GAOA South Mineral Creek Road Resurfacing
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 1240LT22R0057
- Agency
-
Region 2 - Rocky Mountain Region
Forest Service, Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Bayfield, Colorado 81122, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The USDA Forest Service Rocky Mountain Region will solicit proposals to resurface approximately 4.4 miles of the South Mineral Road (National Forest System Road 585) located in San Juan County, Colorado. Work will include reshaping the roadbed, establishing drainage ditches, grading the road surface to a 22-foot width, placing and compacting a 4-inch layer of CDOT Class 6 aggregate material. Proposals will be evaluated based on the contractors' ability to complete the work within a 30 day period of performance while maintaining traffic on the road through the use of control measures. The solicitation and associated documents will be issued in approximately 30 days.
This requirement has been set aside for total small business concerns. The predominate NAICS code is 237990 and the primary PSC code is D301. The estimated value for construction ranges from $500,000 to $1,000,000. Interested parties must be registered in the System for Award Management and monitor the site for any amendments as the sole mechanism for distributing additional information.
Notice text
2 versions
Update #2 · Latest ·
SITE VISIT INFORMATION
A site visit is planned prior to issuance of the solicitation.
Date: May 11, 2022
Time: 11:00 a.m. MT
Location: To access the project travel 2 miles Northwest on US 550 from the town of Silverton. The South Mineral Road (NFSR 585) is on the left. We will start just beyond the beginning of South Mineral road and the billboards and pull out. Notify CO if you plan to attend.
PRESOLICITATION NOTICE
This is a pre-solicitation notice. Proposals will be solicited by the USDA, Forest Service for the South Mineral Road Resurfacing project. The intent of this project is to provide aggregate and reconstruct 4.4 miles of the South Mineral Road (National Forest System Road 585). Work includes reshaping the roadbed by reestablishing ditches and pulling the road with back in to a standard 22' width by cutting the shoulders and adding acceptable material to the existing surface. The new surface will be constructed with a crown of no less than 4%. Additional work will include cleaning lead-out ditches, cutting the washboard, filling potholes and covering large rocks. Once the approved roadbed is prepared, commercially purchased aggregate consisting of CDOT class 6 1”-minus roadbase material with a pi between 2-9 shall be hauled, placed and compacted using layer placement method 204.11(a)(1) to a 4” depth and a 22' width.
The south mineral road will remain open to public traffic during this contract. Traffic control will be required at all times.
The solicitation and associated attachments will be posted in approximately 30 days. Drawings and specifications will be provided at time of solicitation issuance.
Project Location: From the Columbine Ranger District office located at 367 Pearl Street, Bayfield, CO 81122 - take S. Pearl Street to US 160. Turn left onto US 160 west towards Durango for 18.7 miles where US 160 and US 550 combine. Continue on US 550 towards Silverton for 48.2 miles where US 550 turns left to stay on US 550 for 2.0 miles. At the Intersection of Forest Service Road 585 the project will begin and continue for 4.4 miles to the South Mineral Campground intersection.
In accordance with FAR 36.204, the estimated magnitude of construction for this project is between $500,000 and $1,000,000.
Contractors are required to be actively registered with the System for Award Management (SAM) https://www.sam.gov prior to submitting a proposal and to be considered for award. Registering in the SAM system is free. If you need assistance, please be sure to reach out your local Procurement Technical Assistance Center (PTAC) representative. PTAC is a free resource to all small business and your state representative’s contact information can be found at the following website: https://www.aptac-us.org/.
All future information about this acquisition, including amendments, will be distributed solely through this site. Interested parties are responsible for monitoring this site to ensure that they have the most up-to-date information about this acquisition. All responsible sources may submit a response to this announcement which will be considered by this agency.
Place of Contract Performance:
Bayfied, CO in San Juan County
Period of performance: 30 days
Update #1 ·
PRESOLICITATION NOTICE
This is a pre-solicitation notice. Proposals will be solicited by the USDA, Forest Service for the South Mineral Road Resurfacing project. The intent of this project is to provide aggregate and reconstruct 4.4 miles of the South Mineral Road (National Forest System Road 585). Work includes reshaping the roadbed by reestablishing ditches and pulling the road with back in to a standard 22' width by cutting the shoulders and adding acceptable material to the existing surface. The new surface will be constructed with a crown of no less than 4%. Additional work will include cleaning lead-out ditches, cutting the washboard, filling potholes and covering large rocks. Once the approved roadbed is prepared, commercially purchased aggregate consisting of CDOT class 6 1”-minus roadbase material with a pi between 2-9 shall be hauled, placed and compacted using layer placement method 204.11(a)(1) to a 4” depth and a 22' width.
The south mineral road will remain open to public traffic during this contract. Traffic control will be required at all times.
The solicitation and associated attachments will be posted in approximately 30 days. Drawings and specifications will be provided at time of solicitation issuance.
Project Location: From the Columbine Ranger District office located at 367 Pearl Street, Bayfield, CO 81122 - take S. Pearl Street to US 160. Turn left onto US 160 west towards Durango for 18.7 miles where US 160 and US 550 combine. Continue on US 550 towards Silverton for 48.2 miles where US 550 turns left to stay on US 550 for 2.0 miles. At the Intersection of Forest Service Road 585 the project will begin and continue for 4.4 miles to the South Mineral Campground intersection.
In accordance with FAR 36.204, the estimated magnitude of construction for this project is between $500,000 and $1,000,000.
Contractors are required to be actively registered with the System for Award Management (SAM) https://www.sam.gov prior to submitting a proposal and to be considered for award. Registering in the SAM system is free. If you need assistance, please be sure to reach out your local Procurement Technical Assistance Center (PTAC) representative. PTAC is a free resource to all small business and your state representative’s contact information can be found at the following website: https://www.aptac-us.org/.
All future information about this acquisition, including amendments, will be distributed solely through this site. Interested parties are responsible for monitoring this site to ensure that they have the most up-to-date information about this acquisition. All responsible sources may submit a response to this announcement which will be considered by this agency.
Place of Contract Performance:
Bayfied, CO in San Juan County
Period of performance: 30 days
Files
| File | Type | Posted |
|---|---|---|
| Attachment 3 - Standard Spec List.docx | DOCX document | |
| Attachment 2 - Plans and Drawings South Mineral.pdf | ||
| Attachment 4 - South Mineral FS Supplemental Specs.docx | DOCX document | |
| Attachment 1 - Project Location Map 2022 South Mineral.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| GAOA South Mineral Creek Road Resurfacing | Award Notice | |
| GAOA South Mineral Creek Road Resurfacing | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Custer Gallatin National Forest Ashland and Sioux Road Maintenance | Region 6 - Pacific Northwest Region | Total Small Business | |
| Administrative Parking Lot Repairs | Forest Service | Total Small Business | |
| Champion Creek Pit Rock Crushing Supply | Forest Service | Total Small Business | |
| Gusg habitat hydro-logic restoration 202 | Colorado Region | Total Small Business | |
| Jake Rocks Road Reconstruction | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity