Attachment 2 - Plans and Drawings South Mineral.pdf
PDF 1 MB Posted
- Attached to
- GAOA South Mineral Creek Road Resurfacing
- Solicitation number
- 1240LT22R0057
About this file
This document includes plans and drawings as well as a pre-solicitation notice for the South Mineral Creek Road Resurfacing project. The project will resurface 4.4 miles of Forest Service Road 585 near Bayfield, Colorado by reshaping the roadbed, establishing ditches, adding aggregate material, and constructing a new 4-inch thick surface of CDOT Class 6 aggregate. Work will also include cleaning ditches, cutting washboards, filling potholes and covering large rocks. The road will remain open during construction with traffic control required. The pre-solicitation notice states that the solicitation will be issued in approximately 30 days and will include drawings and specifications. It provides an estimated value between $500,000 and $1,000,000 and requires contractors to register in SAM. All future information and amendments will be distributed through the federal contracting website.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 3 - Standard Spec List.docx | DOCX document | |
| Attachment 1 - Project Location Map 2022 South Mineral.pdf | ||
| Attachment 4 - South Mineral FS Supplemental Specs.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATION
VICINITY MAP
TRAVEL DIRECTIONS:
SHEET OF
United States Department of Agriculture
Forest Service
INDEX OF SHEETS
SHEET SHEET TITLE DATE
G-01 COVER SHEET
G-02 SCOPE
G-03 SITE PLAN
G-04 TYPICAL RESURFACING SECTION
FROM THE COLUMBINE RANGER DISTRICT OFFICE, TAKE S. PEARL
STREET TO US160. TURN LEFT ONTO US 160 WEST TOWARDS
DURANGO FOR 18.7 MILES WHERE US160 AND US 550 COMBINE.
CONTINUE ON US55O TOWARDS SILVERTON FOR 48.2 MILES WHERE
US550 TURNS LEFT TO STAY ON US550 FOR 2.0 MILES. AT THE
INTERSECTION OF FOREST SERVICE ROAD 585 THE PROJECT WILL
BEGIN AND CONTINUE FOR 4.4 MILES TO THE SOUTH M,MINERAL
CAMPGROUND INTERSECTION.
RECOMMENDED BY:
APPROVED:
DISTRICT RANGER DATE
FOREST ENGINEER
DATE
FOREST SUPERVISOR DATE
1/2 7/2
2 1 1:
C
OD
YJ
ON
ES
C :\U
SE
RS
\C
OD
YJ
ON
ES
\D
ES
KT
OP
\S
OU
TH
M
IN
ER
AL
\1_
SO
UT
HM
IN
ER
AL
RO
AD
RE
SU
RF
AC
IN
G_
CO
VE
RS
HE
ET
.D W
G;
SOUTH MINERAL ROAD RESURFACING
COLORADO
MINERAL COUNTY
SAN JUAN NATIONAL FOREST
(R02) ROCKY MOUNTAIN
THE INTENT OF THIS PROJECT IS TO PROVIDE AGGREGATE AND RECONSTRUCT 4.4 MILES OF THE SOUTH MINERAL ROAD (NFSR 585). WORK
INCLUDES RESHAPING THE ROADBED BY REESTABLISHING DITCHES AND PULLING THE ROAD WITH BACK IN TO A STANDARD 22' WIDTH BY
CUTTING THE SHOULDERS AND ADDING ACCEPTABLE MATERIAL TO THE EXISTING SURFACE. THE NEW SURFACE WILL BE CONSTRUCTED WITH A
CROWN OF NO LESS THAN 4%. ADDITIONAL WORK WILL INCLUDE CLEANING LEAD-OUT DITCHES, CUTTING THE WASHBOARD, FILLING POTHOLES
AND COVERING LARGE ROCKS. ONCE THE APPROVED ROADBED IS PREPARED, COMMERCIALLY PURCHASED AGGREGATE CONSISTING OF CDOT
CLASS 6 1”-MINUS ROADBASE MATERIAL WITH A PI BETWEEN 2-9 SHALL BE HAULED, PLACED AND COMPACTED USING LAYER PLACEMENT METHOD
204.11(A)(1) TO A 4” DEPTH AND A 22' WIDTH.
THE SOUTH MINERAL ROAD WILL REMAIN OPEN TO PUBLIC TRAFFIC DURING THIS CONTRACT. FLAGGERS WILL BE REQUIRED TO MANAGE
TRAFFIC CONTROL AT ALL TIMES.
151 MOBILIZATION -
MOBILIZATION COVERS MOVEMENT OF PERSONNEL, EQUIPMENT, SUPPLIES, AND INCIDENTALS TO AND FROM THE PROJECT AREA.
REQUIREMENTS AND PROVISIONS SHALL FOLLOW SECTION 151 IN THE FP-14 SPECIFICATIONS. PAYMENT WILL BE MADE AT THE
ACCEPTED RATES SHOWN ON THE BID SCHEDULE FOR EACH CORRESPONDING PIECE OF EQUIPMENT, AS APPLICABLE. MOBILIZATION
WILL BE PAID FOR UNDER PAY ITEM 151.
635 TEMPORARY TRAFFIC CONTROL -
TRAFFIC CONTROL PLAN SHALL BE SUBMITTED AND APPROVED BEFORE THE ISSUANCE OF THE START WORK ORDER THE TRAFFIC
CONTROL PLAN SHALL BE IN ACCORDANCE WITH STANDARDS SET FORTH IN THE MOST CURRENT EDITION OF THE MANUAL ON
UNIFORM TRAFFIC CONTROL DEVICES (MUTCD). ALL WORK SHALL BE CONDUCTED BY PERSONNEL FULLY QUALIFIED TO PERFORM
SUCH TASKS ASSIGNED AND SHALL BE SUPERVISED BY AN ONSITE DESIGNATED CONTRACTOR'S REPRESENTATIVE. REMOVE SIGNS
WHEN WORK IS NOT OCCURRING. TRAFFIC CONTROL WILL BE INCIDENTAL TO PAY ITEM 303.
PAYMENT
THE ACCEPTED QUANTITIES WILL BE PAID FOR AT THE CONTRACT UNIT PRICE FOR EACH PAY ITEM SHOWN IN THE SCHEDULE OF ITEMS.
PAYMENT WILL BE MADE UNDER:
PAY ITEM PAY UNIT
151 - MOBILIZATION……………………………………………LS.
301 - UNTREATED AGGREGATE COURSES………………..TON
303 - ROAD RECONDITIONING………………..………...…….MI.
SCOPE OF WORK
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
1/2 7/2
2 1 1:
C
OD
YJ
ON
ES
C :\U
SE
RS
\C
OD
YJ
ON
ES
\D
ES
KT
OP
\S
OU
TH
M
IN
ER
AL
\2_
SO
UT
HM
IN
ER
AL
RO
AD
RE
SU
RF
AC
IN
G_
SC
OP
E.
DW
G;
(R02)
ROCKY MOUNTAIN
SOUTH MINERAL
ROAD RESURFACING
SAN JUAN NATIONAL
FOREST
COLUMBINE RANGER
DISTRICT
SCOPE
02/13/2020
FS090523_R102013_L1-002.dwg
C.JONES
C.JONES
C.JONES
G-02
04002
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
1/2 7/2
2 1 1:
C
OD
YJ
ON
ES
C :\U
SE
RS
\C
OD
YJ
ON
ES
\D
ES
KT
OP
\S
OU
TH
M
IN
ER
AL
\3_
SO
UT
HM
IN
ER
AL
RO
AD
RE
SU
RF
AC
IN
G_
SI
TE
PL
AN
_G
N.
DW
G;
(R02)
ROCKY MOUNTAIN
SOUTH MINERAL
ROAD RESURFACING
SAN JUAN NATIONAL
FOREST
COLUMBINE RANGER
DISTRICT
SITE PLAN AND GENERAL
NOTES
01/03/2022
FS090523_R102013_L1-002.dwg
C.JONES
CJONES
X.XXX
G-03
004003
GENERAL NOTES
301 UNTREATED AGGREGATE COURSES - AGGREGATE SHALL BE COMPACTED USING COMPACTION METHOD (A)(1) (ROLLER COMPACTION) SPS 204.11.
PLACE AGGREGATE AT A COMPACTED DEPTH OF 4 INCHES AND A 22 FOOT WIDTH. AGGREGATE WILL BE PAID FOR BY THE TON BASED ON SUPPLIED LOAD
TICKETS UNDER PAY ITEM 301.
303 ROAD RECONDITIONING - SCARIFY THE ROAD SURFACE TO A DEPTH THAT WILL REMOVE ALL WASHBOARDS, DO NOT BLADE ROADS WHEN CONDITIONS
ARE SO DRY THAT OPERATIONS ARE INEFFECTIVE. PULL AGGREGATE FROM THE SHOULDERS BACK INTO THE ROADWAY TO BUILD A NO LESS THAN 4%
CROWN. REMOVE ALL DELETERIOUS MATERIAL INCLUDING ROCKS OVER SIX INCHES AND CAST OVER THE FILL SLOPE. PULL DITCHES TO A 3:1 SLOPE
REMOVING MATERIAL AND PROVIDE FOR POSITIVE DRAINAGE.
703 AGGREGATE - THE CRUSHED AGGREGATE SHALL BE 1 INCH MINUS MODIFIED CDOT CLASS 6 WITH A PLASTICITY INDEX BETWEEN 2-9 CONFORMING TO
GRADATION TABLE 703-3. ONE CURRENT AASHTO T-27 SIEVE ANALYSIS SHALL BE PROVIDED FOR THE CRUSHED AGGREGATE AT THE START OF THE PROJECT.
THE TEST MAY BE CONDUCTED BY THE COMMERCIAL PIT OPERATOR. WRITTEN RESULTS SHALL BE SUPPLIED TO THE COR. THE PAYMENT FOR MATERIALS
TESTING AND CERTIFICATION OF AGGREGATE IS INCIDENTAL TO AND INCLUDED UNDER THE PAY ITEM 301. WATERING FOR DUST ABATEMENT AND
COMPACTION MAY BE NECESSARY AT SELECT LOCATIONS AS DETERMINED BY THE COR.
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
4"MIN.COMPACTED
D
I
T
C
H
T
Y
P
TYPICAL RESURFACING SECTION W/ DITCH
6% CROWN OR
4% CROSS SLOPE
NOT TO SCALE
FEET
COR APPROVED RECONDITIONED
ROADBED
NEW
COMPACTED
SURFACE
M
A
X
B
A
C
K
S
L
O
P
E
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
1/2 7/2
2 1 1:
C
OD
YJ
ON
ES
C :\U
SE
RS
\C
OD
YJ
ON
ES
\D
ES
KT
OP
\S
OU
TH
M
IN
ER
AL
\4_
SO
UT
HM
IN
ER
AL
RO
AD
RE
SU
RF
AC
IN
G_
TY
PI
CA
LR
ES
UR
FA
CI
NG
SE
CT
IO
N.
DW
G;
(R02)
ROCKY MOUNTAIN
SOUTH MINERAL
ROAD RESURFACING
SAN JUAN NATIONAL
FOREST
COLUMBINE RANGER
DISTRICT
TYPICAL
RESURFACING
SECTION
01/03/2022
FS090523_R102013_L1-002.dwg
C.JONES
C.JONES
X.XXX
G-04
04004
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
| Sheets and Views |
| 17x11 EXPANDED |
| 2_SouthMineralRoadResurfacing_Scope.pdf |
| Sheets and Views |
| 17X11 EXPANDED |
| 3_SouthMineralRoadResurfacing_SITEPLAN_GN.pdf |
| Sheets and Views |
| 17X11 EXPANDED |
| 4_SouthMineralRoadResurfacing_TypicalResurfacingSection.pdf |
| Sheets and Views |
| 17X11 EXPANDED |
File details come from the government source that posted it. Updated .