Jim Brown Culvert Replacement
Awarded Award Notice Posted
- Solicitation number
- AG-02RC-S-13-0019
- Agency
- Region 1 - Northern Region Forest Service, Department of Agriculture
- Awarded
- to A & K Construction Inc.
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- AG-02RC-C-13-0038 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- From Orofino go east on highway 12 for 8 miles to the junction with state highway 11. Follow Highway 11 for 18 miles to Weippe. From Weippe, follow the Peterson Corners road east for 8.2 miles to Peterson Corners and FS Road 100. Follow FS Road 100 for approximately 2.0 miles north toward Pierce, Idaho to Mile Post 33.8 and the project. Idaho County, Idaho, United States
Notice details come from SAM.gov. Updated .
Notice text
4 versions
Update #4 · Latest ·
Added: Jul 17, 2013 7:29 pm Contract was awarded on 7/17/13 by Karen Ruklic (Matt Markovich was away on a fire assignment). Please see the updated Primary Point of Contact information.
Update #3 ·
Added: Jun 27, 2013 5:59 pm Amendment 0002
Update #2 ·
Added: Jan 28, 2013 6:58 pm
Modified: May 24, 2013 3:53 pmTrack Changes
**SOLICITATION**
This project consists of the removal of an existing 87" x 65" metal culvert and construction of a new 25'-0" span x 6'-6" rise 32' long precast concrete bridge including footings, wingwalls, and curb. Other bridge work includes structural excavation, placement of riprap, excavation and embankment of the roadway approaches for installation of guardrail and aggregate road surfacing. Final roadway will be two lanes. Improvements consist of relocating 200' of the existing stream that is adjacent to the road to an old meander that can be seen on the ground and is 400' long. This work includes excavation for the new streambed which will be placed as fill in the existing channel. Streamside stabilization will be accomplished with some riprap, mostly wattles, clump plantings, and seed. Price range is between $100,000 and $250,000. The estimated start work date is 15 August 2013, with 75 days contract time. The solicitation is expected to be issued after 12 February, 2013.
Update #1 ·
Added: Jan 28, 2013 6:58 pm This project consists of the removal of an existing 87" x 65" metal culvert and construction of a new 25'-0" span x 6'-6" rise 32' long precast concrete bridge including footings, wingwalls, and curb. Other bridge work includes structural excavation, placement of riprap, excavation and embankment of the roadway approaches for installation of guardrail and aggregate road surfacing. Final roadway will be two lanes. Improvements consist of relocating 200' of the existing stream that is adjacent to the road to an old meander that can be seen on the ground and is 400' long. This work includes excavation for the new streambed which will be placed as fill in the existing channel. Streamside stabilization will be accomplished with some riprap, mostly wattles, clump plantings, and seed. Price range is between $100,000 and $250,000. The estimated start work date is 15 August 2013, with 75 days contract time. The solicitation is expected to be issued after 12 February, 2013.
Attachments
| File | Type | Posted |
|---|---|---|
| Schedule_B.doc | DOC document | |
| p3_oblit_detail-11x17.pdf | ||
| p2_summary_-11x17.pdf | ||
| Amendment_0002.pdf | ||
| p4_road_location.pdf | ||
| p1_title_-11x17.pdf | ||
| section_c.doc | DOC document | |
| JIM_BROWN_CREEK_BOX_CULVERT_ADDENDUM.docx | DOCX document | |
| Amendment_0001.pdf | ||
| OwnerPastPerformanceSurvey 1 .docx | DOCX document | |
| Solicitation.doc | DOC document | |
| sf24_bid_bond.pdf | ||
| Supplemental_Specs_Mar-13.docx | DOCX document | |
| workers_comp_form.doc | DOC document | |
| Wage_Determination.pdf | ||
| Jim_Brown_100-38_0_Mar-13.pdf | ||
| JimBrown_PreSol_Map.pdf |
Show all 17
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity