Industry Feedback for Draft Requirements, Solicitation, and Request for White Papers for Other Transaction (OT) - Initial Minot Sentinel Beddown (IMSB), Minot Air Force Base, North Dakota (ND)

Closed Special Notice Posted

Solicitation number
W9128F26SM025
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Minot Air Force Base, North Dakota Minot AFB, North Dakota 58704, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers, Omaha District, is soliciting feedback on draft requirements, solicitation, and white paper RFQ documents for a Design-Bid-Build project under Other Transaction Authority for the Initial Minot Sentinel Beddown (IMSB) at Minot Air Force Base, North Dakota, with feedback due by 1200 CDT on September 23, 2026. The project is not set-aside and encompasses three consolidated facilities—the Consolidated Vehicle Maintenance Complex (CVMC, 116,000 square feet across two buildings), Security Forces Operations Complex (SFOC, 130,000 square feet), and Athletic Complex (two softball fields, one multi-sport field)—with combined construction cost limitation of $203,000,000 and individual performance periods ranging from 550 to 1,440 days from Notice to Proceed. The acquisition uses a two-step qualifications-based competitive selection process under 10 U.S.C. 2808a: Step 1 requires white paper submissions (limited to 10 pages, due 15 calendar days after official RFQ issuance) with down-selection to three firms; Step 2 consists of invitation-only pitch meetings evaluating collaborative approach, construction strategy, and team capability, from which one contractor is selected. Phase 1 covers pre-construction services including design refinement, scheduling, and open-book pricing negotiation; Phase 2 covers construction. Contractors must demonstrate minimum $120 million single-project and $300 million aggregate bonding capacity. White papers must address relevant experience (up to three project examples), staffing and teaming approach with organizational chart, and collaborative methodology across pre-construction and execution. An industry day was conducted virtually on August 27, 2026; recorded presentation slides and attendance list are posted. Industry may request longer lead time for white paper preparation; submit requests with ProjNet feedback. The government anticipates Phase 1 award in Q3 FY2027 and construction completion by September 2027.

Notice text

4 versions

Update #4 · Latest ·

Update: We are requesting feedback regarding the White Papers RFQ response due date. Currently, the government intends to allow 15 calendar days from the time of posting for responses. If there is a need to allow for a longer lead time, please provide your request and state the approximate time period needed to complete your submission. 

This post contains DRAFT versions of the IMSB Project Suite Requirements Overview, Solicitation, and Request for White Papers for Other Transaction (OT) meant only to solicit feedback from interested parties. Feedback from industry may be incorporated into the final RFQ and Solicitation documents. The official IMSB Solicitation and RFQ will be posted once industry comments have been evaluated and incorporated as necessary. Instructions for providing feedback via ProjNet are provided as a separate document within this posting. Feedback is due at 1200 CDT on 23 September 2026.

Update #3 ·

This post contains DRAFT versions of the IMSB Project Suite Requirements Overview, Solicitation, and Request for White Papers for Other Transaction (OT) meant only to solicit feedback from interested parties. Feedback from industry may be incorporated into the final RFQ and Solicitation documents. The official IMSB Solicitation and RFQ will be posted once industry comments have been evaluated and incorporated as necessary. Instructions for providing feedback via ProjNet are provided as a separate document within this posting. Feedback is due at 1200 CDT on 23 September 2026.

Update #2 ·

This Industry Day event has concluded. The presented slides, list of attendees, and link to the recorded virtual meeting have been uploaded to the attachment section below.

Refer to all attachments for more information. 

Update #1 ·

This Industry Day will be conducted virtually. Registration for the event can be found at:

https://www.eventbrite.com/e/industry-day-for-sentinel-cvmc-sfoc-and-athletic-complex-at-minot-afb-nd-tickets-1998763072154?aff=oddtdtcreator

Registration to attend this industry day ends on 26 August 2026 5:00PM Central time. The virtual link to the Microsoft Teams meeting will be provided automatically upon Industry Day signup.

Refer to the attachment for more information. 

Files

Show all 11

Notice history

Similar open opportunities

Opportunity Agency Set-aside Responses due
Sources Sought- Sources Sought & Other Transaction Authority (OTA) Construction for Non-Destructive Testing Facility, Red River Army Depot, Texas Texas 75570, United States · NAICS 236220 ENDIST Fort Worth No set-aside
Design and construct an Air Traffic Control Tower at Mountain Home Air Force Base ID Mountain Home AFB, Idaho 83648, United States · NAICS 236220 ENDIST Seattle No set-aside
RFI: Fort Wolters H Barracks Mineral Wells, Texas 76067, United States · NAICS 236220 ENDIST Fort Worth No set-aside
MACH1_AOI_FA890327M1006_F-47 Future Campus at Nellis AFB Nellis AFB, Nevada 89191, United States · NAICS 236220 Air Force Installation Contracting Agency No set-aside
F-35 Composite Repair and Training Facility / F-35 Maintenance Facility, Hill Air Force Base, Utah Hill Air Force Base, Utah, United States · NAICS 236210 ENDIST Sacramento No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors