C05_Amd_0002.pdf

PDF 163 KB Posted

Attached to
MF 26-2 Willamette Complex SR Road Maintenance Federal contract opportunity
Solicitation number
1240BE26Q0071
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

This is Amendment 002 to Solicitation 1240BE26Q0071 for road maintenance services at the Deschutes National Forest, MF 26-2 Willamette Complex SR Road Maintenance project, issued by the USDA Forest Service Procurement & Property Services, Northwest Zone on June 23, 2026. The amendment is not extended beyond the original receipt date and does not require contractor signature. The solicitation remains a service contract, not construction, and therefore does not require bid bonding.

The amendment provides answers to seven questions submitted by quoters. Key clarifications include: pre-approved aggregate sources (Parvin Butte preferred; Davidsons Rock Quarry also acceptable; other sources approved within 3 days), a 50% minimum self-performance requirement for the general contractor, material gradation specifications for 3/4" aggregate per Table 703-3 (3/4" F gradation), and Carson Hanna as the designated Contracting Officer's Representative (COR). For item 0002 Spot Surfacing, the 12,650 cubic yard quantity includes fluff factor and will be measured by load tickets from the commercial source for payment purposes. The project completion window ends October 30, 2027, with a June 29 start date. Culverts and guardrails are clarified as not being included in the contract scope despite conflicting language in supplemental specifications.

View the file

Other files for this federal contract opportunity

Other files attached to MF 26-2 Willamette Complex SR Road Maintenance, newest first.
File Type Posted
Amd_0001.pdf PDF
1240BE26Q0071.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3. EFFECTIVE DATE

6/23/2026

4. REQUISITION/PURCHASE REQ. NO

1. CONTRACT ID CODE

A. This change order is issued pursuant to; (specify authority): Changes Clause The changes set forth in item 14 are made in the Contract/Order # in item 10A.

B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.) set forth in item 14, pursuant to the authority of FAR 43.103(b)..

C. This supplemental agreement is entered into pursuant to authority of:

D Other: (Specify type of modification and authority):

E. IMPORTANT: Contractor [] is not [X] is required to sign this document and return ONE Original to the issuing office.:

facility code

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT PAGE OF PAGES

2 AMENDMENT/MODIFICATION NO.

6. ISSUE BY CODE

USDA, Forest Service Procurement & Property Services (PPS), Field Procurement Operations Northwest Zone, CSA 3 Services and Supplies

5. PROJECT NO.(IF APPLICABLE)

7. ADMINISTERED BY (if other than item 6) CODE

USDA, Forest Service Procurement & Property Services (PPS), Field Procurement Operations Northwest Zone, CSA 3 Services and Supplies

8. NAME AND ADDRESS OF CONTRACTOR(No., street, county, State and ZIP Code) 9A. Amend Solicitation No. 1240BE26Q0071

9B. Dated 06/01/2026 10A. Modification of Contract/Order #

10B. Dated (see Item 13) code

11. THIS ITEM APPLIES ONLY TO AMENDMENT OF SOLICITATION

[X ] The above numbered solicitation is amended as set forth in the item 14. The hour and date specified for receipt of Offers [] is extended [X] is not extended. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15 and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted, or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment,and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible

Deschutes National Forest, MF 26-2 Willamette Complex SR Road Maintenance

1. This amendment provides quoters with the questions and answers received. See attached 1 page.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER

Andrea Pollock

15B. CONTRACTOR/OFFEROR

By

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

ANDREA Digitally signed by

By POLLOCK ANDREA POLLOCK

(Signature of Contracting Officer)

16C. DATE

SIGNED 6/23/2026

1. Does this project require a bid bond/bonding? No, this is a service not construction, bonding is not required.

2. Culverts and Guardrail (GFE or Contractor-Furnished) - The "All Roads" note in the supplemental specifications states that "all government furnished culverts and guardrails supplies shall be furnished by the contractor." Please clarify whether culverts and guardrail materials are government-furnished or contractor-furnished. If contractor-furnished, please provide the required sizes and specifications so they can be priced. This information should have been deleted in the specifications. There is NO guard rail or culvert installation in the schedule of items so this should be disregarded.

3. Aggregate Source and Weed-Free Approval Timing - Is there a pre-approved aggregate source for the Middle Fork Ranger District, or must the contractor submit a new source for COR approval after award? Given the June 29 start and October 30 completion window, what is the expected turnaround for source approval and the associated weed-free documentation?? Almost all commercial rock sources in the area will be approved. Parvin Butte is preferred but Davidsons Rock Quary is also acceptable. If the contractor chooses a source other than these two, the COR will provide weed free and aggregate specification approval within 3 days. Also, please note that the completion window ends October 30th 2027 (see amendment 001).

4. Is there a minimum amount of work the general contractor is required to self-perform? Yes, the general contractor must complete a minimum of 50% of the dollar value of the contract.

5. What are the material and gradation requirements for the ¾” material specified in items 0002 and 2001? The target values for surface gradation are in Table 703-3, the gradation requested shall be 3/4“ F. The approval will be based on a visual inspection from the COR.

6. Who will be the designated COR for this project? Carson Hanna

7. In reference to item 0002 Spot Surfacing, is the 12,650cy compacted in place quantity? No, this quantity is expected to have fluff factor and will be measure with load tickets from the commercial source. Whatever the load ticket reads are the value that will be paid for.

Deschutes National Forest, MF 26-2 Willamette Complex SR Road Maintenance