Jim_Brown_100-38_0_Mar-13.pdf

PDF 7 MB Posted

Attached to
Jim Brown Culvert Replacement Federal contract opportunity
Solicitation number
AG-02RC-S-13-0019
Issued by
Department of Agriculture Forest Service R1-Northern Region

About this file

Drawings

View the file

Other files for this federal contract opportunity

Other files attached to Jim Brown Culvert Replacement, newest first.
File Type Posted
Schedule_B.doc DOC document
p1_title_-11x17.pdf PDF
section_c.doc DOC document
p3_oblit_detail-11x17.pdf PDF
p2_summary_-11x17.pdf PDF
Amendment_0002.pdf PDF
p4_road_location.pdf PDF
JIM_BROWN_CREEK_BOX_CULVERT_ADDENDUM.docx DOCX document
Amendment_0001.pdf PDF
OwnerPastPerformanceSurvey 1 .docx DOCX document
sf24_bid_bond.pdf PDF
Supplemental_Specs_Mar-13.docx DOCX document
Solicitation.doc DOC document
workers_comp_form.doc DOC document
Wage_Determination.pdf PDF
JimBrown_PreSol_Map.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NO. DESCRIPTION

INDEX TO SHEETS

4 ROAD PLAN & PROFILE

2 SUMMARY OF QUANTITIES &

1 TITLE SHEET

GENERAL LAYOUT

XS1 - XS2 ROAD CROSS SECTIONS

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE, REGION 1

JIM BROWN CREEK

ROAD #100 MP 38.0

ROAD AND BRIDGE PLANS FOR:

CULVERT REPLACEMENT

GENERAL NOTES

NORTHERN IDAHO LOCATION MAP

Wallace

Orofino

Kamiah

SANDPOINT

Porthill

COEUR D'ALENE

Kellogg

St. Maries

SPOKANE

Avery

Clarkia

MISSOULA

MOSCOW

LEWISTON

CLEARWATER HIGHWAY DISTRICT

NEZ PERCE-CLEARWATER NATIONAL FORESTS

CLEARWATER COUNTY, IDAHO

VICINITY MAP

DISTRICT RANGER

FOREST ENGINEER

REVIEWED:

DATE

DATE

NEZ PERCE-CLEARWATER NATIONAL FORESTS

NEZ PERCE-CLEARWATER NATIONAL FORESTS

FOREST SUPERVISOR

DATE

NEZ PERCE-CLEARWATER NATIONAL FORESTS

R E

R E

R E

R E

CRUSHED SURFACING

T36N

T37N

T35N

T36N

PRECAST BRIDGE DETAILS6

GOVERNMENT

FURNISHED:

CHANNEL ROCK

REGIONAL ENGINEER

APPROVED:

DATE

NORTHERN REGION

RECOMMENDED:

APPROVED:

ROAD TYPICAL SECTIONS &

POINT TABLES

STREAM DETAILS7 - 8

GUARDRAIL DETAILS9 - 11

STREAMBED SIMULATION MATERIAL

RIPRAP

CONTRACTOR

FURNISHED:

GOVERNMENT

PIT

STREAM DIVERSION PLAN12

R E

R E

T34N

T35N

WASTE SITE

SEED MIX

NEZ PERCE-CLEARWATER NFs

JIM BROWN CREEK

RD #100 MP 38.0

ESTIMATED QUANTITIES

& GENERAL NOTES

2 12

REGION ONE

SUMMARY OF ESTIMATED QUANTITIES

MOBILIZATION15101 Lump SumLSQ

CRUSHED AGGREGATE, SURFACING, METHOD 2 (GOVERNMENT FURNISHED)30809 Cubic YardCQ

EQUIPMENT RENTAL, HYDRAULIC EXCAVATOR WITH THUMB62201 HourAQ

CONSTRUCTION SURVEYING AND STAKING15221 Lump SumLSQ

28" SPAN, 20" RISE PIPE-ARCH, 0.064" THICK60202 Lineal FootCQ

XX

GENERAL NOTES

CLUMP PLANTED VEGETATION, DISTURBED AREAS62602 Lump SumLSQ 1

CQ = Contract Quantity; AQ= Actual Quantity; LSQ= Lump Sum Quantity

See Section 109.10 of the Forest Service Supplemental Specifications for METHOD definitions.

REMOVAL OF EXISTING 87"X63" STEEL PIPE-ARCH CULVERT20301A EachAQ 1

STRUCTURE EXCAVATION20806 Lump SumLSQ 1

553A01 Lump SumLSQ 1PRECAST CONCRETE BRIDGE (INCLUDING WINGWALLS, FOOTINGS & CURBS)

DESIGN, FABRICATE, TRANSPORT & INSTALL

CHANNEL ROCK SIZE 1 (GOVERNMENT FURNISHED)64808 Cubic YardCQ 5

PLACE STREAMBED SIMULATION ROCK, BED CLASS 4 (GOVERNMENT FURNISHED)64803 Cubic YardCQ 200

GUARDRAIL SYSTEM, TYPE 1, CLASS A61701 Lineal FootCQ 212.5

CHANNEL EXCAVATION20434 Lump SumLSQ 1

GEOCELL27201 Square YardCQ 85

PLACED RIPRAP, CLASS 3 MACHINE PLACED (CONTRACTOR FURNISHED)25101 Cubic YardCQ 80

STRAW WATTLE15722 Lineal FootCQ 720

GROUND PROTECTION MATS, 4'x8' SHEETS20435 EachAQ 12

REMOVAL OF EXISTING 36" CORRUGATED STEEL PIPE20301B EachAQ 1

Lump SumLSQ 1

Lump SumLSQ 1

SEEDING, DRY METHOD (GOVERNMENT FURNISHED SEED)62503

MULCHING, DRY METHOD62509

RD #100 MP 38.0

ROAD TYPICAL SECTIONS & POINT TABLES

3 12

REGION ONE

TYPICAL SECTIONS

STA 2+40 to STA 4+10

STA 4+10 to STA 4+40

SECTION

Not to Scale

RD #100 MP 38.0

ROAD PLAN & PROFILE

4 12

REGION ONE

STA 2+40

BEGIN ROAD WORK

MATCH EXISTING

PLAN

STA 4+80

END ROAD WORK

MATCH EXISTING

REGION ONE

JIM BROWN CREEK

RD #100 MP 38.0

GENERAL LAYOUT

5 12

TYPICAL SECTION

PLAN

SECTION ALONG CENTERLINE STRUCTURE

PRECAST BRIDGE DESIGN NOTES

JIM BROWN CREEK

RD #100 MP 38.0

PRECAST BRIDGE DETAILS

6 12

PRECAST BRIDGE PLAN

WINGWALL DETAILS

SECTION

Not to Scale

FOOTING DETAILS

STRUCTURE DETAILS

RD #100 MP 38.0

STREAM DETAILS

7 12

REGION ONE

PLAN

RD #100 MP 38.0

STREAM DETAILS

8 12

REGION ONE

NEW CHANNEL SECTION

SECTION

Not to Scale

STRAW WATTLE DETAIL

STREAM CONSTRUCTION NOTES

NEW CHANNEL SECTION

JIM BROWN CREEK

RD #100 MP 38.0

GUARDRAIL DETAILS

9 12

JIM BROWN CREEK

RD #100 MP 38.0

GUARDRAIL DETAILS

10 12

3/8

END VIEWTYPICAL SECTION

WASHER

NEZ PERCE-CLEARWATER NFs

JIM BROWN CREEK

RD #100 MP 38.0

GUARDRAIL DETAILS

11 12

JIM BROWN CREEK

RD #100 MP 38.0

STREAM DIVERSION DETAIL

12 12

PLAN

PUMP

PUMP

PUMP

PUMP

SANDBAG DIVERSION DAM STRAW BALE DAM

RD #100 MP 38.0

ROAD CROSS SECTIONS

JIM BROWN CREEK CULVERT

RD #100 MP 38.0

ROAD CROSS SECTIONS

JIM BROWN CREEK CULVERT

File details come from the government source that posted it. Updated .