Maintenance dredging, naval weapons station (NWS) earle

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
N4008521B0055
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Colts Neck, New Jersey, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks maintenance dredging services at the Naval Weapons Station Earle in Colts Neck, New Jersey. The Naval Facilities Engineering Command within the Department of the Navy requires dredging nine areas totaling approximately 2,261,170 cubic yards of material to depths of -45 to -47 feet MLLW. Dredging must occur over two phases in summer 2022 and summer 2023, utilizing a clamshell dredge with a minimum daily production rate of 7,500 cubic yards while allowing 24/7 operations. Bids were due by August 31, 2021 with award made to the lowest priced technically acceptable offer.

There is no set-aside designation. The primary NAICS code is 237990 with a PSC code of D301. The incumbent contractor is unknown but the award value is estimated between $25-100 million. The approximately 2.26 million cubic yards of material will be dredged from nine areas including ship berths, turning basins and channels at the Naval Weapons Station Earle over the two phase project timeline. All dredged materials will be transported via split-hull barge to the Historic Area Remediation Site in Colts Neck, New Jersey for placement and remediation.

Notice text

2 versions

Update #2 · Latest ·

The project consists of Maintenance Dredging the areas surrounding piers at Naval Weapons Station (NWS) Earle including all berths, turning basin, terminal channel, and a portion of Sandy Hook Federal Channel. This project willbe done in order to re-establish the minimum required harbor depths needed for access by the Naval vessels that use these facilities.

Maintenance dredging shall be done via clamshell dredge, with a total estimated volume of 2,261,170 cubic yards (CY) of dredged material to a depth of -45 feet Mean LowerLow Water (MLLW) Datum, plus the standard 2 feet of overdepth of -47 Mean Lower Low Water (MLLW) Datum including the ship berths, the turning basin, the terminal channel and a portion of the Sandy Hook Federal Navigation Channel of the New York Harbor, N.Y. Federal Navigation Project (Sandy Hook Federal Channel). The dredged material would be placed into split-hull and/or bottom dumping scows maneuvered using a tugboat. Barge overflow is authorized when performed in accordance with the Water Quality Cerificate (WQC) issued by the New Jersey Department of Environmental Protection (NJDEP). The dredged material will be placed at the Historic Area Remediation Site (HARS) for the purpose of remediation.

There are nine (9) dredging areas, Dredging Areas B1, B2,, C1, C2, D, E, F, G and H and dredging will be conducted in two dredging phases. During Dredging Phase 1, the piers, turning basin and a portion of the Sandy Hook Channel (Area B1, B2, C1 and C2), consisting of 1,176,375 CY sand, silt, and mud, will be dredged in Summer 2022; and during Dredging Phase II, the remainder of the Sandy Hook Channel (Areas D, E, F, G and H), consisting of approximately 1,043,395 CY sand, will be dredged in Summer 2023.

The project schedule will allow for dredging work to be performed 24 hours/7 days per week and will require a minimum daily production rate of 7,500 CY per day.

Update #1 ·

The project consists of Maintenance Dredging the areas surrounding piers at Naval Weapons Station (NWS) Earle

including all berths, turning basin, terminal channel, and a portion of Sandy Hook Federal Channel. This project will

be done in order to re-establish the minimum required harbor depths needed for access by the Naval vessels that use

these facilities.

Maintenance dredging shall be done via clamshell dredge, with a total estimated volume of 2,261,170 cubic yards

(CY) of dredged material to a depth of -45 feet Mean LowerLow Water (MLLW) Datum, plus the standard 2 feet of

overdepth of -47 Mean Lower Low Water (MLLW) Datum including the ship berths, the turning basin, the terminal

channel and a portion of the Sandy Hook Federal Navigation Channel of the New York Harbor, N.Y. Federal

Navigation Project (Sandy Hook Federal Channel). The dredged material would be placed into split-hull and/or

bottom dumping scows maneuvered using a tugboat. Barge overflow is authorized when performed in accordance

with the Water Quality Cerificate (WQC) issued by the New Jersey Department of Environmental Protection

(NJDEP). The dredged material will be placed at the Historic Area Remediation Site (HARS) for the purpose of

remediation.

There are nine (9) dredging areas, Dredging Areas B1, B2,, C1, C2, D, E, F, G and H and dredging will be

conducted in two dredging phases. During Dredging Phase 1, the piers, turning basin and a portion of the Sandy

Hook Channel (Area B1, B2, C1 and C2), consisting of 1,176,375 CY sand, silt, and mud, will be dredged in

Summer 2022; and during Dredging Phase II, the remainder of the Sandy Hook Channel (Areas D, E, F, G and H),

consisting of approximately 1,043,395 CY sand, will be dredged in Summer 2023.

The project schedule will allow for dredging work to be performed 24 hours/7 days per week and will require a

minimum daily production rate of 7,500 CY per day.

Files

File Type Posted
AMENDMENT 0006 FOR DREDGING PROJECT.pdf PDF
PPI INQUIRY LOG 05.pdf PDF
BID INQUIRY LOG 04 DOCUMENT.pdf PDF
AMENDMENT 0005 FOR DREDGING PROJECT.pdf PDF
Approval letter Environmental Bucket.pdf PDF
AMENDMENT 0004 FOR DREDGING PROJECT.pdf PDF
AMENDMENT 0003 FOR DREDGING PROJECT.pdf PDF
BID INJURY LOG 03.pdf PDF
Appendix A SedimentData 1652592 FY21 NWS Earle Maint Dredging Revised.pdf PDF
nwse_cond_30x_May2020_mllw.zip ZIP file
AMENDMENT 0002 DREDGING PROJECT.pdf PDF
BID INQUIRY LOG 02 RESPONSES 4-9.pdf PDF
Site Visit Log.jpg JPG image
UPDATED NWS EARLE DREDGING BID SCHEDULE.pdf PDF
AMENDMENT 0001 DREDGING PROJECT.pdf PDF
N40085-21-B-0055 BID INQUIRY LOG 01.pdf PDF
Attachment 2- 1652592 FY21 NWS Earle Maint Dredging SPECS FINAL 05-11-21.pdf PDF
Attachment 2- 1652592 FY21 NWS Earle Maint Dredging SPECS FINAL.pdf PDF
Attachment 8- NWS Earle FY21 Bid Schedule_05-11-21_Cost Blank.pdf PDF
N4008521B0055 EARLE DREDGING RFP.pdf PDF
Attachment 4- Appendix B Permits 1652592 FY21 Earle Maint_Dredging.pdf PDF
Attachment 5-Appendix C ACOE TransportSheet 1652592 FY21 Earle Maint Dredging.pdf PDF
Attachment 7 - Pre-Proposal Inquiries Log.doc DOC document
Attachment 1- 1652592 FY21 NWS Earle Maint Dredging Drwgs FINAL.pdf PDF
Attachment 3- Appendix A SedimentData 1652592 FY21 Earle Maint Dredging.pdf PDF
Attachment 6- Appendix D-Project Identification Signboard 1652592 FY21 Earle Dredging.pdf PDF
Show all 26

Notice history

Notice Type Posted
Award notice for earle dredging project Award Award Notice
This notice Latest solicitation Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Reserve basin maintenance dredging contract for sites at the phildelphia navy yard in the public works department pennsylvania area of responsibiliy Philadelphia, Pennsylvania 19112, United States · NAICS 237990 Naval Facilities Engineering Command No set-aside
Annual Maintenance Dredging of Morehead City Inner Harbor Morehead City, North Carolina, United States · NAICS 237990 ENDIST Wilmington No set-aside
Fort Eustis Dredge Material Management Area (FEDMMA) Fort Eustis, Virginia, United States · NAICS 237990 ENDIST Norfolk Total Small Business
Norfolk Harbor Inner Channel to Newport News Maintenance Dredging located in Hampton Roads, Virginia Virginia, United States · NAICS 237990 ENDIST Norfolk No set-aside
Freshwater Bayou - Lock to The Gulf, Freshwater Bayou Maintenance Dredging #26-2, ED 26-025 Louisiana, United States · NAICS 237990 ENDIST New Orleans No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity