Att2B_Specifications_Fence_15Aug25.pdf
PDF 132 KB Posted
- Attached to
- GAOA MELSTONE DAM RECONSTRUCTION Federal contract opportunity
- Solicitation number
- 140L0625R0012
About this file
These are Technical Specifications for the Melstone Dam Fence project issued by the Bureau of Land Management (BLM) in Miles City, Montana, dated August 15, 2025. The project involves removing approximately 230 rods of existing woven wire and five-wire fence and installing approximately 367 rods of new 4-wire fence (3 barbed wires with a bottom barbless wire) in Musselshell County. The specifications detail precise requirements for fence materials including heavy-duty barbed and barbless wire, steel brace rails and posts, wood posts, gates, and mechanical gate closures, with specific technical specifications for wire gauge, galvanization, and installation methods.
The project will be paid as a lump sum for fence removal and installation, with the contractor responsible for clearing a 6-foot width on each side of the fence line, setting posts (both wood and steel), stretching wire, installing gates and deadmen, and ensuring proper wire spacing and tension. The BLM will verify completion based on satisfactory removal of existing fence and installation of new fence components in accordance with the project's detailed specifications and drawings. Contractors must follow strict guidelines for post installation, wire stretching, and material quality, with provisions for using alternative techniques like figure fours and rock jacks in rocky terrain.
View the file
Other files for this federal contract opportunity
Show all 33
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Technical Specifications for
Melstone Dam Fence
BUREAU OF LAND MANAGEMENT
111 Garryowen Road
Miles City, Montana 59301
August 15, 2025
MELSTONE DAM FENCE
PROJECT SPECIFICATIONS
TABLE OF CONTENTS
Specification Page No
TABLE OF CONTENTS
MELSTONE DAM FENCE
GENERAL REQUIREMENTS
01009 General Information and Requirements ...................................................01009(1-5)
SITE WORK
02834 Wire Fences and Gates .............................................................................02834(1-7)
GENERAL INFORMATION AND REQUIREMENTS
MELSTONE DAM FENCE 01009-1
SPECIFICATION 01009
PART 1: GENERAL
1.1 SUMMARY:
A. Description of Work: Furnishing labor, equipment, supplies, and materials to construct a 4-wire fence (3 barbed with bottom barbless wire). Construct approximately 367 rods of new 4-wire fence (3 barbed with bottom barbless wire) with all steel line posts (T-post) and remove approximately 230 rods of woven wire & five wire fence. Replace designated rods of fence, corners, panels, gates, wood, and T-posts along the fence route unless indicated otherwise in the fence alignment on the location maps.
B. Location: Work under this Contract is located in Musselshell County, Montana. The Work locations are shown on the Drawings.
1.2 DEFINITIONS:
A. Approvals: Approval of the submittals is an indication that the Contractor's submittals have been reviewed and that there are no objections, except as noted. Approval of deviations shall apply only to those deviations or omissions from the requirements of the drawings and specifications brought to the Government’s attention in writing. After approval of an item, the Contractor may submit a substitute for approval when the approved item cannot be purchased or delivered in time to avoid delay in completion of the project.
1.3 REFERENCES:
Referenced Specifications/Standards with Abbreviations and/or Acronyms: Wherever the following acronyms are used in these specifications or on the drawings, they are to be construed the same as the respective expressions represented. Copies of the referenced specifications/standards referred to herein may be procured by the Contractor, from the following:
ASTM American Society for Testing and Materials
PO Box C700 West Conshohocken, PA 19248-2959
AWPA American Wood Preserver’s Association
PO Box 361784 Birmingham, AL 35236-1784
1.4 SUBMITTAL:
A. Scope: Submittals shall be based on the requirements listed in these contract specifications.
B. Requirements: For required submittals, allow at least 5 working days for review.
MELSTONE DAM FENCE 01009-2
Submittals shall be delivered to the Government for review.
C. Identification of Submittal: Completely identify each submittal by showing at least the following information: Submit two copies of each submittal for approval.
1. Name and address of submitter, plus name and telephone number of the individual to contact for further information.
2. Name of project as it appears in these specifications.
3. Contract number, drawing number, and specification section number to which the submittal applies.
4. Whether this is an original submittal or re-submittal.
5. Each item shall note the manufacturer's name and address.
1.5 QUALITY ASSURANCE:
A. Codes and Standards: The work shall comply with codes and standards applicable to each type of work and as listed in the individual sections of these specifications. This Contract incorporates materials, applications, and tests by reference, with the same force and effect as when they were given in full text.
B. Conflict: Where a conflict occurs between reference documents and project specifications, the project specifications shall govern.
1.6 DELIVERY, STORAGE, AND HANDLING:
A. Delivery: The Contractor shall protect products incorporated into the work from damage while in transit to the site. Products must be delivered in original unopened containers with manufacturer's name, brand designation, and contents legibly indicated.
B. Storage: The Contractor shall provide temporary storage facilities for products. Storage shall comply with the manufacturer's instructions. The storage area shall permit access for inspection and handling. No material shall be stored with direct contact to the ground.
C. Handling: The Contractor shall load and unload products in such a manner that protects them from damage.
1.7 PROJECT/SITE CONDITIONS:
A. Access to the Work: Public roads damaged by the Contractor shall be restored at
Contractor's expense to the same condition they were in at the commencement of work.
Activity may be restricted during wet or frozen conditions. Mechanized equipment use will be avoided if the equipment causes rutting to a depth of 4 inches or greater. Details on soil types can be found online at the Natural Resources Conservation Service Web Soil Survey.
MELSTONE DAM FENCE 01009-3
Survey monuments or markers disturbed or removed during construction shall be reset at the Contractors expense.
B. Environmental Considerations: Operations of the Contractor upon government premises including storage of materials, camping areas, and equipment parking shall be confined to approved areas.
1.8 SEQUENCING AND SCHEDULING:
A. Work Schedule: The schedule shall be submitted at the pre-work conference. When requested, the Contractor shall submit an updated schedule within 3 calendar days.
PART 2: PRODUCTS
(There are no applicable requirements.)
PART 3: EXECUTION
3.1 PROJECT MEETINGS:
A. Pre-Work Conference:
1. Notification: A pre-work conference will be held prior to the start of work. The
Contractor will be notified in advance of meeting time, date, and place. The purpose will be to review required work, project drawings and specifications, construction schedules, payroll and payments, and administrative provisions of the Contract.
2. Attendance: The Contractor, subcontractors, and the persons responsible for coordination of the work shall be present at the meeting.
3. Presentation: The Contractor shall be prepared to summarize and explain procedures planned for the project.
B. Progress Meetings:
1. Location: Meetings shall be held at the project site or as determined by the Government.
2. Notification: Meetings may be called by either the Government or the Contractor.
Request shall state who should attend and include an agenda.
C. Final Inspection:
1. Location: Meeting shall be held at the project site, or as determined by the
Government.
2. Notification: The Contractor shall notify the Government at least 5 working days
MELSTONE DAM FENCE 01009-4
before the completion date so a final inspection can be scheduled.
3. Superintendent shall be present during this inspection.
3.2 PREPARATION:
A. Work Layout: The Government will set stakes, lath, or posts to give the Contractor measurements, lines, and grades necessary for the work executed under the Contract.
B. Installation Changes: Records shall be maintained by the Contractor and Government of actual installations where at variance with the work shown, where changed, or where not otherwise located by dimension, elevation, or other reference on the Drawings.
3.3 PROTECTION OF EXISTING PROPERTIES
A. General
1. Take precautions to protect all adjoining private and public property and facilities, including underground and overhead utilities, structures, and fences. Restore or replace all disturbed or damaged facilities to its original condition at the Contractor’s expense, taking necessary steps and precautions to protect buried utilities.
2. It is the responsibility of the contractor to contact utility owners using the Montana One Call System for utility locates before starting work. The Contractor is also responsible for ensuring that all private and public utilities are located within the work area, including any fees associated with locates. Protect the utilities exposed during the work and prevent damaging underground utilities adjacent to excavations. Immediately notify the utility owner of any construction damage. Repairs of damage to utilities are at the expense of the Contractor.
END OF SPECIFICATION
WIRE FENCES AND GATES
MELSTONE DAM FENCE 02834-1
SPECIFICATION 02834
PART 1: GENERAL
1.1 SUMMARY:
A. Section Includes: Installing with Contractor property, wire fences, gates, and various panels.
1.2 REFERENCES:
A. American Society for Testing and Materials
ASTM A121-19 Zinc-Coated (Galvanized) Steel Barbed Wire ASTM A641-19 Zinc-Coated (Galvanized) Carbon Steel Wire ASTM A702-13(18) Steel Fence, Posts, and Assemblies, Hot-Wrought ASTM A53-20 Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and
Seamless
B. American Wood Preserver's Association
AWPA U1-20 User Specifications for Treated Wood AWPA T1-20 Processing and Treatment Standards AWPA P1/P13-19 Standard for Creosote Preservative (CR) AWPA P2-19 Standard for Creosote Solutions (CR-S) AWPA P23-14 (R2020) Standard for Chromated Copper Arsenate Type C (CCA-C) AWPA P36-16 Standard for Copper Naphthenate (CuN) AWPA P35-16 Standard for Pentachlorophenol (PCP) AWPA P48-15 Standard for Copper Azole Type C (CA-C)
1.3 SUBMITTALS:
A. Certification: The Contractor shall furnish written certification from the treating plant stating that chemicals and methods used, for wood preservation and net amount of preservative retained, are in conformance with applicable standards. Contractor-furnished gates and accessories will be approved by the Government prior to installation. Furnish written certification from the manufacturer that the Contractor-Furnished fence posts and wire conform to the requirements of this section. Submittals shall be according to Specification 01009 - General Information and Requirements.
PART 2: PRODUCTS
2.1 CONTRACTOR - FURNISHED MATERIALS:
MELSTONE DAM FENCE 02834-2
A. Heavy Duty Barbed Wire: (Redbrand or Approved Equal) Two 12-1/2 gauge galvanized wires twisted together with 2-point barbs of 14 gauge wire spaced 4-6 inches apart. Wire and barbs shall be zinc-coated steel, with a zinc coating of at least 0.28 oz/ft2 of coated surface area and a minimum breaking strength of 950 lb. force. The barbed wire shall be a heavy-duty wire conforming to ASTM A121 requirements. Failure to meet any of these requirements shall result in the rejection of the material at the time of inspection.
B. Heavy Duty Barbless Wire: (Redbrand or Approved Equal) Two 12-1/2 gauge galvanized wires twisted together. Wire shall be zinc-coated steel wire of at least 0.28 oz/ft2 of coated surface area and a minimum breaking strength of 950 lb. force. The wire shall be heavy duty with a high tensile strength, low stretch, tight braiding per rod, conform to all ASTM A641 requirements and must be tagged accordingly. Failure to meet any of these requirements shall result in the rejection of the material at the time of inspection.
C. Steel Brace Rail: Shall be a minimum of 7 feet not to exceed 8 feet, singular piece of round tubular steel constructed with a minimum 1-7/8 inch outside diameter by minimum 11 gauge wall thickness. Brace rail ends shall be pressed flat on both ends and be equipped with both a 90 and 45 degree angle capable of being mounted both horizontally as well as diagonally on all bracing structures. Brace banding shall be 2-7/8 inch heavy duty galvanized brace band, measuring 1 inch wide by minimum 1/8 inch wall thickness and attached with 3/8 inch galvanized grade 5 carriage bolts, 1-1/2 to 2 inch in length with grade 5 galvanized flange nuts.
D. Steel Brace Posts: Shall be 2-7/8 inch outside diameter (OD) by 0.217 inch minimum wall thickness, Oil Company Tubular Goods (OCTG) steel pipe. Pipe shall be used/recycled structural OCTG casing or drill pipe in sound structural condition, clean and radiation free (<12 µR/hr), or new reject pipe, or unused surplus pipe. Surface rust is acceptable;
however, any material that is excessively pitted, rusty, flaking, peeling, or corroded will be rejected. Pipe with splits, bends, or thin spots (hot spots) will not be accepted. Pipe shall be free from oil debris. All pipe that is concrete lined, lined with any synthetic material, has holes or perforations shall not be accepted. All drill stem collars and threads shall be removed.
E. Brace Wires: Shall be four, 9 gauge barbless galvanized wires or two, 12-1/2 gauge double twisted galvanized barbless-wires twisted tight (total of 4 strands). The minimum weight of zinc coating for 9 gauge wire shall be at least 0.35 oz/ft2 of coated surface area and 0.28 oz/ft2 for 12-1/2 gauge wire.
F. Miscellaneous Wire: Wire for fastening wood stays, and deadmen shall be 9 gauge or 12-
1/2 gauge double twisted galvanized wire.
G. Staples: Shall be at least 9 gauge, barbed, bright finished or galvanized, have slash-cut points, and be 1-3/4 inches long.
H. Nails: Shall be 60 D ring shank at least 6 inches long.
MELSTONE DAM FENCE 02834-3
I. Steel Line Posts (T-post): (Chicago Steel or Approved Equal) Shall be a heavy-duty grade steel posts painted green with white, silver, or lime green tops or painted gray with red, white, or silver tops, “T” bar type, with a swaged or riveted anchor plate which does not easily bend or twist when an obstruction is hit during the driving process. Other steel post painted colors can be allowed on a case-by-case basis with the approval of the Government.
Posts shall be furnished with clip-type fasteners. Punched tabs for fastening wires are not acceptable. Steel posts shall be manufactured from wrought, rail, or new billet steel, and shall weigh a minimum of 1.33 lb./ft. exclusive of the anchor plate, which shall weigh a minimum of 0.67 lbs., with a minimum of 18 sq. inches in area. Posts shall meet all ASTM A702 requirements and must be tagged accordingly. Hot dipped galvanized T-posts shall not be painted and shall meet ASTM A123 galvanization requirements. Failure to meet any of these requirements shall result in the rejection of material at the time of inspection.
J. Wood Posts and Gate Stays: Wood posts and gate stays shall be sound single stem members. A slight bend in one plane is acceptable. Posts are not acceptable if a straight line drawn from the geometric center of the top to the geometric center of the butt of the post falls outside of the body of the post. Posts that are twisted, rotted, excessively bent or have checks greater than 1/2 their thickness are considered unsound and are not acceptable.
Posts and gate stays may be full stem members, sawed members, square cross-section members, or split members. The Drawings shall indicate the required post diameters, dimensions, and the depths to be set.
1. Minimum diameter for full stem line posts shall be 5 inches at the small end. Single wood line posts shall be 5 inches in diameter by 7 feet. Minimum cross-sectional area at the small end for split members shall be 10 sq. inches long for line posts. Slabs and wedge-shaped members will not be acceptable. Minimum diameter for gate stays shall be 3 inches at the small end and length shall be minimum 4 feet.
2. The following species will be acceptable if treated for the full length: Ponderosa pine, Lodgepole pine, and Douglas-fir. Split Western Redcedar posts will be acceptable if the butt is treated for a minimum depth in the ground plus 6 inches. The following species will be acceptable without treatment: Honey Locust, Juniper, Osage Orange, and White Oak.
K. Wire Gates: Shall have the same type of wire and wire spacing as the fence as shown in the
Drawings. Wire gates shall have wire stays between the wood end stays unless wood stays must be utilized to allow the gate to stay upright to properly function. Any panels installed on each side of the gates shall be paid as separate installation items.
L. Drill Stem Mechanical Gate Closers: Assembly shall include:
1. Gate Closer: A36 rolled round steel bar 3/16 inch to 5/16 inch diameter or adjustable minimum 3/16 inch diameter galvanized steel cable wire loop with a minimum Working Load Limit (WLL) 840 lb.-force and Minimum Breaking Load (MBL) 4200 lb.-force, fastened to a cam lever device. The pipe cover shall be constructed of a minimum 11 gauge steel plating made to rest upon and exceed the diameter of the 2-
MELSTONE DAM FENCE 02834-4
7/8 inch steel brace post. The mechanical break over latch shall be attached to a minimum of 2-3/8 inch outer diameter (OD) by 11 gauge minimum wall thickness tubular steel stem that slides securely into the 2-7/8 inch OD steel brace post a minimum of 6 inches. The closer must be capable of fitting over a minimum 3-inch diameter wood gate stay and securely holding the gate stay in place. Alternatives require prior approval by the Government with submission of samples.
2. Gate Loop: A minimum 3/16 inch diameter galvanized steel cable wire loop with a minimum Working Load Limit (WLL) 840 lb.-force and Minimum Breaking Load (MBL) 4200 lb.-force, securely connected to the steel brace post with a 3 inch U-bolt muffler clamp assembly 6 inches from the ground and shaped so that the minimum 3 inch diameter gate stay will be securely held in place. The muffler clamp shall be secured to the steel brace post with 9/16 inch grade five (5) galvanized round U-bolt and galvanized flange nuts. A sleeve shall be welded to the muffler clamp, parallel to a leg of the U-bolt. Another sleeve shall be welded parallel to the other leg of the U-bolt, on the same face of the muffler clamp. The sleeve shall be large enough to allow free movement of the steel galvanized cable but small enough to keep terminated ends from passing through when the loop is under pressure. The galvanized steel cable shall be threaded through the sleeves to form a loop without a bind and the ends shall be crimped with a flattened 9/16 inch grade five (5) galvanized nut further secured by a weld. Alternatives require prior approval by the COR with submission of samples.
2.2 WOOD TREATMENT PRACTICES:
A. General: The following treatments may be used. Minimum net retentions and penetrations shall be according to AWPA U1. Treatment method shall be according to AWPA T1, except as otherwise noted. When a treated member must be bored or cut during construction, thoroughly swab untreated surfaces with an approved preservative.
B. Pentachlorophenol Method: Five percent pentachlorophenol solution conforming to AWPA
P35, Type A.
C. Chromated Copper Arsenic: Waterborne preservative conforming to AWPA P23, Type C.
D. Creosote: Shall be according to AWPA P2.
E. Butt-End Treatment for Split Western Redcedar Only: When split western redcedar posts are used with treatment on butt only, treatment may be by either the cold soaking or hot bath process. Either pentachlorophenol or Creosote (Coal tar) solution may be used.
Minimum net retention of preservative shall be 20 lb./ft3 for creosote solutions and 1 lb./ft3 for pentachlorophenol.
PART 3: EXECUTION
3.1 PREPARATION:
MELSTONE DAM FENCE 02834-5
A. Clearing: Maximum mowed/clearing width is 6 ft on each side of the fence line. Some tree removal will be required, as directed by the Government. Significant areas of removal will be shown on the Maps and Drawings. All tree removal shall be conducted from the government side of the fence. Some hand work may be required due to the ground cover or terrain. Provide minimum disturbance to existing grass and sod. Any blade work or other surface disturbance shall require prior approval from the Government.
3.2 INSTALLATION:
A. General: Set wood posts in dug or drilled holes. Drive all steel posts. All line posts shall be steel and wood configuration as designated on the Drawings.
B. Setting Posts: Dig holes for setting wood posts to the depth as shown on the Drawings. Set posts plumb and to the spacing and grades as shown on the Drawings, unless staked otherwise. Space within 6 inches of the dimension shown on the Drawings. Holes shall provide adequate open space around the post so backfill can be tamped the full depth around the post. Backfill gradually and uniformly with soil around each post. Do not exceed 6 inch lifts during backfill. Compact backfill firmly from the bottom of the hole to the ground surface.
*Note: Milled wood posts shall be allowed to have an anchor plate or block attached to the bottom or a wood block attached to the side of the post base area to anchor the post in place since it has no taper to properly hold it in place.
C. Driving Posts:
1. Wood Posts: Drive only when approved by the Government to the depth shown on the
Drawings. Predrill a 2 or 3 inch diameter hole as necessary if wood posts are to be driven. Wood posts shall be machine pointed if driven into the ground. Posts shall be driven plumb. Posts that are split, bent, or broomed will not be accepted.
2. Steel Posts: Drive into the ground to the depth shown on the Drawings, or until the anchor plate of the T-post is slightly below the ground surface. Posts shall be driven plumb. When rock formations prevent driving remove anchor plate of the T-post and excavate or drill holes a minimum of 18 inches deep and slightly larger than the diameter of the post. Place posts in the holes and grout the post solidly in position with cement grout or mortar.
D. Corner Panel, End Panel and Stress Panel Assemblies: Set posts as specified, fabricate panels as shown on the Drawings.
E. Figure Fours and Rock Jacks: May be used in rock. Figure fours shall be used in lieu of steel posts, and rock jacks in lieu of wood line posts, except that where a series of figure fours are required, a rock jack shall be substituted for every fifth figure four. Figure fours and rock jacks shall be constructed as shown on the standard Drawings.
MELSTONE DAM FENCE 02834-6
F. Wire: Stretch tightly and staple to wood posts or securely attach to T-posts with standard wire clips. Wire is properly stretched when it is springy to the touch. Drive staples into wood until the staple comes in contact with the wire against the post, but not so tight as to crimp the wire or prevent movement of the wire. Do not drive staples parallel to the grain of the wood. Terminate wire at each end post, gate post, corner post, or stress panel. Wrap wire around the post two times and tie off by wrapping around the incoming wire a minimum of four times.
G. Brace Wire: Shall be double-looped and twisted tight with a stick or post. The contractor shall ensure that one end of the post or stick is long enough to physically rest behind as well as being physically secured to the horizontal brace member to prevent wire from unwinding.
All brace wires that lie on the groundward side of all support structures shall not exceed an overall height of 6” above the existing ground surface. All brace wires shall have their own twist stick or post, unless otherwise approved by the Government.
H. Wire Spacing: The wire spacing will be from the ground up. Bottom wire shall be barbless unless designated otherwise. Spacing for all projects is indicated on the Drawings.
I. Gates: Shall be installed according to the standard Drawings or the Government.
J. Mechanical Gate Closures: Line up the latch with the gate. Adjust latch assembly after installation so that the latch does not bind, and the gate hangs properly.
K. Deadman: Shall be installed at all minor depressions when the spacing between the bottom wire and the ground exceed 20 inches. Deadman can be rock weighing a minimum of 50 lbs. resting on the ground or a 5-1/2 ft. steel post driven angled into the ground a minimum of 4 ft. parallel and in line with the fence attached with additional double twisted wire of the same material as the bottom wire. See drawing Deadman at Minor Depression. Salvageable steel posts as approved and designated by the Government shall be allowed as deadman.
3.3 FENCE REMOVAL:
A. Shall include removal and disposal of staples, clips, stays, wire, wood & steel posts, various panels, fence marking lathe, plus salvage of designated steel posts, wood posts, and gates as designated and determined by the Contractor and as approved by the Government. All removed material shall become the responsibility of the Contractor. Designated salvageable material shall be stockpiled, utilized as directed and approved by the Government. Material not salvaged shall become the property of the Contractor. The Contractor shall be responsible to remove, dispose, and haul away all material as directed and approved by the Government. No woven wire shall be returned to any of the fence permittees or other operators unless approval is given by the Government. Wood and steel posts shall not be cut off at the ground level. Wood or steel posts that break off at the ground level shall be pulled or the stub shall be pushed 6 inches below the ground surface. Any large holes or voids in the ground from pulled posts shall be covered or filled with appropriate sod or backfill to eliminate any safety hazards. Wood posts shall not be stockpiled and burned on federal land. All felled trees shall be piled on federal land until removal.
MELSTONE DAM FENCE 02834-7
PART 4: MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT:
A. The work described in this section will not be measured for payment in the field. The Lump
Sum price for Fence Removal and Installation shall be full compensation for furnishing all labor, materials, equipment, and incidentals necessary to complete all aspects of the work.
Completion of the work is based on the satisfactory removal of the existing fence and installation of the new fence, including all gate openings, end, stress, and corner panels, single wood line posts, gates, and deadmen, in accordance with staking and the Drawings. The Government will verify that the entire fence removal and installation is complete and has been performed in accordance with the project's specifications and drawings. Verification may include inspection and confirmation that all required components are installed and meet quality standards.
4.2 BASIS OF PAYMENT:
A. Payment: Payment will be Lump Sump:
Pay Item Pay Unit
23 – Fence Removal and Installation ............................................................................................ LS
END OF SPECIFICATION
| 1_Specificiations Cover sheet_Fence |
| 2_TABLE OF CONTENTS_Fences |
| 3_Specification 01009 - General Information and Requirements (Fence) |
| 5_Specification 02834 - Wire Fences and Gates |
File details come from the government source that posted it. Updated .