Marysville Ring Levee Phase 2B & 3

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W9123820R0021
Agency
ENDIST Sacramento US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Y1PZ Construction Of Other Non-Building Facilities
Place of performance
Marysville, California, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks construction services for Phases 2B and 3 of the Marysville Ring Levee project. The U.S. Army Corps of Engineers, Sacramento District is procuring improvements along approximately 7.5 miles of levee surrounding Marysville, California. Key requirements include constructing approximately 15,000 linear feet of cutoff walls using open trench and deep mix methods, addressing under seepage, through-seepage and other issues. Proposals will be evaluated on factors including technical approach, past performance, and price. The response deadline is February 12, 2020.

There is no set-aside designation. The primary NAICS code is 237110 and PSC code is R499. Incumbent contractors have previously worked on Marysville levee projects. The place of performance is Marysville, California. Phase 3 is divided into segments A through E, with segments A through C as base items and segments D and E as options. Segment A work must begin in 2020, with all work to be completed by December 2022 over a minimum of two construction seasons. Estimated values may exceed $7 million.

Notice text

4 versions

Update #4 · Latest ·

****Amendment 3 included specification changes, revised pricing schedule, edits tot he evaluation factors and extends the proposal due date.****

Amendment 2 included a revised pricing schedule, revised specification sections, a reduction of the period of performance, the final Environmental Assessment, and historical structure impact report.

***Intrested Vendors List has been posted, as of 3pm 10 Jan 2020.***

****Attachment 2 - Drawings Volume 2 of 2 is too large to attach to this posting.  Please contact DeAnna.L.Mannel@usace.army.mil for the file to be sent to you via a file transfer site.****

The Marysville Ring Levee (MRL) consists of approximately 7.5 miles of levee surrounding and protecting the City of Marysville, California. Planned levee improvements address under seepage, through-seepage, embankment slope stability, utility penetrations, constructability, settlement and geometrical corrections to the levee embankment.

Two phases of the Marysville Ring Levee program, namely Phase 2B & Phase 3 are solicited as one construction project and are to be constructed in a minimum of two  construction seasons with all construction work completed by Dec. 2022.  Phase 3 has been divided up into multiple Segments (A through E) and Phase 2B labeled as Segment D.  Segments A, B, and C will be base contract items and Segments D and E will be option items.  Upon award of this contract, Segment A must be constructed first in 2020. Segments B and C must not begin physical work sooner than year 2021, unless otherwise notified by the Contracting Officer.   Options Segments D and E must not begin physical work sooner than year 2021 and as the options are exercised, unless otherwise notified by the Contracting Officer.

Approximately 15,000 linear feet of cutoff walls (open trench and deep mix method) will be constructed with a conventional degrade approach with removal of 1/3 of the levee height as measured from an average landside elevation. The cutoff wall begins on the east side of State Route 70 (SR70) and ends at a location just west of Highway 20, where the highway goes over the levee, near the PG&E sub- station.  

Update #3 ·

****Amendment 2 included a revised pricing schedule, revised specification sections, a reduction of the period of performance, the final Environmental Assessment, and historical structure impact report.****

***Intrested Vendors List has been posted, as of 3pm 10 Jan 2020.***

****Attachment 2 - Drawings Volume 2 of 2 is too large to attach to this posting.  Please contact Shaun.O.Conyers@usace.army.mil for the file to be sent to you via a file transfer site.****

The Marysville Ring Levee (MRL) consists of approximately 7.5 miles of levee surrounding and protecting the City of Marysville, California. Planned levee improvements address under seepage, through-seepage, embankment slope stability, utility penetrations, constructability, settlement and geometrical corrections to the levee embankment.

Two phases of the Marysville Ring Levee program, namely Phase 2B & Phase 3 are solicited as one construction project and are to be constructed in a minimum of two  construction seasons with all construction work completed by Dec. 2022.  Phase 3 has been divided up into multiple Segments (A through E) and Phase 2B labeled as Segment D.  Segments A, B, and C will be base contract items and Segments D and E will be option items.  Upon award of this contract, Segment A must be constructed first in 2020. Segments B and C must not begin physical work sooner than year 2021, unless otherwise notified by the Contracting Officer.   Options Segments D and E must not begin physical work sooner than year 2021 and as the options are exercised, unless otherwise notified by the Contracting Officer.

Approximately 15,000 linear feet of cutoff walls (open trench and deep mix method) will be constructed with a conventional degrade approach with removal of 1/3 of the levee height as measured from an average landside elevation. The cutoff wall begins on the east side of State Route 70 (SR70) and ends at a location just west of Highway 20, where the highway goes over the levee, near the PG&E sub- station.  

Update #2 ·

***Intrested Vendors List has been posted, as of 3pm 10 Jan 2020.***

****Attachment 2 - Drawings Volume 2 of 2 is too large to attach to this posting.  Please contact Shaun.O.Conyers@usace.army.mil for the file to be sent to you via a file transfer site.****

The Marysville Ring Levee (MRL) consists of approximately 7.5 miles of levee surrounding and protecting the City of Marysville, California. Planned levee improvements address under seepage, through-seepage, embankment slope stability, utility penetrations, constructability, settlement and geometrical corrections to the levee embankment.

Two phases of the Marysville Ring Levee program, namely Phase 2B & Phase 3 are solicited as one construction project and are to be constructed in a minimum of two  construction seasons with all construction work completed by Dec. 2022.  Phase 3 has been divided up into multiple Segments (A through E) and Phase 2B labeled as Segment D.  Segments A, B, and C will be base contract items and Segments D and E will be option items.  Upon award of this contract, Segment A must be constructed first in 2020. Segments B and C must not begin physical work sooner than year 2021, unless otherwise notified by the Contracting Officer.   Options Segments D and E must not begin physical work sooner than year 2021 and as the options are exercised, unless otherwise notified by the Contracting Officer.

Approximately 15,000 linear feet of cutoff walls (open trench and deep mix method) will be constructed with a conventional degrade approach with removal of 1/3 of the levee height as measured from an average landside elevation. The cutoff wall begins on the east side of State Route 70 (SR70) and ends at a location just west of Highway 20, where the highway goes over the levee, near the PG&E sub- station.  

Update #1 ·

****Attachment 2 - Drawings Volume 2 of 2 is too large to attach to this posting.  Please contact Shaun.O.Conyers@usace.army.mil for the file to be sent to you via a file transfer site.****

The Marysville Ring Levee (MRL) consists of approximately 7.5 miles of levee surrounding and protecting the City of Marysville, California. Planned levee improvements address under seepage, through-seepage, embankment slope stability, utility penetrations, constructability, settlement and geometrical corrections to the levee embankment.

Two phases of the Marysville Ring Levee program, namely Phase 2B & Phase 3 are solicited as one construction project and are to be constructed in a minimum of two  construction seasons with all construction work completed by Dec. 2022.  Phase 3 has been divided up into multiple Segments (A through E) and Phase 2B labeled as Segment D.  Segments A, B, and C will be base contract items and Segments D and E will be option items.  Upon award of this contract, Segment A must be constructed first in 2020. Segments B and C must not begin physical work sooner than year 2021, unless otherwise notified by the Contracting Officer.   Options Segments D and E must not begin physical work sooner than year 2021 and as the options are exercised, unless otherwise notified by the Contracting Officer.

Approximately 15,000 linear feet of cutoff walls (open trench and deep mix method) will be constructed with a conventional degrade approach with removal of 1/3 of the levee height as measured from an average landside elevation. The cutoff wall begins on the east side of State Route 70 (SR70) and ends at a location just west of Highway 20, where the highway goes over the levee, near the PG&E sub- station.  

Attachments

Show all 21

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Marysville Ring Levee Phase 2B & 3 Award Award Notice
Marysville Ring Levee Phase 2B & 3 This notice · Latest solicitation Solicitation
Marysville Ring Levee Phase 2B & 3 Pre-Solicitation
Marysville Ring Levee Phase 2B & 3 Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity