RFP_69056725R000008_ID FLAP FS SC MULTI(1).pdf

PDF 5 MB Posted

Attached to
ID FLAP FS SC MULTI(1), Custer Motorway Stabilization Project Federal contract opportunity
Solicitation number
69056725R000008
Issued by
Department of Transportation Federal Highway Administration

About this file

This document is a Request for Proposals (RFP) for the Custer Motorway Stabilization Project, a federal highway construction task order issued by the Federal Highway Administration (FHWA) Western Federal Lands Division. The solicitation is specifically limited to six pre-qualified contractors: ASCORP Inc., Granite Construction, Hamilton Construction, M.A. Deatley Construction, MJ Hughes Construction, and Thompson Contracting. The project involves motorway stabilization work in Custer County, Idaho, located approximately 10 miles west of Challis, with construction activities focused on two potential work schedules (Schedule A and Schedule B) at mileposts 24.0 and 25.3.

The task order covers bank stabilization, reinforced soil slopes, environmental design elements including log barriers and root wads, temporary stream diversions, and associated construction activities within the Salmon-Challis National Forest. The project has specific environmental and operational constraints, including in-water work limitations (May 1 to August 15), wildlife protection requirements, and seasonal work restrictions. The solicitation indicates the government intends to award based on lowest price, with the potential to complete either Schedule A or Schedule B depending on available funding. The total estimated project value ranges between $700,000 and $2,000,000, with a fixed completion date in 2026.

View the file

Other files for this federal contract opportunity

Other files attached to ID FLAP FS SC MULTI(1), Custer Motorway Stabilization Project, newest first.
File Type Posted
QA_1-20-26.pdf PDF
Amendment A001.pdf PDF
ida-fs-sc-multi_ExistingGround.zip ZIP file
ida-fs-sc-multi1_MP25.3_XYZ_top.pdf PDF
ida-fs-sc-multi1_MP25.3_construction-staking-notes.pdf PDF
ida-fs-sc-multi1_MP 24.0_proposed-profile-grade.pdf PDF
ida-fs-sc-multi1_MP 25.3_earthwork-volume-report.pdf PDF
ida-fs-sc-multi1_WFLHD-28.pdf PDF
ida-fs-sc-multi1_XS_MP 25.3.pdf PDF
ida-fs-sc-multi1_MP 24.0_earthwork-volume-report.pdf PDF
ida-fs-sc-multi1_MP24.0_clearing-limit.pdf PDF
ida-fs-sc-multi1_MP24.0_XYZ_top.pdf PDF
ida-fs-sc-multi1_Plan.pdf PDF
GM 47-24 Custer Motorway Final Geotechnical Memorandum.pdf PDF
ida-fs-sc-multi1_XS_24.0.pdf PDF
Physical Data.zip ZIP file
ida-fs-sc-multi1_MP24.0_construction-staking-notes.pdf PDF
ida-fs-sc-multi1_MP25.3_clearing-limit.pdf PDF
ida-fs-sc-multi1_controlpoints.xlsx XLSX spreadsheet
ida-fs-sc-multi1_MP 25.3_proposed-profile-grade.pdf PDF
ida-fs-sc-multi1_MP25.3_XYZ_base.pdf PDF
ida-fs-sc-multi1_MP 25.3_proposed-horizontal-alignment.pdf PDF
ida-fs-sc-multi1_MP24.0_XYZ_base.pdf PDF
ida-fs-sc-multi1_MP 24.0_proposed-horizontal-alignment.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IDAHO, MONTANA, AND SURROUNDING AREAS MATOC

TASK ORDER REQUEST FOR PROPOSALS

Solicitation No. 69056725R000008

Project Number: ID FLAP FS SC MULTI(1) Project Name: Custer Motorway Stabilization Project

Solicitation, Offer & Award, Bid Schedule, Contract Clauses, Minimum Wage Schedule, Special Contract Requirements, and Plans

This solicitation cites

Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24

This project uses U.S. Customary units of measure.

ISSUING OFFICE:

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

610 EAST FIFTH STREET

VANCOUVER, WA 98661-3801

Phone (360) 619-7520

EMAIL: WFL.CONTRACTS@DOT.GOV

QUICK INDEX

Page Item --- Special Notice

--- Offer Submittal Checklist --- Authority to Sign --- Bid Bond --- Table of Contents A-1 Notice to Offerors A-3 SF1442, Solicitation, Offer and Award A-6a Subcontracting Plan A-7 Bid Schedule B-1 Solicitation Provisions C-1 Contract Clauses D-1 General Wage Decision E-1 Special Contract

Requirements H-1 Permits I-1 Fire Protection and

Suppression Plan

Proposal Due Date:

See Page A-3, Block 13A

PROPOSAL REMINDERS

Electronic bids will not be accepted. Submit printed copy of bid to the address listed on the enclosed SF 1442. Before submitting your bid, please review the following:

• Have you rechecked your figures?

• Have you completed the bid schedule?

• Have you completed and signed the SF 1442, Solicitation, Offer & Award?

• Have you acknowledged all amendments?

• Have you completed the Representations &

Certifications (Page B-1)?

• Is your bid guarantee enclosed in proper form and amount (see FAR Clause 52.228-1), including Power of Attorney affidavit?

• Does the lower left corner of the proposal envelope state “Proposal Enclosed”?

• Does the lower left corner include the Solicitation

Number and project name and number?

mailto:wfl.contracts@dot.gov

PROJECT No ID FLAP FS SC MULTI(1)

PROJECT NAME Custer Motorway Stabilization Project

SCHEDULE A SCHEDULE B

BEGINNING AT See plans See plans

ENDING AT See plans See plans

LENGTH (miles) 0.04 0.10

NATIONAL FOREST Salmon-Challis National Forest

COUNTY Custer

STATE Idaho

FIXED COMPLETION DATE See SF1442, Page A-5

SPECIAL NOTICE

ID FLAP FS SC MULTI(1)

Custer Motorway Stabilization Project

Solicitation No.: 69056725R000008

THIS “TASK ORDER REQUEST FOR PROPOSAL” IS SOLELY FOR THE

FOLLOWING CONTRACTS AND CONTRACTORS:

Contract Number Contractor Name Phone

69056725D000002 ASCORP INC,

DBA DEBCO CONSTRUCTION

217 College Ave. STE 5 Orofino, ID 83544

208-476-3617

69056725D000003 GRANITE CONSTRUCTION

585 W Beach St.

Watsonville, CA 95076

360-606-1335

69056725D000004 HAMILTON CONSTRUCTION

2213 South F Street Springfield, OR 97477

541-746-2426

69056725D000005 M.A. DEATLEY CONSTRUCTION, INC.

829 Evans Road Clarkston, WA 99403

509-751-1580

69056725D000006 MJ HUGHES CONSTRUCTION, INC.

11510 NE 87TH AVE

Vancouver, WA 98662

360-314-2024

69056725D000007 THOMPSON CONTRACTING, INC

502 Gruber Rd.

Libby, MT 59923

406-293-5392

THIS PROJECT IS BEING ADVERTISED ON SAM.GOV TO ANNOUNCE THE

UPCOMING PROJECT AND ASSIST POTENTIAL SUBCONTRACTORS BY PUBLICIZING

OPPORTUNITIES. A PROPOSAL WILL ONLY BE ACCEPTED FROM THE ABOVE

PRIME CONTRACTORS.

This information is also available on our website:

Idaho, Montana and Surrounding Areas MATOC1:

https://highways.dot.gov/federal-lands/business/construction-contracting/idaho-montana-and-surrounding-areas-idiq-matoc

1 A Multiple Award Task Order Contract (MATOC) is a group of contracts awarded to several contractors for upcoming work in a certain geographical area (in this case, work in Idaho, Montana, and Surrounding Areas). The contracts allow the contractor to compete for upcoming highway/bridge construction projects.

https://highways.dot.gov/federal-lands/business/construction-contracting/idaho-montana-and-surrounding-areas-idiq-matoc https://highways.dot.gov/federal-lands/business/construction-contracting/idaho-montana-and-surrounding-areas-idiq-matoc

Offer Submittal Checklist

Project: ID FLAP FS SC MULTI(1), Custer Motorway Stabilization Project

Before submitting your offer, please review the following:

Done?

Is this in the envelope?

Bid Envelope Did I correctly address the envelope? (See page A-3, blocks 7 & 8)

Does the lower left corner of the envelope include the Solicitation Number and the project name/number?

Pages A-3 & A-4 (SF 1442, Solicitation Offer & Award)

Did I include our firm name and address in block 14?

Did I include our firm’s phone number in block 15?

Did I include our firm’s remittance address in block 16?

(Use when different than block 14)

Did I include my unique entity identifier and my Cage Code?

Did I include the number & date of all amendments in block 19?

Did the appropriate official sign/date in block 20A, 20B & 20C?

Bid Schedule (see page A-7)

Did I insert “Unit Bid Price” and “Amount Bid” for each bid item?

Did the appropriate official initial corrections?

When applicable, did I include the totals for each schedule in the summary page? (See last page of bid schedules.)

Bid Bond (Standard Form 24)

Bids received without a valid bid bond will be rejected.

Did I complete my bid bond correctly?

Did I include the original?

Did I attach the Power of Attorney to the bid bond?

Authority to Sign

Did I include a completed form for each person signing the SF1442 and Bid Bond?

Representations & Certifications & FAR Clause

Did I include the completed B-pages (beginning on B-1)?

Did I include the completed clause 1252.228-74 Notification of Payment Bond Protection (See page C-112)?

System for Award Management (SAM) SAM.gov

Do we have up-to-date data in SAM?

Veteran Reporting (FAR Clause 52.222-37) If applicable, did I ensure our firm has completed this annual report?

NOTE: The Contractor is fully responsible to verify that all data is correct each time a offer package is submitted. Failure to properly input and/or update your data may cause the offer to be rejected.

https://sam.gov/content/home

Project: ID FLAP FS SC MULTI(1), Custer Motorway Stabilization Project

Driving Directions to our Vancouver Washington Office:

Directions to WFLHD https://www.google.com/maps/place/610+E+5th+St,+Vancouver,+WA+98661/data=!4m2!3m1!1s0x5495a8ae3f2d7083:0x5b7adcfa96ade37a?hl=en

Authority to Sign

INSTRUCTIONS: When the offeror/principal is a corporation, include this certification with your offer/bid.

Corporate Certificate

I, ____________________________________________ (name), certify that I am the

________________________________________(title), of the corporation named as the Offeror/Principal herein;

that _________________________________________(name), who signed this offer and/or bid bond on behalf of ___________________________ (company name) is

________________________________________ (title) of this corporation;

that the offer was duly signed for and on behalf of said corporation by authority and scope of its governing body, and within the scope of its corporate powers.

_____________________________________ (signature) Affix Corporate Seal

_____________________________________ (title)

Authority to Sign

INSTRUCTIONS: When the offeror/principal is a limited liability company, include this certification with your offer/bid.

Limited Liability Certificate

I, ____________________________________________ (name), certify that I am the

________________________________________(title), of the limited liability company named as the Offeror/Principal herein;

that _________________________________________(name), who signed this offer and/or bid bond on behalf of ___________________________ (company name) is

________________________________________ (title) of this company;

that the offer was duly signed for and on behalf of said company by authority and scope of its governing body, and within the scope of its powers.

_____________________________________ (signature) Affix Company Seal (as applicable) ___________________________________ (title)

Bid Bond (See Instructions on Page 3)

Date Bond Executed (Must Not Be Later Than Bid Opening Date)

OMB Control Number: 9000-0001 Expiration Date: 1/31/2027

Principal (Legal Name And Business Address) Type Of Organization ("X" One)

State Of Incorporation

Surety(ies) (Name And Business Address)

Percent Of Bid Price

Penal Sum Of Bond Amount Not To Exceed Million(s) Thousand(s) Hundred(s) Cents

Bid Identification Bid Date Invitation Number

Authorized For Local Reproduction Previous Edition Is Not Usable

STANDARD FORM 24 (REV. 10/2023)

Prescribed by GSA - FAR (48 CFR) 53.228(a)

Obligation:

We, the Principal and Surety(ies) are firmly bound to the United States of America (hereinafter called the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum "jointly and severally" as well as "severally" only for the purpose of allowing a joint action or actions against any or all of us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit of liability is the full amount of the penal sum.

Conditions:

The Principal has submitted the bid identified above.

Therefore:

The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty (60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms by the Principal; or (b) in the event of failure to execute such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.

Each Surety executing this instrument agrees that its obligation is not impaired by any extension(s) of the time for acceptance of the bid that the Principal may grant to the Government. Notice to the Surety(ies) of extension(s) is waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the period originally allowed for acceptance of the bid.

Other (Specify) Individual Partnership Joint Venture Corporation

69056725R000008 For (Construction, Supplies Or Services) Construction:

ID FLAP FS SC MULTI(1), Custer Motorway Stabilization Project

2.

(Seal)2.(Seal)

1.

1.

1.

1. 3.2.

Name(s) (Typed)

Signature(s)

Individual Surety(ies)

Name(s) And Title(s) (Typed)

Corporate Seal

(Seal)

3.

(Seal)

2.

(Seal) Signature(s)

Principal

2.

State Of Incorporation Liability Limit ($)

2.

2.

1.Name(s) And Title(s) (Typed)

Signature(s) 1. 2. Corporate Seal

Corporate Seal

Su re ty C

Name And Address

Signature(s) Name(s) And Title(s) (Typed)

1.

1.

2.

2.

State Of Incorporation Liability Limit ($)

Corporate Seal

Name(s) And Title(s) (Typed)

Su re ty D

Signature(s)

Name And Address

1.

1.

2.

2.

State Of Incorporation Liability Limit ($)

Corporate Seal

Liability Limit ($)State Of Incorporation

1.

1.

Su re ty A

Name And Address

Su re ty B

Name(s) And Title(s) (Typed)

Signature(s)

Name And Address

Corporate Surety(ies)

Witness:

The Principal and Surety(ies) executed this bid bond and affixed their seals on the above date.

STANDARD FORM 24 (REV. 10/2023) PAGE 2

STANDARD FORM 24 (REV. 10/2023) PAGE 3

Corporate Seal

Su re ty F

Name And Address

Signature(s) Name(s) And Title(s) (Typed)

1.

1.

State Of Incorporation

2.

2.

Liability Limit ($)

Corporate Seal

Name(s) And Title(s) (Typed)

Su re ty G

Signature(s)

Name And Address

1.

1.

2.

2.

State Of Incorporation Liability Limit ($)

Corporate Seal

State Of Incorporation Liability Limit ($)

2.

2.

1.

1.

Name And Address

Signature(s) Name(s) And Title(s) (Typed)

Su re ty E

Instructions

1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services.

2. Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.

3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed dollars).

4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitations listed therein. The value put into the Liability

Limit block is the penal sum (i.e., the face value) of the bond, unless a co-surety arrangement is proposed.

(b) When multiple corporate sureties are involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed "Corporate Surety(ies)." In the space designated

"Surety(ies)" on the face of the form, insert only the letter identifier corresponding to each of the sureties. Moreover, when co-surety arrangements exist, the parties may allocate their respective limitations of liability under the bond, provided that the sum total of their liability equals 100% of the bond penal sum.

(c) When individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form 28) for each individual surety, shall accompany the bond. The Government may require the surety to furnish additional substantiating information concerning its financial capability.

5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word "Corporate Seal"; and shall affix an adhesive seal if executed in Maine, New

Hampshire, or any other jurisdiction requiring adhesive seals.

6. Type the name and title of each person signing this bond in the space provided.

7. In its application to negotiated contracts, the terms "bid" and "bidder" shall include "proposal" and

"offeror."

STANDARD FORM 24 (REV. 10/2023) PAGE 4

Paperwork Reduction Act Statement - This information collection meets the requirements of 44 USC §

3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0001. We estimate that it will take 1 hour to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: General

Services Administration, Regulatory Secretariat Division (MVCB), 1800 F Street, NW, Washington, DC

20405.

Table of Contents

TABLE OF CONTENTS

01 APR 2024–FP24

DESCRIPTION PAGE

Notice to Offeror ......................................................................................................................... A-1

Solicitation, Offer, and Award (SF 1442) ................................................................................... A-3

Bid Schedule ............................................................................................................................... A-7

Solicitation Provisions ................................................................................................................ B-1

Contract Clauses ......................................................................................................................... C-1

General Wage Decision .............................................................................................................. D-1

SCRs Table of Contents

SPECIAL CONTRACT REQUIREMENTS (SCR)

The following Special Contract Requirements amend and supplement the Standard

Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24, U.S. Department of Transportation, Federal Highway Administration.

Division 100 ..................................................................................................................... E-1

Division 150 ................................................................................................................... E-24

Division 200 ..................................................................................................................... F-1

Division 250 ..................................................................................................................... F-5

Division 600 ..................................................................................................................... F-6

Division 700 .................................................................................................................... G-1

Permits ........................................................................................................................................ H-1

Fire Protection and Suppression Plan ........................................................................................... I-1

Table of Contents

This page intentionally left blank.

A-1

Notice to Offeror

Project: ID FLAP FS SC MULTI(1), Custer Motorway Stabilization Project

NOTICE TO OFFEROR

06 OCT 2025–FP24

THIS PROJECT IS BEING SOLICITED AND AWARDED UNDER FP-24.

The FP-24 is FLH’s Standard Specifications for Construction of Roads and Bridges on Federal

Highway Projects. To view the FP-24 electronically go to:

https://highways.dot.gov/federal-lands/specs.

I. Project Location

General Location. The project work is located 10 miles West of Challis, ID in Custer County.

Approximate Global Positioning System (GPS) coordinates for the beginning of the project are

44°30'40.60"N, 114°22'38.27"W.

Project Limits. Signs have not been erected to identify the project limits. No Government personnel will be available for show-me tours.

II. Pre-proposal Information.

GENERAL AND TECHNICAL QUESTIONS REGARDING PROPOSED WORK FOR

THIS PROJECT WILL BE ACCEPTED UNTIL CLOSE-OF-BUSINESS ON 01/22/2026.

Refer to page A-5 for information on how to submit questions related to General Information and

Technical Information. Answers to General and Technical Questions will be posted at https://sam.gov/workspace/contract/opp/0881ddbec28f43349fecd76b37b02021/view.

Every attempt to respond to questions will be made. However, response to questions received after the above posted date is not guaranteed.

MATOC. This solicitation is solicited under the Idaho, Montana, and Surrounding Areas Multiple

Award Task Order Contract (MATOC). Selection of the successful offer is based on price.

Disclosure of Price Tabulations. After receipt of proposals, price tabulations (bid tabs) will be made publicly available and posted to sam.gov; unless the offeror submits an acceptable pricing confidentiality justification on or before the Task Order proposal due date. See Subsection 102.05.

Multiple Schedules. Offers for the construction of this project are being invited under two bid schedules, designated A and B. Schedule A and Schedule B are not alternate bids. Complete both schedules according to Subsection 102.02 of the special contract requirements. Award of the task order will be made according to Subsection 102.05A.

Electronic Plan Sheets. This solicitation includes electronic plan sheets available at https://sam.gov/workspace/contract/opp/0881ddbec28f43349fecd76b37b02021/view.

https://highways.dot.gov/federal-lands/specs https://sam.gov/workspace/contract/opp/0881ddbec28f43349fecd76b37b02021/view https://sam.gov/workspace/contract/opp/0881ddbec28f43349fecd76b37b02021/view

A-2

Project: ID FLAP FS SC MULTI(1), Custer Motorway Stabilization Project

Viewing the Project: This project was pre-advertised in the Notice to Prospective Offerors posted to https://sam.gov/workspace/contract/opp/0881ddbec28f43349fecd76b37b02021/view

August 20, 2025. The project may be advertised during a period when viewing of the project may not be possible due to snow. Therefore, prospective Offerors were encouraged to view the project during fall as conditions permitted. No Federal Highway Administration personnel will be available for show me tours.

Physical Data. Physical data applicable to this project is listed in the Special Contract

Requirements, Subsection 102.02A Physical Data.

Representations & Certifications. Submit or update Representations and Certifications online at https://www.sam.gov/SAM/ before bid submittal.

Requests for Information. Requests for technical information (Plan and Division 100 – 700

Specification questions only) about this project will only be accepted in writing (see Block 9 on page A-5).

SF 1442, Solicitation, Offer, and Award. Particular attention should be paid to Standard Form l442, Solicitation, Offer and Award, to assure that Blocks 14, 15, 16, 19, 20A, and 20C are completed correctly. Sign Block 20B according to the instructions in Subsection 102.02. You must submit a completed ‘Authority to Sign’ document. You must also complete the representations and certifications contained in the Contract Provisions beginning on page B-1.

Failure to furnish or complete any of the above may result in your bid being considered nonresponsive and being rejected.

Issuance of this solicitation does not guarantee that an award will be made. Any resulting awards are subject to the availability of funding and the discretion of the awarding entity, including cancellation or amendment based on a determination of change in agency needs.

PLEASE NOTE: Federal Acquisition Regulation (FAR) Clause 52.211-10, Commencement, Prosecution, and Completion of Work has been removed due to the FAR Overhaul. See the SF-

1442 and Block 11 for contract requirements related to the fixed completion date.

Facsimile and email offers, modifications, and withdrawals. Facsimile and email offers are not authorized for this solicitation. Offers may be modified or withdrawn by email, if such notice is received by the time specified for receipt of offers. The Government will not be responsible for any failure attributable to the transmission or receipt of email data. See FAR Provision 52.215-1, Instructions to Offerors – Competitive Acquisition. EMAIL WFL.Contracts@dot.gov. To confirm receipt, call 360.619.7520.

Surety Bond Guarantee Program. Small businesses that need surety bonds can qualify for U.S.

Small Business Administration (SBA) backed surety bonds. SBA assistance in locating a participating surety company or agent, and completing application forms is available online. For https://sam.gov/workspace/contract/opp/0881ddbec28f43349fecd76b37b02021/view https://www.sam.gov/SAM/ https://www.acquisition.gov/far-overhaul mailto:WFL.Contracts@dot.gov

A-2a

Project: ID FLAP FS SC MULTI(1), Custer Motorway Stabilization Project more information on the U.S. SBA’s Surety Bond Guarantee program, go online to http://www.sba.gov/content/contractors or call 1-800-U-ASK-SBA.

Fraud Alert. Current and potential U.S. Department of Transportation (DOT) Contractors have recently been receiving fraudulent letters purporting to be issued by DOT. These fraudulent letters request that the Contractors resubmit their banking information to DOT. If you receive such a letter, please DO NOT complete the requested worksheet that is attached to the letters and DO

NOT release any information. To register or update information, Contractors are required to go directly through the System for Award Management (SAM) website and never through a third party. You can access SAM at https://www.sam.gov/SAM/ .

III. Post Award Information.

Insurance. Insurance requirements are described in Subsection 107.05.

Contractor Performance Evaluations. This office posts performance evaluations in the

Contractor Performance Assessment Reporting System (CPARS); for additional information, see http://www.cpars.gov/index.htm. Upon receiving an email notice of evaluation availability, you will have 14-60 days to review the evaluation online and submit comments. If you are unable to access the system, call 360.619.7520 for assistance or for a copy of the evaluation.

IV. Specifications and Permits.

Specifications. This solicitation and subsequent contract are governed by the Federal Acquisition

Regulation (FAR), agency supplemental regulations, and the Standard Specifications for

Construction of Roads and Bridges on Federal Highway Projects, FP-24. An electronic version may be found at https://highways.dot.gov/federal-lands/specs.

Electronic Documentation. Requires all documents (including but not limited to correspondence, notifications, submittals, reports, and pay notes) to be submitted in a pdf format, or an approved fixed-layout electronic format. See Subsection 104.04.

Material Sources. Riprap, unclassified borrow, crushed aggregate, fish passage boulders, streambed material, coarse woody debris, and topsoil has not been identified for this project.

Secure all permits and clearances for Contractor-located sites and sources. See Subsection

105.02(c).

Progress Schedules. This project includes new specifications for Prosecution and Progress and for Schedules for Construction Contracts. Carefully review Special Contract Requirements

Section 108 - Prosecution and Progress, and Section 155 – Schedules for Construction Contracts.

http://www.sba.gov/content/contractors https://www.sam.gov/SAM/ http://www.cpars.gov/index.htm https://highways.dot.gov/federal-lands/specs

A-2b

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

Federal Highway Administration

FHWA WESTERN FED LANDS DIVISION

610 E FIFTH STREET

Vancouver WA 98661

690567

Federal Highway Administration

FHWA WESTERN FED LANDS DIVISION

610 E FIFTH STREET

Vancouver WA 98661

a. NAME

ACQUISTIONS

b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

360-619-7520

See Block 10 x 12/29/2025

69056725R000008

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

THIS TASK ORDER REQUEST FOR PROPOSAL IS BEING SOLICITATED TO THE IDAHO, MONTANA, AND

SURROUNDING AREAS MATOC IDIQ HOLDERS. ONLY CONTRACTORS AWARDED AN IDIQ

CONTRACT WILL BE CONSIDERED.

This solicitation is designated ID FLAP FS SC MUTLI(1), Custer Motorway

Stabilization Project

IN STRICT ACCORDANCE WITH:

Federal Acquisition Regulations (FAR) and Transportation Acquisition Regulations

(TAR)

General Wage Decision

Special Contract Requirements

Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24

11. The Contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 calendar days and complete it within ________________ ________________ calendar days after receiving

*Page A-5

______________________ 01/29/2026

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 8/2014)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

A-3

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

Federal Highway Administration

FHWA WESTERN FED LANDS DIVISION

610 E FIFTH STREET

Vancouver WA 98661

690567

31a. NAME OF CONTRACTING OFFICER (Type or print)

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 3304(a)

STANDARD FORM 1442 (REV. 8/2014) BACK

A-4

Unique Entity Identifier(SAM.gov):

Cage Code:

See bid schedule.

All items on bid schedule.

See page A-5

Federal Highway Administration

FHWA WESTERN FED LANDS DIVISION

610 E FIFTH STREET

Vancouver WA 98661

X

A-5

Continuation SF 1442

Block 9 FOR GENERAL INFORMATION, call 360.619.7520 from the hours of 8:00 a.m. to

4:00 p.m. local time or e-mail us at wfl.contracts@dot.gov.

FOR TECHNICAL INFORMATION (plan and specification questions only), requests for technical information about this project will only be accepted in writing.

Submit questions via e-mail at wfl.plans-spec@dot.gov.

QUESTIONS/ANSWERS POSTED ONLINE. You can view questions and answers on the Contract Opportunities Website SAM.gov.

• Insert the solicitation number in search box.

• Scroll to the project.

• Make sure you are on the most recent view and look in the right section of the page for the most recent Q&A document.

FOR DAVIS-BACON WAGE RATE INFORMATION go to the U.S. Department of

Labor, Branch of Construction Wage Determinations Website:

https://www.dol.gov/agencies/whd/government-contracts/state-assignments.

FOR PHYSICAL DATA, See Subsection 102.02a in the Special Contract Requirements for listing of available data. Physical Data will be posted with the solicitation on the

SAM.gov website.

Block 11 COMPLETION DATE: The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 07/22/2026 for Schedule A and 10/29/2026 for Schedule B, subject to such extensions as may be authorized. The time stated for completion shall include final cleanup of the premises.

The completion date is based on the assumption that the successful offeror will receive the notice to proceed by 03/23/2026. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

Work shall be completed on or before the date specified above, subject to such extensions as may be authorized by the terms of the contract and the specifications made a part thereof.

Block 12A PERFORMANCE & PAYMENT BONDS: See FAR Clause, 52.228-15, Performance and Payment Bonds - Construction (clauses begin on page C-1) and Subsection 102.06 of the Standard Specifications for Construction of Roads and Bridges on Federal Highway

Projects, FP-24, U.S. Customary Units.

Block 13B BID BOND AMOUNT: See FAR Clause 52.228-1, Bid Guarantee (clauses begin on page C-1).

mailto:wfl.contracts@dot.gov mailto:wfl.plans-spec@dot.gov https://sam.gov/content/home https://www.dol.gov/agencies/whd/government-contracts/state-assignments https://sam.gov/content/home

A-6

Continuation SF 1442

ADDITIONAL INFORMATION: See Subsections 102.03 and 102.04 of Standard

Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-

24, U.S. Customary Units.

Block 24 SUBMITTING INVOICES: See Subsection 109.08 of the Standard Specifications for

Construction of Roads and Bridges on Federal Highway Projects FP-24, U.S. Customary

Units.

ESTIMATED PRICE RANGE. The price range of the project work is between $700,000 and

$2,000,000.

SUBCONTRACTING PLAN1. This Request for Proposals requires an offeror who is a LARGE business to submit an acceptable subcontracting plan prior to contract award. A large business is one whose average gross annual receipts over the past 3 years equal $45 million or more. For your information the subcontracting plan form is included beginning on page A-6a. This requirement does not apply to SMALL businesses

1 Applicable if anticipated award is $2,000,000 or more.

A-6a

APM 025E – Revised 2/4/2025

ATTACHMENT 2 – FHWA SUBCONTRACTING PLAN TEMPLATE

1. INSTRUCTIONS:

• Where subcontracting opportunities will not exist for the solicitation, the bidder/offeror shall submit a response outlining the rationale for making this determination with its proposal/bid. The statement shall be signed by an official authorized to make decisions on behalf of the firm.

• The following information shall be provided in the bidder/offeror subcontracting plan submission and shall be expressed in terms of goal percentages of the total planned subcontracting dollars.

• Text lines may be added to this template as needed.

Note to the CS/CO: Per APM 025, where a subcontracting plan is required, the complete solicitation shall be sent to the Small Business Specialist (SBS) for review/approval along with Attachment 3, Combined

Subcontracting Plan Routing Sheet. Prior to award, completed Subcontracting Plan(s) shall be sent to the SBS for review/approval along with the previously signed routing sheet.

*insert and complete additional tables if the contract includes option year(s).

1 Percentage = (subcontracted amount in the category/total planned subcontracted amount) 2 Planned subcontracts to “other than small business” concerns + subcontracts to Small Business concerns = 100% 3 SDVOSB is a subcategory of VOSB. Any dollar amount applied to SDVOSB also applies to VOSB.

4 In this document, the term WOSB includes Economically Disadvantaged WOSB (EDWOSB) concerns.

SUBCONTRACTING GOALS – BASE YEAR

Total prime contract amount – Base Year: $ [insert amount]

Total planned subcontracted amount (regardless of firm/entity size status) – Base Year:

$ [insert amount]

Total planned subcontracts to “other than small business” concerns (i.e., large, non-profit, university, etc.)

$[insert amount] [insert #]%1

Total planned subcontracts to Small Business concerns: $[insert amount] [insert #]%2

• Total planned subcontracts to Veteran Owned Small Business concerns (VOSB)3:

$[insert amount] [insert #]% o Total planned subcontracts to Service-Disabled Veteran Owned Small Business (SDVOSB) concerns:

$[insert amount] [insert #]%

• Total planned subcontracts to Historically Underutilized Business Zones (HUBZones): $[insert amount] [insert #]%

• Total planned subcontracts to Small Disadvantaged Business (SDB) concerns (includes 8(a), Alaska Native Corporations (ANC), and Indian Tribes):

$[insert amount] [insert #]%

• Total planned subcontract awards to Women-Owned Small Business concerns (WOSB)4 concerns:

$[insert amount] [insert #]%

A-6b

1.1 Rationale if establishing a goal lower than 5% for VOSB:

1.2 Rationale if establishing a goal lower than 5% for SDVOSB:

1.3 Rationale if establishing a goal lower than 3% for HUBZone:

1.4 Rationale if establishing a goal lower than 5% for SDB:

1.5 Rationale if establishing a goal lower than 5% for WOSB:

1.6 Rationale if establishing a goal lower than the current DOT subcontracting goal:

2. The following principal types of supplies and/or services are planned to be subcontracted under this contract. [Add additional rows if more space is needed.]

5 List all applicable size standards for each proposed subcontractor.

Type of

Supply/Service to be Subcontracted

Company/Firm

Name

Subcontracted

Amount

Subcontractor Size

Standard (Other Than

SB, SB, VOSB, SDVOSB,

HUBZone, SDB, WOSB)5 https://www.sba.gov/document/support-agency-contracting-goals

A-6c

3. The following methods were used to develop the subcontract percentage goals:

4. The following methods were used to identify potential subcontract sources for solicitation purposes. (i.e. source lists used and organizations contacted to identify potential SB concerns, such as the System for Award Management (www.SAM.gov), Dynamic Small Business Search (www.DSBS.sba.gov), trade associations, industry conferences/fairs, etc.)

5. [Select appropriate option.] Indirect costs [were/were not] included in establishing the subcontracting goals specified in the table above.

6. If indirect costs were included, the following method was used to determine the proportionate share of indirect costs to be incurred with SB, VOSB, SDVOSB, HUBZone, SDB and WOSB subcontractors:

7. The following individual will administer the subcontracting program:

Name:

Title:

Address:

Telephone:

E-mail:

This individual's specific duties, as they relate to the subcontracting program, are as follows:

8. The following efforts will be taken to ensure that SB, SDB, VOSB, SDVOSB, HUBZone, and

WOSB subcontractors will have an equitable opportunity to compete for subcontracts:

http://www.sam.gov/ http://www.dsbs.sba.gov/

A-6d

[initial] It is agreed that FAR Clause 52.219-8, Utilization of Small Business Concerns, will be included in all subcontracts, which offer further subcontracting opportunities. It is further agreed that all subcontractors (except small business concerns) at all tiers below the prime contractor who receive subcontracts in excess of $750,000 ($1.5M for construction of any public facility with further subcontracting possibilities) will be required to adopt and comply with a subcontracting plan in accordance with FAR Clause 52.219-9.

9. The following types of records will be maintained concerning procedures that have been adopted to comply with the requirements and goals in the plan (i.e., establishment of source lists, guides and other data that identify SB, VOSB, SDVOSB, HUBZone, SDB and WOSB concerns; a description of the offeror’s efforts to locate SB, VOSB, SDVOSB, HUBZone, SDB and WOSB concerns and to award subcontracts to them, etc.) and shall be maintained through completion of the contract:

10. In accordance with FAR Subpart 19.704(a)(10) through (15), the Contractor further agrees to:

[Initial each line]

Cooperate in any studies or surveys as may be required;

Submit periodic reports as may be required so that the Government can determine the extent of compliance by the Contractor with the subcontracting plan;

After November 30, 2017, include subcontracting data for each order when reporting subcontracting achievements for indefinite-delivery, indefinite-quantity contracts intended for use by multiple agencies;

Submit the Individual Subcontract Report (ISR), and the Summary Subcontract Report (SSR) using the Electronic Subcontracting Reporting System (eSRS) at http://www.esrs.gov/ within the timeframes identified at FAR Subpart 19.704(a)(10)(iv);

Ensure that other than small business subcontractors with subcontracting plans agree to submit eSRS documents online as required;

Provide its prime contract number and its unique entity identifier, and the e-mail address of the offeror’s official responsible for acknowledging receipt of or rejecting the ISRs to all first-tier subcontractors with subcontracting plans so they can enter this information into the eSRS when submitting their ISRs;

http://www.esrs.gov/

A-6e

Require that each subcontractor with a subcontracting plan provide the prime contract number, its own unique entity identifier, and the e-mail address of the subcontractor’s official responsible for acknowledging receipt of or rejecting the ISRs, to its subcontractors with subcontracting plans;

Make a good faith effort to acquire articles, equipment, supplies, services, or materials, or obtain the performance of construction work from the small business concerns that the offeror used in preparing the bid or proposal, in the same or greater scope, amount, and quality used in preparing and submitting the bid or proposal;

Provide the contracting officer with a written explanation if the contractor fails to acquire articles, equipment, supplies, services or materials or obtain the performance of construction work as described in FAR 19.704(a)(12) of this section. This written explanation will be submitted to the contracting officer within 30 days of contract completion;

Will not prohibit a subcontractor from discussing with the contracting officer any material matter pertaining to payment to or utilization of a subcontractor; and

Pay its small business subcontractors on time and in accordance with the terms and conditions of the subcontract, and notify the contracting officer if the offeror pays a reduced or an untimely payment to a small business subcontractor (see FAR 52.242-5).

Submitted by:

POC Name:

Title:

Email Address:

Company Name:

UEI:

Mailing Address:

Signature http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/52_237.htm#P308_50712

A-6f

Bidder/Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions. Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern.

When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item. When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount. Total all of the amounts bid for each pay item and show the total bid amount.

BID SCHEDULE

A-7Bid Schedule

BID SCHEDULE

Project No : ID FLAP FS SC MULTI(1) Schedule : A

Project Name : Custer Motorway Stabilization Project

Schedule Type : Base

Contract Quantity Pay Items

62516-2000 MULCHING, HYDRAULIC METHOD

AMD# Line Item Number

Pay Item Number

Description Supplemental Description

Quantity Unit Unit Price Amount

A0020 15101-0000 MOBILIZATION ALL LPSM

A0040 15201-0000

CONSTRUCTION

SURVEY AND

STAKING

ALL LPSM

A0060 15301-0000 CONTRACTOR

QUALITY CONTROL ALL LPSM

A0080 15401-0000 CONTRACTOR

TESTING ALL LPSM

A0100 15501-0000 CONSTRUCTION

SCHEDULE ALL LPSM

A0120 15705-0100

SOIL EROSION

CONTROL, SILT

FENCE

200.000 LNFT

A0140 15705-1400

SOIL EROSION

CONTROL, FIBER

ROLL

410.000 LNFT

A0160 20102-0000 CLEARING AND

GRUBBING ALL LPSM

A0180 25101-0200 PLACED RIPRAP,

CLASS 2 330.000 CUYD

A0200 26101-1000

REINFORCED SOIL

SLOPE, WELDED

WIRE FACE

(VEGETATED)

2,000.000 SQFT

A0220 62201-0250

DUMP TRUCK, 10

CUBIC YARD MINIMUM

CAPACITY

15.000 HOUR

A0240 62201-0900

WHEEL LOADER, 2

CUBIC YARD MINIMUM

RATED CAPACITY

10.000 HOUR

A0260 62201-2800

MOTOR GRADER, 8

FOOT MINIMUM

BLADE

5.000 HOUR

A0280 62201-3150

HYDRAULIC

EXCAVATOR, 1.0

CUBIC YARD MINIMUM

CAPACITY WITH

THUMB ATTACHMENT

20.000 HOUR

A0300 62301-0000 GENERAL LABOR 10.000 HOUR

A0320 62403-0000 PROVIDING AND

PLACING TOPSOIL 120.000 CUYD

A0340 62516-2000 MULCHING,

HYDRAULIC METHOD 840.000 SQYD

A0360 62603-0000 PLANTINGS (MP 25.3) ALL LPSM

A0380 62801-0000 TEMPORARY STREAM

DIVERSION

(MP 25.3) ALL LPSM

A0400 63502-0600

TEMPORARY TRAFFIC

CONTROL,

BARRICADE TYPE 3

10.000 EACH

A0420 63502-1250

TEMPORARY TRAFFIC

CONTROL, TUBULAR

MARKER, TYPE 42-

INCH

25.000 EACH

A-8Bid Schedule

A0440 63502-2000

TEMPORARY TRAFFIC

CONTROL, PORTABLE

CHANGEABLE

MESSAGE SIGN

2.000 EACH

A0460 63504-1000

TEMPORARY TRAFFIC

CONTROL,

CONSTRUCTION SIGN

230.000 SQFT

A0480 63506-0500 TEMPORARY TRAFFIC

CONTROL, FLAGGER 200.000 HOUR

A0500 63507-0700

TEMPORARY TRAFFIC

CONTROL, TRAFFIC

CONTROL

SUPERVISOR

70.000 DAY

A0520 64702-2000

ENVIRONMENTAL

DESIGN, LOG

BARRIER

(GOVERNMENT

FURNISHED) 70.000 LNFT

A0540 64703-5000 ENVIRONMENTAL

DESIGN, ROOT WAD

(GOVERNMENT

FURNISHED) 20.000 EACH

A0560 64703-6000

ENVIRONMENTAL

DESIGN, FISH

PASSAGE BOULDER

140.000 EACH

A0580 64704-1000

ENVIRONMENTAL

DESIGN, STREAMBED

MATERIAL

140.000 CUYD

A0600 64704-1700

ENVIRONMENTAL

DESIGN, BANK

STABILIZATION

(COARSE WOODY

DEBRIS) 40.000 CUYD

Submitted By: Schedule Total:

A-9Bid Schedule

BID SCHEDULE

Project No : ID FLAP FS SC MULTI(1) Schedule : B

Project Name : Custer Motorway Stabilization Project

Schedule Type : Base

Contract Quantity Pay Items

62516-2000 MULCHING, HYDRAULIC METHOD

AMD# Line Item Number

Pay Item Number

Description Supplemental Description

Quantity Unit Unit Price Amount

B0020 15101-0000 MOBILIZATION ALL LPSM

B0040 15201-0000

CONSTRUCTION

SURVEY AND

STAKING

ALL LPSM

B0060 15301-0000 CONTRACTOR

QUALITY CONTROL ALL LPSM

B0080 15401-0000 CONTRACTOR

TESTING ALL LPSM

B0100 15501-0000 CONSTRUCTION

SCHEDULE ALL LPSM

B0120 15705-0100

SOIL EROSION

CONTROL, SILT

FENCE

420.000 LNFT

B0140 15705-1400

SOIL EROSION

CONTROL, FIBER

ROLL

900.000 LNFT

B0160 20102-0000 CLEARING AND

GRUBBING ALL LPSM

B0180 25101-0200 PLACED RIPRAP,

CLASS 2 480.000 CUYD

B0200 25101-0300 PLACED RIPRAP,

CLASS 3 400.000 CUYD

B0220 26101-1000

REINFORCED SOIL

SLOPE, WELDED

WIRE FACE

(VEGETATED)

5,700.000 SQFT

B0240 62201-0250

DUMP TRUCK, 10

CUBIC YARD MINIMUM

CAPACITY

30.000 HOUR

B0260 62201-0900

WHEEL LOADER, 2

CUBIC YARD MINIMUM

RATED CAPACITY

20.000 HOUR

B0280 62201-2800

MOTOR GRADER, 8

FOOT MINIMUM

BLADE

10.000 HOUR

B0300 62201-3150

HYDRAULIC

EXCAVATOR, 1.0

CUBIC YARD MINIMUM

CAPACITY WITH

THUMB ATTACHMENT

40.000 HOUR

B0320 62301-0000 GENERAL LABOR 20.000 HOUR

B0340 62403-0000 PROVIDING AND

PLACING TOPSOIL 320.000 CUYD

B0360 62516-2000 MULCHING,

HYDRAULIC METHOD 2,433.000 SQYD

B0380 62603-0000 PLANTINGS (MP 24.0) ALL LPSM

B0400 62603-0000 PLANTINGS (MP 25.3) ALL LPSM

B0420 62801-0000 TEMPORARY STREAM

DIVERSION

(MP 24.0) ALL LPSM

B0440 62801-0000 TEMPORARY STREAM

DIVERSION

(MP 25.3) ALL LPSM

B0460 63502-0600

TEMPORARY TRAFFIC

CONTROL,

BARRICADE TYPE 3

10.000 EACH

A-10Bid Schedule

B0480 63502-1250

TEMPORARY TRAFFIC

CONTROL, TUBULAR

MARKER, TYPE 42-

INCH

25.000 EACH

B0500 63502-2000

TEMPORARY TRAFFIC

CONTROL, PORTABLE

CHANGEABLE

MESSAGE SIGN

2.000 EACH

B0520 63504-1000

TEMPORARY TRAFFIC

CONTROL,

CONSTRUCTION SIGN

230.000 SQFT

B0540 63506-0500 TEMPORARY TRAFFIC

CONTROL, FLAGGER 200.000 HOUR

B0560 63507-0700

TEMPORARY TRAFFIC

CONTROL, TRAFFIC

CONTROL

SUPERVISOR

150.000 DAY

B0580 64702-2000

ENVIRONMENTAL

DESIGN, LOG

BARRIER

(GOVERNMENT

FURNISHED) 190.000 LNFT

B0600 64703-5000 ENVIRONMENTAL

DESIGN, ROOT WAD

(GOVERNMENT

FURNISHED) 30.000 EACH

B0620 64703-6000

ENVIRONMENTAL

DESIGN, FISH

PASSAGE BOULDER

280.000 EACH

B0640 64704-1000

ENVIRONMENTAL

DESIGN, STREAMBED

MATERIAL

360.000 CUYD

B0660 64704-1700

ENVIRONMENTAL

DESIGN, BANK

STABILIZATION

(COARSE WOODY

DEBRIS) 130.000 CUYD

Submitted By: Schedule Total:

A-11Bid Schedule

BID SCHEDULE SUMMARY

Schedule Bid Total

Schedule A - Base $

Schedule Bid Total

Schedule B - Base $

A-12Bid Schedule

B-1

Solicitation Provisions

Federal Acquisition Regulation

Representations, Certifications and Other Statements of Offeror

NOTICE:

System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include:

• 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals- Representation,

• 52.222-25, Affirmative Action Compliance, and

• 52.212-3(d) and (t), Offeror Representations and Certifications—Commercial Products and

Commercial Services.

Contracting officers will not consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.

To the extent that any of the following Provisions may be in conflict with the Provisions in the IDIQ contract, the following Provisions will control.

The Offeror Makes the Following Representations and Certifications as a Part of its Offer.

52.209-7 Information Regarding Responsibility Matters (Oct 2018)

(a) Definitions. As used in this provision— “Administrative proceeding” means a non-judicial process that is adjudicatory in nature in order to make a determination of…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .