About this opportunity

The USACE Omaha District plans to issue an IFB on July 28, 2021 for the Missouri River Recovery Program Fawn Island Bank Stabilization project in Harrison County, Iowa. The scope of work includes extending three existing dikes, constructing four new dikes, installing approximately 1,100 linear feet of new revetment, and placing approximately 16,400 tons of riprap across various locations to stabilize the riverbank. All access and construction must be performed from the river using river-based equipment only. The anticipated period of performance is 730 calendar days from notice to proceed. Bids are due on August 31, 2021 with bid opening scheduled for the same date.

This requirement has been set aside for total small business participation. The estimated value is between $1,000,000 and $5,000,000. All solicitation documents will be posted to SAM.gov. Construction duration and quantity details were provided.

Notice text

The U.S. Army Corps of Engineers (USACE) Omaha District plans to issue an invitation for bid (IFB) using the FAR Part 14 – Sealed Bidding method for the project titled: Missouri River Recovery Program Fawn Island Bank Stabilization, Missouri River Mile 674, Harrison County, Iowa.

The tentative date to issue the IFB is 28 July 2021, with bids due and bid opening on 31 August 2021. 

The proposed action includes further stabilization to the riverbank, below or at the ordinary high water mark. Construction would include the extension of three existing dikes, and the construction of four new dikes to fortify the toe of the existing revetment. In areas where no bank protection currently exists, a total of approximately 1,100 linear feet of new revetment would be installed in various locations to stabilize the banks. This would require approximately 16,400 tons of new quarried rock riprap. Access and construction MUST take place entirely from the river with river-based equipment.

Construction duration is 730 calendar days after issuance of the notice to proceed.

Estimated Magnitude of Construction is between $1,000,000 and $5,000,000.

USACE Omaha District will post all solicitation documents to SAM.gov.

Notice history

Notice Type Posted
Missouri River Recovery Program - Fawn Island Bank Stabilization Latest solicitation Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
St Francis Town Levee Renovation Saint Francis, Arkansas, United States · NAICS 237990 ENDIST Memphis No set-aside
FY27 Texas City Ship Channel Main Channel and Turning Basin Galveston, Texas, United States · NAICS 237990 ENDIST Galveston No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors