1240BE26Q0071.pdf

PDF 9 MB Posted

Attached to
MF 26-2 Willamette Complex SR Road Maintenance Federal contract opportunity
Solicitation number
1240BE26Q0071
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

Federal Contract Solicitation Summary

This is a Request for Quotation (RFQ) for road maintenance services on the Willamette National Forest in Oregon, issued by the USDA Forest Service (Solicitation No. 1240BE26Q0071). The solicitation is set aside for small business concerns under the North American Industry Classification Standard 237310, with a $45 million size standard. The offer due date is June 16, 2026 at 4:30 PM Pacific Time, and the period of performance runs from June 22, 2026 to October 30, 2026, with delivery required by October 30, 2026.

The contract requires road maintenance and vegetation management services to repair damage to road surfaces and drainage structures resulting from suppression efforts during the 2024 Willamette Complex fire affecting the Middle Fork Ranger District. Services include surface maintenance on Level 2 roads with roller compaction (150.32 miles), spot surfacing with 3/4" gradation (12,650 cubic yards plus optional 9,700 cubic yards), load, haul, and place materials (12,610 cubic yards), water-bar installation (10 each), ditch and drainage structure cleaning (15.9 and 100.21 miles respectively), entrance berm installation (1 each), hay bales (20), roadside brushing (6.19 miles), logging out maintenance (23.15 miles), and mobilization. Pricing is on a firm fixed-price basis for individual line items. Offerors must submit three separate attachments addressing relevant past performance, technical capability and qualifications, and pricing. The government intends to make one award and requires pricing for all items to be considered responsive. Award is anticipated as a firm fixed-price service contract.

View the file

Other files for this federal contract opportunity

Other files attached to MF 26-2 Willamette Complex SR Road Maintenance, newest first.
File Type Posted
C05_Amd_0002.pdf PDF
Amd_0001.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUMIS CHECKED

CODE 18a. PAYMENT WILL BE MADE BY

CODE

FACILITYCODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

OFFEROR

40BE

PORTLAND OR 97204-2829

STE 310

1220 SW 3RD AVE

USDA-FS CSA NORTHWEST 3

04S1 CODE 16. ADMINISTERED BYCODE

X

X

X

237310

SIZE STANDARD:

100.00 % FOR:SET ASIDE:UNRESTRICTED OR40BE

REQUEST FOR

PROPOSAL

(RFP)

INVITATION

FOR BID (IFB)

10. THIS ACQUISITION ISCODE

REQUEST FOR

QUOTE (RFQ)

14. METHOD OF SOLICITATION

13b. RATING

NORTH AMERICAN INDUSTRY

CLASSIFICATION STANDARD

(NAICS):

SMALL BUSINESS

06/10/2026 1630 PT

05/21/2026

458-200-5265ANDREA POLLOCK

(No collect calls)

INFORMATION CALL:

FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME

4. ORDER NUMBER3. AWARD/ 6. SOLICITATION

1240BE26Q0071

5. SOLICITATION NUMBER

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF

1 3 1168319OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

TELEPHONE NO.

17a. CONTRACTOR/

WESTFIR OR 97492

46375 HIGHWAY 58

WILLAMETTE NATIONAL FOREST

USDA FOREST SVC OAKRIDGE RANGR DIST

15. DELIVER TO

PORTLAND OR 97204-2829

STE 310

1220 SW 3RD AVE

9. ISSUED BY

7.

2. CONTRACT NO.

EFFECTIVE DATE

$45

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW

ISSUE DATE

DELIVERY FOR FREE ON BOARD

(FOB) DESTINATION UNLESS

BLOCK IS MARKED

11.

SEE SCHEDULEX

12. DISCOUNT TERMS THIS CONTRACT IS A RATED

ORDER UNDER THE DEFENSE

PRIORITIES AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

13a.

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

8(A)

USDA-FS CSA NORTHWEST 3

WOMEN-OWNED SMALL

BUSINESS (WOSB)

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

MF 26-2 Willamette Complex SR Road Maintenance Delivery: 10/30/2026 Period of Performance: 06/22/2026 to 10/30/2026

0001 811(1): Surface Maintenance Level 2 Roads with 150.32 DH Roller Compaction

0002 813(1): Spot Surfacing, Gradation 3/4" 12650 CY

Continued ...

(Use Reverse and/or Attach Additional Sheets as Necessary)

HEREIN, IS ACCEPTED AS TO ITEMS:

XX

DATED

ANDREA J. POLLOCK

. YOUR OFFER ON SOLICITATION (BLOCK 5),

INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER

ARE

ARE

31c. DATE SIGNED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)

ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL

SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

26. TOTAL AWARD AMOUNT (For Government Use Only)

OFFER

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

ARE NOT ATTACHED.

ARE NOT ATTACHED.

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

30b. NAME AND TITLE OF SIGNER (Type or print)

30a. SIGNATURE OF OFFEROR/CONTRACTOR

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

25. ACCOUNTING AND APPROPRIATION DATA

29. AWARD OF CONTRACT: REFERENCE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER

37. CHECK NUMBER

FINALPARTIAL

36. PAYMENT

FINALPARTIAL

35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER33. SHIP NUMBER

COMPLETE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)

42b. RECEIVED AT (Location)

42a. RECEIVED BY (Print)

41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

STANDARD FORM 1449 (REV. 11/2021) BACK

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

0003 832(1): Load, Haul, and Place Materials, Less 12610 CY

Than 5 Miles One Way Haul

0004 833(1): Water-bar Installation 10 EA

0005 834(1): Clean Ditches and Drainage Structures 15.9 DH

0006 834 (2): Clean Ditches 100.21 DH

0007 834(3): Install Entrance Berm 1 EA

0008 841(1): Hay Bales (20) 1 LS

0009 842(1): Roadside Brushing 6.19 DH

0010 851(1): Logging Out Maintenance Level 2 Roads 23.15 DH

0011 881(1): Mobilization rate for subtotal amount 1 LS that is > $50,000

Continued ...

32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

3 2 of

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1240BE26Q0071

2001 813(1): Spot Surfacing, Gradation 3/4" 9700 CY

(Option Line Item)

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

MF 26-2 Willamette Complex SR Road Maintenance

1240BE26Q0071

Description -

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued.

Solicitation number 1240BE26Q0071 is issued as a Request for Quotation (RFQ) to provide road maintenance to the Middle Fork Ranger District (MFRD) of the Willamette National Forest (WNF).

This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 237310 The small business size standard is $45 mil. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.

Statement of Requirement

The purpose of this contract is to maintain roads and manage vegetation growth to ensure safe and productive road conditions. Specifically, to repair damage to road surfaces and drainage structures during suppression of the 2024 Willamette Complex fire.

The Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, and other items and non-personal services necessary to provide road maintenance services to the WNF road system.

The contractor shall provide services in accordance with (IAW) this Performance Work Statement (PWS), and all applicable federal, state and local laws and regulations.

The work shall be performed throughout the Northern end of the Middle Fork Ranger District of the WNF in Oregon.

Schedule of Items –

CLIN Description Quantity Unit of Issue

Unit Price Total

0001 811(1): Surface Maintenance Level 2 Roads with Roller Compaction

150.32 MI $ $

0002 813(1): Spot Surfacing, Gradation 3/4"

12,650 CY $ $

0003 832(1): Load, Haul, and Place Materials, Less Than 5 Miles One Way Haul

12,610 CY $ $

0004 833(1): Water-bar Installation 10 EA $ $ 0005 834(1): Clean Ditches and

Drainage Structures

15.9 MI $ $

0006 834 (2): Clean Ditches 100.21 MI $ $

CLIN Description Quantity Unit of Issue

Unit Price Total

0007 834(3): Install Entrance Berm 1 EA $ $ 0007 841(1): Hay Bales 20 LS $ $ 0008 842(1): Roadside Brushing 6.19 MI $ $ 0009 851(1): Logging Out Maintenance

Level 2 Roads

23.15 MI $ $

SUBTOTAL $

0010 881(1): Mobilization rate for subtotal amount that is > $50,000

1 LS $ $

2001 Optional: 813(1): Spot Surfacing, Gradation 3/4"

9,700 CY $ $

TOTAL $

Schedule Notes

• Unit of Issue DH stands for miles.

• Payment will be made on actual work performed unless otherwise noted.

Solicitation Attachments The following documents are included as attachments to this solicitation and can be accessed via the “Attachments/Links” section of the posting.

• Attachment 1 - Performance Work Statement

• Attachment 2 – Technical Specifications

• Attachment 3 – Road Listing

• Attachment 4 – Maps

• Attachment 5 – Wage Determination

Period of Performance

June 29, 2026 to October 30, 2026

Federal Acquisition Regulation (FAR) and United States Department of Agriculture Acquisition Regulation (AGAR) Clauses and Provisions The clauses and provisions contained herein are applicable to any order awarded as a result of this solicitation. The terms and conditions set forth herein supersede all other terms and conditions.

Acceptance of the order in accordance with (IAW) FAR 12.201-1(b)(2) constitutes acceptance of all terms and conditions contained herein.

As part of the Revolutionary FAR Overhaul (RFO), system updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in this solicitation. Contracting officers will rely on representations from offers based on provisions in the solicitation. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.

52.252-2 Clauses Incorporated by Reference Feb 1998

This solicitation incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also the full text of the clause may be accessed electronically at Internet address https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52

52.212-4 Terms and Conditions—Commercial Products and Commercial Services (Nov 2025) ☐ Alternate I (Nov 2025) of 52.212-4 52.203-17 Contractor Employee Whistleblower Rights (Nov 2023) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) 52.222-50 Combating Trafficking in Persons (Nov 2025)

☐ Alternate I (Nov 2025) of 52.222-50 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving (May 2024) 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) 52.233-3 Protest After Award (Sep 2025) 52.233-4 Applicable Law for Breach of Contract Claim (Sep 2025) 52.240-91 Security Prohibitions and Exclusions (Nov 2025)

☐ Alternate I (Nov 2025) of 52.240-91 52.244-6 Subcontracts for Commercial Products and Commercial Services (Nov 2025)

The following clauses are applicable if checked:

☐ 52.203-6 Restrictions on Subcontractor Sales to the Government (Jun 2020) with Alternate I (Nov 2021) of 52.203-6 ☐ 52.203-13 Contractor Code of Business Ethics and Conduct (Nov 2021) ☐ 52.204-9 Personal Identity Verification of Contractor Personnel Jan 2011 ☒ 52.204-13 System for Award Management—Maintenance (Nov 2025) ☐ 52.204-91 Contractor identification (Nov 2025) ☒ 52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Sep 2025) ☐ 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (Sep 2025) ☒ 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Sep 2025) ☐ 52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Nov 2025) ☒ 52.219-6 Notice of Total Small Business Aside (Nov 2025)

☐ Alternate I (Mar 2020).

☐ 52.219-8 Utilization of Small Business Concerns (Nov 2025) ☐ 52.219-9 Small Business Subcontracting Plan (Nov 2025)

☐ Alternate III (Nov 2025) of 52.219-9.

☐ Alternate IV (Nov 2025) of 52.219-9

☐ 52.219-14 Limitations on Subcontracting (Nov 2025) ☐ 52.219-16 Liquidated Damages—Subcontracting Plan (Nov 2025) https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52

☐ 52.219-33 Nonmanufacturer Rule (Nov 2025) ☒ 52.222-3 Convict Labor (June 2003) ☐ 52.222-19 Child Labor—Cooperation with Authorities and Remedies (Nov 2025) ☒ 52.222-35 Equal Opportunity for Veterans (Nov 2025)

☐ Alternate I (Jul 2014) of 52.222-35 ☒ 52.222-36 Equal Opportunity for Workers with Disabilities (Nov 2025)

☐ Alternate I (Jul 2014) of 52.222-36 ☒ 52.222-37 Employment Reports on Veterans (Nov 2025) ☐ 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010 ☒ 52.222-41 Service Contract Labor Standards (Aug 2018) ☒ 52.222-42 Statement of Equivalent Rates for Federal Hires (May 2014)

This Statement is for Information Only:

It is not a Wage Determination

Employee Class Monetary Wage -- Fringe Benefits Equipment Operator WG9-11 $28.90 to $37.34

☐ 52.222-43 Fair Labor Standards Act and Service Contract Labor Standards -- Price Adjustment (Multiple Year and Option Contracts) (Aug 2018) ☐ 52.222-44 Fair Labor Standards Act and Service Contract Labor Standards -- Price Adjustment (May 2014) ☐ 52.222-51 Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) ☐ 52.222-53 Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (Nov 2025) ☒ 52.222-54 Employment Eligibility Verification (Nov 2025) ☒ 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2022) ☒ 52.222-90 Addressing DEI Discrimination by Federal Contractors (Apr 2026) ☐ 52.223-2 Reporting of Biobased Products Under Service and Construction Contracts (Nov 2025) ☐ 52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008)

☐ Alternate I (May 2008) of 52.223-9 ☐ 52.223-11 Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Nov 2025) ☐ 52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (Nov 2025) ☒ 52.223-23 Sustainable Products and Services (Nov 2025) ☐ 52.224-3 Privacy Training (Jan 2017)

☐ Alternate I (Jan 2017) of 52.224-3 ☐ 52.225-1 Buy American-Supplies (Nov 2025)

☐ Alternate I (Oct 2022) of 52.225-1

☐ 52.225-3 Buy American--Free Trade Agreements--Israeli Trade Act (Nov 2025) ☐ Alternate II (Nov 2025) of 52.225-3.

☐ Alternate III (Nov 2025) of 52.225-3.

☐ Alternate IV (Oct 2022) of 52.225-3

☐ 52.225-5 Trade Agreements (Nov 2023) ☐ 52.225-19 Contractor Personnel in a Designated Operational Area or Supporting a Diplomatic or Consular Mission outside the United States (May 2020) ☐ 52.225-26 Contractors Performing Private Security Functions Outside the United States (Oct 2016) ☐ 52.226-4 Notice of Disaster or Emergency Area Set-Aside (Nov 2007) ☐ 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area (Aug 2025) ☐ 52.229-12 Tax on Certain Foreign Procurements ☐ 52.232-29 Terms for Financing of Purchases of Commercial Products and Commercial Services (Nov 2021) ☐ 52.232-30 Installment Payments for Commercial Products and Commercial Services (Nov 2021) ☒ 52.232-33 Payment by Electronic Funds Transfer— System for Award Management (Oct 2018) ☐ 52.232-34 Payment by Electronic Funds Transfer—Other Than System for Award Management (Jul 2013) ☐ 52.232-36 Payment by Third Party (Nov 2025) ☒ 52.237-2 Protection of Government Buildings, Equipment, and Vegetation (Apr 1984) ☐ 52.237-3 Continuity of Services (Jan 1991) ☐ 52.240-92 Security Requirements (Nov 2025) ☐ 52.240-93 Basic Safeguarding of Covered Contractor Information Systems (No 2025) ☐ 52.247-64 Preference for Privately Owned U.S.-Flag Commercial Vessels (Nov 2025)

☐ Alternate I (Apr 2023) of 52.247-64.

☐ Alternate II (Nov 2021) of 52.247-64

Other Applicable Clauses

52.217-7 Option for Increased Quantity - Separately Priced Line Item (Mar 1989) 52.245-1 Government Property (Sep 2021) ☐ Alternate I (Sep 2021) of 52.245-1 52.245-9 Use and Charges

AGAR Clauses

452.203-71 Anti-Discrimination and Diversity, Equity, and Inclusion (DEI) Compliance (May 2026)

(a) By entering into this contract, the contractor certifies that:

(1) It is compliant with all applicable Federal anti-discrimination laws and the Equal Protection principles of the U.S. Constitution, and it will remain compliant for the duration of the contract.

(2) Neither it nor any subcontractor or teaming partner operates or funds any program, policy, or initiative that promotes DEI in a manner that violates any applicable Federal anti-discrimination laws, including but not limited to Title VI and VII of the Civil Rights Act of 1964, or the Equal Protection principles of the U.S. Constitution, and the contractor and any subcontractor or teaming partner will not do so for the duration of the contract.

(b) If the contractor participates in, facilitates, or funds programs that implicate Title VI of the Civil Rights Act of 1964 or Title IX of the Education Amendments of 1972, as amended, including but not limited to grants to or for schools, colleges, universities, 4-H programs, non-governmental organization (NGO) programs, sports programs, and education-related grants to prisons or other detention facilities, the contractor certifies that it will remain compliant with those laws, including the requirements set forth in Executive Order 14168, Defending Women from Gender Ideology Extremism and Restoring Biological Truth to the Federal Government, and Executive Order 14173, Ending Illegal Discrimination and Restoring Merit-Based Opportunity.

(c) The contractor affirms that the above requirements are conditions of payment that go to the essence of the contract and are therefore material terms of the contract. Payments under the contract are predicated on compliance with the above requirements, and therefore the contractor is not eligible for funding under the contract or to retain any funding under the contract absent compliance with the above requirements.

(d) This certification reflects a change in the Government’s position regarding the materiality of the foregoing requirements and therefore any prior payment of similar claims does not reflect the materiality of the foregoing requirements to this contract.

(e) Submission of a knowing false statement relating to contractor’s compliance with the above requirements and/or eligibility for the contract may subject the contractor to liability under the False Claims Act, 31 U.S.C. § 3729, and/or criminal liability, including under 18 U.S.C. §§ 287 and 1001.

(f) The contractor must include the provisions of this clause in all subcontract solicitations.

(g) Failure on the part of the contractor or its subcontractors to comply with the terms of this clause may be grounds for the Contracting Officer to terminate this contract for default.

(End of Clause)

452.204–70 Modification for Contract Closeout (Apr 2026)

(a) If unliquidated funds in the amount of $1000 or less remain on the contract, the Contracting Officer (Contracting Officer) may issue a unilateral modification for deobligation. The contractor will receive a copy of the modification but is not required to provide a signature. The Contracting Officer will immediately proceed with contract closeout upon completion of the period of performance, receipt and acceptance of supplies or services, and final payment.

(b) For commercial contracts not exceeding the simplified acquisition procedure threshold under FAR 12.001(c), if more than $1,000 in unliquidated funds remain at closeout, the Contracting Officer will issue a bilateral deobligation modification. Only the modification requires the contractor’s signature, though a Release of Claims may be requested. If the required documents are not returned within 60 days, the Contracting Officer will issue a unilateral modification and proceed with closeout once performance is complete, acceptance is confirmed, and final payment is made.

(c) For all other non-commercial or non–cost‑reimbursement contracts, if more than $1,000 in unliquidated funds remain at closeout, the Contracting Officer will issue a bilateral deobligation modification and a Release of Claims, both requiring contractor signature. If these documents are not returned within 120 days, the Contracting Officer will issue a unilateral modification u and proceed with closeout upon completion of performance, acceptance, and final payment.

(End of Clause)

Solicitation Information

Award Type

It is anticipated that a firm fixed price service contract will be awarded as a result of this synopsis/solicitation.

The Government intends to make one award from this solicitation. Therefore, to be considered responsive, contractors must submit pricing for all items.

Evaluation and Basis for Award

FAR 52.212-2 Evaluation - Commercial Products and Commercial Services (Nov 2025)

(a) Evaluation factors. The Government will award a contract resulting from this solicitation to the Offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors will be used to evaluate offers:

1) Relevant Past Performance

a) Provide a list of work you have completed in the past 3-years which directly involves the specifications of the solicitation.

b) Include a brief description of the project, dollar amount, year completed, and project owner contact information (name, phone, and email).

c) Include all contracts for the past 5 years that have been terminated for convenience or cause.

The government may use past performance information from any available source.

2) Technical Proposal – The technical proposal will include:

a) Contractor's General Technical Capability –

i) Provide a brief explanation of your ability to accomplish this work. Include a description of the work you plan to subcontract out. Include the company name and SAM UEI (if applicable) for all Subcontractors.

ii) Include a list of all equipment with specs that will be used to complete the work (owned or rented).

iii) Provide your expected project schedule including sequence of work items and approximate time to complete each item.

iv) The roads featured in this project see a lot of recreational use; traffic control is an important element of this project. Please explain in detail your plan to deal with this issue. Include how you plan to accommodate public users during work hours as well as during non-work hours. Include details of how you will deal with public safety on this project

v) Provide the name of the Quality Control Representative who will be responsible for the contractor’s Quality Control Plan (QCP) to ensure services are performed IAW the PWS. The Quality Control Representative will implement and maintain full compliance with the QCP throughout the contract period.

3) Price Proposal – Include the following:

a) the completed Schedule of Items from page 4 of the solicitation,

b) acknowledgement of (if any) amendments to this solicitation by following the instructions that accompany the amendment(s).

b) Submit offer by email to _ Andrea (Annie) Pollock at andrea.pollock@usda.gov _ so that it is delivered into this inbox no later than the due date and time 1630 PT June 16, 2026.

Emails will contain 3 separate attachments - Relevant Past Performance (page 1), Technical Proposal (page 2), Price Quote (page 3), in Microsoft Word, or Adobe PDF format. Be aware that large attachments may increase the time required to deliver an email. It is the offeror’s responsibility to confirm receipt of the offer with _Andrea (Annie) Pollock_.

(c) Notice of award. A written notice of award or acceptance of an offer furnished to the successful Offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer’s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

(End of provision)

52.252-1 Solicitation Provisions Incorporated by Reference Feb 1998

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es): https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52

52.212-1 Instructions to Offerors - Commercial Products and Commercial Services (Nov 2025)

FAR 52.212-1 is amended as follows:

Period for acceptance of offers.

The Offeror agrees to hold the prices in its offer firm for 90 calendar days from the date specified for receipt of offers.

Questions Questions shall be submitted via email to andrea.pollock@usda.gov and are due no later than June 10, 2025, at 12:00 PM Pacific Time. This will ensure enough time to respond before the solicitation period ends. Please include the solicitation name and number as the subject line of the email.

52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation (Jan 2017) 52.209-2 Prohibition on Contracting with Inverted Domestic Corporations - Representation (Sep 2025) 52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law (Sep 2025) 52.240-90 Security Prohibitions and Exclusions Representations and Certifications (Nov 2025)

The following provisions are applicable if checked:

☒ 52.203-11 Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions (Sep 2024) ☒ 52.204-7 System for Award Management—Registration (Nov 2025)

☐ Alternate I (Nov 2025) to 52.204-7 ☒ 52.204-90 Offeror Identification (Nov 2025) ☐ 52.207-6 Solicitation of Offers from Small Business Concerns and Small Business Teaming Arrangements or Joint Ventures (Multiple-Award Contracts) (Aug 2024) ☐ 52.209-12 Certification Regarding Tax Matters (Oct 2025) ☐ 52.219-2 Equal Low Bids (Nov 2025) ☐ 52.222-18 Certification Regarding Knowledge of Child Labor for Listed End Products (Feb 2021) https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52 mailto:andrea.pollock@usda.gov

☐ 52.222-48 Exemption from Application of the Service Contract Labor Standards for Maintenance, Calibration, or Repair of Certain Equipment–Certification (Nov 2025) ☐ 52.222-52 Exemption from Application of the Service Contract Labor Standards for Certain Services-Certification (Nov 2025) ☐ 52.222-56 Certification Regarding Trafficking in Persons Compliance Plan (Oct 2020) ☐ 52.223-4 Recovered Material Certification (May 2008) ☐ 52.225-2 Buy American Certificate (Oct 2022) ☐ 52.225-4 Buy American-Free Trade Agreements-Israeli Trade Act Certificate (Nov 2025) ☐ 52.225-6 Trade Agreements-Certificate (Feb 2021) ☐ 52.226-3 Disaster or Emergency Area Representation (Nov 2007) ☐ 52.229-11 Tax on Certain Foreign Procurements—Notice and Representation (Jul 2025)

Other Applicable FAR Provisions

52.217-5 Evaluation of Options (Nov 2025) 52.237-1 Site Visits (Apr 1984)

AGAR Provisions

452.203-70 Anti-Discrimination and Diversity, Equity, and Inclusion (DEI) Certification (Dec 2025)

(a) By submission of its offer, the offeror certifies that:

(1) It is compliant with all applicable Federal anti-discrimination laws and the Equal Protection principles of the U.S. Constitution.

(2) Neither it nor any proposed subcontractor or teaming partner operates or funds any program, policy, or initiative that promotes DEI in a manner that violates any applicable Federal anti-discrimination laws, including but not limited to Title VI and VII of the Civil Rights Act of 1964, or the Equal Protection principles of the U.S. Constitution.

(b) If the offeror participates in, facilitates, or funds programs that implicate Title VI of the Civil Rights Act of 1964 or Title IX of the Education Amendments of 1972, as amended, including but not limited to grants to or for schools, colleges, universities, 4-H programs, non-governmental organization (NGO) programs, sports programs, and education-related grants to prisons or other detention facilities, by submission of its offer, the offeror certifies that it is compliant with those laws, including the requirements set forth in Executive Order 14168, Defending Women from Gender Ideology Extremism and Restoring Biological Truth to the Federal Government, and Executive Order 14173, Ending Illegal Discrimination and Restoring Merit-Based Opportunity.

(c) The offeror affirms that the above requirements are conditions of payment that go to the essence of the contract and are therefore material terms of the contract. Payments under the contract are predicated on compliance with the above requirements, and therefore the offeror will not be eligible for funding under the contract or to retain any funding under the contract absent compliance with the above requirements.

(d) This certification reflects a change in the Government’s position regarding the materiality of the foregoing requirements and therefore any prior payment of similar claims does not reflect the materiality of the foregoing requirements to this contract.

(e) Submission of a knowing false statement relating to offeror’s compliance with the above requirements and/or eligibility for the contract may subject the offeror to liability under the False Claims Act, 31 U.S.C. § 3729, and/or criminal liability, including under 18 U.S.C. §§ 287 and 1001.

(f) Failure on the part of the offeror or its subcontractors to comply with the terms of this clause may be grounds for the Contracting Officer to terminate the contract for default.

(End of Provision)

NOTICE FOR FILING AGENCY PROTESTS

United States Department of Agriculture (USDA) Protest Procedures

The United States Department of Agriculture (USDA) is committed to fair, transparent, and efficient acquisitions. Interested parties with concerns about this solicitation are encouraged to seek resolution through the following USDA procedures.

Tier 1: Contracting Officer Concern Resolution

Submission: Interested parties with concerns about either the solicitation or subsequent award should first submit their concern directly to the Contracting Officer, providing sufficient detail to allow the Contracting Officer to understand and assess the issue.

Process: The Contracting Officer will review the concern, seek clarification as needed, and engage with the interested party to attempt prompt resolution.

Review Timeline: The Contracting Officer will make every effort to provide a response or resolution within 10 business days of receiving the concern.

Effect on Award or Performance: Tier 1 engagement is not considered an official notification of filing an agency protest and does not pause solicitation deadlines, delay award decisions, or suspend contract performance.

Next Steps: If the matter cannot be resolved at Tier 1, the interested party may file a written agency protest under Tier 2.

USDA encourages all parties to seek resolution with the Contracting Officer before filing an agency protest.

Tier 2: Agency Protest If concerns cannot be resolved at Tier 1, an interested party may file a written agency protest with either the Contracting Officer or the USDA Independent Review Authority. The decision by the USDA Independent Review Authority is an alternative to a decision by the Contracting Officer. The USDA Independent Review Authority will not consider an appeal of the Contracting Officer’s decision on an agency protest.

The protest must state whether the protester elects review by the Contracting Officer, by the UDSA Independent Review Authority. If no election is stated, the Contracting Officer will decide the protest.

Required Information: Protests shall include the information set forth in FAR 33.104-4 (a)(3).

Failure to submit the required information may result in a delay or dismissal of the protest.

Submission: Agency protests should be submitted electronically to SPE.inquiry@usda.gov and the Contracting Officer.

Timeliness: Protests must be filed within the timeframes specified in FAR 33.104.

Effect on Award or Performance: Contract awards or performance will be suspended during the protest period unless justified in writing for urgent and compelling reasons or determined to be in the best interest of the Government.

Review Timeline: USDA strives to resolve agency-level protests within 35 business days of receipt.

Election of Forum: By filing a protest with USDA, the protesters agree not to file a protest on the same matter with the Government Accountability Office (GAO) or any other external forum while the agency protest is pending. If such a protest is filed externally, the USDA agency protest will be dismissed.

Questions: Questions regarding this notice or protest procedures should be directed to the Contracting Officer identified in this solicitation.

mailto:SPE.inquiry@usda.gov

PWS for Willamette Complex (South) Suppression Repair Road Maintenance (Version 2024.07.31) Solicitation Number: 1240BE26Q0071

Performance Work Statement 2024 Willamette Complex (South) Suppression Repair Road Maintenance Project General Information

1.0 General

This is a non-personal services contract to provide road maintenance to the Middle Fork Ranger District (MFRD) of the Willamette National Forest (WNF). The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn, is responsible to the Government. The Contractor shall visit the project location with or without the COR before bid.

2.0 Purpose

The purpose of this contract is to maintain roads and manage vegetation growth to ensure safe and productive road conditions. Specifically, to repair damage to road surfaces and drainage structures during suppression of the 2024 Willamette Complex fire.

3.0 Description of Services

The Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, and other items and non-personal services necessary to provide road maintenance services to the WNF road system. The contractor shall provide services in accordance with (IAW) this Performance Work Statement (PWS), and all applicable federal, state and local laws and regulations.

4.0 Place of Performance and Accessibility

The work shall be performed throughout the Northern end of the Middle Fork Ranger District of the WNF in Oregon.

Vicinity Maps are attached to this contract and Motor Vehicle Use Maps (MVUM) maps are available at the Forest web page https://www.fs.usda.gov/r06/willamette/maps-guides/motor-vehicle-use-map-mvum

Specific Project Location Maps may be issued with each contract as necessary.

Willamette National Forest – Middle Fork Ranger District Avenza Maps will also be provided

Roads shown on the District MVUM maps for each district may only be a portion of all the roads on the forest; specific roads requiring work are listed on the work list.

Work areas may be reached by Forest roads that are accessible by a standard two-wheel drive pickup equipped with snow tires and chains, if needed, during normal operating seasons, unless otherwise indicated on Project Maps. Vehicles shall not operate off-system roads without prior written approval of the Contracting Officer Representative (COR).

Inaccessibility due to snow, fallen trees, slides or washouts on roads may or may not be corrected at the option of the Government. If road access is blocked, the Government may: (1) provide an alternate access route; (2) delete the inaccessible sub items (s) or; (3) substitute similar sub item(s).

Roads shown on unit maps indicate access to units and do not suggest the roads are open within units or for any further travel.

Use of motorized equipment other than handheld equipment such as power saws and brush cutters will not be permitted off designated roads in the project area without approval of the COR or as hereinafter provided.

No vehicle shall bypass any officially blocked road (barriers, locked gates, posted signs, rock/log/dirt, etc.) without approval of the COR.

https://www.fs.usda.gov/r06/willamette/maps-guides/motor-vehicle-use-map-mvum

5.0 Period of Performance

The period of performance shall be from date of award to October 30, 2026.

6.0 Contract Type

The Government will award a Firm-Fixed Price (FFP), Stand-Alone, Service Contract. Performance shall be made only as authorized by the contract. Contractor shall furnish to the Government all services specified in the Schedule of Items and called for by the contract.

7.0 Government Regular Working Hours

The Government's regular working hours are Monday through Friday from 0700 to 1700, except federal holidays or when the government installation is closed due to local or national emergencies, administrative closings, or similar government directed closings.

8.0 Federal Observed Holidays

When a federal holiday occurs on a Saturday, federal employees are normally granted the previous Friday as the holiday observance. When a federal holiday occurs on a Sunday, federal employees are normally granted the following Monday as the holiday observance. Below is the list of recognized federal holidays:

Federal Holidays New Year’s Day (January) Labor Day (September) Martin Luther King Jr’s Birthday (January) Columbus Day (October) President’s Day (February) Veteran’s Day (November) Memorial Day (May) Thanksgiving Day (November) Juneteenth Day (June) Christmas Day (December) Independence Day (July)

9.0 Contractor Key Personnel

Contract Manager: The Contractor shall provide a Contract Manager and designated alternate, as applicable, who has full authority to act for the Contractor on all contract matters relating to this contract. The Contract Manager or alternate shall be available during the Government's regular working hours.

Quality Control Representative: The Contractor shall provide a Quality Control Representative who shall be responsible for the Contractor’s Quality Control Plan (QCP) to ensure services are performed IAW the PWS. The Quality Control Representative shall implement and maintain full compliance of the QCP throughout the contract period.

10.0 Government Key Personnel

Contracting Officer (CO): The CO is the only person with the authority to: enter into, administer, and or terminate contracts; make related determinations and findings on behalf of the government; and legally bind the government. The CO shall ensure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO shall determine and document the final assessment of the contractor's performance in the government’s past performance tracking system.

Contracting Officer’s Representative (COR): A COR may be assigned to this contract to monitor all technical aspects and assist in contract administration. The COR may be authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communication with the Contractor concerning technical aspects of the contract;

issue written interpretations of technical requirements (without increasing or decreasing contract scope), including Government drawings designs, and specifications; monitor Contractor's performance and notify both the CO and Contractor of deficiencies; and provide site entry of Contractor personnel. The COR is not authorized to change any of the terms and conditions of the contract.

11.0 Post-Award Conference and Periodic Progress Meetings

The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office IAW Federal Acquisition Regulation (FAR) Subpart 42.5. The CO and/or COR shall meet periodically with the Contractor to review the contractor's performance. At these meetings the CO will appraise the Contractor of how the Government views the contractor's performance and the contractor will appraise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues.

12.0 Changes

The quantities specified in the Schedule of Items are estimates only and are not guaranteed quantities. The government reserves the right to add, remove, or change the items and quantities to be serviced under this contract, as required. Price adjustments for these changes shall be based on the rates specified in the Schedule of Items for identical or similar items.

Changes will only be authorized by a warranted CO.

13.0 Inspection and Acceptance

Any inspection and acceptance will be at the location specified in the contract. The designated COR will act as the representative of the CO for purposes of inspection and acceptance of services to ensure compliance with the terms, conditions, and specifications of the subject contract. The COR has no authority to make any changes to the terms and conditions of the contract.

14.0 Invoicing and Payment

All contractor invoices shall be submitted via the Invoice Processing Platform (IPP) using contract line item numbers (CLINs). The contractor shall be required to establish account(s), access method(s), log-in(s), and necessary training in order to submit invoices through IPP. Invoices not submitted via IPP shall not be accepted or paid.

Note: The contractor shall only invoice for work performed and as authorized by the contract. Payment will be made only for those items listed on the Schedule of Items. All other work is incidental to those pay items.

Security and Safety Requirements

15.0 Security

The contractor shall be responsible for safeguarding all government property provided to the contractor for contractor use under this contract. At the close of each work period, all government property shall be secured.

16.0 Conduct of Contractor Personnel

The CO may require the contractor to remove from the work site any employee working under this contract for reasons of misconduct, security, or found to be or suspected to be under the influence of alcohol, drugs, or other incapacitating agent. Contractor employee shall be subject to dismissal from the premises upon determination by the CO that such action is in the best interests of the government. Such removal from the work site or dismissal from the premises shall not relieve the contractor of the requirement to provide sufficient personnel to perform the services as required by this PWS.

17.0 Safety

Contractor activities shall be conducted in a safe manner that minimizes accidents as well as any impacts on Government operations and members of the public. Contractor shall comply with applicable federal, state, and local codes and standards, including safety and occupational health requirements, as well as any additional specific requirement contained in this PWS.

Technical Requirements

18.0 Specific Tasks

The Contractor shall provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, and other items and non-personal services necessary to provide road surface maintenance to MFRD road systems. The following establishes the required tasks and the minimum acceptable levels of service. See Attachment “MF 26-2 R6 Specifications Packet” for additional information.

Task 1 – (811) Surface Maintenance, Maintenance Level 2 Roads With Roller Compaction:

a. Smooth and shape native or aggregate surfaced roads including traveled way, shoulders, turnouts, and intersections. Reshape or recondition ditches, water bars, and drain dips. Water shall be applied as necessary to prevent segregation and facilitate compaction. When working in a weed infested area, the contractor shall be required to prevent spreading the infestation into un-infested areas by cleaning vehicles and equipment. The contractor shall use wash stations approved by either the CO or designated COR.

b. When roller compaction is required, an 8–10-ton vibratory roller will be operated over the full width of the roadway for a minimum of 3 complete pass and until there is no visible evidence of consolidation. One pass is defined as operating the vibratory roller from the point where blading begins to the point where blading ends.

c. Road surfaces will be considered acceptable when the travel way is logged out, free of washboards, potholes or other irregularities. The surface is smooth, compact, crowned or sloped to drain, without segregation of the surfacing materials. Suitable materials have been recovered and incorporated. Unsuitable materials have been removed. Ditches and road surface drainage structures function efficiently. Unpaved shoulders are shaped to provide a smooth transition from the paved surface and drain efficiently.

Task 2 – (813) Spot Surfacing:

a. Load, haul, and place surface material to repair or stabilize road surfaces.

b. Spot surfacing is complete when the designated quantity, 22,350 cubic yards (CY), of the ordered material has been placed, shaped, and compacted.

c. All material transported onto National Forest System land will be weed-free. Written documentation of methods used to determine the weed-free status of all materials furnished by the contractor will be furnished to the COR and CO before transport of any materials onto National Forest System Lands.

Task 3 – (832) Load Haul and Place Material:

a. Load, haul and place material according to section 19, table 04-832(1) and associated maps.

b. Loading, hauling and placing is complete when no obstruction remains in or adjacent to the roadway or in ditches which would have the potential to interfere with traffic use, block or divert water from structures or channels. This includes relocation, repositioning, stabilization, shaping to drain, leaving accessible for future disposal needs and revegetation as directed by the COR.

Task 4 – (833) Water Bar Installation:

a. Drainage structure installation is complete when water-bars and rolling dips have been installed to the lines and grades specified, and drainage structure removal is complete when designated culverts have been removed and culverts have been properly disposed of.

Task 5 – (834(1)) Clean Ditches and Drainage Structures:

a. Clean and recondition roadway drainage systems including culverts, ditches, inlet and outlet channels, catch basins, and appurtenances.

b. Drainage system maintenance is complete when no obstruction or debris remains on the roadway or in the defined area adjacent to the structure or in ditches which would have the potential to block water from entering the structure, back water into the structure (except for structures designed to function in a back-flooded manner) or divert water outside the defined channel.

c. Equipment operation in live streams or hydraulic flushing of drainage structures is not permitted. Work does not include bridges, drain dips, or water bars. Work activity will be measured along the centerline of the road regardless of the number of lanes.

Task 6 – (834(2)) Clean Ditches:

a. Clean and recondition roadway drainage systems including ditches

b. Drainage system maintenance is complete when no obstruction or debris remains on the roadway or in the defined area adjacent to the structure or in ditches which would have the potential to block water from entering the structure

Task 7 – Install Entrance Berm (834(3):

a. The Contractor shall place berm barricades to completely close off designated roads to vehicle traffic. The barricades shall be placed at locations flagged in the field, or listed on work sheets as shown on Typical Drawing Sheet 1 of Attachment 2. The applicable berm dimensions will be listed on table for the project site designated on the task order.

b. Berms with trenches shall be constructed from material on-site and placed at the beginning of the designated road, unless otherwise directed by the Government.

c. Berm barricade trenches shall be constructed to allow water drainage away from streams and erodible surfaces.

d. When available at the site the Contractor shall place stumps, cull logs, boulders or other vegetation on dirt berm to discourage vehicular negotiation.

Task 8 – Vegetation Treatment/ Haybale (841):

a. Apply vegetative treatments including seed, mulch, fertilizer or other products in designated areas.

b. Treatment is complete when ordered quantities of vegetative treatment products have been applied to designate or Service Provider disturbed soil areas.

Task 9 – Brushing (842):

a. Roadway vegetation maintenance is complete when the vegetation has been removed from the designated treatment area which interferes with traffic, obscures signs, impedes the flow of water or diverts water from drainage structures

b. The treatment area will be SHOWN ON THE PLANS. If plans or supplemental specifications are not included, the treated area includes the road bed measured from center line to bottom of ditch, or defined road edge, plus an additional 6 feet on each side. If there is no defined road edge, or a ditch does not exist, the treated area is 8 feet from both sides of center line of the road. Provide a vertical clearance of 14 feet measured from the road surface elevation.

Task 10 - Logging Out (ML 3-5) (851)

a. Work is complete when hazards have been removed or stabilized and when the road is passable by the intended traffic.

Task 11 – Mobilization (881): This task consists of the following task and limitations.

a. Moving personnel, equipment, material, and incidentals to the project and performing work necessary before beginning work at the project site.

b. Obtaining permits, insurance, and bonds.

c. The contractor shall be responsible for accounting for costs appropriately and for maintaining records, including supporting documentation, adequate to demonstrate that costs claimed have been incurred, are allocable to the contract, and comply with applicable cost principles in FAR subpart 31.2 and agency supplements.

d. The CO may disallow all or part of the claimed cost that is inadequately supported.

19.0…

This is the start of the file's text. The full file is on GovTribe.