Att5_Lim_on_SubK_Breakout.xlsx
XLSX spreadsheet 94 KB Posted
- Attached to
- GAOA MELSTONE DAM RECONSTRUCTION Federal contract opportunity
- Solicitation number
- 140L0625R0012
About this file
This file is an Excel spreadsheet detailing subcontractor limitations for a small business set-aside contract for the GAOA Melstone Dam Reconstruction project (Solicitation Number 140L0625R0012). The document provides a detailed template for tracking labor and material costs, with specific requirements for self-performance and subcontractor breakdown. The contract requires a minimum of 15% self-performance by the prime contractor, with provisions for tracking payments to small business and large business subcontractors. The solicitation is issued by the Department of the Interior's Bureau of Land Management National Office, focusing on dam reconstruction services with strict guidelines for subcontractor utilization and cost allocation.
View the file
Other files for this federal contract opportunity
Show all 33
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lim on Sub Breakout Limitations on Subcontracting Breakout FAR 52.219-14(e)(3) or (4)
| Solicitation Number | 140L0625R0012 |
| Type of Set-Aside | Small Business |
| Performance Period | |
| Required Self-Performance | 15% |
(A) Total Amount Proposed¹
(B) Total Material Cost2
(C) Self Performed Labor
| (D) Small Business Subcontractor (SSS) Labor3 | ||
| Total Amount Paid to [Insert First SSS Name] | ||
| Total Amount Paid to [Insert Second SSS Name] | ||
| Total Amount Paid to [Insert Third SSS Name] | ||
| Total Amount Paid to [Insert Fourth SSS Name] | ||
| Total Amount Paid to [Insert Fifth SSS Name] | ||
| Total Amount Paid to [Insert Sixth SSS Name] | ||
| Total Amount Paid to SSS Companies | $0.00 |
| (E) Large Business Subcontractor (LBS) Labor | ||
| Total Amount Paid to [Insert First LBS Name] | ||
| Total Amount Paid to [Insert Second LBS Name] | ||
| Total Amount Paid to [Insert Third LBS Name] | ||
| Total Amount Paid to [Insert Fourth LBS Name] | ||
| Total Amount Paid to [Insert Fifth LBS Name] | ||
| Total Amount Paid to [Insert Sixth LBS Name] | ||
| Total Amount Paid to LBS Companies | $0.00 |
(F) Total Labor Cost4 $0.00
| (G) Limitation on Subcontracting Percentage5 | ||
| (Total Labor Cost - Total Amount Paid to LBS Companies) / Total Labor Cost | ERROR:#DIV/0! |
| *Note 1: (A) Total Amount Proposed = (B) Total Material Cost + (F) Total Labor Cost |
| *Note 2: Total Material Cost includes special tooling, special testing equipment, and construction equipment. Additional definition of material cost can be found at 13 CFR 125.1. |
| *Note 3: Subcontractors must be first tier and qualify as a small business under the solicitation NAICS. All second tier subcontractors are counted as LBS labor. |
| *Note 4: Total labor costs consist of all contractual costs other than material. |
| *Note 5: To be compliant, limitation percentage must be greater than the required self-performance percentage. |
Sheet2
| Services (except construction) |
| General construction |
| Construction by special trade contractors |
File details come from the government source that posted it. Updated .