Att11B_NationwidePermitVerification_0005.pdf

PDF 273 KB Posted

Attached to
GAOA MELSTONE DAM RECONSTRUCTION Federal contract opportunity
Solicitation number
140L0625R0012
Issued by
Department of the Interior Bureau of Land Management National Office

About this file

This is a Nationwide Permit (NWP) Verification letter from the U.S. Army Corps of Engineers, Omaha District, Montana Regulatory Office, dated November 20, 2025, authorizing dam maintenance and rehabilitation work at Melstone Reservoir in Musselshell County, Montana.

The Bureau of Land Management (BLM) submitted a Pre-construction Notification on September 16, 2025, for the Melstone Dam Reconstruction project. The Corps verified that the work qualifies for authorization under NWP 3, Maintenance, which regulates discharge of dredged and fill material under Section 404 of the Clean Water Act and structures in navigable waters under Section 10 of the Rivers and Harbors Act. The project consists of four primary components: outlet demolition removing 76 feet of existing 24-inch reinforced concrete pipe with 0.03 acre temporary impact above the ordinary high-water mark (OHWM); outlet construction installing 120 feet of 30-inch pipe, a 58-foot by 53-foot stilling basin, 11-foot inlet tower, and 475-foot toe drain resulting in 0.05 acre impact below OHWM; slope stabilization using approximately 5,380 cubic yards of riprap material for upstream protection with 0.6 acre impact below OHWM; and project completion in accordance with plans dated November 22, 2024. The NWP verification is valid until March 14, 2026, provided no deviations occur from the approved plans. The BLM must submit a signed Compliance Certification form within 30 days of project completion, and authorization does not relieve the permittee from obtaining other required federal, state, or local permits. The project manager is Colten Shimer, reachable at Colten.D.Shimer@usace.army.mil or (406) 200-2689.

View the file

Other files for this federal contract opportunity

Other files attached to GAOA MELSTONE DAM RECONSTRUCTION, newest first.
File Type Posted
SF30_AM06_ContPages_0006.pdf PDF
Sol_140L0625R0012_Amd_0006.pdf PDF
Att9_25R0012_QuesAns_AM06_0006.pdf PDF
Att14_SeepageAnalysis_0005.pdf PDF
Att9_25R0012_QuesAns_AM05_0005.pdf PDF
SiteVisit_SignIn_0005.pdf PDF
Att11A_NationwidePermitFactSheet_0005.pdf PDF
Att11C_CertificationofCompliance_0005.pdf PDF
Sol_140L0625R0012_Amd_0005.pdf PDF
Att10_MelstoneDam_DecisionRecord_0005.pdf PDF
Att13_TypicalDetailReliefDrainWeep_0005.pdf PDF
SF30_AM05_ContPages_0005.pdf PDF
Att3_WD_MT20260077_2Jan26_0005.pdf PDF
Att12_ConstructionWorkSpacesEasement_0005.pdf PDF
Att11D_DEQ_NationwidePermits_0005.pdf PDF
Att7_140L0625R0012_Past_Perf_Questionnaire_AM05_0005.docx DOCX document
Sol_140L0625R0012_Amd_0004.pdf PDF
Sol_140L0625R0012_Amd_0003.pdf PDF
140L0625R0012_ContPages_AM02_0002.pdf PDF
Att7_140L0625R0012_Past_Perf_Questionnaire_AM02_0002.docx DOCX document
Sol_140L0625R0012_Amd_0002.pdf PDF
Sol_140L0625R0012_Amd_0001.pdf PDF
Att2_Specifications_Jan2025.pdf PDF
Att3_WD_MT20250077_18Jul25.pdf PDF
Att1B_Drawings_Fence_9Sep25.pdf PDF
Att5_Lim_on_SubK_Breakout.xlsx XLSX spreadsheet
Sol_140L0625R0012.pdf PDF
Att8_RFI_Form_23Sep.xlsx XLSX spreadsheet
Att7_140L0625R0012_Past_Perf_Questionnaire_23Sep.docx DOCX document
Att2B_Specifications_Fence_15Aug25.pdf PDF
Att6_Experience_ProjectDataSheet_Const.docx DOCX document
Att1_Drawings_20241122.pdf PDF
Att4_Price_Breakout_23Sep.pdf PDF
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE ARMY

U.S. ARMY CORPS OF ENGINEERS, OMAHA DISTRICT

MONTANA REGULATORY OFFICE

100 NEILL AVENUE

HELENA, MT 59601-3329

November 20, 2025

SUBJECT: Nationwide Permit Verification, NWO-2025-01382-MT, BLM - Melstone Dam Maintenance/Rehabilitation - Musselshell County

Bureau of Land Management Attn: Josh Helm 111 Garryowen Rd Miles City MT, 59301 jhelm@blm.gov

Dear Mr. Helm:

This letter is in response to your September 16, 2025 Pre-construction Notification (PCN), requesting Department of the Army (DA) Nationwide Permit (NWP) verification for the above-referenced project. The project site is located on Melstone Reservoir at Latitude 46.603897°, Longitude -107.901337°; Section 26, Township 10 N, Range 30 E; near Melstone, Musselshell County, Montana.

Project-specific components:

1. Outlet Demolition: Removal of the existing 76-foot of 24-inch reinforced concrete pipe (RCP). The demolition and associated excavated material will be removed from the area and placed into uplands resulting in 0.03 acre of temporary impact.

This temporary impact will not occur below the ordinary high-water mark

(OHWM).

2. Outlet Construction: Placement of 120-foot, of 30-inch RCP, construct a 58-foot by 53-foot stilling basin,11-foot inlet tower with a precast manhole. Furthermore a 475-foot toe drain will be installed. The Outlet construction would impact approximately 0.05 acre below OHWM.

3. Slope Stabilization: Approximately 5,380 cubic yards of riprap material will be used to provide upstream slope protection and bedding. The discharge will result in an impact of approximately 0.6 acre below OHWM.

4. Project will be completed as detailed to the plans titled, “Melstone Dam

Reconstruction”, dated, November 22, 2024.

-2-

The Omaha District, Regulatory Branch is committed to providing quality and timely service to our customers. In an effort to improve customer service, please take a moment to complete our Customer

Service Survey found on our website at: https://regulatory.ops.usace.army.mil/customer-service-survey/.

The U.S. Army Corps of Engineers (Corps) regulates the discharge of dredged and fill material into waters of the United States under Section 404 of the Clean Water Act (CWA) (33 U.S.C. 1344) and structures or work in, over, and under navigable waters of the United States under Section 10 of the Rivers and Harbors Act (RHA) (33 U.S.C.

403). The Corps’ regulations are published in the Code of Federal Regulations at 33 CFR parts 320 through 332. NWPs are defined in the Federal Register published on December 27, 2021 (86 FR 73522 and January 13, 2021 (86 FR 2744)). Based on a review of the information you furnished and available to us, we have determined the above referenced work requires DA authorization under Section 404 of the CWA.

Based upon the information you provided, we hereby verify that the work described above, which would be performed in accordance with the plans you provided (sheets 1-27), dated November 22, 2024, is authorized by NWP 3, Maintenance.

Please note that deviations from the original plans and specifications of your project could require additional authorization from this office. This NWP and associated Regional and General Conditions are enclosed and can be accessed on our website at:

https://www.nwo.usace.army.mil/Missions/Regulatory-Program/Montana/. Failure to comply with the General and Regional Conditions of this NWP, may result in the suspension or revocation of your authorization, and you may be subject to appropriate enforcement action. You shall comply with all terms and conditions associated with this

NWP.

Unless this NWP is suspended, modified, or revoked, it is valid until March 14, 2026. It is incumbent upon you to remain informed of changes to this NWP. We will issue a public notice when the NWPs are reissued. Furthermore, if you commence or are under contract to commence this activity before the date that the relevant NWP is modified or revoked, you will have twelve (12) months from the date of the modification or revocation of the NWP to complete the activity under the present terms and conditions of this NWP unless discretionary authority has been exercised on a case-by-case basis to modify, suspend, or revoke the authorization as per 33 CFR 330.6(b).

Any project specific conditions listed in this letter continue to remain in effect after the NWP verification expires unless the district engineer removes those conditions.

To assist in your compliance with NWP General Condition 30, enclosed is a "Compliance Certification" form, which shall be signed and returned within 30 days of completion of the project, including any required mitigation. Your signature on this form certifies that you have completed the work in accordance with the terms and conditions of the NWP. Activities completed under the authorization of an NWP which was in effect at the time the activity was completed continue to be authorized by that NWP.

Authorizations under this NWP does not relieve permittees from obtaining permits or other authorizations from any required federal, state, or local agency.

https://regulatory.ops.usace.army.mil/customer-service-survey/

-3-

The Omaha District, Regulatory Branch is committed to providing quality and timely service to our customers. In an effort to improve customer service, please take a moment to complete our Customer

Service Survey found on our website at: https://regulatory.ops.usace.army.mil/customer-service-survey/.

If you have any questions, please contact Colten Shimer via email at Colten.D.Shimer@usace.army.mil, by mail at the address above, or by phone at (406) 200-2689.

Sincerely, Colten Shimer Project Manager

3 Enclosures

1. NWP 3 Fact Sheet with Regional and General Conditions