UPDATED NWS EARLE DREDGING BID SCHEDULE.pdf
PDF 728 KB Posted
- Solicitation number
- N4008521B0055
About this file
This document contains a price proposal form and supplementary instructions for a federal maintenance dredging contract opportunity. The solicitation is for maintenance dredging of nine areas totaling approximately 2.26 million cubic yards at the Naval Weapons Station Earle in Colts Neck, New Jersey. Dredging will be conducted in two phases, with phase one dredging 1.18 million cubic yards in summer 2022 and phase two dredging the remaining areas totaling approximately 2.04 million cubic yards between summer 2023 and fall 2023. The Navy is seeking fixed unit prices for line item numbers including mobilization, performance bonds, dredging specified areas by clamshell dredge, down time, removal of debris, and transportation and disposal of dredged material. Award will be made to the total of the first three line item numbers. The supplementary instructions provide additional details on schedule, permits, and evaluation criteria.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
eProj.#:1652592
Funds: O&MN
PRICE PROPOSAL FORM
FY 21 MAINTENANCE DREDGING @ Naval Weapons Station Earle, Colts Neck, NJ
Base Bid - Phase 1 Work CLIN Quantity Unit Unit Cost Total
0001a
LS
0001b 1 LS
0001c
1,176,375
CY
0001d 100 Hours
0001e
TON
CLIN 0001 TOTAL =
CLIN 0002 - Bid Option #1 (Phase 2 Work)
Item(s) Quantity Unit Unit Cost Total
0002a
1,043,395
CLIN 0002 TOTAL =
CLIN 0003 - Bid Option #2 (Phase 2 Work)
Item(s) Quantity Unit Unit Cost Total
0003a
41,400
CLIN 0003 TOTAL =
CLIN 0001, 0002 and 0003 Total
CLIN 0004 - Bid Option #3 (Phase 2 Work)
Item(s)
Quantity
Unit
Unit Cost
Total
0004a 1,084,795 CY
CLIN 0004 TOTAL =
DOCUMENT 00 22 13.00 20 SUPPLEMENTARY I`NSTRUCTIONS TO
OFFERORS
PART 1 GENERAL
CONTRACT LINE ITEMS
The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.
Provide the Contract Line Item (CLIN) price for the following items:
CLIN 0001 ‐ BASE PRICE – FY 21 MAINTENANCE DREDGING @ Naval Weapons Station Earle, Colts Neck, NJ
Price includes the following:
CLIN 0001a, 0001b, 0001c, 0001d and 0001e to be performed in accordance with the drawings, specifications and all permits.
Once the contract has been awarded the execution schedule shall be coordinated between the government and the contractor with a notice to proceed to be issued within approximately 180 days or less from the contract award date. Once the notice to proceed has been issued the contractor shall commence with mobilization and dredging within 30 days and/or in accordance with the Time Of Year Restrictions (TOY)stipulated in the permit documents. All dredging work shall be completed and accepted by the government by or before December 31, 2022
CLIN 0001 - Base Bid (Phase 1 Work) CLIN Description(s) Quantity Unit Unit Cost Total
0001a
Mobilization and Demobilizaton to site for all work including demobilization after completing Dredge Areas B1, B2, C1 and C2 and re-mobilization to complete Dredge Areas D, E, F, G, H and D1.
LS
0001b Performance Bond 1 LS
0001c
Bucket dredging of Areas B1, B2, C1 and C2 in accordance with the drawings, specifications and permit requirements, including transportation via bottom dumping scow (barge) to and disposal of dredged material into the Historic Area Remediation Site (HARS).
1,176,375
0001d Down Time (delays) 100 Hours
0001e
Removal and disposal of artificial obstructions and/or debris within dredge area pursuant to Specs Sec. 35 20 23, Par 1.4
TON
CLIN 0001 Total =
CLIN 0002 ‐ BASE PRICE – FY 21 MAINTENANCE DREDGING @ Naval
The decision to award this bid option as described herein shall be at the sole discretion of the Government. The Government reserves the right to award this option no later than 180 Calendar Days after base contract award. No provision is made for economic price adjustment. Method of evaluation of bids for award purposes is specified below.
CLIN 0002a to be performed in accordance with the drawings, specifications and all permits. Once the notice to proceed has been issued the contractor shall commence with mobilization and dredging within 30 days and/or in accordance with the Time Of Year Restrictions (TOY)stipulated in the permit documents. All dredging work shall be completed and accepted by the government by or before December 31, CLIN 0002 - Bid Option #1 (Phase 2 Work) Item(s) Description(s) Quantity Unit Unit Cost Total
0002a
Bucket dredging of Areas D, E, F, G and H in accordance with the drawings, specifications and permit requirements, including transportation via bottom dumping scow (barge) to and disposal of dredged material into the Historic Area Remediation Site (HARS).
1,043,395
CLIN 0002 Total =
CLIN 0003 ‐ BASE PRICE – FY 21 MAINTENANCE DREDGING @ Naval award this option no later than 180 Calendar Days after base contract
CLIN 0003a to be performed in accordance with the drawings, specifications and all permits. Once the notice to proceed has been issued the contractor shall commence with mobilization and dredging within 30 days and/or in accordance with the Time Of Year Restrictions (TOY)stipulated in the permit documents. All dredging work shall be completed and accepted by the government by or before December 31, CLIN 0003 - Bid Option #2 (Phase 2 Work)
0003a
Bucket dredging of Area D1 in accordance with the drawings, specifications and permit requirements, including transportation via bottom dumping scow (barge) to and disposal of dredged material into the Historic Area Remediation Site (HARS).
41,400
CLIN 0003 Total =
CLIN 0004 ‐ BASE PRICE – FY 21 MAINTENANCE DREDGING @ Naval award this option no later than 180 Calendar Days after base contract
CLIN 0004a to be performed in accordance with the drawings, specifications and all permits. Once the notice to proceed has been issued the contractor shall commence with mobilization and dredging within 30 days and/or in accordance with the Time Of Year Restrictions (TOY)stipulated in the permit documents. All dredging work and accepted by the government shall be completed by or before December 31, 2023
CLIN 0004 - Bid Option #3 (Phase 2 Work)
0004a
Unit price adjustment for transportation of dredged material from Areas C2, D, D1, E, F, G and H via bottom dumping scow (barge) to and placement into the Sea Bright Offshore Borrow Area (SBOBA) (pursuant to drawings, specifications and permit requirements) in lieu of HARS placement.
1,084,795
CLIN 0004 Total =
1. 2 GENERAL BID NOTES
Award will be made on the total cost of CLINs 0001, 0002 and 0003 . Enter unit prices and extended totals in spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.
This contract will be awarded as one lump sum with unit prices required for specifically selected work as shown herein. See Contract Clauses, "FAR 52.211‐18, Variation in Estimated Quantity" and "FAR 52.236‐16, Quantity Surveys," "DFARS.236‐7008, Contract Prices."
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
Not Used.