping, Valves, Fittings, and Associated Piping Components for Naval Surface Ships” NOAA Standard Specification AMC-581-1A, “Inspection and Preservation of Ground Tackle

NOAA Standard Specification MOC-631-2D, “57-10-01 for Steel Surfaces

NOAA Standard Specification S1600, “Structural Access Cuts”

NOAA Standard Specification, S2906, “Arc Welding on Waterborne Vessels”

NOAA form 57-17-09 – NOAA Hotwork Permit

NOAA Weight Report Form

Drydock Worksheet

NOAA Form 57-10-01

NOAA Form 57-10-02

NOAA Standard Spec S0700-3, Drydock Standards for NOAA Ship Availabilities

NOAA Standard Spec S0700-1, Drydocking of NOAA Ships

NAVSEA Standard Item 009-32, “Cleaning and Painting Requirements; accomplish,” date: 01 AUG 2008, CATEGORY: II

Fairweather Ultrasonic Gauging Survey May-December 2003

NOAA Standard Specification AMC-583-1b, “General Requirements for Life Raft Inspections”

NOAA STD 631-2D – “Coating Systems for Steel Surfaces”

Same as “NOAA Standard Specification MOC-631-2D, “57-10-01 for Steel Surfaces”

Steel Structures Paint Council (SSPC) Surface Preparation Standards.

Attached as “NACE Surface_preparation_standards”

Drawing: FA-SO201-1 Rev B (General Arrangements)

Superseded by FA_S0201-1_Booklet of General Plans_Rev C

NOAA STD 505-1B – “Valve Overhaul and Test”

MO 2021-10 – Lesson Learned Wrong Pipe Repaired.

FA-S4801-11_SEWAGE AND PLUMBING DRAIN PIPING SYSTEM Rev – (Revised with comments)

FA-528-001_Rev -_GRAY AND BLACK WATER PIPING MODIFICATIONS

NOAA Standard Specification, 510-1B “HVAC Cleaning”

VESTDAVIT Technical Manual PLR-3600

Attached, Vestdavit Type P-3600- Winch Type C (For FWD Utility Boat) VESTDAVIT technical manual – “Type H-7000 1995” Attached, FA_BOAT DAVIT PL -2500 (For Rescue Boat)

VESTDAVIT technical manual – “Type HN-9001 Winch Type A-320” Attached, FA_BOAT DAVIT INSPECTION & INSTALLATION MODEL HN-9002 (For Survey Boats)

NOAA Standard Specification, “Overhaul/Repair of Hydraulic Cylinders Ingersoll Rand SSR UP6 Manual

NOAA Standard Specification S2603, “Inspection, Repair, and Preservation of Ground Tackle”

Attached, as S2603B ASTM F-1321 (CURRENT REVISION) Standard Guide for Conducting a Stability Test

(Lightweight Survey and Inclining Experiment) to Determine the Light Ship Displacement and Centers of Gravity of a Vessel Attached, F1321 NOAA Standard Specification MOC-300-3, General Requirements for Electrical/Electronic Items Furuno FAR-33xx Installation Manual Attached, far3000_series_installation_manual

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name and Title of Signer (Type or Print)
16A. Name and title of Contracting Officer (Type or Print)
15B. Contractor/Offeror
15C. Date Signed
16B. United States of America

(Signature of Contracting Officer) 16C. Date Signed

_____________________________________________(Signature of person authorized to sign)

NSN 7540-01-152-8070
30-105

STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITIONS UNUSABLE

Prescribed by GSA FAR (48 CFR) 53.243

File details come from the government source that posted it. Updated .