This document is an abstract of bids for the Missouri River Recovery Program Fawn Island Bank Stabilization project. The U.S. Army Corps of Engineers Omaha District solicited bids for stabilization of the riverbank at Fawn Island, which included extension of existing dikes, construction of new dikes, and installation of approximately 1,100 linear feet of new revetment. The solicitation closed on September 2, 2021. Two bids were received in response from Newt Marine Service for $1,503,400 and Western Contracting Corporation for $1,356,000. The scope of work must be performed entirely from the river using river-based equipment. The construction duration is 730 calendar days from notice to proceed. The estimated magnitude of construction is between $1 million and $5 million.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2. DATE ISSUED 3. DATE OPENED
3-Aug-21 2-Sep-21
I CERTIFY THAT I HAVE OPENED, READ AND
AND RECORDED ON THIS ABSTRACT
ALL OFFERS RECEIVED IN RESPONSE DATE SIGNED
Missouri River Recovery Program Fawn Island Bank Stabilization - Missouri River Mile 674 Harrison County, Iowa
C. REASONABLE CONTRACT
7A 7B 7C D. E. F.
ITEM # DESCRIPTION OF OFFER ITEM EST. QUANTITY UNIT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT
0001 Entire work, complete, for Dike 1 as shown on the drawings and in the specifications 1,100 Tons $139.86 $153,846.00 $75.00 $82,500.00 $67.00 $73,700.00
0002 Entire work, complete, for Dike 2 as shown on the drawings and in the specifications 3,500 Tons $131.05 $458,675.00 $75.00 $262,500.00 $67.00 $234,500.00
0003 Entire work, complete, for Dike 3 as shown on the drawings and in the specifications 600 Tons $139.86 $83,916.00 $75.00 $45,000.00 $67.00 $40,200.00
0004 Entire work, complete, for Dike 4 as shown on the drawings and in the specifications 800 Tons $139.86 $111,888.00 $75.00 $60,000.00 $67.00 $53,600.00
0005 Entire work, complete, for Dike 5 as shown on the drawings and in the specifications 1,200 Tons $139.86 $167,832.00 $75.00 $90,000.00 $67.00 $80,400.00
0006 Entire work, complete, for Dike 6 as shown on the drawings and in the specifications 2,200 Tons $139.86 $307,692.00 $75.00 $165,000.00 $67.00 $147,400.00
0007 Entire work, complete, for Dike 7 as shown on the drawings and in the specifications 2,500 Tons $139.86 $349,650.00 $75.00 $187,500.00 $67.00 $167,500.00
0008 Entire work, complete, for Revetment 1 as shown on the drawings and in the specifications 1,800 Tons $110.93 $199,674.00 $75.00 $135,000.00 $67.00 $120,600.00
0009 Entire work, complete, for Revetment 2 as shown on the drawings and in the specifications 750 Tons $139.86 $104,895.00 $75.00 $56,250.00 $67.00 $50,250.00
0010 Entire work, complete, for Revetment 3 as shown on the drawings and in the specifications 500 Tons $139.86 $69,930.00 $75.00 $37,500.00 $67.00 $33,500.00
0011 Entire work, complete, for Revetment 4 as shown on the drawings and in the specifications 500 Tons $139.86 $69,930.00 $75.00 $37,500.00 $67.00 $33,500.00
0012 Entire work, complete, for Revetment 5 as shown on the drawings and in the specifications 700 Tons $139.86 $97,902.00 $75.00 $52,500.00 $67.00 $46,900.00
0013 Entire work, complete, for Revetment 6 as shown on the drawings and in the specifications 250 Tons $139.86 $34,965.00 $75.00 $18,750.00 $67.00 $16,750.00
0014 Entire work, complete, for the mobilization / demobilization of all marine equipment as shown on the drawings & in the specifications 1 Job $134,679.00 $134,679.00 $100,000.00 $100,000.00 $371,000.00 $371,000.00
0015 All remaining work 1 Job $69,942.00 $69,942.00 $26,000.00 $26,000.00 $33,600.00 $33,600.00
TOTAL $2,415,416.00 $1,356,000.00 $1,503,400.00
l PAGES
SIGNATURE
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
OMAHA, NE 68102-1618
1616 CAPITOL AVENUE
CONTRACTING DIVISION (CENWO-CT)
US ARMY CORPS OF ENGINEERS
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER
W9128F21B0015
4. ISSUING OFFICE
8. GOVERNMENT ESTIMATE
(Check A, B or C AND COMPLETE D, E AND F)
5. PROJECT TITLE
TO THIS SOLICITATION
5 Jones St, Ste 2
A. HIRED LABOR
IGE Newt Marine Service
NO. 2 NO. 1
9. OFFERS
Dubuque, IA 52001-7674
B. REASONABLE CONTRACT
6. NUMBER OF AMENDMENTS ISSUED
A. OFFEROR A. OFFEROR
Bid Security 20% C. AMENDMENTS ACKNOWLEDGED : Yes
Bid Security 20% C. AMENDMENTS ACKNOWLEDGED : Yes
(Without Profit)
(Including Profit)
Western Contracting Corporation 705 Douglas St, Ste 400 Sioux City, IA 51101-1087
09/02/21
FAWN ISLAND BANK STABILIZATION, MO RIVER MILE 674, HARRISON COUNTY IA
SOLICITATION: W9128F21B0015
OPEN DATE: 2 SEPTEMBER 2021 AT 1500 PM CT.
CONTRACTOR NAME TOTAL QUOTE AMENDMENTS BID BONDS AMOUNT OF BID BOND
Newt Marine Service $1,503,400.00 0 YES 20% Western Contracting Corporation $1,356,000.00 0 YES 20% APPARENT LOW