Attachment 5 - Pre-Award Survey.pdf

PDF 127 KB Posted

Attached to
Marysville Ring Levee Phase 2B & 3 Federal contract opportunity
Solicitation number
W9123820R0021
Issued by
Department of the Army Corps of Engineers Engineering District Sacramento

About this file

This document contains a pre-award survey for a construction contractor seeking federal work. It requests detailed information on the contractor's organization, personnel, equipment, financials, experience, specializations, and current and past projects. Schedules A through C provide templates for disclosing existing commitments, completed projects in the past five years including those over $7 million for the Department of Defense, and owned construction and technical equipment along with its status on other jobs.

The related federal contract opportunity is for Phase 2B and 3 of the Marysville Ring Levee project to improve approximately 7.5 miles of levee surrounding the City of Marysville, California. Work includes cutoff walls, slope stability corrections, and utility and geometrical changes. Phase 3 is divided into Segments A through E, with Segments A through C as base items and Segments D and E as options to be exercised as needed. All work must be completed by December 2022 over two construction seasons. The solicitation is issued by the Department of the Army Corps of Engineers in Sacramento for approximately 15,000 linear feet of cutoff walls using open trench and deep mix methods.

View the file

Other files for this federal contract opportunity

Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The Government will treat the pre-award survey information submitted by the offeror as proprietary.

(Tab 6 of the Price Proposal: Pre-Award Survey Information)

CONSTRUCTION CONTRACTOR DATA DATE:

Firm Name and Telephone Number Main Office Address (Street, City, and State)

Branch Offices Services Rendered Construction Design Consultant

Organization Individual � Joint Venture Partnership � Corporation

Date Organized Date Incorporated:

State:

Names of Officers and Other Key Personnel

I – PRESENT PAYROLL PERSONNEL (List Number of Each Category Below) Partners:

Officers:

Other Key:

Remainder: Subtotal Permanent:

Maximum Personnel at Any Time:

Date:

Total:

II—EQUIPMENT OWNED III—FINANCIAL DATA AS OF

(DATE): Present Value ($)

Current Assets:

Acquisition Cost ($) Current Liabilities:

Net Worth:

IV—TOTAL VALUE OF CONSTRUCTION AND DEMOLITION WORK IN

PAST 6 YRS EXCLUSIVE OF JOINT VENTURE (LIST MOST RECENT

FIRST)

V—LARGEST JOB EVER

CONTRACTED

(If Other Than in Past Six Years)

$ LARGEST JOB IN PAST 6 YRS Contract Amount:

Date: Description:

Owner:

$ Contract Amount:

Date: Description:

Owner:

Avg. Annual Income

VI—TYPE OF WORK IN WHICH FIRM SPECIALIZES

NAME AND POSITION/TITLE OF PERSON SIGNING SIGNATURE

See attachment for explanations or detailed description of item(s) reported above.

CONSTRUCTION CONTRACTOR DATA – SCHEDULE A – EXISTING COMMITMENTS

List below the construction projects your firm currently has under way, including recent awards. Also list construction projects for which your firm is the apparent successful offeror/bidder, but for which a contract has not yet been awarded.

CONTRACT

NUMBER

AMOUNT

DESCRIPTION/

LOCATION

ORGANIZATION/

CONTACT PERSON/

PHONE NUMBER

PERCENT

COMPLETE

CONSTRUCTION CONTRACTOR DATA – SCHEDULE B – COMPLETED PROJECTS

List below the principal construction projects your firm has completed within the past five years, including all DoD contracts with a total value exceeding $7,000,000.00.

NUMBER

AMOUNT

DESCRIPTION/

LOCATION

ORGANIZATION/

CONTACT PERSON/

PHONE NUMBER

PERCENT

SUBLET

CONSTRUCTION CONTRACTOR DATA – SCHEDULE C –

CONSTRUCTION AND/OR TECHNICAL EQUIPMENT

List total equipment and facilities owned for performing the prospective contract and present status as to whether or not it is currently committed to existing contracts.

QUANTITY

DESCRIPTION

CONDITION

YEARS OF

SERVICE

PRESENT

STATUS