Missouri River Recovery Program - Fawn Island Bank Stabilization
Closed Pre-Solicitation Posted
Not the latest version. See the latest solicitation from .
- Solicitation number
- W9128F21B0015
- Agency
-
ENDIST Omaha
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Y1KB Construction Of Canals
- Place of performance
- Little Sioux, Iowa 51545, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The USACE Omaha District plans to issue an IFB on July 28, 2021 for the Missouri River Recovery Program Fawn Island Bank Stabilization project in Harrison County, Iowa. The scope of work includes extending three existing dikes, constructing four new dikes, installing approximately 1,100 linear feet of new revetment, and placing approximately 16,400 tons of riprap across various locations to stabilize the riverbank. All access and construction must be performed from the river using river-based equipment only. The anticipated period of performance is 730 calendar days from notice to proceed. Bids are due on August 31, 2021 with bid opening scheduled for the same date.
This requirement has been set aside for total small business participation. The estimated value is between $1,000,000 and $5,000,000. All solicitation documents will be posted to SAM.gov. Construction duration and quantity details were provided.
Notice text
The U.S. Army Corps of Engineers (USACE) Omaha District plans to issue an invitation for bid (IFB) using the FAR Part 14 – Sealed Bidding method for the project titled: Missouri River Recovery Program Fawn Island Bank Stabilization, Missouri River Mile 674, Harrison County, Iowa.
The tentative date to issue the IFB is 28 July 2021, with bids due and bid opening on 31 August 2021.
The proposed action includes further stabilization to the riverbank, below or at the ordinary high water mark. Construction would include the extension of three existing dikes, and the construction of four new dikes to fortify the toe of the existing revetment. In areas where no bank protection currently exists, a total of approximately 1,100 linear feet of new revetment would be installed in various locations to stabilize the banks. This would require approximately 16,400 tons of new quarried rock riprap. Access and construction MUST take place entirely from the river with river-based equipment.
Construction duration is 730 calendar days after issuance of the notice to proceed.
Estimated Magnitude of Construction is between $1,000,000 and $5,000,000.
USACE Omaha District will post all solicitation documents to SAM.gov.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Missouri River Recovery Program - Fawn Island Bank Stabilization | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| St Francis Town Levee Renovation | ENDIST Memphis | No set-aside | |
| FY27 Texas City Ship Channel Main Channel and Turning Basin | ENDIST Galveston | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity