Lake - echo BAY barge breakwater project
Closed Solicitation Posted
- Solicitation number
- 140P8124B0011
- Agency
- Pacific West Region National Park Service, Department of the Interior
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Points of contact
-
- Caroline Bachelier caroline_bachelier@nps.gov
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Interior National Park Service Pacific West Region is seeking bids for the design, fabrication, and installation of a new floating wave attenuator system to protect an existing water intake barge located at Echo Bay in the Lake Mead National Recreation Area. The purpose is to install a system that can withstand wind speeds up to 90-105 mph and waves up to 4.5 feet high, while reducing the transmitted wave height to a maximum of 1.5 feet. The system must be adjustable to accommodate fluctuations in the lake water level between 1015 feet and 1090 feet. The contract performance period is 60 calendar days after the Notice to Proceed, and bids are due by October 16, 2024.
This is a 100% Small Business Set-Aside opportunity with a magnitude estimated between $500,000 to $1,000,000. The North American Industry Classification System (NAICS) code is 237990 with a $45M size standard. Bid bonds are required, and the contract will be a fixed-price construction contract. The place of performance is the Echo Bay area of Lake Mead National Recreation Area in Nevada.
Notice text
6 versions
Update #6 · Latest ·
LAKE - ECHO BAY BARGE BREAKWATER PROJECT
Amendment 0005 - Questions & Answers
Update #5 ·
LAKE - ECHO BAY BARGE BREAKWATER PROJECT
Amendment 0004 - Extend Bid Due Date
Update #4 ·
LAKE - ECHO BAY BARGE BREAKWATER PROJECT
Amendment 0003 - Questions & Answers
Update #3 ·
LAKE - ECHO BAY BARGE BREAKWATER PROJECT
Amendment 0002 - Questions & Answers
Update #2 ·
LAKE - ECHO BAY BARGE BREAKWATER PROJECT
Amendment 0001 - Update Site Visit Information
Update #1 ·
LAKE - ECHO BAY BARGE BREAKWATER PROJECT
Attachments
| File | Type | Posted |
|---|---|---|
| Sol_140P8124B0011_Amd_0005.pdf | ||
| Sol_140P8124B0011_Amd_0004.pdf | ||
| Sol_140P8124B0011_Amd_0003.pdf | ||
| Sol_140P8124B0011_Amd_0002.pdf | ||
| Sol_140P8124B0011_Amd_0001.pdf | ||
| B08_-_Atch_3_-_Limitation_on_Subcontracting_Report.xlsx | XLSX spreadsheet | |
| Sol_140P8124B0011.pdf | ||
| B08_-_Atch_1_-_EB_Barge_Breakwater__PMIS_254113_Specs_-_Update_07302024.pdf | ||
| B08_-_Atch_2_-_Wage_Determination_NV20240024.pdf | ||
| B08_-_Atch_4_-_Construction_Contraction_Administration.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Lake - echo BAY barge breakwater project | Solicitation | |
| Lake - echo BAY barge breakwater project | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity