Water Piping and Secondary Access Point FIO drawings.zip

ZIP file 1 MB Posted

Attached to
John Day Fish Pump Rehabilitation
Solicitation number
W9127N26BA001
Issued by

About this file

This file is a zipped archive containing water piping and secondary access point drawings for the John Day Fish Pump Rehabilitation project. The drawings serve as technical documentation supporting the rehabilitation work at John Day Dam in Oregon under solicitation W9127N26BA001. These are architectural/engineering design documents that provide detailed specifications for water piping infrastructure and secondary access points required for the fish pump rehabilitation effort.

The drawings are integral to the scope of work involving removal, refurbishment, and replacement of major components of Fish Pump Units 1, 2, and 3, including shafts, bearings, bearing brackets, and right-angle drive gearboxes. As part of a firm-fixed price, total small business set-aside contract administered by the U.S. Army Corps of Engineers Portland District, these technical drawings establish the configuration and specifications that contractors must follow during field disassembly, off-site shop repair, precision machining, and final reinstallation and alignment to manufacturer specifications. The drawings would be essential reference documents for contractors to understand spatial relationships, connection points, and integration requirements for the water piping systems and access provisions related to the pump rehabilitation work.

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .