Attachment 3 - Price Schedule.revised.pdf

PDF 225 KB Posted

Attached to
Marysville Ring Levee Phase 2B & 3 Federal contract opportunity
Solicitation number
W9123820R0021
Issued by
Department of the Army Corps of Engineers Engineering District Sacramento

About this file

This pricing schedule outlines costs for construction work on the Marysville Ring Levee project. The work includes construction of levee segments A through E, with segments A through C as base requirements and segments D and E as optional items. Segment A must be completed in 2020, with segments B and C starting no earlier than 2021. Options may begin in 2021 contingent on option exercise. Work must finish by December 2022. Pricing is provided for various construction tasks including excavation, embankment installation, cutoff walls, road repairs and utility relocation. Costs are listed by line item and estimated quantities. The solicitation seeks bids from contractors to perform this work for the Army Corps of Engineers Sacramento District in order to improve the 7.5 mile Marysville Ring Levee and protect the city from flooding.

View the file

Other files for this federal contract opportunity

Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pricing Schedule for Yuba River Basin Marysville Ring Levee, Phase 2b/3

* QUANTITY IS AN ESTIMATED AMOUNT. SEE SECTION 00 70 00, FAR 52.211-18, FOR VARIATION IN ESTIMATED

QUANTITY CONTRACT CLAUSE.

CLIN 0001 – Phase 3 – Segment A

ITEM

NO.

ITEM DESCRIPTION QUANTITY UOM CONTRACT

UNIT PRICE

CONTRACT

AMOUNT

1.1 MOBILIZATION AND

DEMOBILIZATION

1 JOB

1.2 TEMPORARY TRAFFIC

CONTROL

1 JOB

1.3 SWPPP DESIGN AND

IMPLEMENTATION

1 JOB

1.4 CLEARING AND

GRUBBING

1 JOB

1.5 SURFACE

DEFORMATION

MONITORING

1 JOB

1.6 PAVEMENT MARKINGS 1 JOB

1.7 PRE-AND-POST PROJECT

SURVEYS

1 JOB

1.8 SAWCUT PAVEMENT 1 JOB

1.9 ACCESS RAMPS

RESTORATION

1 JOB

1.10 TOPSOIL STRIPPING 4192* CY

1.11 REMOVE & DISPOSE

PAVEMENT

8495* SY

1.12 REMOVE & REPLACE

FENCE

20* LF

1.13 DEMOLITION GATES

AND POSTS

3 EA

1.14 DEMOLITION BOLLARDS 21 EA

1.15 REMOVE

GROUNDWATER

MONITORING WELL

2 EA

1.16 SALVAGE METAL SHED 1 EA

1.17 BARRIER GATES 1 EA

1.18 EXCAVATION 41511* CY

1.19 SOIL BENTONITE

CUTOFF WALL

207540* SF

1.20 BORROW - IMPERVIOUS

LEVEE FILL

9300* CY

1.21 EMBANKMENT -

GENERAL LEVEE FILL

29091* CY

1.22 EMBANKMENT -

IMPERVIOUS LEVEE FILL

9300* CY

1.23 AGGREGATE BASE

COURSE, CLASS 2

2963* TON

1.24 HOT MIX ASPHALT

(HMA)

1434 TON

1.25 PERMANENT EROSION

CONTROL

7* ACR

1.26 REPLACE TOPSOIL 4192* CY

Phase 3 - SEGMENT A TOTAL

CLIN 0002 - PHASE 3 - SEGMENT B

NO.

ITEM DESCRIPTION QUANTITY UOM CONTRACT

UNIT PRICE

CONTRACT

AMOUNT

2.1 MOBILIZATION AND

DEMOBILIZATION

1 JOB

2.2 TEMPORARY TRAFFIC

CONTROL

1 JOB

2.3 SWPPP DESIGN AND

IMPLEMENTATION

1 JOB

2.4 CLEARING AND

GRUBBING

1 JOB

2.5 SURFACE DEFORMATION

MONITORING

1 JOB

2.6 PAVEMENT MARKINGS 1 JOB

2.7 PRE-AND-POST PROJECT

SURVEYS

1 JOB

2.8 SAWCUT PAVEMENT 1 JOB

2.9 ACCESS RAMPS

RESTORATION

1 JOB

2.10 TOPSOIL STRIPPING 2721* CY

2.11 REMOVE & DISPOSE

PAVEMENT

4881* SY

2.12 REMOVE & REPLACE

GUARDRAIL

85* LF

2.13 REMOVE, DISPOSE, &

REPLACE BARRICADES

1 EA

2.14 DEMOLITION BOLLARDS 4 EA

2.15 BARRIER GATES 1 EA

2.16 EXCAVATION 20444* CY

2.17 SOIL BENTONITE

CUTOFF WALL

128000* SF

2.18 BORROW - IMPERVIOUS

LEVEE FILL

7500* CY

2.19 EMBANKMENT -

GENERAL LEVEE FILL

12944* CY

2.20 EMBANKMENT -

IMPERVIOUS LEVEE FILL

7500* CY

2.21 AGGREGATE BASE

COURSE, CLASS 2

1703* TON

2.22 HOT MIX ASPHALT

(HMA)

824 TON

2.23 PERMANENT EROSION

CONTROL

4.4* ACR

2.24 REPLACE TOPSOIL 2721* CY

Phase 3 - SEGMENT B TOTAL

CLIN 0003 - PHASE 3 - SEGMENT C

NO.

ITEM DESCRIPTION QUANTITY UOM CONTRACT

UNIT PRICE

CONTRACT

AMOUNT

3.1 TEMPORARY TRAFFIC

CONTROL

1 JOB

3.2 SWPPP DESIGN AND

IMPLEMENTATION

1 JOB

3.3 CLEARING AND

GRUBBING

1 JOB

3.4 SURFACE

DEFORMATION

MONITORING

1 JOB

3.5 PAVEMENT MARKINGS 1 JOB

3.6 PRE-AND-POST PROJECT

SURVEYS

1 JOB

3.7 SAWCUT PAVEMENT 1 JOB

3.8 ACCESS RAMPS

RESTORATION

1 JOB

3.9 TOPSOIL STRIPPING 2989* CY

3.10 REMOVE & DISPOSE

PAVEMENT

6041* SY

3.11 REMOVE & REPLACE

FENCE

2960* LF

3.12 DEMOLITION GATES

AND POSTS

3 EA

3.13 REMOVE & REPLACE

GUARDRAIL

10* LF

3.14 REMOVE, DISPOSE, &

REPLACE BARRICADES

1 EA

3.15 BARRIER GATES 3 EA

3.16 EXCAVATION 36511* CY

3.17 SOIL CEMENT

BENTONITE (SCB)

CUTOFF WALL

384130* SF

3.18 BORROW - IMPERVIOUS

LEVEE FILL

9300* CY

3.19 EMBANKMENT -

GENERAL LEVEE FILL

27211* CY

3.20 EMBANKMENT -

IMPERVIOUS LEVEE FILL

9300* CY

3.21 AGGREGATE BASE

COURSE, CLASS 2

2898* TON

3.22 HOT MIX ASPHALT

(HMA)

1020 TON

3.23 PERMANENT EROSION

CONTROL

5* ACR

3.24 REPLACE TOPSOIL 2989* CY

Phase 3 - SEGMENT C TOTAL

CLIN 0004 - PHASE 3 - SEGMENT A

NO.

ITEM DESCRIPTION QUANTITY UOM CONTRACT

UNIT PRICE

CONTRACT

AMOUNT

4.1 REMOVE AND REPLACE

17TH STREET PUMP

STATION PIPELINES

1 JOB

4.2 REMOVE & DISPOSE 14"

WATER PIPE STA 321+00

180* LF

CLIN 0004 TOTAL

OPTIONAL CLIN 1001 - PHASE 2B - SEGMENT D

NO.

ITEM DESCRIPTION QUANTITY UOM CONTRACT

UNIT PRICE

CONTRACT

AMOUNT

1001.1 MOBILIZATION AND

DEMOBILIZATION

1 JOB

1001.2 TEMPORARY TRAFFIC

CONTROL

1 JOB

1001.3 VIBRATION

MONITORING

1 JOB

1001.4 REMOVE & REPLACE

WOOD STEPS

1 JOB

1001.5 SWPPP DESIGN AND

IMPLEMENTATION

1 JOB

1001.6 CLEARING AND

GRUBBING

11* ACR

1001.7 PERMANENT EROSION

CONTROL

13* ACR

1001.8 REMOVE & DISPOSE

PAVEMENT

7450* SY

1001.9 REMOVE & DISPOSE

AGGREGATE SURFACE

COURSE

1670* SY

1001.10 DECONSTRUCT &

PLACE STONE

PROTECTION

3170* SY

1001.11 DEMOLITION D STREET

SEWER TUNNEL

80* LF

1001.12 DEMOLITION B STREET

SEWER TUNNEL

65* LF

1001.13 DEMOLITION SHEET

PILE STA-250+80 TO

STA- 259+85

910* LF

1001.14 DEMOLITION

CONCRETE WALL STA-

259+85

20* LF

1001.15 DEMOLITION

RETAINING WALL STA-

261+95

120* LF

1001.16 DEMOLITION GATES

AND POSTS

2 EA

1001.17 DEMOLITION SAND

PLANT FOUNDATION &

BACKWALL

2 EA

1001.18 DEMOLITION SAND

PLANT CONCRETE PADS

4 EA

1001.19 DEMOLITION

BOLLARDS

20 EA

1001.20 REMOVE & REPLACE

GUARDRAIL

195* LF

1001.21 REMOVE & DISPOSE GAS

LINE, STA 261+05

285* LF

1001.22 REMOVE & DISPOSE

WATER LINE STA 261+80

255* LF

1001.23 REMOVE & DISPOSE

WATER LINE STA 264+00

350* LF

1001.24 REMOVE & DISPOSE

WATER LINE STA 270+70

95* LF

1001.25 REMOVE & DISPOSE 2-

INCH WATER LINE STA

291+70

145* LF

1001.26 REMOVE & DISPOSE 6-

INCH WATER LINE, STA

291+70

145* LF

1001.27 REMOVE & DISPOSE

UNDERGROUND

COMMUNICATION LINE,

STA 250+35

400* LF

1001.28 REMOVE & DISPOSE

UNDERGROUND

COMMUNICATION LINE,

STA 252+20

10* LF

1001.29 REMOVE & DISPOSE GAS

LINE, 295+65

465* LF

1001.30 REMOVE & DISPOSE

UNDERGROUND

COMMUNICATION LINE,

STA 294+90

150* LF

1001.31 REMOVE AND RESET

SECURITY FENCE

135 LF

1001.32 REMOVE AND REPLACE

SECURITY FENCE

135 LF

1001.33 TOPSOIL STRIPPING 10005* CY

1001.34 EXCAVATION 84165* CY

1001.35 BORROW - IMPERVIOUS

LEVEE FILL

19385* CY

1001.36 BORROW - GENERAL

LEVEE FILL

38415* CY

1001.37 EMBANKMENT -

IMPERVIOUS LEVEE FILL

19385* CY

1001.38 EMBANKMENT -

GENERAL LEVEE FILL

97330* CY

1001.39 REPLACE TOPSOIL 10005* CY

1001.40 SOIL BENTONITE

CUTOFF WALL

163150* SF

1001.41 AGGREGATE SURFACE

COURSE

1796* CY

1001.42 AGGREGATE BASE

COURSE, CLASS 2

1645* CY

1001.43 HOT MIX ASPHALT (HMA) 880* TON

1001.44 LANDSIDE BLANKET

DRAIN

205* LF

1001.45 CONCRETE V-DITCH &

OUTLET

420* LF

1001.46 VEGETATION PROTECT

INPLACE

85* EA

1001.47 TRENCH EXCAVATION - B

AND D STREET SEWER

TUNNELS

6000* CY

1001.48 BARRIER GATES 4 EA

1001.49 REMOVE & DISPOSE GAS

LINE, STA 252+70

10 LF

PHASE 2B - SEGMENT D TOTAL

OPTIONAL CLIN 1002 - PHASE 2B - SEGMENT D

*in the event work must in not completed prior to the end of the construction season*

ITEM

NO.

ITEM DESCRIPTION QUANTITY UOM CONTRACT

UNIT PRICE

CONTRACT

AMOUNT

1002.1 RE-MOBILIZATION 1 JOB

OPTIONAL CLIN 1002 TOTAL

OPTIONAL CLIN 1003 PHASE 3 - SEGMENT E - DMM CUTOFF WALL

NO.

ITEM DESCRIPTION QUANTITY UOM CONTRACT

UNIT PRICE

CONTRACT

AMOUNT

1003.1 SEGMENT E DMM

CUTOFF WALL STATION

STA 394+10 - 3+00

1 JOB

OPTIONAL CLIN 1003 TOTAL

OPTIONAL CLIN 1004 – STANDBY TIME

*in the event a cultural artifact is found*

ITEM

NO.

ITEM DESCRIPTION QUANTITY UOM CONTRACT

UNIT PRICE

CONTRACT

AMOUNT

1004.1 CONSTRUCTION

STANDBY

30*

DAY

OPTIONAL CLIN 1004 – STANDBY TIME TOTAL

OPTIONAL CLIN 1005 – REMOBILIZATION

*in the event work must be moved to another project location*

ITEM

NO.

ITEM DESCRIPTION QUANTITY UOM CONTRACT

UNIT PRICE

CONTRACT

AMOUNT

1005.1 ONSITE

REMOBILIZATION

3* JOB

OPTIONAL CLIN 1005 - TOTAL

OPTIONAL CLIN 1006 –CONTAMINATED MATERIAL

NO.

ITEM DESCRIPTION QUANTITY UOM CONTRACT

UNIT PRICE

CONTRACT

AMOUNT

1006.1 EXCAVATION AND

HANDLING

CONTAMINATED

MATERIAL

160* TON

OPTIONAL CLIN 1006 - TOTAL

OPTIONAL CLIN 1007 –DISPOSAL OF HAZARDOUS MATERIAL

NO.

ITEM DESCRIPTION QUANTITY UOM CONTRACT

UNIT PRICE

CONTRACT

AMOUNT

1007.1 TRANSPORTATION &

DISPOSAL HAZARDOUS

MATERIAL

160* TON

OPTIONAL CLIN 1007 - TOTAL

GRAND TOTAL BASE + ALL OPTIONS

File details come from the government source that posted it. Updated .