Belle Fountain Ditch Cleanout Phase 2

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W912EQ26BA002
Agency
Responses due
Set-aside
Service-Disabled Veteran-Owned Small Business

Opportunity facts

Place of performance
Pemiscot County, Missouri

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Army Corps of Engineers, Memphis District, seeks channel cleanout of Belle Fountain Ditch and related infrastructure (Bypass of Steele and Main Ditch) through furnishing of all plant, labor, and materials, with proposals due November 3. This procurement is an SDVOSB set-aside using sealed bid procedures, limiting competition to service-disabled veteran-owned small businesses.

Place of performance is Pemiscot County, Missouri, specifically the corridor from the confluence of New Franklin Ditch and Bypass of Steele heading north through Main Ditch and ending approximately 100 feet before the intersection of Main Ditch and County Road 442, roughly 2.5 miles south of Braggadocio. The NAICS code is 237990, Other Heavy and Civil Engineering Construction, with a small business size standard of $45 million. The PSC code is Z1PC, Maintenance of Unimproved Real Property (Land). Work includes all incidental related activities according to the plans and specifications. Amendment 0001 and Amendment 0002 have been posted.

Notice text

3 versions

Update #3 · Latest ·

Title of Work: Belle Fountain Ditch Cleanout Phase 2 Project Description: The work consists of furnishing all plant, labor, and materials for channel cleanout of Belle Fountain Ditch region including Bypass of Steele and Main Ditch according to the plans and specifications and any incidental related work. The project limits are starting at the confluence of New Franklin Ditch and Bypass of Steele, heading North through Bypass of Steele and it turns into Main Ditch, and ending at the intersection of Main Ditch and County Rd. 442 located approximately 2.5 miles south of Braggadocio, Missouri as shown on the plans. Work Location: The work shall be located at Bypass of Steele where it intersects with New Franklin ditch, then heads north through Main Ditch, and ends 100 ft before the intersection of Main Ditch and County Rd. 442, approximately as indicated. The North American Industry Classification System code is 237990 - Other Heavy and Civil Engineering Construction, with a Small Business Size Standard of $45M. This project is advertised as a Service-Disabled Veteran Owned Small Business (SDVOSB) Set-Aside using sealed bid procedures. Amendment 0001 has been posted. Amendment 0002 has been posted.

Update #2 ·

Title of Work: Belle Fountain Ditch Cleanout Phase 2 Project Description: The work consists of furnishing all plant, labor, and materials for channel cleanout of Belle Fountain Ditch region including Bypass of Steele and Main Ditch according to the plans and specifications and any incidental related work. The project limits are starting at the confluence of New Franklin Ditch and Bypass of Steele, heading North through Bypass of Steele and it turns into Main Ditch, and ending at the intersection of Main Ditch and County Rd. 442 located approximately 2.5 miles south of Braggadocio, Missouri as shown on the plans. Work Location: The work shall be located at Bypass of Steele where it intersects with New Franklin ditch, then heads north through Main Ditch, and ends 100 ft before the intersection of Main Ditch and County Rd. 442, approximately as indicated. The North American Industry Classification System code is 237990 - Other Heavy and Civil Engineering Construction, with a Small Business Size Standard of $45M. This project is advertised as a Service-Disabled Veteran Owned Small Business (SDVOSB) Set-Aside using sealed bid procedures. Amendment 0001 has been posted.

Update #1 ·

Title of Work: Belle Fountain Ditch Cleanout Phase 2 Project Description: The work consists of furnishing all plant, labor, and materials for channel cleanout of Belle Fountain Ditch region including Bypass of Steele and Main Ditch according to the plans and specifications and any incidental related work. The project limits are starting at the confluence of New Franklin Ditch and Bypass of Steele, heading North through Bypass of Steele and it turns into Main Ditch, and ending at the intersection of Main Ditch and County Rd. 442 located approximately 2.5 miles south of Braggadocio, Missouri as shown on the plans. Work Location: The work shall be located at Bypass of Steele where it intersects with New Franklin ditch, then heads north through Main Ditch, and ends 100 ft before the intersection of Main Ditch and County Rd. 442, approximately as indicated. The North American Industry Classification System code is 237990 - Other Heavy and Civil Engineering Construction, with a Small Business Size Standard of $45M. This project is advertised as a Service-Disabled Veteran Owned Small Business (SDVOSB) Set-Aside using sealed bid procedures.

Notice history

Notice Type Posted
Belle Fountain Ditch Cleanout Phase 2 Award Award Notice
This notice Latest solicitation Solicitation
Belle Fountain Ditch Cleanout Phase 2 Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Mill Creek Section 205 Flood Risk Management Improvements Mill Creek Flood Control ChannelWalla Walla, WA 99362Walla Walla County 99362 · NAICS 237990 ENDIST Walla Walla No set-aside
Fort Eustis Dredge Material Management Area (FEDMMA) Fort Eustis, Virginia, United States · NAICS 237990 ENDIST Norfolk Total Small Business

On GovTribe