About this file

This submittal register outlines the submittal requirements for a construction project to improve approximately 7.5 miles of the Marysville Ring Levee in California. Key submittals include a preconstruction quantity survey plan, borrow source and disposal plans, erosion and sediment control plans, an accident prevention plan, a contractor quality control plan, health and safety plans, an instrumentation plan, and as-built drawings. The project involves constructing approximately 15,000 linear feet of cutoff walls using open trench and deep soil-mixing methods along with degrading one-third of the levee height. Additional work includes addressing under seepage, through-seepage, slope stability, utility penetrations, constructability, settlement, and geometric corrections to the levee embankment. The solicitation is for a multi-season construction project to be completed by December 2022, with an option to construct segments in 2021 if exercised by the Contracting Officer.

View the file

Other files for this federal contract opportunity

Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 30 PAGES

Marysville Ring Levee, Phase 2B & 3

01 00 00 SD-01 Preconstruction Submittals

1.26.1 GPreconstruction Quantity Survey

Plan

1.26.1.1 GPreconstruction Access Road

Survey

1.18 GQualifications for Safety and

Health Person(s)

1.14 GBorrow Source Plan

1.15 GDisposal Plan

1.17 GHaul Route Plan

SD-11 Closeout Submittals 1.10.6Worker's Compensation Claims

1.26.1.2 GPost-construction Access Road

Survey 01 11 00 SD-01 Preconstruction Submittals

1.7 GSalvage Plan

1.9.1 GList of Contact Personnel

01 31 13.13 SD-01 Preconstruction Submittals

3.2 GMemo to UPRR

3.3 GContractor's Endorsement

3.3 GProof of insurance

3.16 GTraffic Control Plan

3.4 GWork plans

3.4 GAbsolute and Conditional Work

Windows

3.9 GReduced Clearances

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 30 PAGES

01 31 13.13 3.10 GMaterial data sheets

3.12 GErosion control

3.18 GDetailed construction schedule

3.17 GExcavation Plan

01 32 01 SD-01 Preconstruction Submittals

1.3 GProject Scheduler Qualifications

3.5Bar Chart Schedule

3.1 GProject Schedule

3.5.1 GPreliminary Project Schedule

3.5.2 GInitial Project Schedule

3.6.1Data Optical Discs

3.5.3 GPeriodic Schedule Update

3.7.2 GPeriodic Schedule Update

3.9.1 GJustification of Delay

3.9.3 GTime Impact Analysis

3.9.4 GForensic Schedule Analysis

3.1.1 GSchedule Status Report

01 33 00 SD-01 Preconstruction Submittals

1.6 GSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

1.7 GAccident Prevention Plan (APP)

1.7.2.6Excavation Permits

SD-06 Test Reports 1.4Monthly Exposure Reports 1.6.2.1OSHA 300 Form 1.9.1OSHA 300 Form

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 30 PAGES

01 35 26 1.12Notifications and Reports

1.12.2 GAccident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates 1.6.1.2Crane Operators/Riggers

1.7.2.2 GStandard Lift Plan

1.7.2.3 GCritical Lift Plan

1.8Activity Hazard Analysis (AHA) 1.9.1Confined Space Entry Permit 1.9.1Hot Work Permit 1.12.4Certificate of Compliance

01 45 00 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control (CQC)

Plan

3.7.2.1 GMTC validation

SD-06 Test Reports 3.9Verification Statement

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

3.1.6.1 GTraffic Control Plan

3.1.6.1 GTemporary Bike Detour Signage

and Striping Plan

3.7 GSafety Plan

1.4 GTemporary Earthwork Plan

3.1.6.4 GDust Control Methods And

Procedures

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 30 PAGES

01 50 00 SD-06 Test Reports 2.3Backflow Preventer Tests

SD-07 Certificates 2.3.1Backflow Tester 2.3Backflow Preventers 2.3.2Backflow Prevention Training

Certificate 01 57 19 SD-01 Preconstruction Submittals

1.8.1 GPreconstruction Survey

1.11.5 GSolid Waste Management Permit

1.10.4 GSolid Waste Management Plan

1.8.2 GRegulatory Notifications

1.9 G DOEnvironmental Protection Plan

1.10.3 G DOEnvironmental Protection Plan

1.10.1 G DOAir Quality Control Plan

1.10.1 G DOAir Quality Control Plan

1.11.2 G DOAsbestos Dust Mitigation Plan

and Application

3.4.4 G DOAsbestos Dust Mitigation Plan

and Application

3.4.6.5 G DODirt and Dust Control Plan

1.11.1 G DOAuthority to Construct/Permit to

Operate

3.11 G DOSound Intrusion and Noise

Control Plan

1.10.8 GWaste Water Management Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 30 PAGES

01 57 19 1.10.6 G DOStorm Water Pollution Prevention Plan (SWPPP)

1.10.3 G DOHistorical Protection Plan

1.10.7 G DOTraffic Control Plan

1.10.5 GSpill Prevention, Control and

Countermeasure (SPCC) Plan

3.25 GEnvironmental Manager

Qualifications SD-06 Test Reports

3.16.1.1.2GLaboratory Analysis

1.11.5.1 GSolid Waste Management Report

3.16.2.1 GSolid Waste Management Report

1.10.1 G DOAir Quality Control Plan Reports

3.11 G DONoise Monitoring Logs

3.11 G DOGround Vibration Monitoring Logs

3.15 GNon-hazardous Solid Waste

Diversion Report

1.11 GEnvironmental Permit Application

SD-07 Certificates

1.8.4 GEmployee Training Records

1.8.4 GErosion and Sediment Control

Inspector SD-11 Closeout Submittals

3.16.1 GWaste Determination

Documentation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 30 PAGES

01 57 19 3.16.3.1 GHazardous Waste/Debris Management

3.16.3.6 GDisposal Documentation for

Hazardous and Regulated Waste

1.8.4 GAssembled Employee Training

Records

1.10.7 GPost-Construction Survey

3.16.2.1 GSales Documentation

3.16.2.1 GContractor Certification

01 57 23 SD-01 Preconstruction Submittals

1.5.1 G DOSWPPP

1.5.1 G DOSWPPP

1.5.2 G DOPRDs

1.5.2 G DOPRDs

1.5.2 G DOPRDs

SD-03 Product Data 1.5.1.3BMP Product Data 3.1.1BMP Product Data 3.1.1BMP Product Data 3.1.1BMP Product Data

2.1.1.7 G DOGeotextiles And Mats

SD-06 Test Reports 3.1.1SWPPP Amendment 3.2.1SWPPP Amendment 3.2.1SWPPP Amendment 3.2.1SWPPP Amendment

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 30 PAGES

01 57 23 3.2.1SWPPP Amendment 3.2.1SWPPP Amendment 1.5.2Sampling Results 3.2.6Sampling Results 3.2.7.1Sampling Results 3.2.2REAPs and Inspection Reports 3.2.4REAPs and Inspection Reports 3.2.4REAPs and Inspection Reports 3.2.3Exceedance Reports 1.5.2Annual Report 3.1.2Annual Report 3.1.2Annual Report

SD-10 Operation and Maintenance Data

3.1.2 G DOPost-Construction Storm Water

Management Plan

3.1.2 G DOPost-Construction Storm Water

Management Plan

SD-11 Closeout Submittals

3.1.2 G DOFinal SWPPP

3.2.1 G DOFinal SWPPP

3.1.2 G DONOT Application

3.1.2 G DONOT Application

3.1.2 G DONOT Application

01 71 10 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 30 PAGES

01 71 10 3.1.1 GMobilization/Demobilization Work Plan

3.1.1 GMobilization/Demobilization Work

Plan

3.1.2 GEmergency Levee

Reconstruction Plan

3.1.2 GEmergency Levee

Reconstruction Plan

01 76 26 SD-01 Preconstruction Submittals

1.6 GUtility Protection and Repair Plan

01 78 00 SD-06 Test Reports

3.1.4 GWorking as-built drawings

3.2 G DOFinal as-built record drawings

SD-10 Operation and Maintenance Data

3.7Operation and Maintenance Manuals

SD-11 Closeout Submittals

1.3.4 G DORecord Drawings

3.5 GFinal Approved Shop Drawings

3.6 GConstruction Contract

Specifications

3.8 GProject Completion Report

3.8 GProject Completion Report

02 41 00 SD-01 Preconstruction Submittals

1.2.1 GDemolition Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 30 PAGES

02 41 00 1.8Existing Conditions SD-07 Certificates

1.6 GNotification

02 61 13 SD-02 Shop Drawings

3.1Surveys SD-03 Product Data

1.2.2 GWork Plan

3.10 GClosure Report

SD-06 Test Reports 3.1Surveys 3.5Confirmation Sampling and

Analysis

3.7.1 GSampling of Stored Material

3.7.2 GSampling Liquid

02 81 00 SD-03 Product Data

3.1 GOnsite Hazardous Waste

Management 3.2Notices of Non-Compliance and

Notices of Violation 2.1.1Packaging Notifications

SD-06 Test Reports

3.6 GRecordkeeping

3.7Spill Response

3.6 GException Report

SD-07 Certificates 1.4.3Certification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 30 PAGES

02 81 00 3.2.4Security Plan

1.4.1 GTransportation and Disposal

Coordinator

1.4.2 GTraining

3.2.2EPA Offsite Policy 3.2.5Certificates of Disposal

3.2.3 GShipping Documents and

Packagings Certification 3.5Waste Minimization

03 11 13 SD-02 Shop Drawings

2.2.1 GFormwork

3.1.1 GFormwork

2.2.1 GForm Removal Schedule

SD-03 Product Data 2.2Form Materials

SD-04 Samples

1.3 GSample Panels

2.2.4 GFiber Voids

SD-05 Design Data 2.1Calculations

SD-06 Test Reports 3.2Inspection

SD-07 Certificates 2.2.4Fiber Voids

03 15 00 SD-03 Product Data 2.2Preformed Expansion Joint Filler

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 30 PAGES

03 15 00 2.3Sealant SD-04 Samples

2.3.2Lubricant for Preformed Compression Seals

2.3.3Field-Molded Type SD-07 Certificates

2.2Preformed Expansion Joint Filler 2.3Sealant

03 20 00 SD-02 Shop Drawings

3.1 GReinforcement

SD-07 Certificates 2.3Reinforcing Steel 1.3.1Qualified Welders 1.3.2Qualification of Steel Bar

Butt-Splicers 03 30 00 SD-01 Preconstruction Submittals

1.4.2 GQuality Control Plan

1.4.1Laboratory Accreditation

3.6.5.6 GSampling Plan

SD-03 Product Data 2.2Cementitious Materials 2.4Chemical Admixtures

SD-04 Samples 2.4.5Surface Retarder

SD-05 Design Data

2.1.1 GMixture Proportions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 30 PAGES

03 30 00 SD-06 Test Reports

2.1.1 GMixture Proportions

3.6 GTesting and Inspection for CQC

2.2.3Fly Ash 2.3Aggregates 3.6.5.1Air Content 3.6.5.3Slump 3.6.5.6Compressive Strength 2.5Water

SD-07 Certificates 1.4Contractor Quality Control personnel 3.2.1Ready-Mix Plant

03 39 00 SD-03 Product Data 2.1Curing Materials

SD-06 Test Reports 3.2Testing and Inspection for CQC

SD-08 Manufacturer’s Instructions 2.1Curing Compound

03 42 13 SD-01 Preconstruction Submittals 1.3.2.2Quality Control Procedures

SD-02 Shop Drawings

2.1.1 GStandard Precast Units

2.1.2 GCustom-Made Precast Units

3.2.4.3Special Finishes

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 30 PAGES

03 42 13 2.1.1Standard Precast Units 2.1.3Proprietary Precast Units 3.1.3Embedded Items 2.2.5Accessories

SD-05 Design Data

2.1.2 GDesign Calculations

2.1.5.1Concrete Mix Proportions

SD-06 Test Reports 1.3.2.4Test Reports

SD-07 Certificates 1.3.2.2Quality Control Procedures

03 52 01 SD-05 Design Data

2.3.1 GMix Design For The Controlled

Low Strength Material 05 05 23 SD-01 Preconstruction Submittals

3.2Welding Quality Assurance Plan SD-03 Product Data

1.3 GWelding Procedure Qualifications

1.3.5Welder, Welding Operator, and

Tacker Qualification 1.3.6Inspector Qualification 1.3.2Previous Qualifications 1.3.3Pre-Qualified Procedures 2.2Welding Electrodes and Rods

SD-06 Test Reports 3.3Nondestructive Testing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 30 PAGES

05 05 23 SD-07 Certificates 1.3.1Certified Welding Procedure

Specifications (WPS) 1.3.1Certified Brazing Procedure

Specifications (BPS) 1.3.1Certified Procedure Qualification

Records (PQR) 1.3.1Certified Welder Performance

Qualifications (WPQ) 1.3.1Certified Brazer Performance

Qualifications (BPQ) 05 12 00 SD-01 Preconstruction Submittals

1.3.1.1 GErection Drawings

SD-02 Shop Drawings

1.3.2 GFabrication drawings

SD-03 Product Data

2.6.2Shop primer 2.4.1Welding electrodes and rods 2.3.2.3Direct Tension Indicator Washers 2.4.2Non-Shrink Grout

SD-06 Test Reports 2.6.2Class B coating 2.3.1.1Bolts 2.3.2.1Bolts 2.3.1.2Nuts 2.3.2.2Nuts

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 30 PAGES

05 12 00 2.3.1.4Washers 2.3.2.4Washers 3.8.1.2Weld Inspection Reports

3.8.4 G GEmbrittlement Test Reports

3.8.4 G GEmbrittlement Test Reports

SD-07 Certificates 2.2Steel 2.3.1.1Bolts 2.3.2.1Bolts 2.3.1.2Nuts 2.3.2.2Nuts 2.3.1.4Washers 2.3.2.4Washers 2.5Galvanizing 1.3.3.1Welding procedures and qualifications 2.4.1Welding electrodes and rods

05 30 00 SD-02 Shop Drawings

1.3.4 GFabrication Drawings

SD-03 Product Data 2.2Accessories 2.1Deck Units 2.1.2Galvanizing Repair Paint 2.1.2Touch-Up Paint 1.3.2Welding Equipment 1.3.2Welding Rods and Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 30 PAGES

05 30 00 SD-05 Design Data

2.1 GDeck Units

SD-07 Certificates 1.3.2Welder Qualifications 1.3.2Welding Procedures 1.3.1Manufacturer's Certificate 2.2.5Stud Manufacture's Certification 2.2.5Stud Manufacture's Test Reports

05 50 13 SD-02 Shop Drawings

2.4 GFloor Gratings

2.5 GBollards/Pipe Guards

2.1 GCertificates of Compliance

2.1 SRecycled Content

05 50 14 SD-02 Shop Drawings

1.3.1 GDetail Drawings

2.1.2.1Welding of Structural Steel 2.2.4Structural Steel Welding Repairs 2.1.6Castings

SD-03 Product Data 2.1.2.1.3.1Filler Metal 2.1.8.3Lubricant

SD-06 Test Reports 2.2Tests, Inspections, and

Verifications SD-07 Certificates

1.3.2Welding Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 30 PAGES

05 50 14 2.1.2.3.1 GApplication Qualification for Steel Studs

2.1.2.4Welding of Aluminum 05 52 00 SD-02 Shop Drawings

1.2.1 GFabrication Drawings

3.2 GIron and Steel Hardware

3.2 GSteel Shapes, Plates, Bars and

Strips SD-03 Product Data

2.1.3 GProtective Coating

1.2.1 GAnchorage and Fastening

Systems SD-07 Certificates

1.4.1 GWelding Procedures

1.4.2 GWelder Qualification

SD-08 Manufacturer’s Instructions

3.2 GInstallation Instructions

07 92 00 SD-03 Product Data

2.2 GSealants

2.3 GPrimers

2.4 GBond Breakers

2.5 GBackstops

3.1 GField Adhesion

SD-11 Closeout Submittals

2.2.1 SIndoor Air Quality For Interior

Sealants

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 30 PAGES

09 97 02 SD-01 Preconstruction Submittals

1.2 GSafety, Health, and

Environmental Requirements

1.2.1 GSafety Plan

1.2.1.5 GRespiratory Protection Plan

1.2.2.1 GAirborne Sampling Plan

1.2.2 GMedical Surveillance Plan

SD-03 Product Data Part 2 GManufacturer's Product Data

Sheet SD-04 Samples

Part 2 GProduct Samples

2.1 GSpecial Paint Formulas

SD-06 Test Reports 3.4Inspection Reports 1.2.2.2Medical Status Report 1.2.2.3Change in Medical Status Report

1.2.2.1 GAir Monitoring Test Plan

1.2.2.1Air Monitoring Test Report

SD-07 Certificates 1.4.1Certified EHS Professional 1.4.2Coating Thickness Gage

Qualification 31 00 00 SD-01 Preconstruction Submittals

3.2.6 GTrench Excavation and Shoring

Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 30 PAGES

31 00 00 1.3.8 GDewatering Work Plan

3.11.1 GLevee Degrade Plan

1.3.8Drainage Requirements 3.3.1Shoring And Sheeting Plan

SD-03 Product Data

3.5 GUtilization of Excavated Materials

1.3.3.2Rock Excavation

SD-06 Test Reports 3.15Testing

2.3.1 GBorrow Site Testing

2.3.1 GBorrow Site Testing

SD-07 Certificates 3.15Testing

31 05 19 SD-03 Product Data 2.1.2Thread 2.2Manufacturing Quality Control

Sampling and Testing SD-04 Samples

3.1Quality Assurance Samples and Tests

SD-07 Certificates 2.1.1Geotextile

31 09 13 SD-01 Preconstruction Submittals

1.7 GInstrumentation Plan

3.2PreConstruction Conditions

Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 30 PAGES

31 09 13 SD-02 Shop Drawings

3.3.1 GInstrumentation Installation

Diagram SD-06 Test Reports

3.10Instrumentation Data 3.12Post-Construction Conditions

Report SD-07 Certificates

1.6.1 GInstrumentation Specialist

Qualifications

SD-11 Closeout Submittals

3.13 GFinal Instrumentation Report

31 11 00 SD-03 Product Data

3.6.2 GNonsaleable Materials

SD-04 Samples 2.1Tree Wound Paint

31 56 14 SD-01 Preconstruction Submittals 3.1.1SB Slurry Cutoff Wall

Implementation Plan

2.4 G DOPreconstruction SB Slurry Trial

Mix Design Plan

2.4 G DOPreconstruction SB Slurry Trial

Mix Design Report

3.8.1 G DOSB Cutoff Wall Quality Control

Program

2.3.2 G DOWater Quality Test Results

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 30 PAGES

31 56 14 1.6.1 G DOContractor Qualifications

1.6.6 G DOQuality Control Laboratory

Qualifications

3.8.13 G DORemediation Plan

1.8.4 GDrilling Program Plan

SD-04 Samples 2.2Bentonite 3.8.5Cutoff Wall Key-in Material

SD-06 Test Reports

3.8.1 G DODaily Quality Control Report

3.8.11.2 G DOWeekly Quality Control Report

3.8.10.4 G DOLaboratory Testing Report

3.10.3 G DOConstruction Quality Control Test

Results SD-07 Certificates

2.2 G ROBentonite Powder Manufacturer

Test Results

2.12 G ROCalibration of Scales and Flow

Meters

SD-11 Closeout Submittals

3.10.1 G DOConstruction Records

3.10.2 G DOConstruction Documentation

3.10.4 G DOConstruction Log

3.6 G DOAs-built Drawing

31 83 13 SD-01 Preconstruction Submittals

3.2.1 GProduction Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 30 PAGES

31 83 13 3.2.1.4 GQualification Submittal

3.2.1.5 GSample Quality Control Records

3.2.1.6 GSchedule and Sequence of

Operations

3.2.1.7 GSequence of Operations At Utility

Line Crossings

3.2.1.8 GSampling Plan

3.2.4 GCutoff Wall Production Plan

3.2.1.9 GCutoff Wall Surcharge Loading

Plan

3.2.1.1 GSoil Mixing Operation Plan

3.2.1.2Description Of The Equipment

And Procedures

3.2.1.1 GLayout Of Operations

3.2.3 GDrilling Program Plan

SD-03 Product Data

2.1.4 GAdmixtures

SD-04 Samples 3.7.1.3Wet Bulk Samples 3.7.1.3Chain of Custody Form for

Quality Assurance Samples

3.5.1.2 GTrial Mix Designs

SD-05 Design Data

3.5.1.2 GCutoff Wall SCB Material Mix

Design

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 30 PAGES

31 83 13 3.2.1.2 GProposed Mix Design And Construction Methods

SD-06 Test Reports 3.7.3.2Calibration Results 2.2.2Water Quality Test Report

3.7.3.2 GAs-Built Profile of Cutoff Wall and

End of Construction Summary Report

1.2.2 GConstruction Quality Control Test

Results

1.2.2 GConstruction Quality Control Test

Results

3.7.3.2Daily Field Quality Control Reports

3.5.1.2 GSCB Mix Design Test Report

3.5.1 GDemonstration Section Test

Report

3.5.1.3 GDemonstration Section Test

Report SD-07 Certificates

2.1.2Cement Certification 2.1.3Bentonite Certification 2.1.4Admixture Certification

32 11 24 SD-03 Product Data 2.1.1Aggregates 1.6.1Local/Regional Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 30 PAGES

32 11 24 SD-06 Test Reports 3.6.2.1Gradation 3.6.2.1Gradation 2.1.1Bearing ratio 2.1.1Liquid limit 2.1.1Plasticity index 2.1.1Percentage of wear 3.6.2.3Density 3.6.2.3Density 3.6.2.2Smoothness 3.6.2.5Thickness

32 12 16 SD-01 Preconstruction Submittals

3.9.1 GQuality Control Plan

SD-03 Product Data

2.4 GMix Design

3.5 GQuality Control

3.10 GMaterial Acceptance

SD-04 Samples 2.3Asphalt Cement Binder 2.2Aggregates

SD-06 Test Reports

2.2 GAggregates

3.9.2.10QC Monitoring

SD-07 Certificates

2.3 GAsphalt Cement Binder

3.5Testing Laboratory

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 30 PAGES

32 15 00 SD-03 Product Data 1.3.4Equipment

SD-06 Test Reports 1.3Sampling and Testing 3.12Density Tests

32 31 13 SD-02 Shop Drawings

1.3 GFence Assembly

3.16.1 GLocation of Gate, Corner, End, and Pull Posts

1.3 GGate Assembly

2.16 GGate Hardware and Accessories

1.3 GErection/Installation Drawings

SD-03 Product Data

1.3 GFence Assembly

1.3 GGate Assembly

2.16 GGate Hardware and Accessories

2.1 GRecycled Material Content

2.2 GZinc Coating

1.5.1 GPVC Coating

1.5.1 GAluminum Alloy Coating

2.3 GFabric

2.11 GStretcher Bars

2.19 GConcrete

SD-04 Samples

2.3 GFabric

2.5 GLine Posts

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 30 PAGES

32 31 13 2.7 GSleeves

2.8 GTop Rail

2.10 GTension Wire

2.11 GStretcher Bars

2.14 GGate Posts

2.16 GGate Hardware and Accessories

2.21 GPadlocks

2.18 GWire Ties

2.22Cable Railing and Accessories

SD-07 Certificates

1.5.2 GCertificates of Compliance

SD-08 Manufacturer’s Instructions

1.3 GFence Assembly

1.3 GGate Assembly

1.3 GHardware Assembly

1.3 GAccessories

32 31 24 SD-02 Shop Drawings

1.3 GFence and Gate Installation

Drawings SD-03 Product Data

1.3Gate Assembly 1.3Gate Hardware and Accessories 2.1Gate Hardware and Accessories 2.1Safety Rail Assembly 2.1Safety Rail Hardware and

Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 30 PAGES

32 31 24 2.1Padlocks 2.1Braces Data 2.3Paint Data

SD-04 Samples

2.2 GSample Braces

2.2 GSample Padlocks

2.2 GGate Posts

2.2 GGate Hardware And Accessories

Samples

2.2 GSample Safety Rail Assembly

SD-08 Manufacturer’s Instructions 2.3Paint Application Instructions

32 92 33 SD-01 Preconstruction Submittals

1.6.1 GErosion and sediment control

plan 3.10.1Seed Establishment Period

SD-02 Shop Drawings

1.6.1 GErosion and Sediment Control

Scale Drawings SD-03 Product Data

2.4Fertilizer 2.6Straw Mulch 2.5Tackifier

2.2 GGrass Seed

2.3Wood Fiber 2.8Straw Wattles

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 30 PAGES

32 92 33 2.12.2Straw Wattles SD-04 Samples

2.4Fertilizer 2.6Straw Mulch 2.5Tackifier 2.3Wood Fiber 2.8Straw Wattles Samples

SD-06 Test Reports 2.4Fertilizer 2.6Straw Mulch 2.5Tackifier 2.3Wood Fiber 2.8.1Straw Wattles Reports 3.11Maintenance Record

SD-07 Certificates 2.4Fertilizer 2.6Straw Mulch 2.5Tackifier 2.2.1State-Certified Seed Mix 2.3Wood Fiber 2.3Wood Fiber 2.8Straw Wattle Certificates 3.1.1Installer's Qualification 3.1.1Installer's Qualification

33 11 02 SD-01 Preconstruction Submittals

3.1.1 GConnections

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 30 PAGES

33 11 02 2.1.1.2Preconstruction Survey 2.1.1.1.1Welder Qualification 2.1.1.2Welder Qualification

SD-02 Shop Drawings 2.1.1.2Configuration

SD-03 Product Data

2.1.1 GPipe, Fittings, Joints and

Couplings

2.1.2 GValves

2.1.2.5 GValve Boxes

2.1.2.5 GValve Boxes

2.2.1 GPipe Restraint

2.1.1.2 GAccessories

SD-06 Test Reports 3.3.1.2Leakage Test 3.3.1.1Hydrostatic Test

SD-07 Certificates 2.1.1Pipe, Fittings, Joints and

Couplings 2.1.2Valves

1.4.2.1 GFusion Technician Qualifications

2.1.1.2Lining And Coating

2.1.2.4 GCertificates

SD-08 Manufacturer’s Instructions 2.1.1.1Reinforced Concrete Cylinder

Pipe

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 30 PAGES

33 11 02 SD-10 Operation and Maintenance Data

2.1.2.4 GOperating And Maintenance

Manuals

34 71 13.19 SD-02 Shop Drawings 3.1Installation

2.1 GEquipment/Metal Beam Guard

Railing SD-10 Operation and Maintenance Data

1.4spare parts 35 20 16 SD-02 Shop Drawings

1.5.1 GShop Drawings

SD-05 Design Data

1.5.2 GMaximum Opening and Closing

Loads and Stem Loads

2.6.2 GGate Hoist Requirements

2.5.7 GStem Design

SD-06 Test Reports 3.3.2.1Quality Control Field Test Report 3.3.2.1Inspection And Testing

SD-10 Operation and Maintenance Data

1.5.3Installation Manual 1.5.4Operation and Maintenance

Manuals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it. Updated .