ID FLAP FS SC MULTI(1), Custer Motorway Stabilization Project

Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
69056725R000008
Agency
Federal Highway Administration Department of Transportation
Responses due
Not on record
Set-aside
No set-aside

Opportunity facts

NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways
Place of performance
Challis, Idaho, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Federal Highway Administration is seeking qualified contractors to perform bank stabilization, reinforced soil slope construction, and roadway resurfacing work on the Custer Motorway Stabilization Project located 11 miles west of Challis, Idaho, within the Salmon-Challis National Forest. The project scope encompasses multiple technical disciplines including erosion control, environmental mitigation, temporary stream diversion, traffic management, and ecological design features such as root wads and fish passage improvements. This procurement is limited to six pre-approved prime contractors from the Idaho, Montana, and Surrounding Areas Multiple Award Task Order Contract (MATOC), including ASCORP Inc., Granite Construction, Hamilton Construction, M.A. Deatley Construction, MJ Hughes Construction, and Thompson Contracting. The solicitation documents are expected to be posted to SAM.gov during the Fall/Winter 2025 timeframe, with technical questions directed to wfl.plansspec@dot.gov and general inquiries to wfl.contracts@dot.gov or 360-619-7520. No specific evaluation criteria or proposal deadline has been announced in this pre-solicitation notice, though interested parties are advised to monitor SAM.gov and use the "follow" function to receive notifications when the formal solicitation is released.

This opportunity carries no small business set-aside designation and will be awarded through a negotiated task order contract mechanism. The project is divided into two mutually exclusive bid schedules, with Schedule A covering 0.04 miles at milepost 25.3 and Schedule B covering 0.10 miles across both milepost 24.0 and 25.3 locations, though only one schedule will be selected for award. The estimated contract value ranges from $700,000 to $2,000,000, making this a substantial infrastructure investment. Construction is scheduled to commence in Fall/Winter 2025 with a planned completion date of Summer 2026. Prospective offerors are encouraged to view the project site during fall months when site accessibility permits, as snow and weather conditions may limit site access during winter solicitation and planning phases.

Notice text

PROJECT: ID FLAP FS SC MULTI(1), Custer Motorway Stabilization Project

LOCATION:  11 milest west of Challis, Idaho

WORK: The work consists of bank stabilization with rootwads, reinforced soil slope, and roadway resurfacing.  See “Project Description” posted under attachments for additional details

LENGTH: 0.04 miles (Schedule A); 0.10 miles (Schedule B)

TENTATIVE SOLICITATION DATE: Fall/Winter 2025

TENTATIVE COMPLETION DATE:  Summer 2026  

CONTRACT TYPE: Negotiated Task Order

ESTIMATED PRICE RANGE: Between $700,000 to $2,000,000.

This project will include 2 bid schedules. Only 1 schedule will be awarded. 

INTERESTED VENDORS LIST: To view the Interested Vendors List,you must register as a SAM user, be logged in, and linked to an entity. If you are signed into SAM.gov with your registered entity and you cannot see the Interested Vendors List, you will need to be assigned the Contract Opportunities Administrator role for your entity in SAM.gov. If you need assistance, call the Federal Service Desk at 866-606-8220.

NOTICE OF SUBCONTRACTING OPPORTUNITY

This project will be solicited to the Idaho, Montana, and Surrounding Areas Multiple Award Task Order Contract (MATOC) contractors.

Information on the MATOC contractors may be found on our web site at: https://highways.dot.gov/federal-lands/business/construction-contracting/idaho-montana-and-surrounding-areas-idiq-matoc

PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis. To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page.  When solicitation documents are issued, the REQUEST FOR PROPOSAL (specifications and plans) will be posted at this link.

Attachments

Files attached to this notice, newest first
File Type Posted
Preliminary_ida-fs-sc-multi1_Plan.pdf PDF
Prelim Letter_ID FLAP FS SC MULTI(1).pdf PDF
PROJECT DESCRIPTION_ID FLAP FS SC MULTI(1).pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
ID FLAP FS SC MULTI(1), Custer Motorway Stabilization Project Award Award Notice
ID FLAP FS SC MULTI(1), Custer Motorway Stabilization Project Latest solicitation Solicitation
ID FLAP FS SC MULTI(1), Custer Motorway Stabilization Project This notice · Original Pre-Solicitation