The Vertical Alignment Review Report is a technical document for the Design SurvFt project, dated July 18, 2025. The report details the horizontal and vertical alignment specifications for a road or infrastructure project at Milestone Point (MP) 25.3, using an Alignment\Baseline style. The vertical alignment consists of multiple linear and symmetrical parabola elements with varying tangent grades ranging from -0.033 to -0.017. The report provides precise station and elevation data, including start and end points, vertical points of curvature (VPC), vertical points of intersection (VPI), and vertical points of tangency (VPT), with all measurements recorded in feet. The document includes detailed calculations such as length, entrance and exit grades, and parameters like r and K values for the alignment elements.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Vertical Alignment Review Report
Report Created: Friday, July 18, 2025 Time: 11:53:03 AM
Project: Design SurvFt
Description:
File Name: c:\pw_work_wfl\d0533252\ida-fs-sc-multi1_ALI_25.3.dgn
Last Revised: 7/18/2025 11:52:23
Note: All units in this report are in feet unless specified otherwise.
Horizontal Alignment: MP 25.3
Horizontal Description:
Horizontal Style: Alignment\Baseline
Vertical Alignment: MP 25.3
Vertical Description:
Vertical Style: Alignment\Baseline
Station Elevation
Element: Linear
START 20729.657 6694.252
VPC 20772.812 6693.173
Tangent Grade: -0.025
Tangent Length: 43.155
Element: Symmetrical Parabola
VPC 20772.812 6693.173
VPI 20797.812 6692.548
VPT 20822.812 6692.134
Length: 50.000
Entrance Grade: -0.025
Exit Grade: -0.017 r = 100 * (g2 - g1) / L: 1.692
K = l / (g2 - g1): 59.087
Middle Ordinate: 0.053
Element: Linear
VPT 20822.812 6692.134
VPC 20848.387 6691.711
Tangent Grade: -0.017
Tangent Length: 25.576
Element: Symmetrical Parabola
VPC 20848.387 6691.711
VPI 20873.204 6691.301
VPT 20898.020 6690.480
Page 1 of 2Vertical Alignment Review Report
7/18/2025
Horizontal Alignment: MP 25.3
Horizontal Description:
Horizontal Style: Alignment\Baseline Length: 49.633
Entrance Grade: -0.017
Exit Grade: -0.033 r = 100 * (g2 - g1) / L: -3.333
K = l / (g2 - g1): 30.000
Middle Ordinate: -0.103
Element: Linear
VPT 20898.020 6690.480
END 20965.000 6688.264
Tangent Grade: -0.033
Tangent Length: 66.980
Page 2 of 2Vertical Alignment Review Report
7/18/2025