About this opportunity

The U.S. Army Corps of Engineers Portland District solicited bids for the John Day Fish Pump Rehabilitation at John Day Dam, Oregon, with proposals due May 20, 2026; the procurement was cancelled on June 16 after bid opening because all otherwise acceptable offers exceeded reasonable pricing thresholds under FAR 14.305(b)(6).

This was a Total Small Business Set-Aside, firm-fixed-price (FFP) sealed-bid contract. Place of performance is Rufus, Oregon. The NAICS code is 237990 (Other Heavy and Civil Engineering Construction); PSC code is Z2KA (Repair or Alteration of Dams); small business size standard is $45 million.

The scope encompasses removal, refurbishment, and replacement of major components for Fish Pump Units 1, 2, and 3, including damaged pump shafts, bearings, bearing brackets, and approximately 1,000 horsepower class right-angle drive gearboxes. Unit 2 work is mandatory (CLINs 0001–0006); Units 1 and 3 are optional (CLINs 0007–0018). Work includes field disassembly, off-site shop repair and precision machining, fabrication of replacement parts (including new C95400 aluminum bronze bearing housings and AISI 1118 key stock), installation of greaseless bearing liners, and final reinstallation and alignment to manufacturer specifications. All welds require nondestructive testing on a minimum 50 percent sample per AWS standards. The contractor must furnish performance and payment bonds at 20 percent of bid price or $3 million, whichever is less, with liquidated damages of $1,524.00 per day of delay.

Contract performance runs 965 calendar days from Notice to Proceed. Unit 2 outage window is November 1, 2026 through November 30, 2027; Unit 1 (optional) December 1, 2027 through November 30, 2028; Unit 3 (optional) December 1, 2028 through January 15, 2030. The government estimate was $1.9 million for mandatory CLINs and $3.655 million for optional CLINs. A mandatory site visit occurred April 27, 2026. Amendments 0001–0004 extended the deadline from May 8 to May 13 to May 20, and clarified bidder inquiries (closed May 6). Three bids were received: RMS Pump, Inc. ($5.555 million mandatory); Northbank Civil and Marine, LLC ($14.968 million); and Reagent World, Inc. ($13.492 million mandatory, $3.599 million optional). All bids exceeded the government estimate significantly, prompting the cancellation.

Notice text

9 versions

Update #9 · Latest ·

16 June 2026 - Per RFO 14.305(b)(6), as all otherwise acceptable bids received are at unreasonable prices, it has been determined that it is necessary to cancel the invitation and reject all bids received before award but after bid opening.

W9127N26BA001 Abstract of Offers posted 21 May 2026

W9127N26BA001 Amendment 0004 posted 12 May 2026

Update: Bidder Inquiries in ProjNet will close at the end of the day (6 MAY 2026) and all responses will be posted on or before the 7th business day preceding the bid submission IAW the solicitation.

W9127N26BA001 Contractor JD Fish Pump Site Visit Roster posted 4 May 2026

W9127N26BA001 Amendment 0003 posted 1 May 2026

W9127N26BA001 Amendment 0002 posted 22 April 2026

W9127N26BA001 Amendment 0001 posted 9 April 2026

---------------------------------------------------

The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for the John Day Fish Pump Rehabilitation at John Day Dam, Oregon. The proposed project will be a Total Small Business Set-Aside, firm-fixed price (FFP) contract.

Background: Prior work on fish pump No.3 included replacement of the lower pump shaft, true-up machining of the upper pump shaft, true-up machining of the upper and lower bearing mounting flanges and spigot bores on the cover plate and diffuser, and true-up machining of the diffuser extension cone. The propeller itself had its blade tips built up with weld and re-machined a proper clearance (nominally 1/8" radial clearance) to the pit liner. In addition, the propeller center bores were true-up machined for proper fit (0.004-0.006" clearance) to the new lower shaft. The upper and lower bearings were fitted with greaseless bearing liners and the shafts existing stainless bearing journals were replaced with spares originally manufactured by Worthington Pump. work will be replicated for pump No.2 and possible pump No.1 and No. 3. 

Purpose: The project will include the removal, refurbishment, and replacement of major components of Fish Pump Units 1, 2 and 3, including but not limited to shafts, bearings, bearing brackets, and right-angle drive gearboxes. Work will require field disassembly of existing equipment, transport of components for off-site shop repair, precision machining, fabrication of replacement parts, and final reinstallation and alignment to manufacturer specifications.

The following information represents the project objectives:

  • Removal and replacement of damaged pump shafts and bearings.
  • Repair-by-replacement of approximately 1000 horsepower class power transmission and reduction gearbox.
  • Precision machining (true-up) of shafts, bearing housings, and diffuser components.
  • Installation of greaseless bearing liners and replacement of stainless-steel bearing journals.
  • On-site reassembly, shaft alignment, gearbox installation, and system balancing.
  • Testing of the completed pump unit(s) to verify functional performance.
  • Delivery of updated operation and maintenance manuals, drawings, and spare parts.
Update #8 ·

W9127N26BA001 Abstract of Offers posted 21 May 2026

W9127N26BA001 Amendment 0004 posted 12 May 2026

Update: Bidder Inquiries in ProjNet will close at the end of the day (6 MAY 2026) and all responses will be posted on or before the 7th business day preceding the bid submission IAW the solicitation.

W9127N26BA001 Contractor JD Fish Pump Site Visit Roster posted 4 May 2026

W9127N26BA001 Amendment 0003 posted 1 May 2026

W9127N26BA001 Amendment 0002 posted 22 April 2026

W9127N26BA001 Amendment 0001 posted 9 April 2026

---------------------------------------------------

The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for the John Day Fish Pump Rehabilitation at John Day Dam, Oregon. The proposed project will be a Total Small Business Set-Aside, firm-fixed price (FFP) contract.

Background: Prior work on fish pump No.3 included replacement of the lower pump shaft, true-up machining of the upper pump shaft, true-up machining of the upper and lower bearing mounting flanges and spigot bores on the cover plate and diffuser, and true-up machining of the diffuser extension cone. The propeller itself had its blade tips built up with weld and re-machined a proper clearance (nominally 1/8" radial clearance) to the pit liner. In addition, the propeller center bores were true-up machined for proper fit (0.004-0.006" clearance) to the new lower shaft. The upper and lower bearings were fitted with greaseless bearing liners and the shafts existing stainless bearing journals were replaced with spares originally manufactured by Worthington Pump. work will be replicated for pump No.2 and possible pump No.1 and No. 3. 

Purpose: The project will include the removal, refurbishment, and replacement of major components of Fish Pump Units 1, 2 and 3, including but not limited to shafts, bearings, bearing brackets, and right-angle drive gearboxes. Work will require field disassembly of existing equipment, transport of components for off-site shop repair, precision machining, fabrication of replacement parts, and final reinstallation and alignment to manufacturer specifications.

The following information represents the project objectives:

  • Removal and replacement of damaged pump shafts and bearings.
  • Repair-by-replacement of approximately 1000 horsepower class power transmission and reduction gearbox.
  • Precision machining (true-up) of shafts, bearing housings, and diffuser components.
  • Installation of greaseless bearing liners and replacement of stainless-steel bearing journals.
  • On-site reassembly, shaft alignment, gearbox installation, and system balancing.
  • Testing of the completed pump unit(s) to verify functional performance.
  • Delivery of updated operation and maintenance manuals, drawings, and spare parts.
Update #7 ·

W9127N26BA001 Amendment 0004 posted 12 May 2026

Update: Bidder Inquiries in ProjNet will close at the end of the day (6 MAY 2026) and all responses will be posted on or before the 7th business day preceding the bid submission IAW the solicitation.

W9127N26BA001 Contractor JD Fish Pump Site Visit Roster posted 4 May 2026

W9127N26BA001 Amendment 0003 posted 1 May 2026

W9127N26BA001 Amendment 0002 posted 22 April 2026

W9127N26BA001 Amendment 0001 posted 9 April 2026

---------------------------------------------------

The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for the John Day Fish Pump Rehabilitation at John Day Dam, Oregon. The proposed project will be a Total Small Business Set-Aside, firm-fixed price (FFP) contract.

Background: Prior work on fish pump No.3 included replacement of the lower pump shaft, true-up machining of the upper pump shaft, true-up machining of the upper and lower bearing mounting flanges and spigot bores on the cover plate and diffuser, and true-up machining of the diffuser extension cone. The propeller itself had its blade tips built up with weld and re-machined a proper clearance (nominally 1/8" radial clearance) to the pit liner. In addition, the propeller center bores were true-up machined for proper fit (0.004-0.006" clearance) to the new lower shaft. The upper and lower bearings were fitted with greaseless bearing liners and the shafts existing stainless bearing journals were replaced with spares originally manufactured by Worthington Pump. work will be replicated for pump No.2 and possible pump No.1 and No. 3. 

Purpose: The project will include the removal, refurbishment, and replacement of major components of Fish Pump Units 1, 2 and 3, including but not limited to shafts, bearings, bearing brackets, and right-angle drive gearboxes. Work will require field disassembly of existing equipment, transport of components for off-site shop repair, precision machining, fabrication of replacement parts, and final reinstallation and alignment to manufacturer specifications.

The following information represents the project objectives:

  • Removal and replacement of damaged pump shafts and bearings.
  • Repair-by-replacement of approximately 1000 horsepower class power transmission and reduction gearbox.
  • Precision machining (true-up) of shafts, bearing housings, and diffuser components.
  • Installation of greaseless bearing liners and replacement of stainless-steel bearing journals.
  • On-site reassembly, shaft alignment, gearbox installation, and system balancing.
  • Testing of the completed pump unit(s) to verify functional performance.
  • Delivery of updated operation and maintenance manuals, drawings, and spare parts.
Update #6 ·

Update: Bidder Inquiries in ProjNet will close at the end of the day (6 MAY 2026) and all responses will be posted on or before the 7th business day preceding the bid submission IAW the solicitation.

W9127N26BA001 Contractor JD Fish Pump Site Visit Roster posted 4 May 2026

W9127N26BA001 Amendment 0003 posted 1 May 2026

W9127N26BA001 Amendment 0002 posted 22 April 2026

W9127N26BA001 Amendment 0001 posted 9 April 2026

---------------------------------------------------

The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for the John Day Fish Pump Rehabilitation at John Day Dam, Oregon. The proposed project will be a Total Small Business Set-Aside, firm-fixed price (FFP) contract.

Background: Prior work on fish pump No.3 included replacement of the lower pump shaft, true-up machining of the upper pump shaft, true-up machining of the upper and lower bearing mounting flanges and spigot bores on the cover plate and diffuser, and true-up machining of the diffuser extension cone. The propeller itself had its blade tips built up with weld and re-machined a proper clearance (nominally 1/8" radial clearance) to the pit liner. In addition, the propeller center bores were true-up machined for proper fit (0.004-0.006" clearance) to the new lower shaft. The upper and lower bearings were fitted with greaseless bearing liners and the shafts existing stainless bearing journals were replaced with spares originally manufactured by Worthington Pump. work will be replicated for pump No.2 and possible pump No.1 and No. 3. 

Purpose: The project will include the removal, refurbishment, and replacement of major components of Fish Pump Units 1, 2 and 3, including but not limited to shafts, bearings, bearing brackets, and right-angle drive gearboxes. Work will require field disassembly of existing equipment, transport of components for off-site shop repair, precision machining, fabrication of replacement parts, and final reinstallation and alignment to manufacturer specifications.

The following information represents the project objectives:

  • Removal and replacement of damaged pump shafts and bearings.
  • Repair-by-replacement of approximately 1000 horsepower class power transmission and reduction gearbox.
  • Precision machining (true-up) of shafts, bearing housings, and diffuser components.
  • Installation of greaseless bearing liners and replacement of stainless-steel bearing journals.
  • On-site reassembly, shaft alignment, gearbox installation, and system balancing.
  • Testing of the completed pump unit(s) to verify functional performance.
  • Delivery of updated operation and maintenance manuals, drawings, and spare parts.
Update #5 ·

W9127N26BA001 Contractor JD Fish Pump Site Visit Roster posted 4 May 2026

W9127N26BA001 Amendment 0003 posted 1 May 2026

W9127N26BA001 Amendment 0002 posted 22 April 2026

W9127N26BA001 Amendment 0001 posted 9 April 2026

---------------------------------------------------

The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for the John Day Fish Pump Rehabilitation at John Day Dam, Oregon. The proposed project will be a Total Small Business Set-Aside, firm-fixed price (FFP) contract.

Background: Prior work on fish pump No.3 included replacement of the lower pump shaft, true-up machining of the upper pump shaft, true-up machining of the upper and lower bearing mounting flanges and spigot bores on the cover plate and diffuser, and true-up machining of the diffuser extension cone. The propeller itself had its blade tips built up with weld and re-machined a proper clearance (nominally 1/8" radial clearance) to the pit liner. In addition, the propeller center bores were true-up machined for proper fit (0.004-0.006" clearance) to the new lower shaft. The upper and lower bearings were fitted with greaseless bearing liners and the shafts existing stainless bearing journals were replaced with spares originally manufactured by Worthington Pump. work will be replicated for pump No.2 and possible pump No.1 and No. 3. 

Purpose: The project will include the removal, refurbishment, and replacement of major components of Fish Pump Units 1, 2 and 3, including but not limited to shafts, bearings, bearing brackets, and right-angle drive gearboxes. Work will require field disassembly of existing equipment, transport of components for off-site shop repair, precision machining, fabrication of replacement parts, and final reinstallation and alignment to manufacturer specifications.

The following information represents the project objectives:

  • Removal and replacement of damaged pump shafts and bearings.
  • Repair-by-replacement of approximately 1000 horsepower class power transmission and reduction gearbox.
  • Precision machining (true-up) of shafts, bearing housings, and diffuser components.
  • Installation of greaseless bearing liners and replacement of stainless-steel bearing journals.
  • On-site reassembly, shaft alignment, gearbox installation, and system balancing.
  • Testing of the completed pump unit(s) to verify functional performance.
  • Delivery of updated operation and maintenance manuals, drawings, and spare parts.
Update #4 ·

W9127N26BA001 Amendment 0003 posted 1 May 2026

W9127N26BA001 Amendment 0002 posted 22 April 2026

W9127N26BA001 Amendment 0001 posted 9 April 2026

---------------------------------------------------

The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for the John Day Fish Pump Rehabilitation at John Day Dam, Oregon. The proposed project will be a Total Small Business Set-Aside, firm-fixed price (FFP) contract.

Background: Prior work on fish pump No.3 included replacement of the lower pump shaft, true-up machining of the upper pump shaft, true-up machining of the upper and lower bearing mounting flanges and spigot bores on the cover plate and diffuser, and true-up machining of the diffuser extension cone. The propeller itself had its blade tips built up with weld and re-machined a proper clearance (nominally 1/8" radial clearance) to the pit liner. In addition, the propeller center bores were true-up machined for proper fit (0.004-0.006" clearance) to the new lower shaft. The upper and lower bearings were fitted with greaseless bearing liners and the shafts existing stainless bearing journals were replaced with spares originally manufactured by Worthington Pump. work will be replicated for pump No.2 and possible pump No.1 and No. 3. 

Purpose: The project will include the removal, refurbishment, and replacement of major components of Fish Pump Units 1, 2 and 3, including but not limited to shafts, bearings, bearing brackets, and right-angle drive gearboxes. Work will require field disassembly of existing equipment, transport of components for off-site shop repair, precision machining, fabrication of replacement parts, and final reinstallation and alignment to manufacturer specifications.

The following information represents the project objectives:

  • Removal and replacement of damaged pump shafts and bearings.
  • Repair-by-replacement of approximately 1000 horsepower class power transmission and reduction gearbox.
  • Precision machining (true-up) of shafts, bearing housings, and diffuser components.
  • Installation of greaseless bearing liners and replacement of stainless-steel bearing journals.
  • On-site reassembly, shaft alignment, gearbox installation, and system balancing.
  • Testing of the completed pump unit(s) to verify functional performance.
  • Delivery of updated operation and maintenance manuals, drawings, and spare parts.
Update #3 ·

W9127N26BA001 Amendment 0002 posted 22 April 2026

W9127N26BA001 Amendment 0001 posted 9 April 2026

---------------------------------------------------

The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for the John Day Fish Pump Rehabilitation at John Day Dam, Oregon. The proposed project will be a Total Small Business Set-Aside, firm-fixed price (FFP) contract.

Background: Prior work on fish pump No.3 included replacement of the lower pump shaft, true-up machining of the upper pump shaft, true-up machining of the upper and lower bearing mounting flanges and spigot bores on the cover plate and diffuser, and true-up machining of the diffuser extension cone. The propeller itself had its blade tips built up with weld and re-machined a proper clearance (nominally 1/8" radial clearance) to the pit liner. In addition, the propeller center bores were true-up machined for proper fit (0.004-0.006" clearance) to the new lower shaft. The upper and lower bearings were fitted with greaseless bearing liners and the shafts existing stainless bearing journals were replaced with spares originally manufactured by Worthington Pump. work will be replicated for pump No.2 and possible pump No.1 and No. 3. 

Purpose: The project will include the removal, refurbishment, and replacement of major components of Fish Pump Units 1, 2 and 3, including but not limited to shafts, bearings, bearing brackets, and right-angle drive gearboxes. Work will require field disassembly of existing equipment, transport of components for off-site shop repair, precision machining, fabrication of replacement parts, and final reinstallation and alignment to manufacturer specifications.

The following information represents the project objectives:

  • Removal and replacement of damaged pump shafts and bearings.
  • Repair-by-replacement of approximately 1000 horsepower class power transmission and reduction gearbox.
  • Precision machining (true-up) of shafts, bearing housings, and diffuser components.
  • Installation of greaseless bearing liners and replacement of stainless-steel bearing journals.
  • On-site reassembly, shaft alignment, gearbox installation, and system balancing.
  • Testing of the completed pump unit(s) to verify functional performance.
  • Delivery of updated operation and maintenance manuals, drawings, and spare parts.
Update #2 ·

W9127N26BA001 Amendment 0001 posted 9 April 2026

---------------------------------------------------

The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for the John Day Fish Pump Rehabilitation at John Day Dam, Oregon. The proposed project will be a Total Small Business Set-Aside, firm-fixed price (FFP) contract.

Background: Prior work on fish pump No.3 included replacement of the lower pump shaft, true-up machining of the upper pump shaft, true-up machining of the upper and lower bearing mounting flanges and spigot bores on the cover plate and diffuser, and true-up machining of the diffuser extension cone. The propeller itself had its blade tips built up with weld and re-machined a proper clearance (nominally 1/8" radial clearance) to the pit liner. In addition, the propeller center bores were true-up machined for proper fit (0.004-0.006" clearance) to the new lower shaft. The upper and lower bearings were fitted with greaseless bearing liners and the shafts existing stainless bearing journals were replaced with spares originally manufactured by Worthington Pump. work will be replicated for pump No.2 and possible pump No.1 and No. 3. 

Purpose: The project will include the removal, refurbishment, and replacement of major components of Fish Pump Units 1, 2 and 3, including but not limited to shafts, bearings, bearing brackets, and right-angle drive gearboxes. Work will require field disassembly of existing equipment, transport of components for off-site shop repair, precision machining, fabrication of replacement parts, and final reinstallation and alignment to manufacturer specifications.

The following information represents the project objectives:

  • Removal and replacement of damaged pump shafts and bearings.
  • Repair-by-replacement of approximately 1000 horsepower class power transmission and reduction gearbox.
  • Precision machining (true-up) of shafts, bearing housings, and diffuser components.
  • Installation of greaseless bearing liners and replacement of stainless-steel bearing journals.
  • On-site reassembly, shaft alignment, gearbox installation, and system balancing.
  • Testing of the completed pump unit(s) to verify functional performance.
  • Delivery of updated operation and maintenance manuals, drawings, and spare parts.
Update #1 ·

The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for the John Day Fish Pump Rehabilitation at John Day Dam, Oregon. The proposed project will be a Total Small Business Set-Aside, firm-fixed price (FFP) contract.

Background: Prior work on fish pump No.3 included replacement of the lower pump shaft, true-up machining of the upper pump shaft, true-up machining of the upper and lower bearing mounting flanges and spigot bores on the cover plate and diffuser, and true-up machining of the diffuser extension cone. The propeller itself had its blade tips built up with weld and re-machined a proper clearance (nominally 1/8" radial clearance) to the pit liner. In addition, the propeller center bores were true-up machined for proper fit (0.004-0.006" clearance) to the new lower shaft. The upper and lower bearings were fitted with greaseless bearing liners and the shafts existing stainless bearing journals were replaced with spares originally manufactured by Worthington Pump. work will be replicated for pump No.2 and possible pump No.1 and No. 3. 

Purpose: The project will include the removal, refurbishment, and replacement of major components of Fish Pump Units 1, 2 and 3, including but not limited to shafts, bearings, bearing brackets, and right-angle drive gearboxes. Work will require field disassembly of existing equipment, transport of components for off-site shop repair, precision machining, fabrication of replacement parts, and final reinstallation and alignment to manufacturer specifications.

The following information represents the project objectives:

  • Removal and replacement of damaged pump shafts and bearings.
  • Repair-by-replacement of approximately 1000 horsepower class power transmission and reduction gearbox.
  • Precision machining (true-up) of shafts, bearing housings, and diffuser components.
  • Installation of greaseless bearing liners and replacement of stainless-steel bearing journals.
  • On-site reassembly, shaft alignment, gearbox installation, and system balancing.
  • Testing of the completed pump unit(s) to verify functional performance.
  • Delivery of updated operation and maintenance manuals, drawings, and spare parts.

Files

Show all 19

Notice history

Notice Type Posted
John Day Dam Fish Pump Rehabilitation Project Latest solicitation Solicitation
John Day Fish Pump Rehabilitation Pre-Solicitation
This notice Solicitation
John Day Fish Rehabilitation Pre-Solicitation
JDA Fish Turbine Pump Repair Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
John day DAM unit 10 packing box replacement John Day Dam, Sherman County, Oregonthe John Day Dam On The Columbia River Between Sherman County, Oregon, And Klickitat County, Washington. Rufus, Oregon 97050, United States · NAICS 237990 ENDIST Portland No set-aside
John day DAM navigation lock tainter valve (TV) repairs TV3 and TV4 Location and Access Details. Oregon Side Physical Access, Near Rufus, OR 97050 accessible via I-84, Exit 109. Washington Side (Closest Town), Goldendale, WA 98620 approximately 20 miles north across the river. River Location, Mile 216.6 on the Columbia River, joining Sherman County, Oregon, and Klickitat County, Washington. 98628 · NAICS 237990 ENDIST Portland No set-aside
LLA Fish Pump - Motor Rewind Pomeroy, Washington 99347, United States · NAICS 811310 ENDIST Walla Walla No set-aside
TDA Isolated Phase Bus and Duct Inspection The Dalles Dam in The Dalles, Oregon. Access to The Dalles Dam is from I-84 Exit 88 97058 · NAICS 541380 ENDIST Portland No set-aside
Dworshak Skeleton Bay Draft Tube Bulkhead Rehabilitation NAICS 332812 ENDIST Walla Walla Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity