Attachment 1- 1652592 FY21 NWS Earle Maint Dredging Drwgs FINAL.pdf
PDF 100 MB Posted
- Solicitation number
- N4008521B0055
About this file
This solicitation is for maintenance dredging services at the Naval Weapons Station Earle in New Jersey. The project involves dredging a total estimated volume of 2,261,170 cubic yards of material from nine dredging areas to depths of -45 to -47 feet Mean Lower Low Water, including ship berths, a turning basin, terminal channel, and portion of the Sandy Hook Federal Navigation Channel. Dredging will occur in two phases during the summers of 2022 and 2023, with Phase 1 removing 1,176,375 cubic yards and Phase 2 removing 1,043,395 cubic yards. Dredged material will be transported via split-hull or bottom dumping scows and barges to the Historic Area Remediation Site for remediation purposes. Offerors must be able to dredge 24 hours per day, 7 days per week, with a minimum daily production rate of 7,500 cubic yards. The solicitation was issued by the Department of the Navy Naval Facilities Engineering Command.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .