Amendment 3 - Revised Submittal Register.pdf
PDF 204 KB Posted
- Attached to
- Marysville Ring Levee Phase 2B & 3 Federal contract opportunity
- Solicitation number
- W9123820R0021
About this file
This submittal register outlines the submittal requirements for a construction project to improve approximately 7.5 miles of the Marysville Ring Levee in California. Key submittals include a preconstruction quantity survey plan, borrow source and disposal plans, erosion and sediment control plans, an accident prevention plan, a contractor quality control plan, health and safety plans, an instrumentation plan, and as-built drawings. The project involves constructing approximately 15,000 linear feet of cutoff walls using open trench and deep soil-mixing methods along with degrading one-third of the levee height. Additional work includes addressing under seepage, through-seepage, slope stability, utility penetrations, constructability, settlement, and geometric corrections to the levee embankment. The solicitation is for a multi-season construction project to be completed by December 2022, with an option to construct segments in 2021 if exercised by the Contracting Officer.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 3 - Revised Pricing Schedule.pdf | ||
| Amendment 3 - Summary of Changes.pdf | ||
| Amendment 3 - Spec Changes.pdf | ||
| Amendment 3.pdf | ||
| Amendment 2 - Revised Price Schedule.pdf | ||
| Amendment 2 - Summary of Revisions.pdf | ||
| Amendment 2 - Bok Kai Temple Historic Structure Impact Report.2013.pdf | ||
| Amendment 2.pdf | ||
| Amendment 2 - Revised Spec Sections.pdf | ||
| Amendment 2 - Final Supplemental EA-IS.21 JUNE 2019.pdf | ||
| Interested Vendors List.pdf | ||
| Attachment 3 - Price Schedule.revised.pdf | ||
| Amendment 1.pdf | ||
| Attachment 1 - Specifications.pdf | ||
| Attachment 3 - Price Schedule.pdf | ||
| Attachment 2 - Drawings.Volume1of2.pdf | ||
| Solicitation -W9123820R0021.pdf | ||
| Attachment 4 - Davis Bacon WD.CA20190007.12.6.19.pdf | ||
| Attachment 5 - Pre-Award Survey.pdf | ||
| Attachment 6 - Past Performance Questionnaire.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 30 PAGES
Marysville Ring Levee, Phase 2B & 3
01 00 00 SD-01 Preconstruction Submittals
1.26.1 GPreconstruction Quantity Survey
Plan
1.26.1.1 GPreconstruction Access Road
Survey
1.18 GQualifications for Safety and
Health Person(s)
1.14 GBorrow Source Plan
1.15 GDisposal Plan
1.17 GHaul Route Plan
SD-11 Closeout Submittals 1.10.6Worker's Compensation Claims
1.26.1.2 GPost-construction Access Road
Survey 01 11 00 SD-01 Preconstruction Submittals
1.7 GSalvage Plan
1.9.1 GList of Contact Personnel
01 31 13.13 SD-01 Preconstruction Submittals
3.2 GMemo to UPRR
3.3 GContractor's Endorsement
3.3 GProof of insurance
3.16 GTraffic Control Plan
3.4 GWork plans
3.4 GAbsolute and Conditional Work
Windows
3.9 GReduced Clearances
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 30 PAGES
01 31 13.13 3.10 GMaterial data sheets
3.12 GErosion control
3.18 GDetailed construction schedule
3.17 GExcavation Plan
01 32 01 SD-01 Preconstruction Submittals
1.3 GProject Scheduler Qualifications
3.5Bar Chart Schedule
3.1 GProject Schedule
3.5.1 GPreliminary Project Schedule
3.5.2 GInitial Project Schedule
3.6.1Data Optical Discs
3.5.3 GPeriodic Schedule Update
3.7.2 GPeriodic Schedule Update
3.9.1 GJustification of Delay
3.9.3 GTime Impact Analysis
3.9.4 GForensic Schedule Analysis
3.1.1 GSchedule Status Report
01 33 00 SD-01 Preconstruction Submittals
1.6 GSubmittal Register
01 35 26 SD-01 Preconstruction Submittals
1.7 GAccident Prevention Plan (APP)
1.7.2.6Excavation Permits
SD-06 Test Reports 1.4Monthly Exposure Reports 1.6.2.1OSHA 300 Form 1.9.1OSHA 300 Form
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 30 PAGES
01 35 26 1.12Notifications and Reports
1.12.2 GAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates 1.6.1.2Crane Operators/Riggers
1.7.2.2 GStandard Lift Plan
1.7.2.3 GCritical Lift Plan
1.8Activity Hazard Analysis (AHA) 1.9.1Confined Space Entry Permit 1.9.1Hot Work Permit 1.12.4Certificate of Compliance
01 45 00 SD-01 Preconstruction Submittals
3.2 GContractor Quality Control (CQC)
Plan
3.7.2.1 GMTC validation
SD-06 Test Reports 3.9Verification Statement
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.1.6.1 GTraffic Control Plan
3.1.6.1 GTemporary Bike Detour Signage
and Striping Plan
3.7 GSafety Plan
1.4 GTemporary Earthwork Plan
3.1.6.4 GDust Control Methods And
Procedures
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 30 PAGES
01 50 00 SD-06 Test Reports 2.3Backflow Preventer Tests
SD-07 Certificates 2.3.1Backflow Tester 2.3Backflow Preventers 2.3.2Backflow Prevention Training
Certificate 01 57 19 SD-01 Preconstruction Submittals
1.8.1 GPreconstruction Survey
1.11.5 GSolid Waste Management Permit
1.10.4 GSolid Waste Management Plan
1.8.2 GRegulatory Notifications
1.9 G DOEnvironmental Protection Plan
1.10.3 G DOEnvironmental Protection Plan
1.10.1 G DOAir Quality Control Plan
1.10.1 G DOAir Quality Control Plan
1.11.2 G DOAsbestos Dust Mitigation Plan
and Application
3.4.4 G DOAsbestos Dust Mitigation Plan
and Application
3.4.6.5 G DODirt and Dust Control Plan
1.11.1 G DOAuthority to Construct/Permit to
Operate
3.11 G DOSound Intrusion and Noise
Control Plan
1.10.8 GWaste Water Management Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 30 PAGES
01 57 19 1.10.6 G DOStorm Water Pollution Prevention Plan (SWPPP)
1.10.3 G DOHistorical Protection Plan
1.10.7 G DOTraffic Control Plan
1.10.5 GSpill Prevention, Control and
Countermeasure (SPCC) Plan
3.25 GEnvironmental Manager
Qualifications SD-06 Test Reports
3.16.1.1.2GLaboratory Analysis
1.11.5.1 GSolid Waste Management Report
3.16.2.1 GSolid Waste Management Report
1.10.1 G DOAir Quality Control Plan Reports
3.11 G DONoise Monitoring Logs
3.11 G DOGround Vibration Monitoring Logs
3.15 GNon-hazardous Solid Waste
Diversion Report
1.11 GEnvironmental Permit Application
SD-07 Certificates
1.8.4 GEmployee Training Records
1.8.4 GErosion and Sediment Control
Inspector SD-11 Closeout Submittals
3.16.1 GWaste Determination
Documentation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 30 PAGES
01 57 19 3.16.3.1 GHazardous Waste/Debris Management
3.16.3.6 GDisposal Documentation for
Hazardous and Regulated Waste
1.8.4 GAssembled Employee Training
Records
1.10.7 GPost-Construction Survey
3.16.2.1 GSales Documentation
3.16.2.1 GContractor Certification
01 57 23 SD-01 Preconstruction Submittals
1.5.1 G DOSWPPP
1.5.1 G DOSWPPP
1.5.2 G DOPRDs
1.5.2 G DOPRDs
1.5.2 G DOPRDs
SD-03 Product Data 1.5.1.3BMP Product Data 3.1.1BMP Product Data 3.1.1BMP Product Data 3.1.1BMP Product Data
2.1.1.7 G DOGeotextiles And Mats
SD-06 Test Reports 3.1.1SWPPP Amendment 3.2.1SWPPP Amendment 3.2.1SWPPP Amendment 3.2.1SWPPP Amendment
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 30 PAGES
01 57 23 3.2.1SWPPP Amendment 3.2.1SWPPP Amendment 1.5.2Sampling Results 3.2.6Sampling Results 3.2.7.1Sampling Results 3.2.2REAPs and Inspection Reports 3.2.4REAPs and Inspection Reports 3.2.4REAPs and Inspection Reports 3.2.3Exceedance Reports 1.5.2Annual Report 3.1.2Annual Report 3.1.2Annual Report
SD-10 Operation and Maintenance Data
3.1.2 G DOPost-Construction Storm Water
Management Plan
3.1.2 G DOPost-Construction Storm Water
Management Plan
SD-11 Closeout Submittals
3.1.2 G DOFinal SWPPP
3.2.1 G DOFinal SWPPP
3.1.2 G DONOT Application
3.1.2 G DONOT Application
3.1.2 G DONOT Application
01 71 10 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 30 PAGES
01 71 10 3.1.1 GMobilization/Demobilization Work Plan
3.1.1 GMobilization/Demobilization Work
Plan
3.1.2 GEmergency Levee
Reconstruction Plan
3.1.2 GEmergency Levee
Reconstruction Plan
01 76 26 SD-01 Preconstruction Submittals
1.6 GUtility Protection and Repair Plan
01 78 00 SD-06 Test Reports
3.1.4 GWorking as-built drawings
3.2 G DOFinal as-built record drawings
SD-10 Operation and Maintenance Data
3.7Operation and Maintenance Manuals
SD-11 Closeout Submittals
1.3.4 G DORecord Drawings
3.5 GFinal Approved Shop Drawings
3.6 GConstruction Contract
Specifications
3.8 GProject Completion Report
3.8 GProject Completion Report
02 41 00 SD-01 Preconstruction Submittals
1.2.1 GDemolition Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 30 PAGES
02 41 00 1.8Existing Conditions SD-07 Certificates
1.6 GNotification
02 61 13 SD-02 Shop Drawings
3.1Surveys SD-03 Product Data
1.2.2 GWork Plan
3.10 GClosure Report
SD-06 Test Reports 3.1Surveys 3.5Confirmation Sampling and
Analysis
3.7.1 GSampling of Stored Material
3.7.2 GSampling Liquid
02 81 00 SD-03 Product Data
3.1 GOnsite Hazardous Waste
Management 3.2Notices of Non-Compliance and
Notices of Violation 2.1.1Packaging Notifications
SD-06 Test Reports
3.6 GRecordkeeping
3.7Spill Response
3.6 GException Report
SD-07 Certificates 1.4.3Certification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 30 PAGES
02 81 00 3.2.4Security Plan
1.4.1 GTransportation and Disposal
Coordinator
1.4.2 GTraining
3.2.2EPA Offsite Policy 3.2.5Certificates of Disposal
3.2.3 GShipping Documents and
Packagings Certification 3.5Waste Minimization
03 11 13 SD-02 Shop Drawings
2.2.1 GFormwork
3.1.1 GFormwork
2.2.1 GForm Removal Schedule
SD-03 Product Data 2.2Form Materials
SD-04 Samples
1.3 GSample Panels
2.2.4 GFiber Voids
SD-05 Design Data 2.1Calculations
SD-06 Test Reports 3.2Inspection
SD-07 Certificates 2.2.4Fiber Voids
03 15 00 SD-03 Product Data 2.2Preformed Expansion Joint Filler
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 30 PAGES
03 15 00 2.3Sealant SD-04 Samples
2.3.2Lubricant for Preformed Compression Seals
2.3.3Field-Molded Type SD-07 Certificates
2.2Preformed Expansion Joint Filler 2.3Sealant
03 20 00 SD-02 Shop Drawings
3.1 GReinforcement
SD-07 Certificates 2.3Reinforcing Steel 1.3.1Qualified Welders 1.3.2Qualification of Steel Bar
Butt-Splicers 03 30 00 SD-01 Preconstruction Submittals
1.4.2 GQuality Control Plan
