ida-fs-sc-multi1_MP 24.0_earthwork-volume-report.pdf

PDF 336 KB Posted

Attached to
ID FLAP FS SC MULTI(1), Custer Motorway Stabilization Project Federal contract opportunity
Solicitation number
69056725R000008
Issued by
Department of Transportation Federal Highway Administration

About this file

The Volumes Report is a detailed construction measurement document created on Friday, July 18, 2025, at 10:39:18 AM, providing comprehensive volume calculations for various construction elements. The report includes measurements for multiple construction components such as Rockery Wall Backfill (136.974 cubic yards), Fill (69.770 cubic yards), Subex_Backfill1 (112.239 cubic yards), Leveling (45.907 cubic yards), Surface 1 Symbology (341.196 cubic yards), Pavement Layer 3 (235.435 cubic yards), and Wall Foundation (131.056 cubic yards). The report also tracks Volumes_Fill at 52.780 cubic yards and Volumes_Cut at 2,793.064 cubic yards, with a mass ordinate of 2,740.284, and notes that all units are in feet, square feet, and cubic yards unless otherwise specified.

View the file

Other files for this federal contract opportunity

Other files attached to ID FLAP FS SC MULTI(1), Custer Motorway Stabilization Project, newest first.
File Type Posted
QA_1-20-26.pdf PDF
Amendment A001.pdf PDF
RFP_69056725R000008_ID FLAP FS SC MULTI(1).pdf PDF
ida-fs-sc-multi_ExistingGround.zip ZIP file
ida-fs-sc-multi1_MP25.3_XYZ_top.pdf PDF
ida-fs-sc-multi1_MP25.3_construction-staking-notes.pdf PDF
ida-fs-sc-multi1_MP 24.0_proposed-profile-grade.pdf PDF
ida-fs-sc-multi1_MP 25.3_earthwork-volume-report.pdf PDF
ida-fs-sc-multi1_WFLHD-28.pdf PDF
ida-fs-sc-multi1_MP 25.3_proposed-profile-grade.pdf PDF
ida-fs-sc-multi1_MP25.3_XYZ_base.pdf PDF
ida-fs-sc-multi1_MP 25.3_proposed-horizontal-alignment.pdf PDF
ida-fs-sc-multi1_MP24.0_XYZ_base.pdf PDF
ida-fs-sc-multi1_MP 24.0_proposed-horizontal-alignment.pdf PDF
ida-fs-sc-multi1_Plan.pdf PDF
GM 47-24 Custer Motorway Final Geotechnical Memorandum.pdf PDF
ida-fs-sc-multi1_XS_24.0.pdf PDF
Physical Data.zip ZIP file
ida-fs-sc-multi1_MP24.0_construction-staking-notes.pdf PDF
ida-fs-sc-multi1_MP25.3_clearing-limit.pdf PDF
ida-fs-sc-multi1_controlpoints.xlsx XLSX spreadsheet
ida-fs-sc-multi1_XS_MP 25.3.pdf PDF
ida-fs-sc-multi1_MP24.0_clearing-limit.pdf PDF
ida-fs-sc-multi1_MP24.0_XYZ_top.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Volumes Report

Report Created: Friday, July 18, 2025 Time: 10:39:18 AM

Cross Section Set Name:

<None>

Alignment Name:

Input Grid Factor:

Note: All units in this report are in feet, square feet and cubic yards unless specified otherwise.

Station Type Area Volume Factor Adjusted Volume

Included in Mass Ordinate?

Mass Ordinate

0.000 2740.284

Rockery Wall Backfill: 136.974 1.000 136.974 No

Fill: 69.770 1.000 69.770 No

Subex_Backfill1: 112.239 1.000 112.239 No

Leveling: 45.907 1.000 45.907 No

Surface 1 Symbology: 341.196 1.000 341.196 No

Pavement Layer 3: 235.435 1.000 235.435 No

Wall Foundation: 131.056 1.000 131.056 No

Volumes_Fill: 52.780 1.000 52.780 Yes

Volumes_Cut: 2793.064 1.000 2793.064 Yes

Wall Backfill: 1842.250 1.000 1842.250 No

Totals:

Rockery Wall Backfill: 136.974 136.974 No

Total Rockery Wall Backfill: 136.974 136.974

Fill: 69.770 69.770 No

Total Fill: 69.770 69.770

Subex_Backfill1: 112.239 112.239 No

Total Subex_Backfill1: 112.239 112.239

Leveling: 45.907 45.907 No

Total Leveling: 45.907 45.907

Total Cut: 0.000 0.000

Surface 1 Symbology: 341.196 341.196 No

Total Surface 1 Symbology: 341.196 341.196

Pavement Layer 3: 235.435 235.435 No

Total Pavement Layer 3: 235.435 235.435

Wall Foundation: 131.056 131.056 No

Total Wall Foundation: 131.056 131.056

Total Pavement Surface: 0.000 0.000

Total Bottom Mesh: 0.000 0.000

Page 1 of 2Volumes Report

7/18/2025file:///C:/Users/emily.king/AppData/Local/Temp/RPTg3jlfzuu.html

Streambed Material Streambed Material

Embankment RSS Crushed Agg. Leveling Course

Riprap Revetment, Class 3 Embankment

Placed Riprap, Class 2 Embankment Excavation

RSS Backfill

Station Type Area Volume Factor Adjusted Volume

Included in Mass Ordinate?

Mass Ordinate

Volumes_Fill: 52.780 52.780 Yes

Total Volumes_Fill: 52.780 52.780

Volumes_Cut: 2793.064 2793.064 Yes

Total Volumes_Cut: 2793.064 2793.064

Wall Backfill: 1842.250 1842.250 No

Total Wall Backfill: 1842.250 1842.250

Total DNC: 0.000 0.000

Total Centerline: 0.000 0.000

Total Edge of Pavt: 0.000 0.000

Total Centerline Exist: 0.000 0.000

Total Fill: 0.000 0.000

Total AUX_01: 0.000 0.000

Total Wall Top: 0.000 0.000

Total Wall Bottom: 0.000 0.000

Total Hinge: 0.000 0.000

Total AUX_02: 0.000 0.000

Total DNC-1: 0.000 0.000

Total Cut: 0.000 0.000

Total Baseline: 0.000 0.000

Total Terrain_Breakline: 0.000 0.000

Total Stream Restoration: 0.000 0.000

Page 2 of 2Volumes Report

7/18/2025file:///C:/Users/emily.king/AppData/Local/Temp/RPTg3jlfzuu.html