This document contains a pricing schedule amendment for construction services for Phase 2B and 3 of the Marysville Ring Levee project. The pricing schedule amendment provides updated estimated quantities and unit pricing for various construction line items across Segments A through E. These segments involve improvements such as cutoff walls, levee embankment work including excavation and fill, drainage, road and utility relocations, and erosion control across approximately 7.5 miles of levee. The Army Corps of Engineers is soliciting these construction services with Segments A, B and C as base line items to be started in 2020 and 2021, while Segments D and E are option line items that may start in 2021 if exercised. Pricing is provided by line item according to unit measures such as linear feet, square feet, cubic yards, tons and jobs.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 3.pdf | ||
| Amendment 3 - Revised Submittal Register.pdf | ||
| Amendment 3 - Summary of Changes.pdf | ||
| Amendment 3 - Spec Changes.pdf | ||
| Amendment 2 - Bok Kai Temple Historic Structure Impact Report.2013.pdf | ||
| Amendment 2.pdf | ||
| Amendment 2 - Revised Spec Sections.pdf | ||
| Amendment 2 - Final Supplemental EA-IS.21 JUNE 2019.pdf | ||
| Amendment 2 - Revised Price Schedule.pdf | ||
| Amendment 2 - Summary of Revisions.pdf | ||
| Interested Vendors List.pdf | ||
| Amendment 1.pdf | ||
| Attachment 3 - Price Schedule.revised.pdf | ||
| Solicitation -W9123820R0021.pdf | ||
| Attachment 4 - Davis Bacon WD.CA20190007.12.6.19.pdf | ||
| Attachment 5 - Pre-Award Survey.pdf | ||
| Attachment 6 - Past Performance Questionnaire.pdf | ||
| Attachment 1 - Specifications.pdf | ||
| Attachment 3 - Price Schedule.pdf | ||
| Attachment 2 - Drawings.Volume1of2.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Schedule for Yuba River Basin Marysville Ring Levee, Phase 2b/3
* QUANTITY IS AN ESTIMATED AMOUNT. SEE SECTION 00 70 00, FAR 52.211-18, FOR VARIATION IN ESTIMATED
QUANTITY CONTRACT CLAUSE.
CLIN 0001 – Phase 3 – Segment A
ITEM
NO.
ITEM DESCRIPTION QUANTITY UOM CONTRACT
UNIT PRICE
CONTRACT
AMOUNT
1.1 MOBILIZATION AND
DEMOBILIZATION
1 JOB
1.2 TEMPORARY TRAFFIC
CONTROL
1 JOB
1.3 SWPPP DESIGN AND
IMPLEMENTATION
1 JOB
1.4 CLEARING AND
GRUBBING
1 JOB
1.5 SURFACE DEFORMATION
MONITORING
1 JOB
1.65 PAVEMENT MARKINGS 1 JOB
1.76 PRE-AND-POST PROJECT
SURVEYS
1 JOB
1.87 SAWCUT PAVEMENT 1 JOB
1.98 ACCESS RAMPS
RESTORATION
1 JOB
1.109 TOPSOIL STRIPPING 4192* CY
1.1110 REMOVE & DISPOSE
PAVEMENT
8495* SY
1.1211 REMOVE & REPLACE
FENCE
20* LF
1.1312 DEMOLITION GATES
AND POSTS
3 EA
1.1413 DEMOLITION BOLLARDS 21 EA
1.1514 REMOVE
GROUNDWATER
MONITORING WELL
2 EA
1.1615 SALVAGE METAL SHED 1 EA
1.1716 BARRIER GATES 1 EA
1.1817 EXCAVATION 41511* CY
1.1918 SOIL BENTONITE
CUTOFF WALL
207540* SF
1.2019 BORROW - IMPERVIOUS
LEVEE FILL
9300* CY
1.2120 EMBANKMENT -
GENERAL LEVEE FILL
29091* CY
1.2221 EMBANKMENT -
IMPERVIOUS LEVEE FILL
9300* CY
1.2322 AGGREGATE BASE
COURSE, CLASS 2
2963* 1416*
TON
CY
1.2423 HOT MIX ASPHALT
(HMA)
1434 TON
1.2524 PERMANENT EROSION
CONTROL
7* ACR
1.2625 REPLACE TOPSOIL 4192* CY
Phase 3 – SEGMENT A TOTAL
CLIN 0002 – PHASE 3 – SEGMENT B
NO.
ITEM DESCRIPTION QUANTITY UOM CONTRACT
UNIT PRICE
CONTRACT
AMOUNT
2.1 MOBILIZATION AND
DEMOBILIZATION
1 JOB
2.2 TEMPORARY TRAFFIC
CONTROL
1 JOB
2.3 SWPPP DESIGN AND
IMPLEMENTATION
1 JOB
2.4 CLEARING AND
GRUBBING
1 JOB
2.5 SURFACE DEFORMATION
MONITORING
1 JOB
2.65 PAVEMENT MARKINGS 1 JOB
2.76 PRE-AND-POST PROJECT
SURVEYS
1 JOB
2.87 SAWCUT PAVEMENT 1 JOB
2.98 ACCESS RAMPS
RESTORATION
1 JOB
2.109 TOPSOIL STRIPPING 2721* CY
2.1110 REMOVE & DISPOSE
PAVEMENT
4881* SY
2.1211 REMOVE & REPLACE
GUARDRAIL
85* LF
2.1312 REMOVE, DISPOSE, &
REPLACE BARRICADES
1 EA
2.1413 DEMOLITION BOLLARDS 4 EA
2.1514 BARRIER GATES 1 EA
2.1615 EXCAVATION 20444* CY
2.1716 SOIL BENTONITE
CUTOFF WALL
128000* SF
2.1817 BORROW – IMPERVIOUS
LEVEE FILL
7500* CY
2.1918 EMBANKMENT –
GENERAL LEVEE FILL
12944* CY
2.2019 EMBANKMENT –
IMPERVIOUS LEVEE FILL
7500* CY
2.2120 AGGREGATE BASE
COURSE, CLASS 2
1703* 814*
2.2221 HOT MIX ASPHALT
824 TON
2.2322 PERMANENT EROSION
CONTROL
4.4* ACR
2.2423 REPLACE TOPSOIL 2721* CY
Phase 3 - SEGMENT B TOTAL
CLIN 0003 - PHASE 3 - SEGMENT C
NO.
ITEM DESCRIPTION QUANTITY UOM CONTRACT
UNIT PRICE
CONTRACT
AMOUNT
3.1 TEMPORARY TRAFFIC
CONTROL
1 JOB
3.2 SWPPP DESIGN AND
IMPLEMENTATION
1 JOB
3.3 CLEARING AND
GRUBBING
1 JOB
3.4 SURFACE
DEFORMATION
MONITORING
1 JOB
3.54 PAVEMENT MARKINGS 1 JOB
3.65 PRE-AND-POST PROJECT
SURVEYS
1 JOB
3.76 SAWCUT PAVEMENT 1 JOB
3.87 ACCESS RAMPS
RESTORATION
3.98 TOPSOIL STRIPPING 2989* CY
3.109 REMOVE & DISPOSE
PAVEMENT
6041* SY
3.1110 REMOVE & REPLACE
FENCE
2960* LF
3.1211 DEMOLITION GATES
AND POSTS
3 EA
3.1312 REMOVE & REPLACE
GUARDRAIL
10* LF
3.1413 REMOVE, DISPOSE, &
REPLACE BARRICADES
1 EA
3.1514 BARRIER GATES 3 EA
3.1615 EXCAVATION 36511* CY
3.1716 SOIL CEMENT
BENTONITE (SCB)
CUTOFF WALL
384130* SF
3.1817 BORROW - IMPERVIOUS
LEVEE FILL
9300* CY
3.1918 EMBANKMENT -
GENERAL LEVEE FILL
27211* CY
3.2019 EMBANKMENT -
IMPERVIOUS LEVEE FILL
9300* CY
3.2120 AGGREGATE BASE
COURSE, CLASS 2
2898* 1007*
3.2221 HOT MIX ASPHALT
1020 TON
3.2322 PERMANENT EROSION
CONTROL
5* ACR
3.2423 REPLACE TOPSOIL 2989* CY
3.24 AGGREGATE SURFACE
COURSE
378* CY
Phase 3 - SEGMENT C TOTAL
CLIN 0004 - PHASE 3 - SEGMENT AC
NO.
ITEM DESCRIPTION QUANTITY UOM CONTRACT
UNIT PRICE
CONTRACT
AMOUNT
4.1 REMOVE AND REPLACE
17TH STREET PUMP
STATION PIPELINES
1 JOB
4.2 REMOVE & DISPOSE 14"
WATER PIPE STA 321+00
180* LF
CLIN 0004 TOTAL
OPTIONAL CLIN 1001 - PHASE 2B - SEGMENT D
NO.
ITEM DESCRIPTION QUANTITY UOM CONTRACT
UNIT PRICE
CONTRACT
AMOUNT
1001.1 MOBILIZATION AND
DEMOBILIZATION
1 JOB
1001.2 TEMPORARY TRAFFIC
CONTROL
1 JOB
1001.3 VIBRATION
MONITORING
1 JOB
1001.4 REMOVE & REPLACE
WOOD STEPS
1 JOB
1001.5 SWPPP DESIGN AND
IMPLEMENTATION
1 JOB
1001.6 CLEARING AND
GRUBBING
11* ACR
1001.7 PERMANENT EROSION
CONTROL
13* ACR
1001.8 REMOVE & DISPOSE
PAVEMENT
7450* SY
1001.9 REMOVE & DISPOSE
AGGREGATE SURFACE
COURSE
1670* SY
1001.10 DECONSTRUCT &
PLACE STONE
PROTECTION
3170* SY
1001.11 DEMOLITION D STREET
SEWER TUNNEL
80* LF
1001.12 DEMOLITION B STREET
SEWER TUNNEL
65* LF
1001.13 DEMOLITION SHEET
PILE STA-250+80 TO
910* LF
STA- 259+85
1001.14 DEMOLITION
CONCRETE WALL STA-
259+85
20* LF
1001.15 DEMOLITION
RETAINING WALL STA-
261+95
120* LF
1001.16 DEMOLITION GATES
AND POSTS
2 EA
1001.17 DEMOLITION SAND
PLANT FOUNDATION &
BACKWALL
2 EA
1001.18 DEMOLITION SAND
PLANT CONCRETE PADS
4 EA
1001.19 DEMOLITION
BOLLARDS
20 EA
1001.20 REMOVE & REPLACE
GUARDRAIL
195* LF
1001.21 REMOVE & DISPOSE GAS
LINE, STA 261+05
285* LF
1001.22 REMOVE & DISPOSE
WATER LINE STA 261+80
255* LF
1001.23 REMOVE & DISPOSE
WATER LINE STA 264+00
350* LF
1001.24 REMOVE & DISPOSE
WATER LINE STA 270+70
95* LF
1001.25 REMOVE & DISPOSE 2-
INCH WATER LINE STA
291+70
145* LF
1001.26 REMOVE & DISPOSE 6-
INCH WATER LINE, STA
291+70
145* LF
1001.27 REMOVE & DISPOSE
UNDERGROUND
COMMUNICATION LINE,
STA 250+35
400* LF
1001.28 REMOVE & DISPOSE
UNDERGROUND
COMMUNICATION LINE,
STA 252+20
10* LF
1001.29 REMOVE & DISPOSE GAS
LINE, 295+65
465* LF
1001.30 REMOVE & DISPOSE
UNDERGROUND
COMMUNICATION LINE,
STA 294+90
150* LF
1001.31 REMOVE AND RESET
SECURITY FENCE
135 LF
1001.32 REMOVE AND REPLACE
SECURITY FENCE
135 LF
1001.33 TOPSOIL STRIPPING 10005* CY
1001.34 EXCAVATION 84165* CY
1001.35 BORROW - IMPERVIOUS
LEVEE FILL
19385* CY
1001.36 BORROW - GENERAL
LEVEE FILL
38415* CY
1001.37 EMBANKMENT -
IMPERVIOUS LEVEE FILL
19385* CY
1001.38 EMBANKMENT -
GENERAL LEVEE FILL
97330* CY
1001.39 REPLACE TOPSOIL 10005* CY
1001.40 SOIL BENTONITE
CUTOFF WALL
163150* SF
1001.41 AGGREGATE SURFACE
COURSE
1796* CY
1001.42 AGGREGATE BASE
COURSE, CLASS 2
1645* CY
1001.43 HOT MIX ASPHALT (HMA) 880* TON
1001.44 LANDSIDE BLANKET
DRAIN
205* LF
1001.45 CONCRETE V-DITCH &
OUTLET
420* LF
1001.46 VEGETATION PROTECT
INPLACE
85* EA
1001.47 TRENCH EXCAVATION - B
AND D STREET SEWER
TUNNELS
6000* CY
1001.48 BARRIER GATES 4 EA
1001.49 REMOVE & DISPOSE GAS
LINE, STA 252+70
10 LF
PHASE 2B - SEGMENT D TOTAL
OPTIONAL CLIN 1002 - PHASE 2B - SEGMENT D
*in the event work must in not completed prior to the end of the construction season*
ITEM
NO.
ITEM DESCRIPTION QUANTITY UOM CONTRACT
UNIT PRICE
CONTRACT
AMOUNT
1002.1 RE-MOBILIZATION 1 JOB
OPTIONAL CLIN 1002 TOTAL
OPTIONAL CLIN 1003 PHASE 3 - SEGMENT E - DMM CUTOFF WALL
NO.
ITEM DESCRIPTION QUANTITY UOM CONTRACT
UNIT PRICE
CONTRACT
AMOUNT
1003.1 SEGMENT E DMM
CUTOFF WALL STATION
STA 394+10 - 3+00
OPTIONAL CLIN 1003 TOTAL
OPTIONAL CLIN 1004 – STANDBY TIME
*in the event a cultural artifact is found*
ITEM
NO.
ITEM DESCRIPTION QUANTITY UOM CONTRACT
UNIT PRICE
CONTRACT
AMOUNT
1004.1 CONSTRUCTION
STANDBY
30* DAY
OPTIONAL CLIN 1004 – STANDBY TIME TOTAL
OPTIONAL CLIN 1005 – REMOBILIZATION
*in the event work must be moved to another project location*
ITEM
NO.
ITEM DESCRIPTION QUANTITY UOM CONTRACT
UNIT PRICE
CONTRACT
AMOUNT
1005.1 ONSITE
REMOBILIZATION
3* JOB
OPTIONAL CLIN 1005 - TOTAL
OPTIONAL CLIN 1006 –CONTAMINATED MATERIAL
NO.
ITEM DESCRIPTION QUANTITY UOM CONTRACT
UNIT PRICE
CONTRACT
AMOUNT
1006.1 EXCAVATION AND
HANDLING
CONTAMINATED
MATERIAL
160* TON
OPTIONAL CLIN 1006 - TOTAL
OPTIONAL CLIN 1007 –DISPOSAL OF HAZARDOUS MATERIAL
NO.
ITEM DESCRIPTION QUANTITY UOM CONTRACT
UNIT PRICE
CONTRACT
AMOUNT
1007.1 TRANSPORTATION &
DISPOSAL HAZARDOUS
MATERIAL
160* TON
OPTIONAL CLIN 1007 - TOTAL
GRAND TOTAL BASE + ALL OPTIONS
File details come from the government source that posted it. Updated .