Maintenance dredging, naval weapons station (NWS) earle
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- N4008521B0055
- Agency
-
Naval Facilities Engineering Command
Department of the Navy, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Z1KF Maintenance Of Dredging Facilities
- Place of performance
- Colts Neck, New Jersey, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks maintenance dredging services at the Naval Weapons Station Earle in Colts Neck, New Jersey. The Naval Facilities Engineering Command within the Department of the Navy requires dredging nine areas totaling approximately 2,261,170 cubic yards of material to depths of -45 to -47 feet MLLW. Dredging must occur over two phases in summer 2022 and summer 2023, utilizing a clamshell dredge with a minimum daily production rate of 7,500 cubic yards while allowing 24/7 operations. Bids were due by August 31, 2021 with award made to the lowest priced technically acceptable offer.
There is no set-aside designation. The primary NAICS code is 237990 with a PSC code of D301. The incumbent contractor is unknown but the award value is estimated between $25-100 million. The approximately 2.26 million cubic yards of material will be dredged from nine areas including ship berths, turning basins and channels at the Naval Weapons Station Earle over the two phase project timeline. All dredged materials will be transported via split-hull barge to the Historic Area Remediation Site in Colts Neck, New Jersey for placement and remediation.
Notice text
2 versions
Update #2 · Latest ·
The project consists of Maintenance Dredging the areas surrounding piers at Naval Weapons Station (NWS) Earle including all berths, turning basin, terminal channel, and a portion of Sandy Hook Federal Channel. This project willbe done in order to re-establish the minimum required harbor depths needed for access by the Naval vessels that use these facilities.
Maintenance dredging shall be done via clamshell dredge, with a total estimated volume of 2,261,170 cubic yards (CY) of dredged material to a depth of -45 feet Mean LowerLow Water (MLLW) Datum, plus the standard 2 feet of overdepth of -47 Mean Lower Low Water (MLLW) Datum including the ship berths, the turning basin, the terminal channel and a portion of the Sandy Hook Federal Navigation Channel of the New York Harbor, N.Y. Federal Navigation Project (Sandy Hook Federal Channel). The dredged material would be placed into split-hull and/or bottom dumping scows maneuvered using a tugboat. Barge overflow is authorized when performed in accordance with the Water Quality Cerificate (WQC) issued by the New Jersey Department of Environmental Protection (NJDEP). The dredged material will be placed at the Historic Area Remediation Site (HARS) for the purpose of remediation.
There are nine (9) dredging areas, Dredging Areas B1, B2,, C1, C2, D, E, F, G and H and dredging will be conducted in two dredging phases. During Dredging Phase 1, the piers, turning basin and a portion of the Sandy Hook Channel (Area B1, B2, C1 and C2), consisting of 1,176,375 CY sand, silt, and mud, will be dredged in Summer 2022; and during Dredging Phase II, the remainder of the Sandy Hook Channel (Areas D, E, F, G and H), consisting of approximately 1,043,395 CY sand, will be dredged in Summer 2023.
The project schedule will allow for dredging work to be performed 24 hours/7 days per week and will require a minimum daily production rate of 7,500 CY per day.
Update #1 ·
The project consists of Maintenance Dredging the areas surrounding piers at Naval Weapons Station (NWS) Earle
including all berths, turning basin, terminal channel, and a portion of Sandy Hook Federal Channel. This project will
be done in order to re-establish the minimum required harbor depths needed for access by the Naval vessels that use
these facilities.
Maintenance dredging shall be done via clamshell dredge, with a total estimated volume of 2,261,170 cubic yards
(CY) of dredged material to a depth of -45 feet Mean LowerLow Water (MLLW) Datum, plus the standard 2 feet of
overdepth of -47 Mean Lower Low Water (MLLW) Datum including the ship berths, the turning basin, the terminal
channel and a portion of the Sandy Hook Federal Navigation Channel of the New York Harbor, N.Y. Federal
Navigation Project (Sandy Hook Federal Channel). The dredged material would be placed into split-hull and/or
bottom dumping scows maneuvered using a tugboat. Barge overflow is authorized when performed in accordance
with the Water Quality Cerificate (WQC) issued by the New Jersey Department of Environmental Protection
(NJDEP). The dredged material will be placed at the Historic Area Remediation Site (HARS) for the purpose of
remediation.
There are nine (9) dredging areas, Dredging Areas B1, B2,, C1, C2, D, E, F, G and H and dredging will be
conducted in two dredging phases. During Dredging Phase 1, the piers, turning basin and a portion of the Sandy
Hook Channel (Area B1, B2, C1 and C2), consisting of 1,176,375 CY sand, silt, and mud, will be dredged in
Summer 2022; and during Dredging Phase II, the remainder of the Sandy Hook Channel (Areas D, E, F, G and H),
consisting of approximately 1,043,395 CY sand, will be dredged in Summer 2023.
The project schedule will allow for dredging work to be performed 24 hours/7 days per week and will require a
minimum daily production rate of 7,500 CY per day.
Files
Show all 26
Notice history
| Notice | Type | Posted |
|---|---|---|
| Award notice for earle dredging project | Award Notice | |
| This notice | Solicitation |
Similar open opportunities
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity