This document contains a bid schedule for a federal maintenance dredging contract opportunity. The project consists of dredging nine areas surrounding piers at the Naval Weapons Station Earle in New Jersey to reestablish minimum harbor depths for naval vessels. Dredging will remove an estimated total of 2,261,170 cubic yards of material to depths of 45 to 47 feet below the mean lower low water datum. Phase one will dredge four areas in summer 2022 for 1,176,375 cubic yards, while phase two will dredge the remaining five areas in summer 2023 for approximately 1,043,395 cubic yards. Dredged material will be transported via barge and disposed at the Historic Area Remediation Site. The contract includes unit pricing for dredging, mob/demob, delays, debris removal, and optional pricing to dispose material at an alternate location. Bids are due under solicitation number N4008521B0055, with award made to the lowest priced conforming offer.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
eProj.#:1652592
Funds: O&MN
PRICE PROPOSAL FORM
FY 21 MAINTENANCE DREDGING @ Naval Weapons Station Earle, Colts Neck, NJ
Base Bid - Phase 1 Work CLIN Quantity Unit Unit Cost Total
0001a 1 LS
0001b 1 LS
0001c 1,176,375 CY
0001d 100 Hours
0001e 25 TON
CLIN 0001 TOTAL
CLIN 0002 - Bid Option #1 (Phase 2 Work) Item(s) Quantity Unit Unit Cost Total
0002a 1,043,395 CY
CLIN 0002 TOTAL =
CLIN 0003 - Bid Option #2 (Phase 2 Work) Item(s) Quantity Unit Unit Cost Total
0003a 41,400 CY
CLIN 0003 TOTAL =
CLIN 0001, 0002 and 0003 Total
CLIN 0004 - Bid Option #3 (Phase 2 Work)
Item(s) Quantity Unit Unit Cost Total
0004a 1,084,795 CY
CLIN 0004 TOTAL =
jsgeo Typewritten Text Date: 05-11-2021
DOCUMENT 00 22 13.00 20 SUPPLEMENTARY I`NSTRUCTIONS TO
OFFERORS
PART 1 GENERAL
CONTRACT LINE ITEMS
The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.
Provide the Contract Line Item (CLIN) price for the following items:
CLIN 0001 ‐ BASE PRICE – FY 21 MAINTENANCE DREDGING @ Naval Weapons Station Earle, Colts Neck, NJ
Price includes the following:
CLIN 0001a, 0001b, 0001c, 0001d and 0001e to be performed in accordance with the drawings, specifications and all permits.
Once the contract has been awarded the execution schedule shall be coordinated between the government and the contractor with a notice to proceed to be issued within approximately 270 days or less from the contract award date. Once the notice to proceed has been issued the contractor shall commence with mobilization and dredging within 30 days and/or in accordance with the Time Of Year Restrictions (TOY)stipulated in
CLIN 0001 - Base Bid (Phase 1 Work) CLIN Description(s) Quantity Unit Unit Cost Total
0001a
Mobilization and Demobilizaton to site for all work including demobilization after completing Dredge Areas B1, B2, C1 and C2 and re-mobilization to complete Dredge Areas D, E, F, G, H and D1.
1 LS
0001b Performance Bond 1 LS
0001c
Bucket dredging of Areas B1, B2, C1 and C2 in accordance with the drawings, specifications and permit requirements, including transportation via bottom dumping scow (barge) to and disposal of dredged material into the Historic Area Remediation Site (HARS).
1,176,375 CY
0001d Down Time (delays) 100 Hours
0001e Removal and disposal of artificial obstructions and/or debris within dredge area pursuant to Specs Sec. 35 20 23, Par 1.4
25 TON
CLIN 0001 Total =
CLIN 0002 - Bid Option #1 (Phase 2 Work) Item(s) Description(s) Quantity Unit Unit Cost Total
0002a
Bucket dredging of Areas D, E, F, G and H in accordance with the drawings, specifications and permit requirements, including transportation via bottom dumping scow (barge) to and disposal of dredged material into the Historic Area Remediation Site (HARS).
1,043,395 CY
CLIN 0002 Total =
CLIN 0002 ‐ BASE PRICE – FY 21 MAINTENANCE DREDGING @ Naval Weapons Station Earle, Colts Neck, NJ
The decision to award this bid option as described herein shall be at the sole discretion of the Government. The Government reserves the right to award this option no later than 365 Calendar Days after base contract award. No provision is made for economic price adjustment. Method of evaluation of bids for award purposes is specified below.
Price includes the following:
CLIN 0002a to be performed in accordance with the drawings, specifications and all permits. Once the notice to proceed has been issued the contractor shall commence with mobilization and dredging within 30 days and/or in accordance with the Time Of Year Restrictions
CLIN 0003 ‐ BASE PRICE – FY 21 MAINTENANCE DREDGING @ Naval Weapons Station Earle, Colts Neck, NJ
The decision to award this bid option as described herein shall be at the sole discretion of the Government. The Government reserves the right to award this option no later than 365 Calendar Days after base contract award. No provision is made for economic price adjustment. Method of evaluation of bids for award purposes is specified below.
Price includes the following:
CLIN 0003a to be performed in accordance with the drawings, specifications and all permits. Once the notice to proceed has been issued the contractor shall commence with mobilization and dredging within 30 days and/or in accordance with the Time Of Year Restrictions
CLIN 0003 - Bid Option #2 (Phase 2 Work) Item(s) Description(s) Quantity Unit Unit Cost Total
0003a
Bucket dredging of Area D1 in accordance with the drawings, specifications and permit requirements, including transportation via bottom dumping scow (barge) to and disposal of dredged material into the Historic Area Remediation Site (HARS).
41,400 CY
CLIN 0003 Total =
1. 2 GENERAL BID NOTES
Award will be made on the total cost of CLINs 0001, 0002 and 0003 . Enter unit prices and extended totals in spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.
This contract will be awarded as one lump sum with unit prices required for specifically selected work as shown herein. See Contract Clauses, "FAR 52.211‐18, Variation in Estimated Quantity" and "FAR 52.236‐16, Quantity Surveys," "DFARS.236‐7008, Contract Prices."
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
Not Used.
CLIN 0004 ‐ BASE PRICE – FY 21 MAINTENANCE DREDGING @ Naval Weapons Station Earle, Colts Neck, NJ
The decision to award this bid option as described herein shall be at the sole discretion of the Government. The Government reserves the right to award this option no later than 365 Calendar Days after base contract award. No provision is made for economic price adjustment. Method of evaluation of bids for award purposes is specified below.
Price includes the following:
CLIN 0004a to be performed in accordance with the drawings, specifications and all permits. Once the notice to proceed has been issued the contractor shall commence with mobilization and dredging within 30 days and/or in accordance with the Time Of Year Restrictions (TOY)stipulated in the permit documents. All dredging work shall be
CLIN 0004 - Bid Option #3 (Phase 2 Work) Item(s) Description(s) Quantity Unit Unit Cost Total
0004a
Unit price adjustment for transportation of dredged material from Areas C2, D, D1, E, F, G and H via bottom dumping scow (barge) to and placement into the Sea Bright Offshore Borrow Area (SBOBA) (pursuant to drawings, specifications and permit requirements) in lieu of HARS placement.
1,084,795 CY
CLIN 0004 Total =