Missouri River Recovery Program - Fawn Island Bank Stabilization
Closed Solicitation Posted
- Solicitation number
- W9128F21B0015
- Agency
-
ENDIST Omaha
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Y1KB Construction Of Canals
- Place of performance
- Little Sioux, Iowa 51545, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers Omaha District is soliciting bids for the Missouri River Recovery Program Fawn Island Bank Stabilization project through invitation for bid W9128F21B0015. The scope of work involves stabilizing approximately 1,100 linear feet of riverbank through extending three existing dikes, constructing four new dikes, and installing approximately 16,400 tons of new quarried rock riprap in various locations. Access and construction must be performed entirely from the river using river-based equipment over a 730 calendar day performance period. Bids are due by September 2, 2021 and the solicitation is restricted to small businesses.
This set-aside procurement has a total estimated value between $1,000,000 to $5,000,000. The NAICS code is 237990 and PSC code is C111. The place of performance is Little Sioux, Iowa. Two bids were received from Newt Marine Service for $1,503,400 and Western Contracting Corporation for $1,356,000. The work must be performed in Harrison County, Iowa along the Missouri River at mile marker 674.
Notice text
U.S. Army Corps of Engineers (USACE) Omaha District Invitation for Bid (IFB) using the FAR Part 14 – Sealed Bidding method for the project titled: Missouri River Recovery Program Fawn Island Bank Stabilization, Missouri River Mile 674, Harrison County, Iowa.
The solicitation will close on 2 September 2021. This IFB is restricted to Small Businesses.
The scope of work for this project includes:
Stabilization to the riverbank, below or at the ordinary high water mark. Construction would include the extension of three existing dikes, and the construction of four new dikes to fortify the toe of the existing revetment. In areas where no bank protection currently exists, a total of approximately 1,100 linear feet of new revetment would be installed in various locations to stabilize the banks. This would require approximately 16,400 tons of new quarried rock riprap. Access and construction MUST take place entirely from the river with river-based equipment.
Construction duration is 730 calendar days after issuance of the notice to proceed.
Estimated Magnitude of Construction is between $1,000,000 and $5,000,000.
USACE Omaha District will post all solicitation documents to SAM.gov.
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Missouri River Recovery Program - Fawn Island Bank Stabilization | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Lower brule north shoreline stabilization and ecosystem restoration, element 2 | ENDIST Omaha | Total Small Business | |
| Lock and DAM 25 new 1, 200 FT lock navigation and ecosystem sustainability program (NESP) | ENDIST St Louis | No set-aside | |
| Belle Fountain Ditch Cleanout Phase 2 | ENDIST Memphis | Service-Disabled Veteran-Owned Small Business | |
| St Francis Town Levee Renovation | ENDIST Memphis | No set-aside | |
| FY27 Texas City Ship Channel Main Channel and Turning Basin | ENDIST Galveston | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity