Maintenance Dredging, Delaware River, Philadelphia to Trenton

Closed Solicitation Posted

Solicitation number
W912BU22B0005
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks a firm fixed price contract for maintenance dredging of approximately 500,000 cubic yards of sediment from the Delaware River and Fairless Turning Basin between Philadelphia and Trenton, Pennsylvania. The U.S. Army Corps of Engineers, Philadelphia District, will award the contract to hydraulically dredge specified areas to a depth of 41 feet MLLW plus one foot allowable overdepth in the river and turning basin. An optional area may also be dredged to 25 feet MLLW plus one foot. Proposals were due by May 4, 2022 and the base period of performance is 120 days from notice to proceed.

There is no set-aside designation. The primary NAICS code is 237990 and PSC code is D203. Dredged materials will be placed in the Biles Island Disposal Area in Falls Township, Pennsylvania. The base contract value ranges from $5.9 million to $28.6 million to dredge approximately 500,000 cubic yards, and performance must occur between July 1 and December 31 for river work and July 1 to March 15 for work in the basin. All work will take place within the Delaware River and Fairless Turning Basin between Philadelphia and Trenton, Pennsylvania.

Notice text

The Army Corps of Engineers, Philadelphia District, intends to award a firm fixed price contract for Maintenance Dredging, Delaware River and the Fairless Turning Basin, Philadelphia to Trenton Project. 

Description of Work: Contract work consists of  maintenance dredging of approximately 500,000 cubic yards of sediment within the Delaware River, Philadelphia to Trenton main navigation channel between the Turnpike Bridge (Sta 97+000) and just North of the Fairless Turning Basin (Sta 123+700) as well as within the Basin.  There will be an Option to dredge just above the basin between Stations 123+700 and 124+700.

Work includes hydraulic dredging with placement of the dredged material into the Biles Island Disposal Area in Falls Township, Pennsylvania.  The base contract dredging in the Delaware River as well as within Fairless Turning Basin, will be required to a depth of 41’ MLLW (Datum) plus 1’ allowable overdepth.  The Option, if awarded will include dredging only to a depth of 25’ MLLW plus 1’ allowable overdepth.

The base contract period of performance is 120 calendar days from the Notice to Proceed (NTP) with an additional 30 days added if Option 1 is awarded.  Contractor must be prepared to commence actual dredging within ten (10) days of the Notice to Proceed (NTP).  All dredging in the river must be completed between 1 July and 31 December and between 1 July and 15 March in the Basin due to environmental restrictions. 

.

Files

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Maintenance Dredging, Delaware River, Philadelphia to Trenton Pre-Solicitation
Maintenance Dredging, Delaware River, Philadelphia to Trenton Original Pre-Solicitation

Similar open opportunities

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors