Gaoa melstone DAM reconstruction

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
140L0625R0012
Agency
National Office Bureau of Land Management, Department of the Interior
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Z2KA Repair Or Alteration Of Dams
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Bureau of Land Management seeks a firm fixed-price construction contract for the reconstruction of Melstone Dam located in Musselshell County, Montana, under NAICS code 237990 (Other Heavy and Civil Engineering Construction). This comprehensive dam reconstruction project includes demolition of outlet conduit structures, controlled breaches, dewatering, installation of reinforced concrete pipe, concrete work, major excavation and backfill operations, muck excavation, sand filter drain installation, energy dissipation basins, riprap installation, and final grading with topsoiling and restoration. The contractor must demonstrate relevant project experience within the past five years, submit a detailed project schedule with Gantt chart, provide past performance documentation via CPARS reports or questionnaires, and submit competitive pricing for evaluation using a best value tradeoff approach. Critical contract requirements include a minimum 15 percent self-performance by the prime contractor, compliance with prevailing wage rates under Montana Wage Determination MT20260077, performance and payment bonds at 100 percent of contract price, and a bid guarantee of 20 percent of bid price or $3,000,000 (whichever is less). The proposal due date is February 20, 2026, with questions deadline of February 4, 2026, and a mandatory site visit was conducted on January 29, 2026.

This solicitation is designated as a Total Small Business Set-Aside with a size standard of $45.0 million, meaning only small business concerns may submit proposals. The estimated contract value falls between $1 million and $5 million, with construction activities commencing within 10 calendar days of receiving the Notice to Proceed (assumed April 10, 2026) and all work to be completed no later than December 10, 2027. The contractor must complete performance in 300 calendar days, with construction activity and surface disturbance prohibited from March 15 to July 15 annually to protect sage grouse strutting activities and migratory birds, and work hours restricted to 7:00 AM to 7:00 PM Monday through Friday unless written approval is obtained for weekend or holiday work. The project involves significant earthwork components, including 34,390 cubic yards of common excavation, 47,150 cubic yards of compacted embankment, and 2,640 tons of new riprap slope protection. The work will be performed at Melstone Dam in Musselshell County, Montana (coordinates 46.603858, -107.902075), with construction work spaces totaling approximately 26.2 acres across multiple parcels and four temporary water storage pond locations identified for construction support.

Notice text

GAOA MELSTONE DAM RECONSTRUCTION

Attachments

Files attached to this notice, newest first
File Type Posted
SF30_AM06_ContPages_0006.pdf PDF
Sol_140L0625R0012_Amd_0006.pdf PDF
Att9_25R0012_QuesAns_AM06_0006.pdf PDF
SiteVisit_SignIn_0005.pdf PDF
Att11A_NationwidePermitFactSheet_0005.pdf PDF
Att11C_CertificationofCompliance_0005.pdf PDF
Att11B_NationwidePermitVerification_0005.pdf PDF
Att14_SeepageAnalysis_0005.pdf PDF
Att9_25R0012_QuesAns_AM05_0005.pdf PDF
Sol_140L0625R0012_Amd_0005.pdf PDF
Att10_MelstoneDam_DecisionRecord_0005.pdf PDF
Att13_TypicalDetailReliefDrainWeep_0005.pdf PDF
SF30_AM05_ContPages_0005.pdf PDF
Att3_WD_MT20260077_2Jan26_0005.pdf PDF
Att12_ConstructionWorkSpacesEasement_0005.pdf PDF
Att11D_DEQ_NationwidePermits_0005.pdf PDF
Att7_140L0625R0012_Past_Perf_Questionnaire_AM05_0005.docx DOCX document
Sol_140L0625R0012_Amd_0004.pdf PDF
Sol_140L0625R0012_Amd_0003.pdf PDF
Att7_140L0625R0012_Past_Perf_Questionnaire_AM02_0002.docx DOCX document
140L0625R0012_ContPages_AM02_0002.pdf PDF
Sol_140L0625R0012_Amd_0002.pdf PDF
Sol_140L0625R0012_Amd_0001.pdf PDF
Att3_WD_MT20250077_18Jul25.pdf PDF
Att2_Specifications_Jan2025.pdf PDF
Att1B_Drawings_Fence_9Sep25.pdf PDF
Att5_Lim_on_SubK_Breakout.xlsx XLSX spreadsheet
Sol_140L0625R0012.pdf PDF
Att8_RFI_Form_23Sep.xlsx XLSX spreadsheet
Att7_140L0625R0012_Past_Perf_Questionnaire_23Sep.docx DOCX document
Att2B_Specifications_Fence_15Aug25.pdf PDF
Att6_Experience_ProjectDataSheet_Const.docx DOCX document
Att1_Drawings_20241122.pdf PDF
Att4_Price_Breakout_23Sep.pdf PDF
Show all 34

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Gaoa melstone DAM reconstruction Award Award Notice
Gaoa melstone DAM reconstruction This notice · Latest solicitation Solicitation
Gaoa melstone DAM reconstruction Pre-Solicitation
Gaoa melstone DAM reconstruction Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity