About this file

This document is an amendment to a solicitation for the LAKE - ECHO BAY BARGE BREAKWATER PROJECT. The key details are:

The purpose of this amendment is to: A) Provide answers to contractor questions regarding the existing breakwater system, wind speed design requirements, solar navigation lights, and winch platforms. B) Publish the site visit sign-in sheet. C) The bid due date remains September 12, 2024 at 1100 PDT, with the bid opening 24 hours later via Microsoft Teams. D) All other terms and conditions remain the same.

The solicitation is for the Department of the Interior National Park Service Pacific West Region to procure a new breakwater system to protect an existing intake barge at Lake Mead. Contractors are required to remove and dispose of the existing floating breakwater components, while the anchor blocks can be reused if accessible. The new breakwater system must be designed to withstand wind speeds up to 90-105 mph, and include winches and solar navigation lights as specified. The length of the new breakwater is to be determined by the contractor.

View the file

Other files for this federal contract opportunity

Other files attached to LAKE - ECHO BAY BARGE BREAKWATER PROJECT, newest first.
File Type Posted
Sol_140P8124B0011_Amd_0005.pdf PDF
Sol_140P8124B0011_Amd_0004.pdf PDF
Sol_140P8124B0011_Amd_0003.pdf PDF
Sol_140P8124B0011_Amd_0001.pdf PDF
B08_-_Atch_2_-_Wage_Determination_NV20240024.pdf PDF
B08_-_Atch_4_-_Construction_Contraction_Administration.pdf PDF
B08_-_Atch_3_-_Limitation_on_Subcontracting_Report.xlsx XLSX spreadsheet
Sol_140P8124B0011.pdf PDF
B08_-_Atch_1_-_EB_Barge_Breakwater__PMIS_254113_Specs_-_Update_07302024.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P8124B0011 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PPL

Boulder City NV 89005-2426 601 Nevada Way

NPS, PWR - LAKE MABO

08/28/20240002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

08/13/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

See Continuation Page

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Caroline Bachelier

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

140P8124B0011 Amendment 0002

The purpose of this amendment is to:

A. Answer Contractor Questions:

Question 1: The existing breakwater system that is remaining shall be removed by the contractor. The surface floats shall be removed. Anchor blocks do not need to be removed.

Please confirm that the entire breakwater system is floating and accessible above surface to be removed. Please confirm if the contractor is responsible for disposal of the existing breakwater system? Please confirm if the existing cable to the anchoring system needs to be removed/disposed? It is noted that the anchor blocks do not need to be removed, what are the size of the existing anchor blocks? Amount? And can the existing anchor blocks be reused for the new breakwater?

Answer 1: This is all that is remaining of the existing system. All that we can see are what is remaining of the floating items. These pictures were taken last week. Yes, contractor is to remove and dispose of the remaining floating items. The anchor blocks do not need to be removed. They can be reused if you can access them and dive to them. The as-built drawings that we were given indicate that the existing anchors are 1,700 pounds. There were 9 existing anchor blocks assemblies. Each white ball buoy is where the anchor assembly is attached.

Question 2: Winds in excess of 60 miles per hour are encountered on the lake.

“Exceeds 60 mph” is arbitrary. Please confirm the max wind speed the contractor/dock manufacture needs to design for.

Answer 2: We are trying to find specific wind speeds on the lake. It fluctuates year-round. We have marina anchorages and marina roof structures designed for wind speeds of 90 and 105 mph. But these are not occupied structures. We have periods of a few days of sustained winds and then times of a sudden storm develops and generates high winds on the lake. What is the factor of safety over your designs? Under the local sustained wind speeds, a design speed of 60 mph would cover the year.

From the Las Vegas Weather Service.

Question 3: Specifications state: 11. Wave attenuators shall have winch platforms and winches to adjust anchorage during lake water elevation changes. All winch platforms shall have adequate cleats, mooring lines & anchors, and solar navigation lights per USCG standard for operation and maintenance.

How many solar navigation lights are required for the job? Is there a specific solar navigation light the NPS is looking to have? If so, please state the manufacturer/type of Solar Navigation Light the contractor shall include in the bid.

Answer 3: Contractor shall determine the proper number of lights to provide safe navigation warnings. For a 3 sided structure, placing lights on all 4 corners would be a suggested method. The NPS cannot dictate specific items based on the work needing to be open and competitive.

Question 4: A galvanized steel winch platform is proposed. Platform to be approximately 10 feet by 12 feet in size. Submit design for review and approval. A concrete wave attenuator does not need a separate “winch platform” in order to adjust the cable and winch anchoring system. Please confirm that a separate “winch platform” is not needed as long as proposed wave attenuator system is sufficient enough to manage winches from on top of the wave attenuator.

Answer 4: If the winch assembly could be incorporated into the wave attenuator mechanism, that would be an acceptable product. Yes, a separate winch platform is not needed if the winch can be incorporated into the assembly.

Question 5: Specifications state: 500’ (Verify length) of Wave Attenuator equipment – purchase and install. Question: What does 500’ (Verify length) mean? Is 500’ of wave attenuation the length the contractor is to bid?

Answer 5: The existing example wave attenuator installed was 500 foot in length. The original idea was to modify that existing product. The original length needed to be confirmed. The new system can be any length that successfully meets the intent of protecting the existing intake barge. Contractor shall determine the length needed to protect the barge.

B. Publish the Site Visit Sign-In Sheet.

C. The bid due date remains the same, September 12, 2024, at 1100 PDT.

D. The bid opening will happen 24 hours after the bid due date/time. The bid opening will happen via Microsoft Teams.

https://teams.microsoft.com/l/meetup-join/19%3ameeting_NmUwM2E0YmUtOWM2OC00MWE2LWI1MGMtYjVjYTQzZTU1ZWI3

%40thread.v2/0?context=%7b%22Tid%22%3a%220693b5ba-4b18-4d7b-9341-f32f400a5494%22%2c%22Oid%22%3a%222da10b0b-e814-41bc-9eff-e60b77ae9f23%22%7d

E. All other terms and conditions remain the same.

File details come from the government source that posted it. Updated .