This solicitation is for maintenance dredging of approximately 500,000 cubic yards of sediment from the Delaware River and Fairless Turning Basin in Philadelphia to Trenton. The work includes hydraulic dredging of the main navigation channel and basin to depths of 41 feet plus one foot allowable overdepth, as well as an optional area to dredge above the basin to a depth of 25 feet plus one foot overdepth. The base contract period of performance is 120 calendar days from notice to proceed, with an additional 30 days if the optional work is awarded. All dredging in the river must be completed between July 1 and December 31, and between July 1 and March 15 in the basin. Dredged materials will be placed in the Biles Island Disposal Area in Falls Township, Pennsylvania. The solicitation was issued by the U.S. Army Corps of Engineers Philadelphia District for a firm fixed price contract.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
1. CONTRACT ID CODE PAGE OF PAGES
1 1
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU22B0005
X 9B. DATED (SEE ITEM 11)
17-Mar-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to advise that Page 11 ONLY of Amendment 0001, Section 35 20 23 Dredging has been replaced with the attached REVISED Page 11.
********************************BID OPENING IS NOT EXTENDED****************************
Please indicate receipt of this amendment on Standard Form 1442 (SOLICITATION, OFFER, AND AWARD) as Amendment 0003. Failure to acknowledge all amendments may be cause for rejection of the offers.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Apr-2022
CODE
US ARMY ENGINEER DISTRICT, PHILADELPHIA
POC: SUSAN LI WANAMAKER BUILDING 100 PENN SQU
PHILADELPHIA PA 19107-3390
W912BU 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
This page was intentionally left blank for duplex printing.
Amendment No. 0003
IFB W912BU22B0005
14. DESCRIPTION OF AMENDMENT (continued)
a. REQUESTS FOR INFORMATION (RFI) WITH RESPONSES: RFI’s with responses, annotated Amendment No. 0003, are attached to this amendment.
b. TECHNICAL SPECIFICATIONS:
(1) Section 35 20 23 – DREDGING: Please delete page 35 20 23-11 in its entirety and substitute the revised page 35 20 23-11, annotated as Amendment No. 0003, attached hereto.
c. Please indicate receipt of this amendment on Standard Form 1442 (SOLICITATION, OFFER, AND AWARD) as Amendment No. 0003. Failure to acknowledge all amendments may be cause for rejection of the bid.
RFI# Request for Information Response
With the permission to use a Mechanical Dredge for this contract, may we request the Government to allow the use of dragging or levelling equipment should any shoals, lumps, or other lack of contract depth be disclosed by the after dredge sounding or sweeping, or both. Please see Amendment 0003.
REQUESTS FOR INFORMATION with RESPONSES Solicitation No. W912BU22B0005
Requests for Information Page 1
OPTION 1
Acceptance Station Req'd Dredging Overdepth Total Section to Station to 25' (CY) 25' to 26'(CY) Available (CY)
7 123+700 to 124+677(Green) 58,000 7,500 65,500
3.6 LIMIT OF DREDGING
3.6.1 General
The areas to be dredged are within the contract limits as indicated on the contract drawings, and as specified in the Contract Clause titled: FINAL EXAMINATION AND ACCEPTANCE, and as defined by dredging prism indicated in the Paragraphs "OVERDEPTH, SIDE SLOPES, AND EXCESIVE DREDGING", and "MEASUREMENT AND PAYMENT", of this section.
Along those edges indicated on the drawings, dredge to a point extending 25 feet outside the channel edges where shoaling occurs along the channel or basin edge within the authorized contract limits (as determined by before-dredging surveys), unless otherwise determined or directed by the Contracting Officer.
3.6.2 Quantity Acceptance
Clear each acceptance section in its entirety to the required depth prior to acceptance of the work by the Government. If after-dredging surveys of a portion of an acceptance section indicate dredging is required, and it was indicated by the before-dredging surveys, remove required material found to be remaining above the required depth, unless such dredging is waived by the Contracting Officer. Dragging of a bar or other device will be allowed. Material removed as a result of redredging, within the dredging prism, will be paid for at the contract unit price and quantity as determined by the difference between initial before-dredging survey and the final after-dredging survey. In any portion of an acceptance section, when the after dredging survey indicates dredging is required that was not indicated by the before dredging survey, remove such material to the required depth, unless waived by the Contracting Officer. Such work will be paid for at the contract unit price and any additional quantity calculation will be made based on the after-dredging surveys, provided the material is not determined by the Contracting Officer to be misplaced material.
3.7 DEBRIS REMOVAL
Remove debris that may be encountered during dredging operations. Exact locations, types, and quantities of debris is unknown. Debris removed from the dredged area shall be removed from the water. Disposal shall be the responsibility of the Contractor and disposal shall be outside the limits of Government property.
3.8 CONTRACTOR QUALITY CONTROL
Prepare and maintain Daily Report of Operations forms. Sample Daily Report of Operations forms are attached at the end of this Section. Further instructions on the preparation and submittal of these forms will be provided at the Pre-Dredging Coordination Meeting.
Section 35 20 23 Page 11
Amendment No. 0001
3.9 FINAL EXAMINATION AND ACCEPTANCE
As soon as practicable after the completion of areas, which in the opinion of the Contracting Officer, will not be affected by further dredging operations, each area will be examined by the Government by sounding or sweeping, or both. Remove shoals and lumps by dredging. However, if the bottom is soft and the shoal areas form no material obstruction to navigation, removal may be waived at the discretion of the Contracting Officer. The Contractor will be notified when soundings or sweepings are to be made and will be permitted to accompany the sounding or sweeping party and to inspect the data and methods used in preparing the final estimate. When areas are found to be in a satisfactory condition, the work therein will be accepted as complete. Final estimates will be subject to deductions or correction of deductions previously made because of excessive overdepth, dredging outside or authorized areas, or disposal of material in an unauthorized manner. Should more than two soundings or sweeping operations by the Government over an area be necessary by reason of work for the removal of shoals disclosed at a prior sounding or sweeping, the cost of such third and any subsequent sounding or sweeping operations will be charged against the Contractor. The rate of each day in which the Government plant is engaged in such sounding or sweeping operations and/or is enroute to or from the site or held, for the Contractor's convenience, at or near the site for these operations shall be $5,500.00, except on Saturday, Sunday and holidays when the rate shall be $6,000.00.
3.10 MEASUREMENT AND PAYMENT
3.10.1 Mobilization and Demobilization
All costs connected with the mobilization and demobilization of all of the Contractor's dredging plant and equipment will be paid for at the contract lump sum price for this item. Sixty percent of the lump sum price will be paid to the Contractor upon completion of his mobilization at the first work assignment area. The remaining forty percent will be included in the final payment for work under this contract.
3.10.1.1 Cost Data
In the event the Contracting Officer considers that the amount in this item (60 percent) which represents mobilization, does not bear a reasonable relation to the cost of the work in this contract, the Contracting Officer may require the Contractor to produce cost data to justify this portion of the bid. Failure to justify such price to the satisfaction of the Contracting Officer, will result in payment of actual mobilization costs, as determined by the Contracting Officer at the completion of mobilization, and payment of the remainder of this item in the final payment under this contract. The determination of the Contracting Officer is not subject to appeal.
3.10.1.2 Mobilization and Demobilization Costs
All costs connected with the mobilization and demobilization of the Contractor's dredging plant and equipment as defined below shall be included in the contract lump sum price for the Bid Item titled, "Mobilization and Demobilization", as listed in the Bidding Schedule.
a. Mobilization shall include all costs for operations accomplished prior to commencement of actual dredging operations; i.e., transfer of dredge, attendant plant, and equipment to site; preparation of disposal
Section 35 20 23 Page 12
| SF30 AND CONTIUATION SHEETS |
| AMENDMENT DESCRIPTION |
| REQUESTS FOR INFORMATION AND RESPONSES |
| REVISED 35 20 23 DREDGING PAGE 11 |