1.4.1Laboratory Accreditation
3.6.5.6 GSampling Plan
SD-03 Product Data 2.2Cementitious Materials 2.4Chemical Admixtures
SD-04 Samples 2.4.5Surface Retarder
SD-05 Design Data
2.1.1 GMixture Proportions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 30 PAGES
03 30 00 SD-06 Test Reports
2.1.1 GMixture Proportions
3.6 GTesting and Inspection for CQC
2.2.3Fly Ash 2.3Aggregates 3.6.5.1Air Content 3.6.5.3Slump 3.6.5.6Compressive Strength 2.5Water
SD-07 Certificates 1.4Contractor Quality Control personnel 3.2.1Ready-Mix Plant
03 39 00 SD-03 Product Data 2.1Curing Materials
SD-06 Test Reports 3.2Testing and Inspection for CQC
SD-08 Manufacturer’s Instructions 2.1Curing Compound
03 42 13 SD-01 Preconstruction Submittals 1.3.2.2Quality Control Procedures
SD-02 Shop Drawings
2.1.1 GStandard Precast Units
2.1.2 GCustom-Made Precast Units
3.2.4.3Special Finishes
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 30 PAGES
03 42 13 2.1.1Standard Precast Units 2.1.3Proprietary Precast Units 3.1.3Embedded Items 2.2.5Accessories
SD-05 Design Data
2.1.2 GDesign Calculations
2.1.5.1Concrete Mix Proportions
SD-06 Test Reports 1.3.2.4Test Reports
SD-07 Certificates 1.3.2.2Quality Control Procedures
03 52 01 SD-05 Design Data
2.3.1 GMix Design For The Controlled
Low Strength Material 05 05 23 SD-01 Preconstruction Submittals
3.2Welding Quality Assurance Plan SD-03 Product Data
1.3 GWelding Procedure Qualifications
1.3.5Welder, Welding Operator, and
Tacker Qualification 1.3.6Inspector Qualification 1.3.2Previous Qualifications 1.3.3Pre-Qualified Procedures 2.2Welding Electrodes and Rods
SD-06 Test Reports 3.3Nondestructive Testing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 30 PAGES
05 05 23 SD-07 Certificates 1.3.1Certified Welding Procedure
Specifications (WPS) 1.3.1Certified Brazing Procedure
Specifications (BPS) 1.3.1Certified Procedure Qualification
Records (PQR) 1.3.1Certified Welder Performance
Qualifications (WPQ) 1.3.1Certified Brazer Performance
Qualifications (BPQ) 05 12 00 SD-01 Preconstruction Submittals
1.3.1.1 GErection Drawings
SD-02 Shop Drawings
1.3.2 GFabrication drawings
SD-03 Product Data
2.6.2Shop primer 2.4.1Welding electrodes and rods 2.3.2.3Direct Tension Indicator Washers 2.4.2Non-Shrink Grout
SD-06 Test Reports 2.6.2Class B coating 2.3.1.1Bolts 2.3.2.1Bolts 2.3.1.2Nuts 2.3.2.2Nuts
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 30 PAGES
05 12 00 2.3.1.4Washers 2.3.2.4Washers 3.8.1.2Weld Inspection Reports
3.8.4 G GEmbrittlement Test Reports
3.8.4 G GEmbrittlement Test Reports
SD-07 Certificates 2.2Steel 2.3.1.1Bolts 2.3.2.1Bolts 2.3.1.2Nuts 2.3.2.2Nuts 2.3.1.4Washers 2.3.2.4Washers 2.5Galvanizing 1.3.3.1Welding procedures and qualifications 2.4.1Welding electrodes and rods
05 30 00 SD-02 Shop Drawings
1.3.4 GFabrication Drawings
SD-03 Product Data 2.2Accessories 2.1Deck Units 2.1.2Galvanizing Repair Paint 2.1.2Touch-Up Paint 1.3.2Welding Equipment 1.3.2Welding Rods and Accessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 30 PAGES
05 30 00 SD-05 Design Data
2.1 GDeck Units
SD-07 Certificates 1.3.2Welder Qualifications 1.3.2Welding Procedures 1.3.1Manufacturer's Certificate 2.2.5Stud Manufacture's Certification 2.2.5Stud Manufacture's Test Reports
05 50 13 SD-02 Shop Drawings
2.4 GFloor Gratings
2.5 GBollards/Pipe Guards
2.1 GCertificates of Compliance
2.1 SRecycled Content
05 50 14 SD-02 Shop Drawings
1.3.1 GDetail Drawings
2.1.2.1Welding of Structural Steel 2.2.4Structural Steel Welding Repairs 2.1.6Castings
SD-03 Product Data 2.1.2.1.3.1Filler Metal 2.1.8.3Lubricant
SD-06 Test Reports 2.2Tests, Inspections, and
Verifications SD-07 Certificates
1.3.2Welding Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 30 PAGES
05 50 14 2.1.2.3.1 GApplication Qualification for Steel Studs
2.1.2.4Welding of Aluminum 05 52 00 SD-02 Shop Drawings
1.2.1 GFabrication Drawings
3.2 GIron and Steel Hardware
3.2 GSteel Shapes, Plates, Bars and
Strips SD-03 Product Data
2.1.3 GProtective Coating
1.2.1 GAnchorage and Fastening
Systems SD-07 Certificates
1.4.1 GWelding Procedures
1.4.2 GWelder Qualification
SD-08 Manufacturer’s Instructions
3.2 GInstallation Instructions
07 92 00 SD-03 Product Data
2.2 GSealants
2.3 GPrimers
2.4 GBond Breakers
2.5 GBackstops
3.1 GField Adhesion
SD-11 Closeout Submittals
2.2.1 SIndoor Air Quality For Interior
Sealants
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 30 PAGES
09 97 02 SD-01 Preconstruction Submittals
1.2 GSafety, Health, and
Environmental Requirements
1.2.1 GSafety Plan
1.2.1.5 GRespiratory Protection Plan
1.2.2.1 GAirborne Sampling Plan
1.2.2 GMedical Surveillance Plan
SD-03 Product Data Part 2 GManufacturer's Product Data
Sheet SD-04 Samples
Part 2 GProduct Samples
2.1 GSpecial Paint Formulas
SD-06 Test Reports 3.4Inspection Reports 1.2.2.2Medical Status Report 1.2.2.3Change in Medical Status Report
1.2.2.1 GAir Monitoring Test Plan
1.2.2.1Air Monitoring Test Report
SD-07 Certificates 1.4.1Certified EHS Professional 1.4.2Coating Thickness Gage
Qualification 31 00 00 SD-01 Preconstruction Submittals
3.2.6 GTrench Excavation and Shoring
Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 30 PAGES
31 00 00 1.3.8 GDewatering Work Plan
3.11.1 GLevee Degrade Plan
1.3.8Drainage Requirements 3.3.1Shoring And Sheeting Plan
SD-03 Product Data
3.5 GUtilization of Excavated Materials
1.3.3.2Rock Excavation
SD-06 Test Reports 3.15Testing
2.3.1 GBorrow Site Testing
2.3.1 GBorrow Site Testing
SD-07 Certificates 3.15Testing
31 05 19 SD-03 Product Data 2.1.2Thread 2.2Manufacturing Quality Control
Sampling and Testing SD-04 Samples
3.1Quality Assurance Samples and Tests
SD-07 Certificates 2.1.1Geotextile
31 09 13 SD-01 Preconstruction Submittals
1.7 GInstrumentation Plan
3.2PreConstruction Conditions
Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 30 PAGES
31 09 13 SD-02 Shop Drawings
3.3.1 GInstrumentation Installation
Diagram SD-06 Test Reports
3.10Instrumentation Data 3.12Post-Construction Conditions
Report SD-07 Certificates
1.6.1 GInstrumentation Specialist
Qualifications
SD-11 Closeout Submittals
3.13 GFinal Instrumentation Report
31 11 00 SD-03 Product Data
3.6.2 GNonsaleable Materials
SD-04 Samples 2.1Tree Wound Paint
31 56 14 SD-01 Preconstruction Submittals 3.1.1SB Slurry Cutoff Wall
Implementation Plan
2.4 G DOPreconstruction SB Slurry Trial
Mix Design Plan
2.4 G DOPreconstruction SB Slurry Trial
Mix Design Report
3.8.1 G DOSB Cutoff Wall Quality Control
Program
2.3.2 G DOWater Quality Test Results
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 30 PAGES
31 56 14 1.6.1 G DOContractor Qualifications
1.6.6 G DOQuality Control Laboratory
Qualifications
3.8.13 G DORemediation Plan
1.8.4 GDrilling Program Plan
SD-04 Samples 2.2Bentonite 3.8.5Cutoff Wall Key-in Material
SD-06 Test Reports
3.8.1 G DODaily Quality Control Report
3.8.11.2 G DOWeekly Quality Control Report
3.8.10.4 G DOLaboratory Testing Report
3.10.3 G DOConstruction Quality Control Test
Results SD-07 Certificates
2.2 G ROBentonite Powder Manufacturer
Test Results
2.12 G ROCalibration of Scales and Flow
Meters
SD-11 Closeout Submittals
3.10.1 G DOConstruction Records
3.10.2 G DOConstruction Documentation
3.10.4 G DOConstruction Log
3.6 G DOAs-built Drawing
31 83 13 SD-01 Preconstruction Submittals
3.2.1 GProduction Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 30 PAGES
31 83 13 3.2.1.4 GQualification Submittal
3.2.1.5 GSample Quality Control Records
3.2.1.6 GSchedule and Sequence of
Operations
3.2.1.7 GSequence of Operations At Utility
Line Crossings
3.2.1.8 GSampling Plan
3.2.4 GCutoff Wall Production Plan
3.2.1.9 GCutoff Wall Surcharge Loading
Plan
3.2.1.1 GSoil Mixing Operation Plan
3.2.1.2Description Of The Equipment
And Procedures
3.2.1.1 GLayout Of Operations
3.2.3 GDrilling Program Plan
SD-03 Product Data
2.1.4 GAdmixtures
SD-04 Samples 3.7.1.3Wet Bulk Samples 3.7.1.3Chain of Custody Form for
Quality Assurance Samples
3.5.1.2 GTrial Mix Designs
SD-05 Design Data
3.5.1.2 GCutoff Wall SCB Material Mix
Design
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 30 PAGES
31 83 13 3.2.1.2 GProposed Mix Design And Construction Methods
SD-06 Test Reports 3.7.3.2Calibration Results 2.2.2Water Quality Test Report
3.7.3.2 GAs-Built Profile of Cutoff Wall and
End of Construction Summary Report
1.2.2 GConstruction Quality Control Test
Results
1.2.2 GConstruction Quality Control Test
Results
3.7.3.2Daily Field Quality Control Reports
3.5.1.2 GSCB Mix Design Test Report
3.5.1 GDemonstration Section Test
Report
3.5.1.3 GDemonstration Section Test
Report SD-07 Certificates
2.1.2Cement Certification 2.1.3Bentonite Certification 2.1.4Admixture Certification
32 11 24 SD-03 Product Data 2.1.1Aggregates 1.6.1Local/Regional Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 30 PAGES
32 11 24 SD-06 Test Reports 3.6.2.1Gradation 3.6.2.1Gradation 2.1.1Bearing ratio 2.1.1Liquid limit 2.1.1Plasticity index 2.1.1Percentage of wear 3.6.2.3Density 3.6.2.3Density 3.6.2.2Smoothness 3.6.2.5Thickness
32 12 16 SD-01 Preconstruction Submittals
3.9.1 GQuality Control Plan
SD-03 Product Data
2.4 GMix Design
3.5 GQuality Control
3.10 GMaterial Acceptance
SD-04 Samples 2.3Asphalt Cement Binder 2.2Aggregates
SD-06 Test Reports
2.2 GAggregates
3.9.2.10QC Monitoring
SD-07 Certificates
2.3 GAsphalt Cement Binder
3.5Testing Laboratory
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 30 PAGES
32 15 00 SD-03 Product Data 1.3.4Equipment
SD-06 Test Reports 1.3Sampling and Testing 3.12Density Tests
32 31 13 SD-02 Shop Drawings
1.3 GFence Assembly
3.16.1 GLocation of Gate, Corner, End, and Pull Posts
1.3 GGate Assembly
2.16 GGate Hardware and Accessories
1.3 GErection/Installation Drawings
SD-03 Product Data
1.3 GFence Assembly
1.3 GGate Assembly
2.16 GGate Hardware and Accessories
2.1 GRecycled Material Content
2.2 GZinc Coating
1.5.1 GPVC Coating
1.5.1 GAluminum Alloy Coating
2.3 GFabric
2.11 GStretcher Bars
2.19 GConcrete
SD-04 Samples
2.3 GFabric
2.5 GLine Posts
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 30 PAGES
32 31 13 2.7 GSleeves
2.8 GTop Rail
2.10 GTension Wire
2.11 GStretcher Bars
2.14 GGate Posts
2.16 GGate Hardware and Accessories
2.21 GPadlocks
2.18 GWire Ties
2.22Cable Railing and Accessories
SD-07 Certificates
1.5.2 GCertificates of Compliance
SD-08 Manufacturer’s Instructions
1.3 GFence Assembly
1.3 GGate Assembly
1.3 GHardware Assembly
1.3 GAccessories
32 31 24 SD-02 Shop Drawings
1.3 GFence and Gate Installation
Drawings SD-03 Product Data
1.3Gate Assembly 1.3Gate Hardware and Accessories 2.1Gate Hardware and Accessories 2.1Safety Rail Assembly 2.1Safety Rail Hardware and
Accessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 30 PAGES
32 31 24 2.1Padlocks 2.1Braces Data 2.3Paint Data
SD-04 Samples
2.2 GSample Braces
2.2 GSample Padlocks
2.2 GGate Posts
2.2 GGate Hardware And Accessories
Samples
2.2 GSample Safety Rail Assembly
SD-08 Manufacturer’s Instructions 2.3Paint Application Instructions
32 92 33 SD-01 Preconstruction Submittals
1.6.1 GErosion and sediment control
plan 3.10.1Seed Establishment Period
SD-02 Shop Drawings
1.6.1 GErosion and Sediment Control
Scale Drawings SD-03 Product Data
2.4Fertilizer 2.6Straw Mulch 2.5Tackifier
2.2 GGrass Seed
2.3Wood Fiber 2.8Straw Wattles
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 30 PAGES
32 92 33 2.12.2Straw Wattles SD-04 Samples
2.4Fertilizer 2.6Straw Mulch 2.5Tackifier 2.3Wood Fiber 2.8Straw Wattles Samples
SD-06 Test Reports 2.4Fertilizer 2.6Straw Mulch 2.5Tackifier 2.3Wood Fiber 2.8.1Straw Wattles Reports 3.11Maintenance Record
SD-07 Certificates 2.4Fertilizer 2.6Straw Mulch 2.5Tackifier 2.2.1State-Certified Seed Mix 2.3Wood Fiber 2.3Wood Fiber 2.8Straw Wattle Certificates 3.1.1Installer's Qualification 3.1.1Installer's Qualification
33 11 02 SD-01 Preconstruction Submittals
3.1.1 GConnections
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 30 PAGES
33 11 02 2.1.1.2Preconstruction Survey 2.1.1.1.1Welder Qualification 2.1.1.2Welder Qualification
SD-02 Shop Drawings 2.1.1.2Configuration
SD-03 Product Data
2.1.1 GPipe, Fittings, Joints and
Couplings
2.1.2 GValves
2.1.2.5 GValve Boxes
2.1.2.5 GValve Boxes
2.2.1 GPipe Restraint
2.1.1.2 GAccessories
SD-06 Test Reports 3.3.1.2Leakage Test 3.3.1.1Hydrostatic Test
SD-07 Certificates 2.1.1Pipe, Fittings, Joints and
Couplings 2.1.2Valves
1.4.2.1 GFusion Technician Qualifications
2.1.1.2Lining And Coating
2.1.2.4 GCertificates
SD-08 Manufacturer’s Instructions 2.1.1.1Reinforced Concrete Cylinder
Pipe
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 30 PAGES
33 11 02 SD-10 Operation and Maintenance Data
2.1.2.4 GOperating And Maintenance
Manuals
34 71 13.19 SD-02 Shop Drawings 3.1Installation
2.1 GEquipment/Metal Beam Guard
Railing SD-10 Operation and Maintenance Data
1.4spare parts 35 20 16 SD-02 Shop Drawings
1.5.1 GShop Drawings
SD-05 Design Data
1.5.2 GMaximum Opening and Closing
Loads and Stem Loads
2.6.2 GGate Hoist Requirements
2.5.7 GStem Design
SD-06 Test Reports 3.3.2.1Quality Control Field Test Report 3.3.2.1Inspection And Testing
SD-10 Operation and Maintenance Data
1.5.3Installation Manual 1.5.4Operation and Maintenance
Manuals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
File details come from the government source that posted it. Updated .