This document contains a pre-proposal inquiry attachment and responses to questions regarding Solicitation Number N40085-21-B-0055 for maintenance dredging at Naval Weapons Station Earle. The project involves dredging approximately 2,261,170 cubic yards of material from nine dredging areas to depths of -45 to -47 feet MLLW in two phases during Summer 2022 and Summer 2023. Phase 1 will dredge four areas totaling 1,176,375 cubic yards. Phase 2 will dredge the remaining five areas totaling 1,043,395 cubic yards. Dredged material will be placed in split-hull or bottom dumping scows and barged to the Historic Area Remediation Site for disposal. The daily production rate must be at least 7,500 cubic yards. Clarifications were provided regarding bid submission format and requirements, dredging area details, schedules, and survey data.

View the file

Other files

File Type Posted
PPI INQUIRY LOG 05.pdf PDF
AMENDMENT 0006 FOR DREDGING PROJECT.pdf PDF
BID INQUIRY LOG 04 DOCUMENT.pdf PDF
AMENDMENT 0005 FOR DREDGING PROJECT.pdf PDF
Approval letter Environmental Bucket.pdf PDF
AMENDMENT 0004 FOR DREDGING PROJECT.pdf PDF
AMENDMENT 0003 FOR DREDGING PROJECT.pdf PDF
BID INJURY LOG 03.pdf PDF
Appendix A SedimentData 1652592 FY21 NWS Earle Maint Dredging Revised.pdf PDF
AMENDMENT 0002 DREDGING PROJECT.pdf PDF
nwse_cond_30x_May2020_mllw.zip ZIP file
AMENDMENT 0001 DREDGING PROJECT.pdf PDF
UPDATED NWS EARLE DREDGING BID SCHEDULE.pdf PDF
N40085-21-B-0055 BID INQUIRY LOG 01.pdf PDF
Site Visit Log.jpg JPG image
Attachment 8- NWS Earle FY21 Bid Schedule_05-11-21_Cost Blank.pdf PDF
Attachment 2- 1652592 FY21 NWS Earle Maint Dredging SPECS FINAL 05-11-21.pdf PDF
Attachment 3- Appendix A SedimentData 1652592 FY21 Earle Maint Dredging.pdf PDF
Attachment 1- 1652592 FY21 NWS Earle Maint Dredging Drwgs FINAL.pdf PDF
Attachment 2- 1652592 FY21 NWS Earle Maint Dredging SPECS FINAL.pdf PDF
Attachment 6- Appendix D-Project Identification Signboard 1652592 FY21 Earle Dredging.pdf PDF
N4008521B0055 EARLE DREDGING RFP.pdf PDF
Attachment 4- Appendix B Permits 1652592 FY21 Earle Maint_Dredging.pdf PDF
Attachment 7 - Pre-Proposal Inquiries Log.doc DOC document
Attachment 5-Appendix C ACOE TransportSheet 1652592 FY21 Earle Maint Dredging.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRE-PROPOSAL INQUIRY ATTACHMENT (7)

Solicitation Number: N40085-21-B-0055 Contractor Name:

Contractor POC (Name and email):

Instructions: DO NOT submit in PDF format. DO submit as a word document Contractor

PPI#

Section of RFP or Page Number

Paragraph Reference

Drawing Number

Question RESPONSE

01 Section 00 21 13 - Instructions to Bidders

10. Delivery of Bid Bid Submission

(p. 11)

Please clarify delivery of bid language. Bid submission states " The offeror shall submit one (1) CD-ROM electronic copy, one (1) hard copy marked “Original" and one (1) hard copy marked “Copy,” in a three ring binder.

In the event of a discrepancy between the electronic copy and the hard copies, the “original” hard copy shall govern." It continues that "For electronic copy shall be labeled

“BID SUBMISSION FOR IFB

N4008521B0055, and email shall be sent to georgia.a.scott.civ@us.navy.mil and philip.j.cole.civ@us.navy.mil".

Seeing as a CD cannot be e-mailed, we request that the language be modified so as to accept a PDF as the electronic form allowed for bid submission via email.

Bid Submission sent by (mail courier) shall include one (1) CD-ROM, one (1) hard copy of bid marked “Original" and one

(1) hard copy of bid marked “Copy,” in a three ring binder.

A copy of your bid shall also be emailed to:

georgia.a.scott.civ@us.navy.mil and philip.j.cole.civ@us.navy.mil

02 Section 00 10 00 – Solicitation Attachment 8: Bid Schedule Document

(p. 3-6) There are inconsistencies in the description of what should be included in the price in Section 00 10 00 - Solicitation and the Attachment 8, Schedule. Please update the descriptions to the correct applicable language, so that they reflect the same description.

Please review and use the attached updated bid schedule under Amendment 0001.

03 Section 00 21 13 -

Instructions to Bidders

Bonding Requirements

(p. 12)

The IFB states that a copy of Representation and Certifications must be submitted, however, Section

When submitting requirements for Representation and Certifications please refer to section 00 70 00 and provide all

00 45 00 - Representations and Certifications does not contain any to submit. The Reps & Certs are provided in the following Section 00 70 00 - Conditions of the Contract.

Please clarify which Reps & Certs are required with bid submittal.

information outlined in that section.

04 35 20 23 3.2.6 – 6.1 p7 Is there a particular sub-section within the HARS and SBOBA disposal sites where the dredged material should be placed? Please provide. Or the Contractor is allowed to place the material anywhere within the limits of those disposal areas?

The EPA will designate the disposal sub-area within HARS.

GOV will provide coordinates to the contractor once received from the EPA.

05 01 11 00 Price Proposal Form

1.4 p1-2

CLIN 0001

Note.

CLIN 0002

Note

Please clarify the differing completion dates for the Phases 1 & 2 Works: 01 11 00 – required completion November 2022 & November 2023, while Price Proposal Form Notes indicate December 2022 & December 2023

Phase 1 work shall be completed by December 31, 2022. Phase 2 work shall be completed by December 31, 2023.

06 01 11 00 1.2.1 p1 Please clarify if hopper dredges are allowed to perform the project or portion thereof under this contract.

Hopper dredges are NOT allowed. This project is only permitted for bucket dredging, 07 1.8 p5 “Dredging of side slopes shall follow, as closely as practicable, the lines indicated or specified”. Offeror respectfully requests NAVFAC to consider adding language to the specification common to other dredging contracts procured by the Federal Government that allow box cutting, and payment for the dredged material, as follows:

“Side slopes may be formed by box cutting, step cutting, or dredging along the side slope.

Material actually removed, within the limits approved the CO, to provide for final side

No language change(s) will be incorporated. Payable volume shall be determined pursuant to applicable specifications sections.

slopes not flatter than shown on the contract, but not in excess of the amount originally lying above this limiting side slope, will be measure and paid for in accordance with the provisions contained…Such amount will be estimated and paid for whether dredged in original position or by box cut dredging whereby space is dredged below the allowable side slope plane on the bottom of the slope for upslope material capable of falling into the cut.”

008 V-0002 V-101 – V-121

Please provide the bathymetric survey of the dredging areas:

Phase 1 and Phase 2 works, in electronic or xyz formal.

.XYZ of the government’s most recent bathymetric survey will be furnished.

009 Price Proposal

Form

CLIN 0004

Description

Option 3 Disposal Area C2, D, D1, E, F, G, & H

Please clarify if Area C2 is correct to be included in the Phase 2 Work (placement into the SBOBA), which will happen in 2023. However, this area is already part of the Base – Phase 1 work that will happen in 2022 that will go to HARS.

Presently there is uncertainty regarding the time-line associated with obtaining approval from regulatory agencies for use of SBOBA. It is most likely that material from Area C2 will go to the HARS.

However, should the government obtain the required SBOBA approvals prior to the completion of the AREA C2 dredging then it is possible that the government could exercise Bid Option #4 in time for the material to be placed in SBOBA in lieu of the HARS.

File details come from the government source that posted it. Updated .