This solicitation is for maintenance dredging at Naval Weapons Station Earle in New Jersey. The project involves dredging a total estimated volume of 2,261,170 cubic yards of material from nine dredging areas to depths of -45 to -47 feet Mean Lower Low Water, including ship berths, a turning basin, terminal channel, and portion of the Sandy Hook Federal Navigation Channel. Dredging will be conducted via clamshell dredge in two phases during Summer 2022 and Summer 2023, with a minimum daily production rate of 7,500 cubic yards. Dredged material will be placed in split-hull and bottom dumping scows and transported to the Historic Area Remediation Site for remediation purposes. The solicitation was issued by the Department of the Navy Naval Facilities Engineering Command.