MF 26-2 Willamette Complex SR Road Maintenance

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
1240BE26Q0071
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Prineville, Oregon, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Agriculture Forest Service R6-Pacific Northwest Region seeks road maintenance and vegetation management services to repair fire damage on the Willamette National Forest, with quotations due June 24, 2026 at 4:30 PM PT. The procurement is set aside for total small business under NAICS 237310, with a $45 million size standard.

Place of performance is the Northern end of the Middle Fork Ranger District of the Willamette National Forest in Oregon, with administrative oversight at Prineville, Oregon. Work runs from June 29, 2026 to October 30, 2027. Services include surface maintenance on 150.32 miles of Level 2 roads with roller compaction, spot surfacing of 12,650 cubic yards (with optional 9,700 cubic yards) at 3/4" gradation, load-haul-place of 12,610 cubic yards, water-bar installation, ditch and drainage structure cleaning across 15.9 and 100.21 miles respectively, entrance berm installation, hay bale placement, roadside brushing across 6.19 miles, and logging-out maintenance across 23.15 miles, plus mobilization. The contractor must furnish all labor, supervision, management, tools, materials, equipment, facilities, and transportation. Pre-approved aggregate sources are Parvin Butte (preferred) and Davidsons Rock Quarry; other sources require approval within three days. The general contractor must perform at least 50% of work with its own forces. Pricing is firm fixed-price per line item. Offerors must submit three attachments addressing past performance, technical capability and qualifications, and pricing; all items must be priced for an offer to be responsive. The government intends one award. The Contracting Officer's Representative is Carson Hanna.

Notice text

3 versions

Update #3 · Latest ·

Amendment 0002 - Provides quoters with questions and answers. 

Amendment 0001 -

1.This amendment extends the quotation due date to 6/24/2026 at 4:30 PM PT.
2.This amendment changes the project completion date to 10/30/2027.

The purpose of this contract is to maintain roads and manage vegetation growth to ensure safe and productive road conditions. Specifically, to repair damage to road surfaces and drainage structures during suppression of the 2024 Willamette Complex fire.

The Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, and other items and non-personal services necessary to provide road maintenance services to the Willamette NF road system.


The contractor shall provide services in accordance with (IAW) this Performance Work Statement (PWS), and all applicable federal, state and local laws and regulations.

The work shall be performed throughout the Northern end of the Middle Fork Ranger District of the Willamette NF in Oregon.

Update #2 ·

Amendment 0001 -

1.This amendment extends the quotation due date to 6/24/2026 at 4:30 PM PT.
2.This amendment changes the project completion date to 10/30/2027.

The purpose of this contract is to maintain roads and manage vegetation growth to ensure safe and productive road conditions. Specifically, to repair damage to road surfaces and drainage structures during suppression of the 2024 Willamette Complex fire.

The Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, and other items and non-personal services necessary to provide road maintenance services to the Willamette NF road system.


The contractor shall provide services in accordance with (IAW) this Performance Work Statement (PWS), and all applicable federal, state and local laws and regulations.

The work shall be performed throughout the Northern end of the Middle Fork Ranger District of the Willamette NF in Oregon.

Update #1 ·

The purpose of this contract is to maintain roads and manage vegetation growth to ensure safe and productive road conditions. Specifically, to repair damage to road surfaces and drainage structures during suppression of the 2024 Willamette Complex fire.

The Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, and other items and non-personal services necessary to provide road maintenance services to the Willamette NF road system.


The contractor shall provide services in accordance with (IAW) this Performance Work Statement (PWS), and all applicable federal, state and local laws and regulations.

The work shall be performed throughout the Northern end of the Middle Fork Ranger District of the Willamette NF in Oregon.

Files

File Type Posted
C05_Amd_0002.pdf PDF
Amd_0001.pdf PDF
1240BE26Q0071.pdf PDF

Notice history

Notice Type Posted
MF 26-2 Willamette Complex SR Road Maintenance Award Award Notice
This notice Latest solicitation Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Barlow Ranger District Barlow Rd Dufur, Oregon 97021, United States · NAICS 115310 Forest Service Total Small Business
Corral G-Z Stewardship IRSC, Region 6, Fremont-Winema National Forest, Bly Ranger District, Bly , Oregon Bly, Oregon 97622, United States · NAICS 113310 Forest Service Total Small Business
Pacific Northwest (PNW) Stewardship BPA- Region 6 (OR & WA) - OPEN/CONTINUOUS Portland, Oregon 97204, United States · NAICS 115310 Forest Service No set-aside
End of the World Long Term Stewardship Grangeville, Idaho, United States · NAICS 113310 Forest Service No set-aside
Jake Rocks Road Reconstruction Warren, Pennsylvania 16365, United States · NAICS 237310 Forest Service Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity