This solicitation is for construction of Phases 2B and 3 of the Marysville Ring Levee project. The Corps of Engineers seeks a contractor to construct multiple segments of levee improvements along approximately 7.5 miles surrounding the City of Marysville, California over two construction seasons, with all work completed by December 2022. Segments A, B, and C are base contract line items to be constructed first, with options for Segments D and E. Segment A work must start in 2020, while Segments B and C may not begin until 2021. The scope includes excavation, embankment, cutoff walls, erosion control, and utility relocations. Approximately 15,000 linear feet of open trench and deep mix method cutoff walls will be installed through conventional degrade to a maximum of 1/3 the levee height from average landside elevation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 3 - Revised Submittal Register.pdf | ||
| Amendment 3 - Summary of Changes.pdf | ||
| Amendment 3 - Spec Changes.pdf | ||
| Amendment 3 - Revised Pricing Schedule.pdf | ||
| Amendment 3.pdf | ||
| Amendment 2 - Bok Kai Temple Historic Structure Impact Report.2013.pdf | ||
| Amendment 2.pdf | ||
| Amendment 2 - Revised Spec Sections.pdf | ||
| Amendment 2 - Final Supplemental EA-IS.21 JUNE 2019.pdf | ||
| Amendment 2 - Revised Price Schedule.pdf | ||
| Amendment 2 - Summary of Revisions.pdf | ||
| Interested Vendors List.pdf | ||
| Amendment 1.pdf | ||
| Attachment 3 - Price Schedule.revised.pdf | ||
| Solicitation -W9123820R0021.pdf | ||
| Attachment 4 - Davis Bacon WD.CA20190007.12.6.19.pdf | ||
| Attachment 5 - Pre-Award Survey.pdf | ||
| Attachment 6 - Past Performance Questionnaire.pdf | ||
| Attachment 1 - Specifications.pdf | ||
| Attachment 2 - Drawings.Volume1of2.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Schedule for Yuba River Basin Marysville Ring Levee, Phase 2b/3
* QUANTITY IS AN ESTIMATED AMOUNT. SEE SECTION 00 70 00, FAR 52.211-18, FOR VARIATION IN ESTIMATED
QUANTITY CONTRACT CLAUSE.
CLIN 0001 – Phase 3 – Segment A
ITEM
NO.
ITEM DESCRIPTION QUANTITY UOM CONTRACT
UNIT PRICE
CONTRACT
AMOUNT
1.1 MOBILIZATION AND
DEMOBILIZATION
1 JOB
1.2 TEMPORARY TRAFFIC
CONTROL
1 JOB
1.3 SWPPP DESIGN AND
IMPLEMENTATION
1 JOB
1.4 CLEARING AND
GRUBBING
1 JOB
1.5 SURFACE
DEFORMATION
MONITORING
1 JOB
1.6 PAVEMENT MARKINGS 1 JOB
1.7 PRE-AND-POST PROJECT
SURVEYS
1 JOB
1.8 SAWCUT PAVEMENT 1 JOB
1.9 ACCESS RAMPS
RESTORATION
1 JOB
1.10 TOPSOIL STRIPPING 4192* CY
1.11 REMOVE & DISPOSE
PAVEMENT
8495* SY
1.12 REMOVE & REPLACE
FENCE
20* LF
1.13 DEMOLITION GATES
AND POSTS
3 EA
1.14 DEMOLITION BOLLARDS 21 EA
1.15 REMOVE
GROUNDWATER
MONITORING WELL
2 EA
1.16 SALVAGE METAL SHED 1 EA
1.17 BARRIER GATES 1 EA
1.18 EXCAVATION 41511* CY
1.19 SOIL BENTONITE
CUTOFF WALL
207540* SF
1.20 BORROW - IMPERVIOUS
LEVEE FILL
9300* CY
1.21 EMBANKMENT -
GENERAL LEVEE FILL
29091* CY
1.22 EMBANKMENT -
IMPERVIOUS LEVEE FILL
9300* CY
1.23 AGGREGATE BASE
COURSE, CLASS 2
2963* TON
1.24 HOT MIX ASPHALT
(HMA)
1434 TON
1.25 PERMANENT EROSION
CONTROL
7* ACR
1.26 REPLACE TOPSOIL 4192* CY
Phase 3 - SEGMENT A TOTAL
CLIN 0002 - PHASE 3 - SEGMENT B
NO.
ITEM DESCRIPTION QUANTITY UOM CONTRACT
UNIT PRICE
CONTRACT
AMOUNT
2.1 MOBILIZATION AND
DEMOBILIZATION
1 JOB
2.2 TEMPORARY TRAFFIC
CONTROL
1 JOB
2.3 SWPPP DESIGN AND
IMPLEMENTATION
1 JOB
2.4 CLEARING AND
GRUBBING
1 JOB
2.5 SURFACE DEFORMATION
MONITORING
1 JOB
2.6 PAVEMENT MARKINGS 1 JOB
2.7 PRE-AND-POST PROJECT
SURVEYS
1 JOB
2.8 SAWCUT PAVEMENT 1 JOB
2.9 ACCESS RAMPS
RESTORATION
1 JOB
2.10 TOPSOIL STRIPPING 2721* CY
2.11 REMOVE & DISPOSE
PAVEMENT
4881* SY
2.12 REMOVE & REPLACE
GUARDRAIL
85* LF
2.13 REMOVE, DISPOSE, &
REPLACE BARRICADES
1 EA
2.14 DEMOLITION BOLLARDS 4 EA
2.15 BARRIER GATES 1 EA
2.16 EXCAVATION 20444* CY
2.17 SOIL BENTONITE
CUTOFF WALL
128000* SF
2.18 BORROW - IMPERVIOUS
LEVEE FILL
7500* CY
2.19 EMBANKMENT -
GENERAL LEVEE FILL
12944* CY
2.20 EMBANKMENT -
IMPERVIOUS LEVEE FILL
7500* CY
2.21 AGGREGATE BASE
COURSE, CLASS 2
1703* TON
2.22 HOT MIX ASPHALT
(HMA)
824 TON
2.23 PERMANENT EROSION
CONTROL
4.4* ACR
2.24 REPLACE TOPSOIL 2721* CY
Phase 3 - SEGMENT B TOTAL
CLIN 0003 - PHASE 3 - SEGMENT C
NO.
ITEM DESCRIPTION QUANTITY UOM CONTRACT
UNIT PRICE
CONTRACT
AMOUNT
3.1 TEMPORARY TRAFFIC
CONTROL
1 JOB
3.2 SWPPP DESIGN AND
IMPLEMENTATION
1 JOB
3.3 CLEARING AND
GRUBBING
1 JOB
3.4 SURFACE
DEFORMATION
MONITORING
1 JOB
3.5 PAVEMENT MARKINGS 1 JOB
3.6 PRE-AND-POST PROJECT
SURVEYS
1 JOB
3.7 SAWCUT PAVEMENT 1 JOB
3.8 ACCESS RAMPS
RESTORATION
1 JOB
3.9 TOPSOIL STRIPPING 2989* CY
3.10 REMOVE & DISPOSE
PAVEMENT
6041* SY
3.11 REMOVE & REPLACE
FENCE
2960* LF
3.12 DEMOLITION GATES
AND POSTS
3 EA
3.13 REMOVE & REPLACE
GUARDRAIL
10* LF
3.14 REMOVE, DISPOSE, &
REPLACE BARRICADES
1 EA
3.15 BARRIER GATES 3 EA
3.16 EXCAVATION 36511* CY
3.17 SOIL CEMENT
BENTONITE (SCB)
CUTOFF WALL
384130* SF
3.18 BORROW - IMPERVIOUS
LEVEE FILL
9300* CY
3.19 EMBANKMENT -
GENERAL LEVEE FILL
27211* CY
3.20 EMBANKMENT -
IMPERVIOUS LEVEE FILL
9300* CY
3.21 AGGREGATE BASE
COURSE, CLASS 2
2898* TON
3.22 HOT MIX ASPHALT
(HMA)
1020 TON
3.23 PERMANENT EROSION
CONTROL
5* ACR
3.24 REPLACE TOPSOIL 2989* CY
Phase 3 - SEGMENT C TOTAL
CLIN 0004 - PHASE 3 - SEGMENT A
NO.
ITEM DESCRIPTION QUANTITY UOM CONTRACT
UNIT PRICE
CONTRACT
AMOUNT
4.1 REMOVE AND REPLACE
17TH STREET PUMP
STATION PIPELINES
1 JOB
4.2 REMOVE & DISPOSE 14"
WATER PIPE STA 321+00
180* LF
CLIN 0004 TOTAL
OPTIONAL CLIN 1001 - PHASE 2B - SEGMENT D
NO.
ITEM DESCRIPTION QUANTITY UOM CONTRACT
UNIT PRICE
CONTRACT
AMOUNT
1001.1 MOBILIZATION AND
DEMOBILIZATION
1 JOB
1001.2 TEMPORARY TRAFFIC
CONTROL
1 JOB
1001.3 VIBRATION
MONITORING
1 JOB
1001.4 REMOVE & REPLACE
WOOD STEPS
1 JOB
1001.5 SWPPP DESIGN AND
IMPLEMENTATION
1 JOB
1001.6 CLEARING AND
GRUBBING
11* ACR
1001.7 PERMANENT EROSION
CONTROL
13* ACR
1001.8 REMOVE & DISPOSE
PAVEMENT
7450* SY
1001.9 REMOVE & DISPOSE
AGGREGATE SURFACE
COURSE
1670* SY
1001.10 DECONSTRUCT &
PLACE STONE
PROTECTION
3170* SY
1001.11 DEMOLITION D STREET
SEWER TUNNEL
80* LF
1001.12 DEMOLITION B STREET
SEWER TUNNEL
65* LF
1001.13 DEMOLITION SHEET
PILE STA-250+80 TO
STA- 259+85
910* LF
1001.14 DEMOLITION
CONCRETE WALL STA-
259+85
20* LF
1001.15 DEMOLITION
RETAINING WALL STA-
261+95
120* LF
1001.16 DEMOLITION GATES
AND POSTS
2 EA
1001.17 DEMOLITION SAND
PLANT FOUNDATION &
BACKWALL
2 EA
1001.18 DEMOLITION SAND
PLANT CONCRETE PADS
4 EA
1001.19 DEMOLITION
BOLLARDS
20 EA
1001.20 REMOVE & REPLACE
GUARDRAIL
195* LF
1001.21 REMOVE & DISPOSE GAS
LINE, STA 261+05
285* LF
1001.22 REMOVE & DISPOSE
WATER LINE STA 261+80
255* LF
1001.23 REMOVE & DISPOSE
WATER LINE STA 264+00
350* LF
1001.24 REMOVE & DISPOSE
WATER LINE STA 270+70
95* LF
1001.25 REMOVE & DISPOSE 2-
INCH WATER LINE STA
291+70
145* LF
1001.26 REMOVE & DISPOSE 6-
INCH WATER LINE, STA
291+70
145* LF
1001.27 REMOVE & DISPOSE
UNDERGROUND
COMMUNICATION LINE,
STA 250+35
400* LF
1001.28 REMOVE & DISPOSE
UNDERGROUND
COMMUNICATION LINE,
STA 252+20
10* LF
PHASE 2B - SEGMENT D TOTAL
OPTIONAL CLIN 1002 - PHASE 2B - SEGMENT D
*in the event work must in not completed prior to the end of the construction season*
ITEM
NO.
ITEM DESCRIPTION QUANTITY UOM CONTRACT
UNIT PRICE
CONTRACT
AMOUNT
1002.1 RE-MOBILIZATION 1 JOB
OPTIONAL CLIN 1002 TOTAL
OPTIONAL CLIN 1003 PHASE 3 - SEGMENT E - DMM CUTOFF WALL
NO.
ITEM DESCRIPTION QUANTITY UOM CONTRACT
UNIT PRICE
CONTRACT
AMOUNT
1003.1 SEGMENT E DMM
CUTOFF WALL STATION
STA 394+10 - 3+00
1 JOB
OPTIONAL CLIN 1003 TOTAL
OPTIONAL CLIN 1004 – STANDBY TIME
*in the event a cultural artifact is found*
ITEM
NO.
ITEM DESCRIPTION QUANTITY UOM CONTRACT
UNIT PRICE
CONTRACT
AMOUNT
1004.1 CONSTRUCTION
STANDBY
30*
DAY
OPTIONAL CLIN 1004 – STANDBY TIME TOTAL
OPTIONAL CLIN 1005 – REMOBILIZATION
*in the event work must be moved to another project location*
ITEM
NO.
ITEM DESCRIPTION QUANTITY UOM CONTRACT
UNIT PRICE
CONTRACT
AMOUNT
1005.1 ONSITE
REMOBILIZATION
3* JOB
OPTIONAL CLIN 1005 - TOTAL
OPTIONAL CLIN 1006 –CONTAMINATED MATERIAL
NO.
ITEM DESCRIPTION QUANTITY UOM CONTRACT
UNIT PRICE
CONTRACT
AMOUNT
1006.1 EXCAVATION AND
HANDLING
CONTAMINATED
MATERIAL
160* TON
OPTIONAL CLIN 1006 - TOTAL
OPTIONAL CLIN 1007 –DISPOSAL OF HAZARDOUS MATERIAL
NO.
ITEM DESCRIPTION QUANTITY UOM CONTRACT
UNIT PRICE
CONTRACT
AMOUNT
1007.1 TRANSPORTATION &
DISPOSAL HAZARDOUS
MATERIAL
160* TON
OPTIONAL CLIN 1007 - TOTAL
GRAND TOTAL BASE + ALL OPTIONS
File details come from the government source that posted it. Updated .