Att14_SeepageAnalysis_0005.pdf

PDF 1 MB Posted

Attached to
GAOA MELSTONE DAM RECONSTRUCTION Federal contract opportunity
Solicitation number
140L0625R0012
Issued by
Department of the Interior Bureau of Land Management National Office

About this file

This document is Appendix A of a Geotechnical Report prepared by Dowl, containing seepage analysis for Melstone Dam.

The appendix presents two detailed seepage analysis diagrams for the dam using SEEP/W software. The first diagram illustrates steady-state seepage conditions under normal pool elevation of 2,863.4 feet, employing the Steady-State method. The second diagram depicts rapid drawdown seepage conditions under a drawdown pool elevation of 2,967.5 feet, using the Transient method. Both analyses are presented in U.S. Customary Units and dated January 6, 2025. The diagrams display cross-sectional profiles of the dam showing water total head measurements in feet, distance measurements, and elevation changes. Color-coded zones in the diagrams represent different seepage gradients and flow patterns through the dam structure, with equipotential lines and flow paths clearly marked. The analyses appear to evaluate the dam's performance under different water level scenarios to assess potential seepage rates and phreatic surface locations within the embankment.

View the file

Other files for this federal contract opportunity

Other files attached to GAOA MELSTONE DAM RECONSTRUCTION, newest first.
File Type Posted
SF30_AM06_ContPages_0006.pdf PDF
Sol_140L0625R0012_Amd_0006.pdf PDF
Att9_25R0012_QuesAns_AM06_0006.pdf PDF
SiteVisit_SignIn_0005.pdf PDF
Att11A_NationwidePermitFactSheet_0005.pdf PDF
Att11C_CertificationofCompliance_0005.pdf PDF
Sol_140L0625R0012_Amd_0005.pdf PDF
Att10_MelstoneDam_DecisionRecord_0005.pdf PDF
Att13_TypicalDetailReliefDrainWeep_0005.pdf PDF
SF30_AM05_ContPages_0005.pdf PDF
Att11B_NationwidePermitVerification_0005.pdf PDF
Att9_25R0012_QuesAns_AM05_0005.pdf PDF
Att3_WD_MT20260077_2Jan26_0005.pdf PDF
Att12_ConstructionWorkSpacesEasement_0005.pdf PDF
Att11D_DEQ_NationwidePermits_0005.pdf PDF
Att7_140L0625R0012_Past_Perf_Questionnaire_AM05_0005.docx DOCX document
Sol_140L0625R0012_Amd_0004.pdf PDF
Sol_140L0625R0012_Amd_0003.pdf PDF
Att7_140L0625R0012_Past_Perf_Questionnaire_AM02_0002.docx DOCX document
140L0625R0012_ContPages_AM02_0002.pdf PDF
Sol_140L0625R0012_Amd_0002.pdf PDF
Sol_140L0625R0012_Amd_0001.pdf PDF
Att3_WD_MT20250077_18Jul25.pdf PDF
Att1B_Drawings_Fence_9Sep25.pdf PDF
Att5_Lim_on_SubK_Breakout.xlsx XLSX spreadsheet
Att2_Specifications_Jan2025.pdf PDF
Sol_140L0625R0012.pdf PDF
Att8_RFI_Form_23Sep.xlsx XLSX spreadsheet
Att7_140L0625R0012_Past_Perf_Questionnaire_23Sep.docx DOCX document
Att2B_Specifications_Fence_15Aug25.pdf PDF
Att6_Experience_ProjectDataSheet_Const.docx DOCX document
Att1_Drawings_20241122.pdf PDF
Att4_Price_Breakout_23Sep.pdf PDF
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GG

e o t e c h n i c a ll

R e p o r t

PEOPLE WHO MAKE IT HAPPEN dowl.com

Appendix A Seepage Analysis

File details come from the government source that posted it. Updated .