ID FLAP FS SC MULTI(1), Custer Motorway Stabilization Project

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
69056725R000008
Agency
Federal Highway Administration Department of Transportation
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways
Place of performance
Challis, Idaho, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Federal Highway Administration is seeking proposals for the Custer Motorway Stabilization Project (Solicitation No. 69056725R000008), a roadway stabilization and bank stabilization task order involving reinforced soil slopes, riprap placement, environmental design elements, and associated construction activities in the Salmon-Challis National Forest, Idaho. This solicitation is exclusively limited to six pre-qualified prime contractors under a Multiple Award Task Order Contract (MATOC): ASCORP Inc./DEBCO Construction, Granite Construction, Hamilton Construction, M.A. Deatley Construction, MJ Hughes Construction, and Thompson Contracting. The project requires addressing two shallow embankment failure sites at mileposts 24.0 and 25.3 along Forest Road 070 (Yankee Fork Road), with specific geotechnical and environmental constraints including in-water work limitations (May 1 to August 15), wildlife protection requirements, and seasonal work restrictions. The government intends to award based on lowest price evaluation criteria, with the option to complete either Schedule A or Schedule B depending on available funding. The proposal due date is January 29, 2026, with a recent Questions and Answers clarification issued on January 20, 2026 addressing bid item designations for the two alternative schedules.

This solicitation has no set-aside designation and is limited to established MATOC contractors with existing contract numbers ranging from 69056725D000002 through 69056725D000007. The estimated project value ranges between $700,000 and $2,000,000, with work encompassing approximately 0.14 miles of roadway requiring detailed earthwork volumes including approximately 2,793 cubic yards of cut material and significant fill requirements at both project sites. The project involves construction of a 254.5-foot reinforced soil slope at MP 24.0 with a maximum height of 21.5 feet and a 175-foot reinforced soil slope at MP 25.3 with a maximum height of 15.5 feet, utilizing site-specific geotechnical materials confirmed through laboratory testing. Work is scheduled for completion in 2026, with bidders required to provide pricing for both Schedule A and Schedule B alternatives despite only one schedule being selected for award. The place of performance is in Custer County, Idaho, approximately 10 miles west of Challis (Challis, ID 83226), within the Salmon-Challis National Forest.

Notice text

3 versions

Update #3 · Latest ·

Update 01/20/2026: QA_1-20-26.pdf posted to attachments.

Update 01/13/2026: Amendment A001 posted to attachments.

IDAHO, MONTANA, AND SURROUNDING AREAS MATOC TASK ORDER REQUEST FOR PROPOSALS

PROJECT: ID FLAP FS SC MULTI(1), Custer Motorway Stabilization Project

Solicitation No.: 69056725R000008

THIS “TASK ORDER REQUEST FOR PROPOSAL” IS SOLELY FOR THE FOLLOWING CONTRACTS AND CONTRACTORS:

*Contract No. 69056725D000002
Contractor: ASCORP INC, DBA DEBCO CONSTRUCTION
Address: 217 College Ave. STE 5, Orofino, ID 83544
Phone: 208-476-3617
*Contract No. 69056725D000003
Contractor: GRANITE CONSTRUCTION
Address: 585 W Beach St., Watsonville, CA 95076
Phone: 360-606-1335
*Contract No. 69056725D000004
Contractor: HAMILTON CONSTRUCTION
Address: 2213 South F Street, Springfield, OR 97477
Phone: 541-746-2426
*Contract No. 69056725D000005
Contractor: M.A. DEATLEY CONSTRUCTION, INC.
Address: 829 Evans Road, Clarkston, WA 99403
Phone: 509-751-1580
*Contract No. 69056725D000006
Contractor: MJ HUGHES CONSTRUCTION, INC.
Address: 11510 NE 87TH AVE, Vancouver, WA 98662
Phone: 360-314-2024
*Contract No. 69056725D000007
Contractor: THOMPSON CONTRACTING, INC
Address: 502 Gruber Rd., Libby, MT 59923
Phone: 406-293-5392

THIS PROJECT IS BEING ADVERTISED ON SAM.GOV TO ANNOUNCE THE UPCOMING PROJECT AND ASSIST POTENTIAL SUBCONTRACTORS BY PUBLICIZING OPPORTUNITIES. A PROPOSAL WILL ONLY BE ACCEPTED FROM THE ABOVE
PRIME CONTRACTORS.


This information is also available on our website:
Idaho, Montana and Surrounding Areas MATOC: https://highways.dot.gov/federal-lands/business/construction-contracting/idaho-montana-andsurrounding-areas-idiq-matoc

Request for Proposals, Plans, and Physical Data provided under "Attachments".

Update #2 ·

Update 01/13/2026: Amendment A001 posted to attachments.

IDAHO, MONTANA, AND SURROUNDING AREAS MATOC TASK ORDER REQUEST FOR PROPOSALS

PROJECT: ID FLAP FS SC MULTI(1), Custer Motorway Stabilization Project

Solicitation No.: 69056725R000008

THIS “TASK ORDER REQUEST FOR PROPOSAL” IS SOLELY FOR THE FOLLOWING CONTRACTS AND CONTRACTORS:

*Contract No. 69056725D000002
Contractor: ASCORP INC, DBA DEBCO CONSTRUCTION
Address: 217 College Ave. STE 5, Orofino, ID 83544
Phone: 208-476-3617
*Contract No. 69056725D000003
Contractor: GRANITE CONSTRUCTION
Address: 585 W Beach St., Watsonville, CA 95076
Phone: 360-606-1335
*Contract No. 69056725D000004
Contractor: HAMILTON CONSTRUCTION
Address: 2213 South F Street, Springfield, OR 97477
Phone: 541-746-2426
*Contract No. 69056725D000005
Contractor: M.A. DEATLEY CONSTRUCTION, INC.
Address: 829 Evans Road, Clarkston, WA 99403
Phone: 509-751-1580
*Contract No. 69056725D000006
Contractor: MJ HUGHES CONSTRUCTION, INC.
Address: 11510 NE 87TH AVE, Vancouver, WA 98662
Phone: 360-314-2024
*Contract No. 69056725D000007
Contractor: THOMPSON CONTRACTING, INC
Address: 502 Gruber Rd., Libby, MT 59923
Phone: 406-293-5392

THIS PROJECT IS BEING ADVERTISED ON SAM.GOV TO ANNOUNCE THE UPCOMING PROJECT AND ASSIST POTENTIAL SUBCONTRACTORS BY PUBLICIZING OPPORTUNITIES. A PROPOSAL WILL ONLY BE ACCEPTED FROM THE ABOVE
PRIME CONTRACTORS.


This information is also available on our website:
Idaho, Montana and Surrounding Areas MATOC: https://highways.dot.gov/federal-lands/business/construction-contracting/idaho-montana-andsurrounding-areas-idiq-matoc

Request for Proposals, Plans, and Physical Data provided under "Attachments".

Update #1 ·

IDAHO, MONTANA, AND SURROUNDING AREAS MATOC TASK ORDER REQUEST FOR PROPOSALS

PROJECT: ID FLAP FS SC MULTI(1), Custer Motorway Stabilization Project

Solicitation No.: 69056725R000008

THIS “TASK ORDER REQUEST FOR PROPOSAL” IS SOLELY FOR THE FOLLOWING CONTRACTS AND CONTRACTORS:

*Contract No. 69056725D000002
Contractor: ASCORP INC, DBA DEBCO CONSTRUCTION
Address: 217 College Ave. STE 5, Orofino, ID 83544
Phone: 208-476-3617
*Contract No. 69056725D000003
Contractor: GRANITE CONSTRUCTION
Address: 585 W Beach St., Watsonville, CA 95076
Phone: 360-606-1335
*Contract No. 69056725D000004
Contractor: HAMILTON CONSTRUCTION
Address: 2213 South F Street, Springfield, OR 97477
Phone: 541-746-2426
*Contract No. 69056725D000005
Contractor: M.A. DEATLEY CONSTRUCTION, INC.
Address: 829 Evans Road, Clarkston, WA 99403
Phone: 509-751-1580
*Contract No. 69056725D000006
Contractor: MJ HUGHES CONSTRUCTION, INC.
Address: 11510 NE 87TH AVE, Vancouver, WA 98662
Phone: 360-314-2024
*Contract No. 69056725D000007
Contractor: THOMPSON CONTRACTING, INC
Address: 502 Gruber Rd., Libby, MT 59923
Phone: 406-293-5392

THIS PROJECT IS BEING ADVERTISED ON SAM.GOV TO ANNOUNCE THE UPCOMING PROJECT AND ASSIST POTENTIAL SUBCONTRACTORS BY PUBLICIZING OPPORTUNITIES. A PROPOSAL WILL ONLY BE ACCEPTED FROM THE ABOVE
PRIME CONTRACTORS.


This information is also available on our website:
Idaho, Montana and Surrounding Areas MATOC: https://highways.dot.gov/federal-lands/business/construction-contracting/idaho-montana-andsurrounding-areas-idiq-matoc

Request for Proposals, Plans, and Physical Data provided under "Attachments".

Attachments

Files attached to this notice, newest first
File Type Posted
QA_1-20-26.pdf PDF
Amendment A001.pdf PDF
RFP_69056725R000008_ID FLAP FS SC MULTI(1).pdf PDF
ida-fs-sc-multi_ExistingGround.zip ZIP file
ida-fs-sc-multi1_MP25.3_XYZ_top.pdf PDF
ida-fs-sc-multi1_MP25.3_construction-staking-notes.pdf PDF
ida-fs-sc-multi1_MP 24.0_proposed-profile-grade.pdf PDF
ida-fs-sc-multi1_MP 25.3_earthwork-volume-report.pdf PDF
ida-fs-sc-multi1_WFLHD-28.pdf PDF
ida-fs-sc-multi1_XS_MP 25.3.pdf PDF
ida-fs-sc-multi1_MP 24.0_earthwork-volume-report.pdf PDF
ida-fs-sc-multi1_MP24.0_clearing-limit.pdf PDF
ida-fs-sc-multi1_MP24.0_XYZ_top.pdf PDF
ida-fs-sc-multi1_Plan.pdf PDF
GM 47-24 Custer Motorway Final Geotechnical Memorandum.pdf PDF
ida-fs-sc-multi1_XS_24.0.pdf PDF
Physical Data.zip ZIP file
ida-fs-sc-multi1_MP24.0_construction-staking-notes.pdf PDF
ida-fs-sc-multi1_MP25.3_clearing-limit.pdf PDF
ida-fs-sc-multi1_controlpoints.xlsx XLSX spreadsheet
ida-fs-sc-multi1_MP 25.3_proposed-profile-grade.pdf PDF
ida-fs-sc-multi1_MP25.3_XYZ_base.pdf PDF
ida-fs-sc-multi1_MP 25.3_proposed-horizontal-alignment.pdf PDF
ida-fs-sc-multi1_MP24.0_XYZ_base.pdf PDF
ida-fs-sc-multi1_MP 24.0_proposed-horizontal-alignment.pdf PDF
Show all 25

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
ID FLAP FS SC MULTI(1), Custer Motorway Stabilization Project Award Award Notice
ID FLAP FS SC MULTI(1), Custer Motorway Stabilization Project This notice · Latest solicitation Solicitation
ID FLAP FS SC MULTI(1), Custer Motorway Stabilization Project Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity