Amendment 0007 - James L. King Federal Justice Building Fire Alarm Replacement Project
Closed Solicitation Posted
- Solicitation number
- 47PE0720R0039
- Agency
-
Region 4
Public Buildings Service, General Services Administration
- Responses due
- Set-aside
- Service-Disabled Veteran-Owned Small Business
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Miami FL 33132 USA
Notice details come from SAM.gov. Updated .
About this opportunity
The General Services Administration Southeast Sunbelt Region 4 is soliciting proposals for a design-build contract to replace the fire alarm system at the James L. King Federal Justice Building in Miami, Florida. The project includes completely removing the existing fire alarm system and installing a new automatic fire alarm system meeting all applicable codes. Offerors must have experience designing and installing fire alarm systems per PBS-P100, NFPA 72, and NFPA 101 standards. Proposals are due no later than October 12, 2020 and will be evaluated based on technical qualifications, past performance, and price.
This opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses. The NAICS code is 236220 for commercial and institutional building construction. The PSC code is R499 for fire protection services. The replacement of the fire alarm system must be completed within 400 calendar days of the notice to proceed at the 315,716 gross square foot building located at Miami, Florida.
Notice text
10 versions
Update #10 · Latest ·
Amendment 0007 is hereby issued to:
i.Include the additional specification not included in the initial solicitation or RFIs:
a.One (1) amplifier per floor so that no circuits traverse floors that does not serve.
b.Two (2) booster power supplies per floor
ii. The proposal due date has been extended from September 18, 2020 to October 12, 2020
All terms and conditions remain in effect.
//////////////////////////////////////////////////////////////////Last item////////////////////////////////////////////////////////////
Amendment 0006 (email) is hereby issued to:
a. incorporate the RFI documentation in the solicitation packet.
With the addition of this new information a follo-up amendment will be issued to extend the proposal due date
All other terms and conditions remain in effect.
//////////////////////////////////////////////////////////////////Last item////////////////////////////////////////////////////////////
Amendment 0005 is hereby issued to:
a. Change the proposal due date from 4 September 2020 to 18 September 2020.
b. In order to be considered for award, offers conforming to the requirements of the Solicitation must be received at the following office no later than 4:00 pm local time on the following date and at the following email address: elizabeth.moten@gsa.gov.
c. This amendment is also issued to change the Contracting Officer from Lori Fischer to Cathal Duffy.
All other terms and conditions remain in effect.
//////////////////////////////////////////////////////////////////Last item////////////////////////////////////////////////////////////
Amendment 0004 is hereby issued to:
a. Incorporate an additional site visit scheduled for 30 July 2020 at 9:00 AM.
b. MASKS ARE MANDATORY.
c. Change the RFI due date from 7 August 2020 at 12:00 PM TO 14 August 2020 at 12:00 PM
d. Change the proposal due date from August 17, 2020 TO 4 September 2020 at 4:00PM
//////////////////////////////////////////////////////////////////Last item////////////////////////////////////////////////////////////
Amendment 0003
a. Amendment 0003 is hereby issued to incorporate the CAD Files into the solicitation.
b. RFIs are due on 7 August 2020 at 12:00PM. Please email RFIs to elizabeth.moten@gsa.gov.
c. The proposal due date has changed from 24 July 2020 TO 17 August 2020 at 4:00PM
d. All other terms and condition remain unchanged.
////////////////////////////////////////////////////////////Last Item///////////////////////////////////////////////////////////////////
Amendment 0002
a. Amendment 0002 is hereby issued to remove the previous solicitation documentation and add the correct solicitation documents. The previous documents pertained to another project not associated with the James L. King Fire Alarm project.
////////////////////////////////////////////////////////////Last Item///////////////////////////////////////////////////////////////////
Amendment 0001
a. Amendment 0001 is hereby issued to change the site visit date and time.
b. The new date and time will be June 24, 2020 at 11:00 AM
c. Please email elizabeth.moten@gsa.gov to RSVP to attend the site visit. Please remember that social distancing will be in place during, and your understanding is greatly appreciatied thoughout the process.
d. MASK ARE MANDATORY.
e. Response date and time remains unchanged.
f. All other terms and condition remain unchanged.
////////////////////////////////////////////////////////////Last Item///////////////////////////////////////////////////////////////////
The General Services Administration (GSA) Southeast Sunbelt Region 4 announces the opportunity for a Request for Proposal to to replace the fire alarm system at the James L. King Federal Justice Building in Miami, FL.
BACKGROUND: The James L. King Federal Justice Building is a high rise office building located in downtown Miami, FL. It was constructed in 1993 and consists of a twelve-story 12-story, masonry and glass office building with 6 passenger elevators and 1 private elevator. There are no floors below grade. Courts have 6 District Courtrooms and 2 Court of Appeals Courtrooms in the Building. The building’s gross square footage is 315,716 GSF.
PROJECT GOAL: The goal of this project is to increase the level of life safety provided in this building by replacing the existing fire alarm system. The new fire alarm system is to be an automatic type fire alarm system that meets the current requirements of the applicable codes and standards.
PROJECT SCOPE: The project includes but is not limited to the following work: Provide Design-Build services for complete replacement of the existing fire alarm system throughout the building. Work will include the complete removal of the existing fire alarm system including wire and all related devices and components, and the design and installation of a new fire alarm system which will serve the entire building. The new
automatic fire alarm system will meet the requirements of the 2018 Edition of PBS-P100, 2019 Edition Of NFPA 72 and the 2018 Edition of NFPA 101, Life Safety Code. To include any modifications to the building required for the installation and all incidental and related work for a complete and functional fire alarm system.
A new Gamewell FCI– By Honeywell (E3) Complete Main Fire Alarm Control Panel (FACP) with Voice Evac was recently installed (08/2019), including main panel with touch screen color display and graphic annunciator, microphone, amplifiers, Intelligent Loop Interface-Main Board, Intelligent Loop Interface-Expansion Board, DACT, all cards, monitor modules, and control modules, all located within the Fire Command Room. A new Remote Annunciator Panel was also installed in the U.S. Marshals Control Room.
Therefore, the remainder of the entire building wide fire alarm system on all floors will be removed and replaced including but not limited to all initiating devices, notification devices, wiring, tamper switches, flow switches, monitor modules, control modules, door release devices, Firefighter’s phones, and any remaining conduit not conducive for reuse. All elevator shaft smoke detectors and various spot smoke detectors located throughout the building will be removed and not replaced. An additional remote annunciator will be installed in the O&M office. New Firefighter’s telephone handsets and cabinet to be installed in Fire Command Room.
The contractor will be responsible for a complete design for the project, including calculations, specifications, and drawings needed to perform the required modifications to the fire alarm and emergency communications system. The contractor will be responsible for the installation of all work and shall provide all material, equipment, accessories, commissioning and testing in compliance with the design documents.
PROJECT CONDITIONS: The building will remain occupied throughout the project.
PROJECT SCHEDULE: It is anticipated that the design and construction will be completed within 400 calendar days after Notice to Proceed. Notice to Proceed for Design and Construction will be issued by GSA within 14 calendar day of contract award. Total contract duration for this project is 400 calendar days. This includes all design and construction activities including submittal review and approval, lead time for material delivery and ordering, etc.
RESPONSE DATE: Proposals are due NLT July 24, 2020, 4:00PM EST. Please submit your proposal to Elizabeth Moten via email to elizabeth.moten@gsa.gov and cc Lori Fischer at Lori.fischer@gsa.gov. LATE RESPONSES WILL NOT BE ACCEPTED AND WILL BE CONSIDERED NON-RESPONSIVE.
NAICS Code: 236220 -- Commercial and Institutional Building Construction
PLEASE ENSURE THAT YOU READ THE SOLICITATION IN ITS ENTIRETY.
Contracting Officer - Lori Fischer (lori.fischer@gsa.gov)
Contracting Specialist - Elizabeth Moten (elizabeth.moten@gsa.gov)
Project Manager - Josh Lockwood (josh.lockwood@gsa.gov)
Update #9 ·
Amendment 0006 (email) is hereby issued to:
a. incorporate the RFI documentation in the solicitation packet.
With the addition of this new information a follo-up amendment will be issued to extend the proposal due date
All other terms and conditions remain in effect.
//////////////////////////////////////////////////////////////////Last item////////////////////////////////////////////////////////////
Amendment 0005 is hereby issued to:
a. Change the proposal due date from 4 September 2020 to 18 September 2020.
b. In order to be considered for award, offers conforming to the requirements of the Solicitation must be received at the following office no later than 4:00 pm local time on the following date and at the following email address: elizabeth.moten@gsa.gov.
c. This amendment is also issued to change the Contracting Officer from Lori Fischer to Cathal Duffy.
All other terms and conditions remain in effect.
//////////////////////////////////////////////////////////////////Last item////////////////////////////////////////////////////////////
Amendment 0004 is hereby issued to:
a. Incorporate an additional site visit scheduled for 30 July 2020 at 9:00 AM.
b. MASKS ARE MANDATORY.
c. Change the RFI due date from 7 August 2020 at 12:00 PM TO 14 August 2020 at 12:00 PM
d. Change the proposal due date from August 17, 2020 TO 4 September 2020 at 4:00PM
//////////////////////////////////////////////////////////////////Last item////////////////////////////////////////////////////////////
Amendment 0003
a. Amendment 0003 is hereby issued to incorporate the CAD Files into the solicitation.
b. RFIs are due on 7 August 2020 at 12:00PM. Please email RFIs to elizabeth.moten@gsa.gov.
c. The proposal due date has changed from 24 July 2020 TO 17 August 2020 at 4:00PM
d. All other terms and condition remain unchanged.
////////////////////////////////////////////////////////////Last Item///////////////////////////////////////////////////////////////////
Amendment 0002
a. Amendment 0002 is hereby issued to remove the previous solicitation documentation and add the correct solicitation documents. The previous documents pertained to another project not associated with the James L. King Fire Alarm project.
////////////////////////////////////////////////////////////Last Item///////////////////////////////////////////////////////////////////
Amendment 0001
a. Amendment 0001 is hereby issued to change the site visit date and time.
b. The new date and time will be June 24, 2020 at 11:00 AM
c. Please email elizabeth.moten@gsa.gov to RSVP to attend the site visit. Please remember that social distancing will be in place during, and your understanding is greatly appreciatied thoughout the process.
d. MASK ARE MANDATORY.
e. Response date and time remains unchanged.
f. All other terms and condition remain unchanged.
////////////////////////////////////////////////////////////Last Item///////////////////////////////////////////////////////////////////
The General Services Administration (GSA) Southeast Sunbelt Region 4 announces the opportunity for a Request for Proposal to to replace the fire alarm system at the James L. King Federal Justice Building in Miami, FL.
BACKGROUND: The James L. King Federal Justice Building is a high rise office building located in downtown Miami, FL. It was constructed in 1993 and consists of a twelve-story 12-story, masonry and glass office building with 6 passenger elevators and 1 private elevator. There are no floors below grade. Courts have 6 District Courtrooms and 2 Court of Appeals Courtrooms in the Building. The building’s gross square footage is 315,716 GSF.
PROJECT GOAL: The goal of this project is to increase the level of life safety provided in this building by replacing the existing fire alarm system. The new fire alarm system is to be an automatic type fire alarm system that meets the current requirements of the applicable codes and standards.
PROJECT SCOPE: The project includes but is not limited to the following work: Provide Design-Build services for complete replacement of the existing fire alarm system throughout the building. Work will include the complete removal of the existing fire alarm system including wire and all related devices and components, and the design and installation of a new fire alarm system which will serve the entire building. The new
automatic fire alarm system will meet the requirements of the 2018 Edition of PBS-P100, 2019 Edition Of NFPA 72 and the 2018 Edition of NFPA 101, Life Safety Code. To include any modifications to the building required for the installation and all incidental and related work for a complete and functional fire alarm system.
A new Gamewell FCI– By Honeywell (E3) Complete Main Fire Alarm Control Panel (FACP) with Voice Evac was recently installed (08/2019), including main panel with touch screen color display and graphic annunciator, microphone, amplifiers, Intelligent Loop Interface-Main Board, Intelligent Loop Interface-Expansion Board, DACT, all cards, monitor modules, and control modules, all located within the Fire Command Room. A new Remote Annunciator Panel was also installed in the U.S. Marshals Control Room.
Therefore, the remainder of the entire building wide fire alarm system on all floors will be removed and replaced including but not limited to all initiating devices, notification devices, wiring, tamper switches, flow switches, monitor modules, control modules, door release devices, Firefighter’s phones, and any remaining conduit not conducive for reuse. All elevator shaft smoke detectors and various spot smoke detectors located throughout the building will be removed and not replaced. An additional remote annunciator will be installed in the O&M office. New Firefighter’s telephone handsets and cabinet to be installed in Fire Command Room.
The contractor will be responsible for a complete design for the project, including calculations, specifications, and drawings needed to perform the required modifications to the fire alarm and emergency communications system. The contractor will be responsible for the installation of all work and shall provide all material, equipment, accessories, commissioning and testing in compliance with the design documents.
PROJECT CONDITIONS: The building will remain occupied throughout the project.
PROJECT SCHEDULE: It is anticipated that the design and construction will be completed within 400 calendar days after Notice to Proceed. Notice to Proceed for Design and Construction will be issued by GSA within 14 calendar day of contract award. Total contract duration for this project is 400 calendar days. This includes all design and construction activities including submittal review and approval, lead time for material delivery and ordering, etc.
RESPONSE DATE: Proposals are due NLT July 24, 2020, 4:00PM EST. Please submit your proposal to Elizabeth Moten via email to elizabeth.moten@gsa.gov and cc Lori Fischer at Lori.fischer@gsa.gov. LATE RESPONSES WILL NOT BE ACCEPTED AND WILL BE CONSIDERED NON-RESPONSIVE.
NAICS Code: 236220 -- Commercial and Institutional Building Construction
PLEASE ENSURE THAT YOU READ THE SOLICITATION IN ITS ENTIRETY.
Contracting Officer - Lori Fischer (lori.fischer@gsa.gov)
Contracting Specialist - Elizabeth Moten (elizabeth.moten@gsa.gov)
Project Manager - Josh Lockwood (josh.lockwood@gsa.gov)
Update #8 ·
Amendment 0005 is hereby issued to:
a. Change the proposal due date from 4 September 2020 to 18 September 2020.
b. In order to be considered for award, offers conforming to the requirements of the Solicitation must be received at the following office no later than 4:00 pm local time on the following date and at the following email address: elizabeth.moten@gsa.gov.
c. This amendment is also issued to change the Contracting Officer from Lori Fischer to Cathal Duffy.
All other terms and conditions remain in effect.
//////////////////////////////////////////////////////////////////Last item////////////////////////////////////////////////////////////
Amendment 0004 is hereby issued to:
a. Incorporate an additional site visit scheduled for 30 July 2020 at 9:00 AM.
b. MASKS ARE MANDATORY.
c. Change the RFI due date from 7 August 2020 at 12:00 PM TO 14 August 2020 at 12:00 PM
d. Change the proposal due date from August 17, 2020 TO 4 September 2020 at 4:00PM
//////////////////////////////////////////////////////////////////Last item////////////////////////////////////////////////////////////
Amendment 0003
a. Amendment 0003 is hereby issued to incorporate the CAD Files into the solicitation.
b. RFIs are due on 7 August 2020 at 12:00PM. Please email RFIs to elizabeth.moten@gsa.gov.
c. The proposal due date has changed from 24 July 2020 TO 17 August 2020 at 4:00PM
d. All other terms and condition remain unchanged.
////////////////////////////////////////////////////////////Last Item///////////////////////////////////////////////////////////////////
Amendment 0002
a. Amendment 0002 is hereby issued to remove the previous solicitation documentation and add the correct solicitation documents. The previous documents pertained to another project not associated with the James L. King Fire Alarm project.
////////////////////////////////////////////////////////////Last Item///////////////////////////////////////////////////////////////////
Amendment 0001
a. Amendment 0001 is hereby issued to change the site visit date and time.
b. The new date and time will be June 24, 2020 at 11:00 AM
c. Please email elizabeth.moten@gsa.gov to RSVP to attend the site visit. Please remember that social distancing will be in place during, and your understanding is greatly appreciatied thoughout the process.
d. MASK ARE MANDATORY.
e. Response date and time remains unchanged.
f. All other terms and condition remain unchanged.
////////////////////////////////////////////////////////////Last Item///////////////////////////////////////////////////////////////////
The General Services Administration (GSA) Southeast Sunbelt Region 4 announces the opportunity for a Request for Proposal to to replace the fire alarm system at the James L. King Federal Justice Building in Miami, FL.
BACKGROUND: The James L. King Federal Justice Building is a high rise office building located in downtown Miami, FL. It was constructed in 1993 and consists of a twelve-story 12-story, masonry and glass office building with 6 passenger elevators and 1 private elevator. There are no floors below grade. Courts have 6 District Courtrooms and 2 Court of Appeals Courtrooms in the Building. The building’s gross square footage is 315,716 GSF.
PROJECT GOAL: The goal of this project is to increase the level of life safety provided in this building by replacing the existing fire alarm system. The new fire alarm system is to be an automatic type fire alarm system that meets the current requirements of the applicable codes and standards.
PROJECT SCOPE: The project includes but is not limited to the following work: Provide Design-Build services for complete replacement of the existing fire alarm system throughout the building. Work will include the complete removal of the existing fire alarm system including wire and all related devices and components, and the design and installation of a new fire alarm system which will serve the entire building. The new
automatic fire alarm system will meet the requirements of the 2018 Edition of PBS-P100, 2019 Edition Of NFPA 72 and the 2018 Edition of NFPA 101, Life Safety Code. To include any modifications to the building required for the installation and all incidental and related work for a complete and functional fire alarm system.
A new Gamewell FCI– By Honeywell (E3) Complete Main Fire Alarm Control Panel (FACP) with Voice Evac was recently installed (08/2019), including main panel with touch screen color display and graphic annunciator, microphone, amplifiers, Intelligent Loop Interface-Main Board, Intelligent Loop Interface-Expansion Board, DACT, all cards, monitor modules, and control modules, all located within the Fire Command Room. A new Remote Annunciator Panel was also installed in the U.S. Marshals Control Room.
Therefore, the remainder of the entire building wide fire alarm system on all floors will be removed and replaced including but not limited to all initiating devices, notification devices, wiring, tamper switches, flow switches, monitor modules, control modules, door release devices, Firefighter’s phones, and any remaining conduit not conducive for reuse. All elevator shaft smoke detectors and various spot smoke detectors located throughout the building will be removed and not replaced. An additional remote annunciator will be installed in the O&M office. New Firefighter’s telephone handsets and cabinet to be installed in Fire Command Room.
The contractor will be responsible for a complete design for the project, including calculations, specifications, and drawings needed to perform the required modifications to the fire alarm and emergency communications system. The contractor will be responsible for the installation of all work and shall provide all material, equipment, accessories, commissioning and testing in compliance with the design documents.
PROJECT CONDITIONS: The building will remain occupied throughout the project.
PROJECT SCHEDULE: It is anticipated that the design and construction will be completed within 400 calendar days after Notice to Proceed. Notice to Proceed for Design and Construction will be issued by GSA within 14 calendar day of contract award. Total contract duration for this project is 400 calendar days. This includes all design and construction activities including submittal review and approval, lead time for material delivery and ordering, etc.
RESPONSE DATE: Proposals are due NLT July 24, 2020, 4:00PM EST. Please submit your proposal to Elizabeth Moten via email to elizabeth.moten@gsa.gov and cc Lori Fischer at Lori.fischer@gsa.gov. LATE RESPONSES WILL NOT BE ACCEPTED AND WILL BE CONSIDERED NON-RESPONSIVE.
NAICS Code: 236220 -- Commercial and Institutional Building Construction
PLEASE ENSURE THAT YOU READ THE SOLICITATION IN ITS ENTIRETY.
Contracting Officer - Lori Fischer (lori.fischer@gsa.gov)
Contracting Specialist - Elizabeth Moten (elizabeth.moten@gsa.gov)
Project Manager - Josh Lockwood (josh.lockwood@gsa.gov)
Update #7 ·
Amendment 0004 is hereby issued to:
a. Incorporate an additional site visit scheduled for 30 July 2020 at 9:00 AM.
b. MASKS ARE MANDATORY.
c. Change the RFI due date from 7 August 2020 at 12:00 PM TO 14 August 2020 at 12:00 PM
d. Change the proposal due date from August 17, 2020 TO 4 September 2020 at 4:00PM
//////////////////////////////////////////////////////////////////Last item////////////////////////////////////////////////////////////
Amendment 0003
a. Amendment 0003 is hereby issued to incorporate the CAD Files into the solicitation.
b. RFIs are due on 7 August 2020 at 12:00PM. Please email RFIs to elizabeth.moten@gsa.gov.
c. The proposal due date has changed from 24 July 2020 TO 17 August 2020 at 4:00PM
d. All other terms and condition remain unchanged.
////////////////////////////////////////////////////////////Last Item///////////////////////////////////////////////////////////////////
Amendment 0002
a. Amendment 0002 is hereby issued to remove the previous solicitation documentation and add the correct solicitation documents. The previous documents pertained to another project not associated with the James L. King Fire Alarm project.
////////////////////////////////////////////////////////////Last Item///////////////////////////////////////////////////////////////////
Amendment 0001
a. Amendment 0001 is hereby issued to change the site visit date and time.
b. The new date and time will be June 24, 2020 at 11:00 AM
c. Please email elizabeth.moten@gsa.gov to RSVP to attend the site visit. Please remember that social distancing will be in place during, and your understanding is greatly appreciatied thoughout the process.
d. MASK ARE MANDATORY.
e. Response date and time remains unchanged.
f. All other terms and condition remain unchanged.
////////////////////////////////////////////////////////////Last Item///////////////////////////////////////////////////////////////////
The General Services Administration (GSA) Southeast Sunbelt Region 4 announces the opportunity for a Request for Proposal to to replace the fire alarm system at the James L. King Federal Justice Building in Miami, FL.
BACKGROUND: The James L. King Federal Justice Building is a high rise office building located in downtown Miami, FL. It was constructed in 1993 and consists of a twelve-story 12-story, masonry and glass office building with 6 passenger elevators and 1 private elevator. There are no floors below grade. Courts have 6 District Courtrooms and 2 Court of Appeals Courtrooms in the Building. The building’s gross square footage is 315,716 GSF.
PROJECT GOAL: The goal of this project is to increase the level of life safety provided in this building by replacing the existing fire alarm system. The new fire alarm system is to be an automatic type fire alarm system that meets the current requirements of the applicable codes and standards.
PROJECT SCOPE: The project includes but is not limited to the following work: Provide Design-Build services for complete replacement of the existing fire alarm system throughout the building. Work will include the complete removal of the existing fire alarm system including wire and all related devices and components, and the design and installation of a new fire alarm system which will serve the entire building. The new
automatic fire alarm system will meet the requirements of the 2018 Edition of PBS-P100, 2019 Edition Of NFPA 72 and the 2018 Edition of NFPA 101, Life Safety Code. To include any modifications to the building required for the installation and all incidental and related work for a complete and functional fire alarm system.
A new Gamewell FCI– By Honeywell (E3) Complete Main Fire Alarm Control Panel (FACP) with Voice Evac was recently installed (08/2019), including main panel with touch screen color display and graphic annunciator, microphone, amplifiers, Intelligent Loop Interface-Main Board, Intelligent Loop Interface-Expansion Board, DACT, all cards, monitor modules, and control modules, all located within the Fire Command Room. A new Remote Annunciator Panel was also installed in the U.S. Marshals Control Room.
Therefore, the remainder of the entire building wide fire alarm system on all floors will be removed and replaced including but not limited to all initiating devices, notification devices, wiring, tamper switches, flow switches, monitor modules, control modules, door release devices, Firefighter’s phones, and any remaining conduit not conducive for reuse. All elevator shaft smoke detectors and various spot smoke detectors located throughout the building will be removed and not replaced. An additional remote annunciator will be installed in the O&M office. New Firefighter’s telephone handsets and cabinet to be installed in Fire Command Room.
The contractor will be responsible for a complete design for the project, including calculations, specifications, and drawings needed to perform the required modifications to the fire alarm and emergency communications system. The contractor will be responsible for the installation of all work and shall provide all material, equipment, accessories, commissioning and testing in compliance with the design documents.
PROJECT CONDITIONS: The building will remain occupied throughout the project.
PROJECT SCHEDULE: It is anticipated that the design and construction will be completed within 400 calendar days after Notice to Proceed. Notice to Proceed for Design and Construction will be issued by GSA within 14 calendar day of contract award. Total contract duration for this project is 400 calendar days. This includes all design and construction activities including submittal review and approval, lead time for material delivery and ordering, etc.
RESPONSE DATE: Proposals are due NLT July 24, 2020, 4:00PM EST. Please submit your proposal to Elizabeth Moten via email to elizabeth.moten@gsa.gov and cc Lori Fischer at Lori.fischer@gsa.gov. LATE RESPONSES WILL NOT BE ACCEPTED AND WILL BE CONSIDERED NON-RESPONSIVE.
NAICS Code: 236220 -- Commercial and Institutional Building Construction
PLEASE ENSURE THAT YOU READ THE SOLICITATION IN ITS ENTIRETY.
Contracting Officer - Lori Fischer (lori.fischer@gsa.gov)
Contracting Specialist - Elizabeth Moten (elizabeth.moten@gsa.gov)
Project Manager - Josh Lockwood (josh.lockwood@gsa.gov)
Update #6 ·
Amendment 0003
a. Amendment 0003 is hereby issued to incorporate the CAD Files into the solicitation.
b. RFIs are due on 7 August 2020 at 12:00PM. Please email RFIs to elizabeth.moten@gsa.gov.
c. The proposal due date has changed from 24 July 2020 TO 17 August 2020 at 4:00PM
d. All other terms and condition remain unchanged.
////////////////////////////////////////////////////////////Last Item///////////////////////////////////////////////////////////////////
Amendment 0002
a. Amendment 0002 is hereby issued to remove the previous solicitation documentation and add the correct solicitation documents. The previous documents pertained to another project not associated with the James L. King Fire Alarm project.
////////////////////////////////////////////////////////////Last Item///////////////////////////////////////////////////////////////////
Amendment 0001
a. Amendment 0001 is hereby issued to change the site visit date and time.
b. The new date and time will be June 24, 2020 at 11:00 AM
c. Please email elizabeth.moten@gsa.gov to RSVP to attend the site visit. Please remember that social distancing will be in place during, and your understanding is greatly appreciatied thoughout the process.
d. MASK ARE MANDATORY.
e. Response date and time remains unchanged.
f. All other terms and condition remain unchanged.
////////////////////////////////////////////////////////////Last Item///////////////////////////////////////////////////////////////////
The General Services Administration (GSA) Southeast Sunbelt Region 4 announces the opportunity for a Request for Proposal to to replace the fire alarm system at the James L. King Federal Justice Building in Miami, FL.
BACKGROUND: The James L. King Federal Justice Building is a high rise office building located in downtown Miami, FL. It was constructed in 1993 and consists of a twelve-story 12-story, masonry and glass office building with 6 passenger elevators and 1 private elevator. There are no floors below grade. Courts have 6 District Courtrooms and 2 Court of Appeals Courtrooms in the Building. The building’s gross square footage is 315,716 GSF.
PROJECT GOAL: The goal of this project is to increase the level of life safety provided in this building by replacing the existing fire alarm system. The new fire alarm system is to be an automatic type fire alarm system that meets the current requirements of the applicable codes and standards.
PROJECT SCOPE: The project includes but is not limited to the following work: Provide Design-Build services for complete replacement of the existing fire alarm system throughout the building. Work will include the complete removal of the existing fire alarm system including wire and all related devices and components, and the design and installation of a new fire alarm system which will serve the entire building. The new
automatic fire alarm system will meet the requirements of the 2018 Edition of PBS-P100, 2019 Edition Of NFPA 72 and the 2018 Edition of NFPA 101, Life Safety Code. To include any modifications to the building required for the installation and all incidental and related work for a complete and functional fire alarm system.
A new Gamewell FCI– By Honeywell (E3) Complete Main Fire Alarm Control Panel (FACP) with Voice Evac was recently installed (08/2019), including main panel with touch screen color display and graphic annunciator, microphone, amplifiers, Intelligent Loop Interface-Main Board, Intelligent Loop Interface-Expansion Board, DACT, all cards, monitor modules, and control modules, all located within the Fire Command Room. A new Remote Annunciator Panel was also installed in the U.S. Marshals Control Room.
Therefore, the remainder of the entire building wide fire alarm system on all floors will be removed and replaced including but not limited to all initiating devices, notification devices, wiring, tamper switches, flow switches, monitor modules, control modules, door release devices, Firefighter’s phones, and any remaining conduit not conducive for reuse. All elevator shaft smoke detectors and various spot smoke detectors located throughout the building will be removed and not replaced. An additional remote annunciator will be installed in the O&M office. New Firefighter’s telephone handsets and cabinet to be installed in Fire Command Room.
The contractor will be responsible for a complete design for the project, including calculations, specifications, and drawings needed to perform the required modifications to the fire alarm and emergency communications system. The contractor will be responsible for the installation of all work and shall provide all material, equipment, accessories, commissioning and testing in compliance with the design documents.
PROJECT CONDITIONS: The building will remain occupied throughout the project.
PROJECT SCHEDULE: It is anticipated that the design and construction will be completed within 400 calendar days after Notice to Proceed. Notice to Proceed for Design and Construction will be issued by GSA within 14 calendar day of contract award. Total contract duration for this project is 400 calendar days. This includes all design and construction activities including submittal review and approval, lead time for material delivery and ordering, etc.
RESPONSE DATE: Proposals are due NLT July 24, 2020, 4:00PM EST. Please submit your proposal to Elizabeth Moten via email to elizabeth.moten@gsa.gov and cc Lori Fischer at Lori.fischer@gsa.gov. LATE RESPONSES WILL NOT BE ACCEPTED AND WILL BE CONSIDERED NON-RESPONSIVE.
NAICS Code: 236220 -- Commercial and Institutional Building Construction
PLEASE ENSURE THAT YOU READ THE SOLICITATION IN ITS ENTIRETY.
Contracting Officer - Lori Fischer (lori.fischer@gsa.gov)
Contracting Specialist - Elizabeth Moten (elizabeth.moten@gsa.gov)
Project Manager - Josh Lockwood (josh.lockwood@gsa.gov)
Update #5 ·
Amendment 0003
a. Amendment 0003 is hereby issued to incorporate the CAD Files into the solicitation.
b. RFIs are due on 7 August 2020 at 12:00PM. Please email RFIs to elizabeth.moten@gsa.gov.
c. The proposal due date has changed from 24 July 2020 TO 17 August 2020 at 4:00PM
c. All other terms and condition remain unchanged.
////////////////////////////////////////////////////////////Last Item///////////////////////////////////////////////////////////////////
Amendment 0002
a. Amendment 0002 is hereby issued to remove the previous solicitation documentation and add the correct solicitation documents. The previous documents pertained to another project not associated with the James L. King Fire Alarm project.
////////////////////////////////////////////////////////////Last Item///////////////////////////////////////////////////////////////////
Amendment 0001
a. Amendment 0001 is hereby issued to change the site visit date and time.
b. The new date and time will be June 24, 2020 at 11:00 AM
c. Please email elizabeth.moten@gsa.gov to RSVP to attend the site visit. Please remember that social distancing will be in place during, and your understanding is greatly appreciatied thoughout the process.
d. MASK ARE MANDATORY.
e. Response date and time remains unchanged.
f. All other terms and condition remain unchanged.
////////////////////////////////////////////////////////////Last Item///////////////////////////////////////////////////////////////////
The General Services Administration (GSA) Southeast Sunbelt Region 4 announces the opportunity for a Request for Proposal to to replace the fire alarm system at the James L. King Federal Justice Building in Miami, FL.
BACKGROUND: The James L. King Federal Justice Building is a high rise office building located in downtown Miami, FL. It was constructed in 1993 and consists of a twelve-story 12-story, masonry and glass office building with 6 passenger elevators and 1 private elevator. There are no floors below grade. Courts have 6 District Courtrooms and 2 Court of Appeals Courtrooms in the Building. The building’s gross square footage is 315,716 GSF.
PROJECT GOAL: The goal of this project is to increase the level of life safety provided in this building by replacing the existing fire alarm system. The new fire alarm system is to be an automatic type fire alarm system that meets the current requirements of the applicable codes and standards.
PROJECT SCOPE: The project includes but is not limited to the following work: Provide Design-Build services for complete replacement of the existing fire alarm system throughout the building. Work will include the complete removal of the existing fire alarm system including wire and all related devices and components, and the design and installation of a new fire alarm system which will serve the entire building. The new
automatic fire alarm system will meet the requirements of the 2018 Edition of PBS-P100, 2019 Edition Of NFPA 72 and the 2018 Edition of NFPA 101, Life Safety Code. To include any modifications to the building required for the installation and all incidental and related work for a complete and functional fire alarm system.
A new Gamewell FCI– By Honeywell (E3) Complete Main Fire Alarm Control Panel (FACP) with Voice Evac was recently installed (08/2019), including main panel with touch screen color display and graphic annunciator, microphone, amplifiers, Intelligent Loop Interface-Main Board, Intelligent Loop Interface-Expansion Board, DACT, all cards, monitor modules, and control modules, all located within the Fire Command Room. A new Remote Annunciator Panel was also installed in the U.S. Marshals Control Room.
Therefore, the remainder of the entire building wide fire alarm system on all floors will be removed and replaced including but not limited to all initiating devices, notification devices, wiring, tamper switches, flow switches, monitor modules, control modules, door release devices, Firefighter’s phones, and any remaining conduit not conducive for reuse. All elevator shaft smoke detectors and various spot smoke detectors located throughout the building will be removed and not replaced. An additional remote annunciator will be installed in the O&M office. New Firefighter’s telephone handsets and cabinet to be installed in Fire Command Room.
The contractor will be responsible for a complete design for the project, including calculations, specifications, and drawings needed to perform the required modifications to the fire alarm and emergency communications system. The contractor will be responsible for the installation of all work and shall provide all material, equipment, accessories, commissioning and testing in compliance with the design documents.
PROJECT CONDITIONS: The building will remain occupied throughout the project.
PROJECT SCHEDULE: It is anticipated that the design and construction will be completed within 400 calendar days after Notice to Proceed. Notice to Proceed for Design and Construction will be issued by GSA within 14 calendar day of contract award. Total contract duration for this project is 400 calendar days. This includes all design and construction activities including submittal review and approval, lead time for material delivery and ordering, etc.
RESPONSE DATE: Proposals are due NLT July 24, 2020, 4:00PM EST. Please submit your proposal to Elizabeth Moten via email to elizabeth.moten@gsa.gov and cc Lori Fischer at Lori.fischer@gsa.gov. LATE RESPONSES WILL NOT BE ACCEPTED AND WILL BE CONSIDERED NON-RESPONSIVE.
NAICS Code: 236220 -- Commercial and Institutional Building Construction
PLEASE ENSURE THAT YOU READ THE SOLICITATION IN ITS ENTIRETY.
Contracting Officer - Lori Fischer (lori.fischer@gsa.gov)
Contracting Specialist - Elizabeth Moten (elizabeth.moten@gsa.gov)
Project Manager - Josh Lockwood (josh.lockwood@gsa.gov)
Update #4 ·
Amendment 0003
a. Amendment 0003 is hereby issued to incorporate the CAD Files into the solicitation.
b. RFIs are due on 17 August 2020 at 12:00PM. Please email RFIs to elizabeth.moten@gsa.gov.
c. The proposal due date has changed from 24 July 2020 TO 17 August 2020 at 4:00PM
c. All other terms and condition remain unchanged.
////////////////////////////////////////////////////////////Last Item///////////////////////////////////////////////////////////////////
Amendment 0002
a. Amendment 0002 is hereby issued to remove the previous solicitation documentation and add the correct solicitation documents. The previous documents pertained to another project not associated with the James L. King Fire Alarm project.
////////////////////////////////////////////////////////////Last Item///////////////////////////////////////////////////////////////////
Amendment 0001
a. Amendment 0001 is hereby issued to change the site visit date and time.
b. The new date and time will be June 24, 2020 at 11:00 AM
c. Please email elizabeth.moten@gsa.gov to RSVP to attend the site visit. Please remember that social distancing will be in place during, and your understanding is greatly appreciatied thoughout the process.
d. MASK ARE MANDATORY.
e. Response date and time remains unchanged.
f. All other terms and condition remain unchanged.
////////////////////////////////////////////////////////////Last Item///////////////////////////////////////////////////////////////////
The General Services Administration (GSA) Southeast Sunbelt Region 4 announces the opportunity for a Request for Proposal to to replace the fire alarm system at the James L. King Federal Justice Building in Miami, FL.
BACKGROUND: The James L. King Federal Justice Building is a high rise office building located in downtown Miami, FL. It was constructed in 1993 and consists of a twelve-story 12-story, masonry and glass office building with 6 passenger elevators and 1 private elevator. There are no floors below grade. Courts have 6 District Courtrooms and 2 Court of Appeals Courtrooms in the Building. The building’s gross square footage is 315,716 GSF.
PROJECT GOAL: The goal of this project is to increase the level of life safety provided in this building by replacing the existing fire alarm system. The new fire alarm system is to be an automatic type fire alarm system that meets the current requirements of the applicable codes and standards.
PROJECT SCOPE: The project includes but is not limited to the following work: Provide Design-Build services for complete replacement of the existing fire alarm system throughout the building. Work will include the complete removal of the existing fire alarm system including wire and all related devices and components, and the design and installation of a new fire alarm system which will serve the entire building. The new
automatic fire alarm system will meet the requirements of the 2018 Edition of PBS-P100, 2019 Edition Of NFPA 72 and the 2018 Edition of NFPA 101, Life Safety Code. To include any modifications to the building required for the installation and all incidental and related work for a complete and functional fire alarm system.
A new Gamewell FCI– By Honeywell (E3) Complete Main Fire Alarm Control Panel (FACP) with Voice Evac was recently installed (08/2019), including main panel with touch screen color display and graphic annunciator, microphone, amplifiers, Intelligent Loop Interface-Main Board, Intelligent Loop Interface-Expansion Board, DACT, all cards, monitor modules, and control modules, all located within the Fire Command Room. A new Remote Annunciator Panel was also installed in the U.S. Marshals Control Room.
Therefore, the remainder of the entire building wide fire alarm system on all floors will be removed and replaced including but not limited to all initiating devices, notification devices, wiring, tamper switches, flow switches, monitor modules, control modules, door release devices, Firefighter’s phones, and any remaining conduit not conducive for reuse. All elevator shaft smoke detectors and various spot smoke detectors located throughout the building will be removed and not replaced. An additional remote annunciator will be installed in the O&M office. New Firefighter’s telephone handsets and cabinet to be installed in Fire Command Room.
The contractor will be responsible for a complete design for the project, including calculations, specifications, and drawings needed to perform the required modifications to the fire alarm and emergency communications system. The contractor will be responsible for the installation of all work and shall provide all material, equipment, accessories, commissioning and testing in compliance with the design documents.
PROJECT CONDITIONS: The building will remain occupied throughout the project.
PROJECT SCHEDULE: It is anticipated that the design and construction will be completed within 400 calendar days after Notice to Proceed. Notice to Proceed for Design and Construction will be issued by GSA within 14 calendar day of contract award. Total contract duration for this project is 400 calendar days. This includes all design and construction activities including submittal review and approval, lead time for material delivery and ordering, etc.
RESPONSE DATE: Proposals are due NLT July 24, 2020, 4:00PM EST. Please submit your proposal to Elizabeth Moten via email to elizabeth.moten@gsa.gov and cc Lori Fischer at Lori.fischer@gsa.gov. LATE RESPONSES WILL NOT BE ACCEPTED AND WILL BE CONSIDERED NON-RESPONSIVE.
NAICS Code: 236220 -- Commercial and Institutional Building Construction
PLEASE ENSURE THAT YOU READ THE SOLICITATION IN ITS ENTIRETY.
Contracting Officer - Lori Fischer (lori.fischer@gsa.gov)
Contracting Specialist - Elizabeth Moten (elizabeth.moten@gsa.gov)
Project Manager - Josh Lockwood (josh.lockwood@gsa.gov)
Update #3 ·
Amendment 0002
a. Amendment 0002 is hereby issued to remove the previous solicitation documentation and add the correct solicitation documents. The previous documents pertained to another project not associated with the James L. King Fire Alarm project.
////////////////////////////////////////////////////////////Last Item///////////////////////////////////////////////////////////////////
Amendment 0001
a. Amendment 0001 is hereby issued to change the site visit date and time.
b. The new date and time will be June 24, 2020 at 11:00 AM
c. Please email elizabeth.moten@gsa.gov to RSVP to attend the site visit. Please remember that social distancing will be in place during, and your understanding is greatly appreciatied thoughout the process.
d. MASK ARE MANDATORY.
e. Response date and time remains unchanged.
f. All other terms and condition remain unchanged.
////////////////////////////////////////////////////////////Last Item///////////////////////////////////////////////////////////////////
The General Services Administration (GSA) Southeast Sunbelt Region 4 announces the opportunity for a Request for Proposal to to replace the fire alarm system at the James L. King Federal Justice Building in Miami, FL.
BACKGROUND: The James L. King Federal Justice Building is a high rise office building located in downtown Miami, FL. It was constructed in 1993 and consists of a twelve-story 12-story, masonry and glass office building with 6 passenger elevators and 1 private elevator. There are no floors below grade. Courts have 6 District Courtrooms and 2 Court of Appeals Courtrooms in the Building. The building’s gross square footage is 315,716 GSF.
PROJECT GOAL: The goal of this project is to increase the level of life safety provided in this building by replacing the existing fire alarm system. The new fire alarm system is to be an automatic type fire alarm system that meets the current requirements of the applicable codes and standards.
PROJECT SCOPE: The project includes but is not limited to the following work: Provide Design-Build services for complete replacement of the existing fire alarm system throughout the building. Work will include the complete removal of the existing fire alarm system including wire and all related devices and components, and the design and installation of a new fire alarm system which will serve the entire building. The new
automatic fire alarm system will meet the requirements of the 2018 Edition of PBS-P100, 2019 Edition Of NFPA 72 and the 2018 Edition of NFPA 101, Life Safety Code. To include any modifications to the building required for the installation and all incidental and related work for a complete and functional fire alarm system.
A new Gamewell FCI– By Honeywell (E3) Complete Main Fire Alarm Control Panel (FACP) with Voice Evac was recently installed (08/2019), including main panel with touch screen color display and graphic annunciator, microphone, amplifiers, Intelligent Loop Interface-Main Board, Intelligent Loop Interface-Expansion Board, DACT, all cards, monitor modules, and control modules, all located within the Fire Command Room. A new Remote Annunciator Panel was also installed in the U.S. Marshals Control Room.
Therefore, the remainder of the entire building wide fire alarm system on all floors will be removed and replaced including but not limited to all initiating devices, notification devices, wiring, tamper switches, flow switches, monitor modules, control modules, door release devices, Firefighter’s phones, and any remaining conduit not conducive for reuse. All elevator shaft smoke detectors and various spot smoke detectors located throughout the building will be removed and not replaced. An additional remote annunciator will be installed in the O&M office. New Firefighter’s telephone handsets and cabinet to be installed in Fire Command Room.
The contractor will be responsible for a complete design for the project, including calculations, specifications, and drawings needed to perform the required modifications to the fire alarm and emergency communications system. The contractor will be responsible for the installation of all work and shall provide all material, equipment, accessories, commissioning and testing in compliance with the design documents.
PROJECT CONDITIONS: The building will remain occupied throughout the project.
PROJECT SCHEDULE: It is anticipated that the design and construction will be completed within 400 calendar days after Notice to Proceed. Notice to Proceed for Design and Construction will be issued by GSA within 14 calendar day of contract award. Total contract duration for this project is 400 calendar days. This includes all design and construction activities including submittal review and approval, lead time for material delivery and ordering, etc.
RESPONSE DATE: Proposals are due NLT July 24, 2020, 4:00PM EST. Please submit your proposal to Elizabeth Moten via email to elizabeth.moten@gsa.gov and cc Lori Fischer at Lori.fischer@gsa.gov. LATE RESPONSES WILL NOT BE ACCEPTED AND WILL BE CONSIDERED NON-RESPONSIVE.
NAICS Code: 236220 -- Commercial and Institutional Building Construction
PLEASE ENSURE THAT YOU READ THE SOLICITATION IN ITS ENTIRETY.
Contracting Officer - Lori Fischer (lori.fischer@gsa.gov)
Contracting Specialist - Elizabeth Moten (elizabeth.moten@gsa.gov)
Project Manager - Josh Lockwood (josh.lockwood@gsa.gov)
Update #2 ·
Amendment 0001
a. Amendment 0001 is hereby issued to change the site visit date and time.
b. The new date and time will be June 24, 2020 at 11:00 AM
c. Please email elizabeth.moten@gsa.gov to RSVP to attend the site visit. Please remember that social distancing will be in place during, and your understanding is greatly appreciatied thoughout the process.
d. MASK ARE MANDATORY.
e. Response date and time remains unchanged.
f. All other terms and condition remain unchanged.
////////////////////////////////////////////////////////////Last Item///////////////////////////////////////////////////////////////////
The General Services Administration (GSA) Southeast Sunbelt Region 4 announces the opportunity for a Request for Proposal to to replace the fire alarm system at the James L. King Federal Justice Building in Miami, FL.
BACKGROUND: The James L. King Federal Justice Building is a high rise office building located in downtown Miami, FL. It was constructed in 1993 and consists of a twelve-story 12-story, masonry and glass office building with 6 passenger elevators and 1 private elevator. There are no floors below grade. Courts have 6 District Courtrooms and 2 Court of Appeals Courtrooms in the Building. The building’s gross square footage is 315,716 GSF.
PROJECT GOAL: The goal of this project is to increase the level of life safety provided in this building by replacing the existing fire alarm system. The new fire alarm system is to be an automatic type fire alarm system that meets the current requirements of the applicable codes and standards.
PROJECT SCOPE: The project includes but is not limited to the following work: Provide Design-Build services for complete replacement of the existing fire alarm system throughout the building. Work will include the complete removal of the existing fire alarm system including wire and all related devices and components, and the design and installation of a new fire alarm system which will serve the entire building. The new
automatic fire alarm system will meet the requirements of the 2018 Edition of PBS-P100, 2019 Edition Of NFPA 72 and the 2018 Edition of NFPA 101, Life Safety Code. To include any modifications to the building required for the installation and all incidental and related work for a complete and functional fire alarm system.
A new Gamewell FCI– By Honeywell (E3) Complete Main Fire Alarm Control Panel (FACP) with Voice Evac was recently installed (08/2019), including main panel with touch screen color display and graphic annunciator, microphone, amplifiers, Intelligent Loop Interface-Main Board, Intelligent Loop Interface-Expansion Board, DACT, all cards, monitor modules, and control modules, all located within the Fire Command Room. A new Remote Annunciator Panel was also installed in the U.S. Marshals Control Room.
Therefore, the remainder of the entire building wide fire alarm system on all floors will be removed and replaced including but not limited to all initiating devices, notification devices, wiring, tamper switches, flow switches, monitor modules, control modules, door release devices, Firefighter’s phones, and any remaining conduit not conducive for reuse. All elevator shaft smoke detectors and various spot smoke detectors located throughout the building will be removed and not replaced. An additional remote annunciator will be installed in the O&M office. New Firefighter’s telephone handsets and cabinet to be installed in Fire Command Room.
The contractor will be responsible for a complete design for the project, including calculations, specifications, and drawings needed to perform the required modifications to the fire alarm and emergency communications system. The contractor will be responsible for the installation of all work and shall provide all material, equipment, accessories, commissioning and testing in compliance with the design documents.
PROJECT CONDITIONS: The building will remain occupied throughout the project.
PROJECT SCHEDULE: It is anticipated that the design and construction will be completed within 400 calendar days after Notice to Proceed. Notice to Proceed for Design and Construction will be issued by GSA within 14 calendar day of contract award. Total contract duration for this project is 400 calendar days. This includes all design and construction activities including submittal review and approval, lead time for material delivery and ordering, etc.
RESPONSE DATE: Proposals are due NLT July 24, 2020, 4:00PM EST. Please submit your proposal to Elizabeth Moten via email to elizabeth.moten@gsa.gov and cc Lori Fischer at Lori.fischer@gsa.gov. LATE RESPONSES WILL NOT BE ACCEPTED AND WILL BE CONSIDERED NON-RESPONSIVE.
NAICS Code: 236220 -- Commercial and Institutional Building Construction
PLEASE ENSURE THAT YOU READ THE SOLICITATION IN ITS ENTIRETY.
Contracting Officer - Lori Fischer (lori.fischer@gsa.gov)
Contracting Specialist - Elizabeth Moten (elizabeth.moten@gsa.gov)
Project Manager - Josh Lockwood (josh.lockwood@gsa.gov)
Update #1 ·
The General Services Administration (GSA) Southeast Sunbelt Region 4 announces the opportunity for a Request for Proposal to to replace the fire alarm system at the James L. King Federal Justice Building in Miami, FL.
BACKGROUND: The James L. King Federal Justice Building is a high rise office building located in downtown Miami, FL. It was constructed in 1993 and consists of a twelve-story 12-story, masonry and glass office building with 6 passenger elevators and 1 private elevator. There are no floors below grade. Courts have 6 District Courtrooms and 2 Court of Appeals Courtrooms in the Building. The building’s gross square footage is 315,716 GSF.
PROJECT GOAL: The goal of this project is to increase the level of life safety provided in this building by replacing the existing fire alarm system. The new fire alarm system is to be an automatic type fire alarm system that meets the current requirements of the applicable codes and standards.
PROJECT SCOPE: The project includes but is not limited to the following work: Provide Design-Build services for complete replacement of the existing fire alarm system throughout the building. Work will include the complete removal of the existing fire alarm system including wire and all related devices and components, and the design and installation of a new fire alarm system which will serve the entire building. The new
automatic fire alarm system will meet the requirements of the 2018 Edition of PBS-P100, 2019 Edition Of NFPA 72 and the 2018 Edition of NFPA 101, Life Safety Code. To include any modifications to the building required for the installation and all incidental and related work for a complete and functional fire alarm system.
A new Gamewell FCI– By Honeywell (E3) Complete Main Fire Alarm Control Panel (FACP) with Voice Evac was recently installed (08/2019), including main panel with touch screen color display and graphic annunciator, microphone, amplifiers, Intelligent Loop Interface-Main Board, Intelligent Loop Interface-Expansion Board, DACT, all cards, monitor modules, and control modules, all located within the Fire Command Room. A new Remote Annunciator Panel was also installed in the U.S. Marshals Control Room.
Therefore, the remainder of the entire building wide fire alarm system on all floors will be removed and replaced including but not limited to all initiating devices, notification devices, wiring, tamper switches, flow switches, monitor modules, control modules, door release devices, Firefighter’s phones, and any remaining conduit not conducive for reuse. All elevator shaft smoke detectors and various spot smoke detectors located throughout the building will be removed and not replaced. An additional remote annunciator will be installed in the O&M office. New Firefighter’s telephone handsets and cabinet to be installed in Fire Command Room.
The contractor will be responsible for a complete design for the project, including calculations, specifications, and drawings needed to perform the required modifications to the fire alarm and emergency communications system. The contractor will be responsible for the installation of all work and shall provide all material, equipment, accessories, commissioning and testing in compliance with the design documents.
PROJECT CONDITIONS: The building will remain occupied throughout the project.
PROJECT SCHEDULE: It is anticipated that the design and construction will be completed within 400 calendar days after Notice to Proceed. Notice to Proceed for Design and Construction will be issued by GSA within 14 calendar day of contract award. Total contract duration for this project is 400 calendar days. This includes all design and construction activities including submittal review and approval, lead time for material delivery and ordering, etc.
RESPONSE DATE: Proposals are due NLT July 24, 2020, 4:00PM EST. Please submit your proposal to Elizabeth Moten via email to elizabeth.moten@gsa.gov and cc Lori Fischer at Lori.fischer@gsa.gov. LATE RESPONSES WILL NOT BE ACCEPTED AND WILL BE CONSIDERED NON-RESPONSIVE.
NAICS Code: 236220 -- Commercial and Institutional Building Construction
PLEASE ENSURE THAT YOU READ THE SOLICITATION IN ITS ENTIRETY.
Contracting Officer - Lori Fischer (lori.fischer@gsa.gov)
Contracting Specialist - Elizabeth Moten (elizabeth.moten@gsa.gov)
Project Manager - Josh Lockwood (josh.lockwood@gsa.gov)
Files
Show all 20
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| SACN Replace Fire Alarms and Intrusions Systems | — | Total Small Business | |
| Y1DA--Project620-22-110 Replace and Upgrade Fire alarm System at Montrose VAMC | Veterans Integrated Service Network 2 | Service-Disabled Veteran-Owned Small Business | |
| Z1DA--Upgrade Fire Alarm System Construction 676-22-110 | Veterans Integrated Service Network 12 | Service-Disabled Veteran-Owned Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity